23-1061-42 PVAMU-MSC Roof Replacement.pdf
PDF 14 MB Posted
- Attached to
- MSC Roof Waterproofing Project PV-0690
- Solicitation number
- 715-PV-0690
- Issued by
- Waller County, Port Arthur City, Texas
About this file
This document is an Invitation for Bid (IFB) issued by Prairie View A&M University (PVAMU) for the MSC Roof Waterproofing Project PV-0690. The project involves the removal and replacement of the roofing on the MSC Building located in Texas. The IFB provides details on the scope of work, including the size and type of roof to be replaced, and the estimated quantity of materials required. The bid submission deadline is listed as March 29, 2023, and a mandatory pre-bid conference is scheduled for March 10, 2023. The contract is expected to be awarded by April 12, 2023, with the work to be completed within 120 calendar days of the Notice to Proceed.
The IFB outlines the pricing and payment terms, including the requirement for a 5% bid bond and a 100% performance and payment bond. No specific set-aside requirements are mentioned, and there is no information provided about the current incumbent contractor or the funding sources for the project. The document also includes standard legal clauses and contract terms.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SSC Service Solutions
PRAIRIE VIEW A&M UNIVERSITY
COLLEGE STATION, TEXAS
PROJECT MANUAL FOR:
MSC Roof Waterproofing Project
PV-0690
VOLUME 1
Date 07/08/2024
PREPARED BY:
SSC
Facilities Services
Engineering Design and Construction Services
979-845-5317/Fax 979-862-1661
07-08-2024
Armko Industries, Inc.
Texas Registered Engineering Firm F-006498
PRAIRIE VIEW A&M UNIVERSITY PROJECT #PV0690
MSC – ROOF REPLACEMENT
PRAIRIE VIEW, TX
TABLE OF CONTENTS
DOCUMENT 00 00 10
00 00 00 Project Manual Cover and Professional Seals
00 00 10 Table of Contents
00 21 00 CSP Instructions
00 42 13 CSP Part 1
00 45 16 CSP Part 2
00 45 17 CSP Part 3
CSP Part 4 HUB Subcontracting Plan (varies by campus)
SAMPLE Master Agreement Contract
Certificate of Insurance Requirements (Regions)
00 61 13 Texas Statutory Performance Bond
00 61 14 Texas Statutory Payment Bond
00 72 00 Uniform General and Supplementary Conditions (UGSC)
00 73 00 SSC Special Conditions (College Station or Regions)
00 73 50 Wage Rates (per specific county location)
DIVISION 1 – GENERAL REQUIREMENTS
01 10 00 Summary of Work
01 22 00 Unit Prices
01 23 00 Alternates
01 25 00 Substitution Procedures
01 29 00 Payment Procedures
00 31 00 Project Management and Coordination
01 31 50 Project Meetings
01 32 00 Construction Progress Documentation
01 33 00 Submittal Procedures
01 34 00 Shop Drawings, Product Data and Samples
01 42 00 References
01 43 00 Quality Assurance
01 45 00 Quality Control
01 50 00 Temporary Facilities and Controls
01 60 00 Product Requirements
01 72 50 Field Engineering
01 73 50 Cutting and Patching
01 74 00 Cleaning and Waste Management
01 77 00 Closeout Procedures
01 78 20 Facilities Management Data
01 78 23 Operations and Maintenance
DIVISION 02 – Not Used
DIVISION 03 – Not Used
PRAIRIE VIEW A&M UNIVERSITY PROJECT #PV0690
MSC – ROOF REPLACEMENT
PRAIRIE VIEW, TX
DIVISION 04 – Not Used
DIVISION 05 – Not Used
DIVISION 06 – CARPENTRY
10 53 – Rough Carpentry
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
22 16 – Roof Board Insulation 54 16 – Multi-Ply PVC Roof System 57 13 – Sprayed Polyurethane Foam Roofing 62 00 – Sheet Metal and Miscellaneous Accessories 72 00 – Roof Accessories 92 00 – Sealants and Caulking 99 00 – Roof Plans / Detail Drawings
REMAINING DIVISIONS – Not Used
SSC Service For Education
Facilities Services
Revised 02/2024
Page - 1 of 9
REQUEST FOR COMPETITIVE SEALED PROPOSALS
SECTION 00 21 00
INSTRUCTIONS
For SSC Services for Education
Prairie View A&M University – Prairie View, TX
Project No.: PV-0690
Project Title: MSC Roof Waterproofing Project
Date: 07/08/2024
Page - 2 of 9
Table of Contents
Instructions for Proposals
Proposal Form and Pricing Schedule (Part 1)
Technical Proposal (Part 2)
Safety, Risk Assessment & Quality Control (Part 3)
HUB Subcontracting Plan (Part 4)
Sample Master Agreement Contract - Appendix A
UGSC
Special Conditions
Contractor Submittal Checklist
(Please use this checklist to ensure all the proper documents are provided)
Are parts 1-4 complete?
Is part 1 executed in ink?
Is submittal addressed correctly?
Is submittal on time?
Is submittal (hard copy and Flash Drive) properly labeled?
Is submittal in sealed envelopes?
Signed the HUB Subcontracting Plan?
Signed the proposal?
Revised 02/2024
Page - 3 of 9
SSC SERVICES FOR EDUCATION
INSTRUCTIONS FOR COMPETITIVE SEALED PROPOSALS
SECTION 00 21 00
1.0 GENERAL:
1.1 SSC Services for Education (SSC) as Owner Designated Representative (ODR) for Prairie
View A&M University – Prairie View, TX is requesting Competitive Sealed Proposals (CSP) from general construction contractors.
1.2 All data submitted with a Proposal, except as noted herein, is deemed to be part of the
Contract.
1.3 Purchases made for State of Texas use are exempt from the State Sales tax and Federal
Excise tax. Do not include tax in bid. Excise Tax Exemption Certificates are available upon request.
1.4 Payment for work performed will be in accordance with the SSC Uniform General and
Supplementary Conditions ("UGSC"). The UGSC will not be changed.
1.5 Proposal documents will be available via a Web Based file sharing program in a PDF format. All printing is the responsibility of the bidder.
2.0 RECEIPT OF PROPOSALS:
2.1 The review and approval of the CSP process is a multi-step process that requires variable amounts of time. Responders are advised that these projected dates may change as required.
Pre-Proposal Meeting – Physical Plant Administration Building
580 Anne Preston Street, Prairie View, TX -
7/30/2024, 9:00 AM
Deadline for Questions 8/07/2024, 5:00 PM
Deadline for Addenda (Min.10 business days prior to proposal) 8/09/2024, 5:00 PM
Deadline for Receipt of Proposals 8/20/2024, 2:00 PM
Deadline for Receipt of HSP (Part 4) 8/20/2024, 2:00 PM
Public Proposal Opening – Physical Plant Administration
Building
580 Anne Preston Street, Prairie View, TX - Conf. Rm. 105
8/23/2024, 2:30 PM
Evaluation of Proposals Completed 10 days
Award of Contract 10 days
2.2 Location: Proposals are to be received at the office of the Owners Designated
Representative:
Cortney Foster
Physical Plant Administration Building
580 Anne Preston Street
Prairie View, TX. 77446
Page - 4 of 9
3.0 INFORMATION INQUIRIES:
3.1 Questions regarding the proposal process should be directed:
Cortney Foster, Project Manager
Cortney.Foster@sscserv.com, 936-234-6543
3.2 Inquiries regarding the technical aspects of the Construction Documents shall be directed to:
Dennis Leifrig, IIBEC, CIT-1
Armko Industries, Inc.
dleifrig@armko.com
832-922-9232
3.3 Inquiries regarding the HUB documents shall be directed to:
Greg Iacopetti
936-261-1902 solicitations@PVAMU.EDU
4.0 DISCREPANCIES AND INTERPRETATIONS:
4.1 Notify the ODR and A/E, in writing, at least ten (10) business days prior to the scheduled
Proposal opening date, if discrepancies, ambiguities or omissions are found in the
Proposal/Construction documents, or if further information or interpretation is desired.
4.2 Answers will be provided in addenda format. All provisions and requirements of such addenda will supersede or modify affected portions of the Proposal documents. All addenda will be incorporated in and bound with the Contract Document. No other explanation or interpretation will be considered binding. Notice of Addenda are posted on the Texas Smart Buy website on the original project posting. Any additional documentation needed will be uploaded to e-Builder on the same original link shown on the Notice of Project.
5.0 SUBMITTAL CONTENT & PROCEDURE:
5.1 Contents
Proposal Form & Pricing Schedule (Part 1, Section 00 42 13) o Base Proposal & Alternates o Construction Time
Technical Proposal (Part 2, Section 00 45 16) o Company Information & History o Experience & Qualifications o Ability & Qualifications of Professional Personnel o Project Approach & Methodology o List of Subcontractors
Safety, Risk Assessment & Quality Control (Part 3, Section 00 45 17) o Safety Program
Page - 5 of 9 o Site Specific Risk Assessment o Quality Control Program
HUB Subcontracting Plan (Part 4)
Refer to HUB Subcontracting Plan (see separate attachment) for information and requirements (refer back to 3.3 for Inquiry information).
5.2 Procedure
5.2.1 Submit Parts 1-3 as (1) hard copy in a sealed envelope clearly labeled “CSP
Submission for Project Number PV-0690 Parts 1-3” with Respondent’s Company
Name clearly identified on the outside.
5.2.2 Submit Part 4 (HUB Subcontracting Plan) in a separate sealed envelope clearly labeled “HUB Subcontracting Plan for Project Number PV-0690 with respondent’s
Company Name clearly identified on the outside.
5.2.3 Submit (1) digital copy in .pdf format of Parts (1-4) on a flash drive, which is to be included in sealed envelope containing Part 4.
5.2.4 ALL Parts (1-4) and flash drive are to be submitted by deadline as set forth in 2.1.
THE ODR IS NOT RESPONSIBLE FOR DOCUMENTS THAT CANNOT BE READ OR
CONVERTED. UNREADABLE PROPOSALS MAY BE, AT ODR’S SOLE DISCRETION,
REJECTED AS NONRESPONSIVE.
5.3 If the Proposal and all parts are submitted by mail, the address is:
Physical Plant Administration Building
580 Anne Preston Street
Prairie View, TX. 77446
ATTN: Cortney Foster
“PROPOSAL ENCLOSED”
5.4 Delivery of all Proposal parts prior to the advertised deadline(s) is the sole responsibility of the respondent.
6.0 PREPARATION OF COMPETITIVE SEALED PROPOSAL:
6.1 The Proposal must be based on conditions at the project site, the bidding documents and any addenda issued.
6.2 The Proposal, Part 1 must be authoritatively executed in ink and submitted on the
Proposal Form.
6.3 A Proposal showing omissions, alterations, conditions, or carrying riders or qualifications which modify the Proposal Form & Pricing Schedule (00 42 13) will be rejected as irregular.
6.4 Only one Part 1 Proposal shall be submitted. If two or more Part 1 Proposals are submitted, either in one envelope or in separate envelopes, such multiple Proposals may be subject to rejection.
Page - 6 of 9
6.5 Proposal amounts may not be amended or modified in any manner after the time set for deadline for receipt of Proposals. After all Proposals are publicly opened, but before they are read aloud, they will be examined by the presiding official to determine if they are in proper form and properly signed. Proposals which are illegible or incomplete will not be read, nor will the Proposal prices be revealed.
6.6 A respondent will receive no compensation or reimbursement of expenses incurred in the preparation of a Competitive Sealed Proposal submission.
6.7 All respondents are strongly urged to attend Pre-Proposal Conferences. Respondent attendance may be included as part of evaluation.
6.8 Proposals received after the advertised time for deadline for receipt of Proposals will be ineligible and will be returned unopened.
6.9 The ODR reserves the right to reject any or all Proposals at any time prior to award.
7.0 PUBLIC INFORMATION AND NOTICE OF CONFIDENTIALITY:
7.1 The ODR considers all Proposal information, documentation and supporting materials submitted in response to these instructions to be non-confidential and/or non-proprietary in nature, and therefore, shall be subject to the public disclosure under the
Texas Public Information Act (Texas Government Code, Sec. 552.001 et seq.) after the award of the contract. Portions of the respondent’s Technical Proposal which contains trade secrets or other proprietary data which must remain confidential shall be identified as below:
7.1.1 Mark the cover sheet of the Technical Proposal with the following phrase: “This
Proposal includes data that shall not be disclosed outside of ODR and the A/E design team and shall not be duplicated, used or disclosed in whole or in part for any purpose other than to evaluate this Proposal.”
7.1.2 Mark each sheet and specific data on that sheet that the respondent wishes to restrict with the following phrase: “Use or disclosure of this specifically marked data is subject to the restrictions regarding confidentiality cited on the cover sheet of this Proposal.”
8.0 RESPONDENT REQUIREMENTS:
8.1 The ODR may make such investigations as necessary to determine the ability of the respondent to perform the Work, and the respondent shall furnish any requested information data including an audited financial statement within five (5) days of the
Proposal Opening. The ODR reserves the right to reject any Proposal if the evidence submitted by, or investigation of, such respondent fails to satisfy the ODR that this respondent is properly qualified to complete the Work. Any false statements or omissions will automatically disqualify applicants from consideration.
8.2 Each respondent submitting a Proposal must be prepared to furnish the firm’s State
Comptroller Vendor Identification Number, or the date on which an application was submitted. Contract payments to the successful respondent are contingent on submittal of this identification number and on having a current Form W-9 on file with SSC.
Page - 7 of 9
8.3 Respondents must be in a “Taxpayer is not on Vendor Hold” status with the Texas State
Comptroller’s Office in order to be awarded the contract. Respondent certifies this with the submittal of a properly executed proposal. Ref: Texas Comptroller of Public Accounts
Taxpayer and Vendor Information. http://mycpa.cpa.state.tx.us/coa/search.do.
8.4 As required by Chapter 231 Texas Family Code, a Proposal for a contract to be paid from state funds must include the name and social security number of the sole proprietor, each partner, shareholder or owner with an ownership interest of a least 25 percent of the business entity submitting the Proposal.
8.5 The Texas Family Code requires each Proposal to include the following statement: “Under
Section, 231.006, Family Code, the vendor or applicant certifies that the individual or business entity named in this contract Proposal or application, is not ineligible to receive the specified grant, loan or payment and acknowledges that this contract may be terminated and payment may be withheld if this certification is inaccurate.” Respondent agrees with this certification statement upon submittal of a properly executed Proposal.
9.0 OWNERSHIP OF THE COMPETITIVE SEALED PROPOSAL:
9.1 Submitted Proposals, documentation and supporting materials shall become the property of the ODR.
10.0 SITE INVESTIGATION:
10.1 It is the responsibility of each respondent to examine the project site, existing improvements and adjacent property and be familiar with existing conditions before submission of a Proposal.
10.2 After investigating the project site and comparing the Drawing and Specifications with the existing conditions, the respondent should immediately notify the ODR, in accordance with paragraph 4.0 of these Instructions for Competitive Sealed Proposals, of any conditions for which requirements are not clear, or about which there is any question regarding the extent of the Work involved.
10.3 Should the successful respondent fail to make the required investigation and should a question arise later as to the extent of the Work involved in any particular case, after receiving recommendations from the A/E, the ODR will make the proper interpretation of the Contract Documents.
Page - 8 of 9
11.0 CSP EVALUATION SCORING GUIDELINES:
11.1 Proposals will be opened publicly.
11.2 Proposals will be evaluated by the ODR/Owner and others as determined by SSC. The criteria for evaluation and selection of the successful respondent for this award will be based upon the factors listed below with the corresponding percentage of weighting:
Base Proposal Amount & Alternates 51%
Construction Time 10%
Technical Proposal 24% o Company Information & History o Experience & Qualifications o Ability & Qualifications of Professional Personnel o Project Approach & Methodology o List of Subcontractors
The following will be rated as Pass or Fail. Pass = 5%, Fail =0%
Litigation & Claims 5% o Project incompletion, judgements/claims/lawsuits
Safety, Risk Assessment & Quality Control 5% o Safety Program o Site Specific Risk Assessment o Quality Control Program
Quality Control 5%
HUB Subcontracting Plan
Missing, incomplete, or late submission of HUB Subcontracting Plan will result in disqualification of entire submission.
12.0 CONTRACT AWARD PROCESS
12.1 After opening the HUB submissions and determining that each submission is qualified the
Proposals pricing is read publicly. Afterwards, the ODR/Owner, A/E & others as determined by SSC will evaluate and rank each Proposal with respect to the published selection criteria described under Section 11. After opening and ranking, an award may be made on the basis of the initially submitted Proposal, without discussion, clarification or modification, or the ODR may discuss with the selected respondent, offers for cost adjustment and other elements of the Proposal. Other than the data read at the Proposal opening, the ODR shall not disclose any information derived from the Proposals submitted by competing firms in conducting such discussions.
Page - 9 of 9
12.2 If the ODR/Owner determines that it is unable to reach a satisfactory agreement with the first ranked respondent, the ODR will terminate discussions with that respondent. The
ODR will then proceed with negotiations with each successive respondent as they appear in the order of ranking until an agreement is reached, or until the ODR has rejected all
Proposals. After termination of discussions with any respondent, ODR will not resume discussions with that respondent.
12.3 Following the ODR/Owner approval of the order of ranking of respondent and the ODR contract award or Proposal rejection action, the respondents may be notified via email of which firm has been selected.
12.4 The ODR/Owner reserves the right to accept or reject any or all alternates or to accept any combination of alternates considered advantageous.
12.5 The award or rejection action regarding the Proposal is at the sole discretion of the
ODR/Owner and the ODR makes no warranty regarding this Proposal that a contract will be awarded to any respondent.
12.6 The ODR agrees that if the Contract is awarded, it will be awarded to the respondent offering the best value to the Owner. The ODR/Owner is not bound to accept the lowest priced Proposal if that Proposal is judged not to be the best value for the Owner, as determined by the ODR/Owner.
12.7 SSC Agreement
If applicable, provide comments pertaining to SSC’s Sample Master Agreement Contract
(attached as Appendix A).
NOTE: SSC will not make significant changes to its Master Agreement Contract. Minor changes may be considered, SSC will not guarantee acceptance of such changes.
END OF SECTION
SSC Services for Education
Revised 2/2024
CSP Part 1 - Proposal Form & Pricing Schedule Projects over $100,000
Page - 1 of 7
SSC SERVICES FOR EDUCATION
COMPETITIVE SEALED PROPOSAL
PART 1
PROPOSAL FORM & PRICING SCHEDULE
SECTION 00 42 13
Project No.: PV-0690 Project Title: MSC Roof Waterproofing Project
__________________________________________doing business as _________________________________
Business Name (Corporation, Partnership or Individual) hereby proposes to furnish and install all work required by the Contract Documents that includes, SSC Uniform General and Supplementary Conditions ("UGSC"), SSC Special Conditions, the Drawings, the Project Manual/Specifications and any Addenda issued prior to the Proposal.
The "Total Contract Cost" shall include the cost of delivery, insurance, bonds, taxes, labor, materials, supervision, overhead, profit, incidentals and the use of all equipment and tools required to complete the work. The proposed Contract Cost, indicated in the Pricing Schedule included shall constitute full compensation for work required by the Contract Documents and the Addenda.
• The RESPONDENT certifies that this proposal is made in good faith, without collusion or connection with any other person or persons offering a proposal for the same work, and that it is made in pursuance of and subject to all the terms and conditions of the Construction Documents for the work to be accomplished, all of which have been examined by the RESPONDENT.
• All work required by the Contract Documents and enumerated in the Pricing Schedule included, whether specifically mentioned, included by implication or appurtenant thereto, shall be performed by the RESPONDENT, irrespective of whether it is named in the Pricing Schedule.
• The Proposal will remain subject to acceptance for 90 calendar days after submittal, or for such longer time as the RESPONDENT may agree to in writing upon request by the Owners Designated Representative
(ODR).
• The RESPONDENT will submit a construction schedule and execute the contract within 10 business days after notification of contract award.
• Proposal amounts must be shown in both written words and figures. In case of discrepancy, the amount shown in words will govern.
Revised 2/2024
CSP Part 1 - Proposal Form & Pricing Schedule
Page - 2 of 7
DESCRIPTION TOTAL PRICE
Contractor must list an amount for each line item as required for the scope of this project OR bid will be disqualified for being incomplete. Blank division entries are acceptable if the division is not in the scope of work.
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastics and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12 - Furnishings
Division 13 - Special Construction
Division 14 - Conveying Equipment
Division 21 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC)
Division 25- Integrated Automation
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 44 - Pollution Control Equipment
Division 45 - Industry-Specific Manufacturing Equipment
BASE PROPOSAL AMOUNT
Revised 2/2024
CSP Part 1 - Proposal Form & Pricing Schedule
Page - 3 of 7
ITEM NO. 1 - BASE PROPOSAL - MSC BUILDING
• Work shall include all labor and materials to provide a new SPF roof system on Roof Areas A, B, C, E, F, G, H, J, L, M, N, P of the Willie A. Tempton Sr. Memorial Student Center Building. All roof areas are to be taken down to existing sloped metal roof deck. Contractor to verify roof deck and insulation at all locations.
• Contractor to flute fill existing sloped metal roof deck, trimming excess SPF foam level with top of the metal flute and prime prior to follow-up layer. Roof is not considered “in the dry” till first full layer of foam is installed.
• Contractor to install the new 3.5lb density SPF or as required for the impact protection system as per manufacturer requirements and install R-25 insulation, in multiple lifts of foam, with a minimum lift thickness of 1-inch to all areas and paying attention to drainage to roof drainage. All abnormalities in the foam will be repaired prior next layer of SPF being installed. ALL deficiencies will be corrected and repaired daily.
• Install minimum of 50-mils of polyurea impact protection to entire roof system with spot checks daily to ensure system meets specifications prior to final walk and slit samples.
• Install multiple coats of silicone solids coating to achieve 30-mils, minimum, with base coat a contrasting color to the topcoat. Aggregate will be broadcast in the final coating.
• Contractor to install contrasting color granule as broadcast media as walkways and around mechanical units.
Sesco- Rainbow granule mix.
• All sheet metal copings, counter flashings, pipe bonnets and slip flashings are to be new stainless or Kynar where they occur. Any parapet coping cap will be standing seamed metal design with a 1-inch vertical joint and hem.
• Raise all existing roof hatches to maintain minimum 8-inches of flashing height. Prep and clean, prime where needed, and aluminize all roof hatches.
• Raise existing thru-wall flashings, as required, at all block, brick and EIFS wall surfaces. New waterproofing membrane, stainless steel thru-wall pan are required. All brick surfaces are required to have a 3-course brick removal to install required system, Block walls are require to have 1 course and EIFS wall surfaces are required to be cut 4-inches higher than thru-wall location and repair and replace all required EIFS wall systems. New paint on entire EIFS wall surface is required matching existing paint surface.
• Raise all curb flashings to a height of ten inches (10") above finished roof surface where needed.
• Contractor to install PVC clad metal receiver at 10-inches for base flashing termination, attached to existing 3/4-inch plywood at parapet walls and install new PVC KEE membrane, adhered, up to existing stone coping sill pan and receiver. Membrane to be hot air welded at clad receiver and termination bar fastened at 12-inches O.C. Install new stainless-steel coping at both conditions allowing the roofing system to be terminated correctly.
• Contractor to raise existing door threshold and install sill pan flashing, tying into adjacent thru-wall flashing.
Contractor will be required to cut existing metal door and install new weather sweep.
• Remove and replace existing roof access ladders to incorporate new O’Keeffe 503-A style roof access ladders to meet all OSHA requirements. No penetration should fasten through the roof surface to maintain water tightness. Remove all vertical penetrations through the roof surface.
• Extend existing soil pipes to a height of eight inches (8") above finished roof surface where needed.
• Install splash blocks, where necessary, to minimize erosion of aggregate in topcoat from downspouts and gutters from above that are not in contract. Stainless steel metal splash blocks at roof level and concrete splash blocks in a bed of sand sloping away from the building at grade.
• Clean, wire brush, treat for rust and paint with aluminized paint each drain bowl assembly and replace any assembly that has missing or broken pieces.
• Install roof drain clamping rings in a full bed of sealant compatible and recommended by the material manufacturer. Install drain bowl strainer.
• Remove, repair if needed, replace, and recertify lightning protection across all roof areas, connecting anything that is not currently connected and grounded. Certification letter shall be given as part of the close-out documents. Bonded Electric is the requested lightning protection company to perform the work.
Revised 2/2024
CSP Part 1 - Proposal Form & Pricing Schedule
Page - 4 of 7
• All measurements and core information are the responsibility of the Contractor for bidding purposes.
• Provide a manufacturer’s twenty (20) year foam blister proof and leak proof warranty.
• Provide a five (5) year Contractor’s warranty.
• All mechanical, electrical, plumbing disconnections shall be the responsibility of the contractor. This is considered a turn-key project, Prairie View A&M is to furnish nothing. All work is the responsibility of the contractor.
• All installation shall be per NRCA, SPRI, ES-1, ASCE 7-16, the specifications and manufacturer's guidelines.
The amount for the complete construction of MSC Roof Waterproofing Project, including all general, plumbing, mechanical, and electrical work indicated on the drawings by Armko Industries, Inc. dated 7/8/2024:
BASE AMOUNT: __________________________________________________Dollars $______________________
________________ Calendar Days
ITEM NO. 2 - BASE PROPOSAL 1- MSC BUILDING
• Work shall include all labor and materials to provide a new Mulit-ply PVC roofing system on Roof Areas K, Q, R, S, T, and U of the Willie A. Tempton Sr. Memorial Student Center Building. Roof areas are to be taken down to existing metal roof deck. Contractor to verify roof deck and insulation at all locations.
• Contractor to install minimum insulation thickness to match height of the wood blocking at the edge condition allowing drainage to existing roof drains as well as gutter and downspout system where they occur.
• Install 1-layer of tapered polyisocyanurate insulation, mechanically attached to existing metal roof deck.
• Install 1-layer of ½-inch gypsum cover board set in ribbons on adhesive per manufacturer approved assembly requirements.
• Install 1-layer of 90-mil (nom) smooth sanded base sheet, torch applied.
• Install 1-layer of 60-mil (min) PVC KEE fleeceback membrane set in adhesive per manufacturer requirements and assembly meeting local codes.
• Install new, matching, Kynar coated metal goose neck covers at all canopy support structures.
• Install new OMG Speedtite retrofit drains with vortex breaker at all canopy roof drain conditions. Install new aluminum strainers as required.
• Install new gutter and downspout system, matching existing gutter and downspout sizes along with new straps and hangers as required.
• Install new Kynar coated edge metal with continuous galvanized cleat at all locations. Owner to select color of Kynar metal. All other metal structures outside the roofing assembly is not to be damaged or touched.
BASE AMOUNT: __________________________________________________Dollars $______________________
Revised 2/2024
CSP Part 1 - Proposal Form & Pricing Schedule
Page - 5 of 7
ITEM NO. 3 - ALTERNATE PROPOSAL 1- MSC BUILDING
• Work shall include all labor and materials to provide a new Multi-ply PVC roof system on Roof Areas A, B, C, E, F, G, H, J, L, M, N, P of the Willie A. Tempton Sr. Memorial Student Center Building. All roof areas are to be taken down to existing sloped metal roof deck. Contractor to verify roof deck and insulation at all locations.
• Contractor to install a R-25(min) roofing system with a starting layer of 2.2-inch polyisocyanurate insulation layer mechanically attached to the existing sloped metal roof deck.
• Install a second layer of 2.2-inch polyisocyanurate insulation, adhered to previous layer per manufacturer assembly requirements.
• Contractor to install a ½-inch gypsum coverboard on all areas, applied in accordance with the manufacture’s requirements and in low-rise foam adhesive.
• Contractor to install a 90-mil (nom) SBS smooth sanded inter-ply sheet, torch applied in field of roof and self-adhered at curbs to prevent possible wood curb torching.
• Install 1-layer of 60-mil (min) PVC KEE fleeceback membrane set in adhesive per manufacturer requirements and assembly meeting local codes.
• All sheet metal copings, counter flashings, pipe bonnets and slip flashings are to be new stainless or Kynar where they occur. Any parapet coping cap will be standing seamed metal design with a 1-inch vertical joint and hem. Utilize Kynar coated metals where visible from the ground and at Parapet coping caps. Owner to select color of Kynar metals.
• Raise all existing roof hatches to maintain minimum 8-inches of flashing height. Prep and clean, prime where needed, and aluminize all roof hatches.
• Raise existing thru-wall flashings, as required, at all block, brick and EIFS wall surfaces. New waterproofing membrane, stainless steel thru-wall pan are required. All brick surfaces are required to have a 3-course brick removal to install required system, Block walls are require to have 1 course and EIFS wall surfaces are required to be cut 4-inches higher than thru-wall location and repair and replace all required EIFS wall systems. New paint on entire wall surface is required matching existing paint surface.
• Raise all curb flashings to a height of ten inches (10") above finished roof surface where needed.
• Contractor to install new PVC KEE membrane, adhered, up to existing stone coping sill pan and receiver.
Membrane to have termination bar fastened at 12-inches O.C. Install new stainless-steel coping at termination bar.
• Contractor to raise existing door threshold and install sill pan flashing, tying into adjacent thru-wall flashing.
Contractor will be required to cut existing metal door and install new weather sweep.
• Remove and replace existing roof access ladders to incorporate new O’Keeffe 503-A style roof access ladders to meet all OSHA requirements. No penetration should fasten through the roof surface to maintain water tightness. Remove all vertical penetrations through the roof surface.
• Extend existing soil pipes to a height of eight inches (8") above finished roof surface where needed. Utilize manufacturer premanufactured PVC penetration boots. No field wraps are allowed.
• Install splash blocks, where necessary, to minimize erosion of aggregate in topcoat from downspouts and gutters from above that are not in contract. Stainless steel metal splash blocks at roof level and concrete splash blocks in a bed of sand sloping away from the building at grade.
• Clean, wire brush, treat for rust and paint with aluminized paint each drain bowl assembly and replace any assembly that has missing or broken pieces.
• Install roof drain clamping rings with new stainless-steel nuts, bolts and washers.
• Remove, repair if needed, replace, and recertify lightning protection across all roof areas, connecting anything that is not currently connected and grounded. Certification letter shall be given as part of the close-out documents. Bonded Electric is the requested lightning protection company to perform the work.
• All measurements and core information are the responsibility of the Contractor for bidding purposes.
• Provide a manufacturer’s twenty (20) year NDL with no limitation of repair cost to the owner.
• Provide a five (5) year Contractor’s warranty.
• All mechanical, electrical, plumbing disconnections shall be the responsibility of the contractor. This is considered a turn-key project, Prairie View A&M is to furnish nothing. All work is the responsibility of the
Revised 2/2024
CSP Part 1 - Proposal Form & Pricing Schedule
Page - 6 of 7 contractor.
• All installation shall be per NRCA, SPRI, ES-1, ASCE 7-16, the specifications and manufacturer's guidelines.
The amount for the complete construction of MSC Roof Waterproofing Project, including all general, plumbing, mechanical, and electrical work indicated on the drawings by Armko Industries, Inc. dated 7/8/2024:
Alternate Total: _____________________________________________________Dollars $___________________
UNIT PRICE PROPOSAL:
1. Remove and replace deteriorated metal decking: $_______________per sqft
2. Remove and replace deteriorated wood blocking: $_______________per Lnft.
3. Remove and replace deteriorated ¾-inch plywood at parapet $_______________per sqft
4. Remove and replace all sealants and wetglaze windows above roof level $_______________per Lnft.
ADDENDA – Contractor must list number of Addenda issued.
Respondent has received the following Addenda to the Request for Proposals, but agrees and understands that it will be responsible for performing the Work in accordance with all terms and conditions in all Addenda issued in connection with the Request for Proposals, and that it’s Proposal will be construed to include all requirements of all such Addenda.
Addenda No.(s)
NOTE: Failure to acknowledge Addenda does not release Contractor from financial obligation to complete all Addenda.
Revised 2/2024
CSP Part 1 - Proposal Form & Pricing Schedule
Page - 7 of 7
The undersigned Respondent has carefully examined and considered the Project Site and relevant conditions and circumstances for the Work, information and requirements set out in the Request for Proposals, the Drawings and Project Manual/Specifications, and the requirements of the proposed Contract Documents, including the ODR’s Agreement, the Uniform General and Supplemental Conditions, Special Conditions, and Tex. Gov. Code pertaining to Prevailing Wages Rates, in making this Proposal. Capitalized terms used but not otherwise defined in this Proposal Form shall have the same meanings as designated in the Request for Proposals.
The undersigned Proposer further agrees to the following conditions:
1. An incomplete Proposal or one having additional information or other modifications or qualifications inscribed thereon, may be cause for rejection of the entire Proposal.
2. That, if accepted by the Owner ODR, this Proposal becomes a part to the Contract Documents upon the signing of the Contract Agreement, and failing to comply with any part of this Bid will be taken as failure of the Proposer to comply with the Contract Documents, and will be just cause for rejection of the Work.
RESPONDENT:
Company Employer Federal Identification Number (EIN)
By:
Signature
Title Company Phone Number
Date Company Email or Fax Number
Company Contact and Address for Invoice
CSP Part 2 - Technical Proposal
Page - 1 of 5
PART 2
TECHNICAL PROPOSAL
SECTION 00 45 16
SSC Services for Education Prairie View A&M University – Prairie View, TX Project No.: PV-0690 Project Title: MSC Roof Waterproofing Project
NOTE: Contractor must complete each item pertaining to this form or bid may be disqualified for being incomplete.
FALSIFICATION OF ANY INFORMATION ON THIS PROPOSAL MAY RESULT IN DISQUALIFICATION.
General Contractor's Name:
Address:
City, State, Zip:
Telephone No.: E-Mail:
State Comptroller Vendor Identification Number:
1.0 GENERAL
1.1 Qualification information submitted shall be applicable only to the Contractor’s office that will perform this Work.
2.0 COMPANY INFORMATION & HISTORY
2.1 Corporation Partnership Sole Proprietorship Joint Venture Limited
Liability Company State of Organization:
2.2 How many years has organization been in business as a contractor?
2.3 How many years has your organization been in business under its present business name?
2.4 Under what other or former names has your organization operated?
2.5 List other fully staffed offices or fully staffed branch offices of your organization:
Name/Location Branch Manager Telephone Number
2.6 Corporate Officers, Partners or Owners of Organization:
Name Title Construction Experience
Page - 2 of 5
2.7 If your organization is a corporation, answer the following:
• Date of incorporation:
• State of incorporation:
• President’s name:
• Vice-president’s name(s):
• Secretary’s name:
• Treasurer’s name:
2.8 If your organization is a partnership, answer the following:
• Date of organization:
• Type of partnership, if applicable:
• Name(s) of general partner(s):
2.9 If your organization is individually owned, answer the following:
• Date of organization:
• Name of owner:
2.10 If the form of your organization is other than those listed above, describe it and name principals:
2.11 List jurisdictions and trade categories in which your organization is legally qualified to do business, and indicate registration or license numbers, if applicable.
2.12 List jurisdictions in which your organization’s partnership or trade name is filed.
3.0 LITIGATION/CLAIMS
3.1 Has your organization ever failed to complete any work awarded to it as YES NO contracted, that resulted in termination of the contract?
3.2 Are there any judgements, claims, arbitration proceedings or suits YES NO pending or outstanding against your organization or its officers made by your customers?
3.3 Has your organization filed any lawsuits or requested arbitration with YES NO regard to construction contracts within the last five years?
3.4 Within the last five years, has any officer or principal of your organization YES NO ever been an officer or principal of another organization when it failed to complete a construction contract?
Page - 3 of 5
4.0 EXPERIENCE & QUALIFICATONS
4.1 List categories of work that your organization normally performs with its own forces.
4.2 Propose to perform % of the work for this project with own forces.
(List Trades)
4.3 List major construction projects of similar scope and size where General Contractor acted as prime of publically funded projects. Using a similar format to that shown below list projects your organization has in-progress and/or has completed (Limit 10 projects) within the past 5 years:
(Include as attachment at end of this document titled as “Current & Past Projects”)
FOR EXAMPLE ONLY
Name and Location of Project: __________________ _____________________ Contract Amount:_____________ ______ Percent Complete:
Contract Start Date:
Contractual Completion Date:
Actual Completion Date:________________
Owner Reference Contact:
Name Telephone
Physical Address
Email:______________________________________
A/E Reference Contact:
Name Telephone
Physical Address Email:______________________________________
PROJECT PHOTO HERE
Page - 4 of 5
4.4 Total number and dollar amount of contracts currently in progress:
Number $
4.5 Largest single contract amount currently in-progress: $
Project Name:
Projected Completion Date:
4.6 Volume of work completed over last 5 years: (Through 12/31) 2023 $ 2022 $ 2021 $ 2020 $ 2019 $
5.0 REFERENCES
5.1 Client References: _________________________________________________________
5.2 Trade References:
5.3 Bank References:
5.4 Surety
• Name of bonding company:
• Name and address of agent:
6.0 ABILITY & QUALIFICATIONS OF PROFESSIONAL PERSONNEL
6.1 Project Organization Chart (Please attach at the end of this document)
6.2 Detailed resumes of individuals assigned to this project including project manager, superintendent, project scheduler/expediter, and quality control supervisors as applicable. (Please attach at end of this document)
6.2.1 Resumes of your key personnel shall include professional affiliations such as membership in the American Institute of Constructors and if the individual is a Level I or Level II Certified Professional Constructor.
6.2.2 In addition, a listing of other construction personnel within your organization that are members of the American Institute of Constructors shall be included and their respective level of certification.
Page - 5 of 5
6.3 Approximate amount of time each project team member is expected to spend on the project:
7.0 PROJECT APPROACH & METHODOLOGY
7.1 Provide methodology on meeting the parameters/expectations of the specific project. (If additional space is needed please insert additional sheets at the end of this document):
8.0 LIST OF SUBCONTRACTORS
8.1 Please list all subcontractors proposing to use on this project. (If additional space is needed please insert additional sheets at the end of this document):
9.0 PROPOSED PROJECT SCHEDULE
9.1 List procedures outlining how the contractor will update the Architect & ODR on progress of the project work schedule in order to meet the established contractual completion date:
9.2 Please attach proposed project schedule in Gantt format at the end of this document, including material/equipment lead times prior to construction.
CSP Part 3 - Safety, Risk Assessment & Accident Prevention, & Quality Control
Page - 1 of 2
Part 3
SAFETY, RISK ASSESSMENT & QUALITY CONTROL
SECTION 00 45 17
Project No.: PV-0690 Project Title: MSC Roof Waterproofing Project
NOTE: Contractor must complete each item pertaining to this form or bid may be disqualified for being incomplete.
FALSIFICATION OF ANY INFORMATION ON THIS PROPOSAL MAY RESULT IN DISQUALIFICATION.
General Contractor's Name:
Address:
City, State, Zip:
Telephone No.: E-Mail:
State Comptroller Vendor Identification Number:
1.0 SAFETY PROGRAM
1.1 List your organization's Workers Compensation Experience Modification Rate (EMR) for the last three years, as obtained from your insurance agent. Provide proof in the form of a letter from your Insurance Agent. If you do not have an EMR rating provide name and contact information for your Insurance Agent.
2023 Average (3 years)
Insurance Company Name:
Agent Name:
Agent Phone #:
Agent Email:
1.2 OSHA Recordable Incident Rate. Attach your OSHA 300A log or similar documentation of company’s injuries if the OSHA 300A log is not required due to the size of your company:
The OSHA Recordable Incident Rate (or Incident Rate) is calculated by multiplying the number of recordable cases by 200,000, and then dividing that number by the number of labor hours at the company.
Number of OSHA Recordable Cases X 200,000
IR = -------------------------------------------------------------------
Number of Employee labor hours worked
IR = _________________________________________
CSP Part 3 - Safety, Risk Assessment & Accident Prevention, & Quality Control
Page - 2 of 2
1.3 Are regular project safety meetings held? Yes No
If yes, frequency: Weekly Bi-monthly Monthly As Needed
1.4 Are project safety inspections conducted? Yes No
If yes, who performs inspection?
How often?
Who is required to attend?
1.5 Does organization have a written safety program? Yes No
If yes, provide a copy. It will become a compliance document upon contract award.
2.0 SITE SPECIFIC RISK ASSESSMENT
2.1 Submit a complete Risk Assessment Program for this specific project at the end of this section.
3.0 QUALITY CONTROL PROGRAM
3.1 Submit a complete quality control program for this project which will become a compliance document upon contract award.
3.2 This plan should address all aspects of quality control including responsibility for surveillance work, acceptance, rejection, documentation and resolution of deficiencies, trend analysis and corrective action and interface with Owner's inspectors.
3.3 Contractor to maintain documentation log of project progress including photos from beginning to end of project.
Rev. 2/17
HUB Subcontracting Plan (HSP)
QUICK CHECKLIST
While this HSP Quick Checklist is being provided to merely assist you in readily identifying the sections of the HSP form that you will need to complete, it is very important that you adhere to the instructions in the HSP form and instructions provided by the contracting agency.
If you will be awarding all of the subcontracting work you have to offer under the contract to only Texas certified HUB vendors, complete:
Section 1 - Respondent and Requisition Information Section 2 a. - Yes, I will be subcontracting portions of the contract.
Section 2 b. - List all the portions of work you will subcontract, and indicate the percentage of the contract you expect to award to Texas certified HUB vendors.
Section 2 c. - Yes Section 4 - Affirmation GFE Method A (Attachment A) - Complete an Attachment A for each of the subcontracting opportunities you listed in Section 2 b.
If you will be subcontracting any portion of the contract to Texas certified HUB vendors and Non-HUB vendors, and the aggregate percentage of all the subcontracting work you will be awarding to the Texas certified HUB vendors with which you do not have a continuous contract* in place for more than five (5) years meets or exceeds the HUB Goal the contracting agency identified in the “Agency Special Instructions/Additional Requirements”, complete:
Section 1 - Respondent and Requisition Information Section 2 a. - Yes, I will be subcontracting portions of the contract.
Section 2 b. - List all the portions of work you will subcontract, and indicate the percentage of the contract you expect to award to Texas certified HUB vendors and Non-HUB vendors.
Section 2 c. - No Section 2 d. - Yes Section 4 - Affirmation GFE Method A (Attachment A) - Complete an Attachment A for each of the subcontracting opportunities you listed in Section 2 b.
If you will be subcontracting any portion of the contract to Texas certified HUB vendors and Non-HUB vendors or only to Non-HUB vendors, and the aggregate percentage of all the subcontracting work you will be awarding to the Texas certified HUB vendors with which you do not have a continuous contract* in place for more than five (5) years does not meet or exceed the HUB Goal the contracting agency identified in the “Agency Special Instructions/Additional Requirements”, complete:
Section 2 a. - Yes, I will be subcontracting portions of the contract.
Section 2 b. - List all the portions of work you will subcontract, and indicate the percentage of the contract you expect to award to Texas certified HUB vendors and Non-HUB vendors.
Section 2 c. - No Section 2 d. - No Section 4 - Affirmation GFE Method B (Attachment B) - Complete an Attachment B for each of the subcontracting opportunities you listed in Section 2 b.
If you will not be subcontracting any portion of the contract and will be fulfilling the entire contract with your own resources (i.e., employees, supplies, materials and/or equipment), complete:
Section 2 a. - No, I will not be subcontracting any portion of the contract, and I will be fulfilling the entire contract with my own resources.
Section 3 - Self Performing Justification Section 4 - Affirmation
*Continuous Contract: Any existing written agreement (including any renewals that are exercised) between a prime contractor and a HUB vendor, where the HUB vendor provides the prime contractor with goods or service, to include under the same contract for a specified period of time. The frequency the HUB vendor is utilized or paid during the term of the contract is not relevant to whether the contract is considered continuous. Two or more contracts that run concurrently or overlap one another for different periods of time are considered by CPA to be individual contracts rather than renewals or extensions to the original contract. In such situations the prime contractor and HUB vendor are entering (have entered) into “new” contracts.
HUB Subcontracting Plan (HSP)
In accordance with Texas Gov’t Code §2161.252, the contracting agency has determined that subcontracting opportunities are probable under this contract. Therefore, all respondents, including State of Texas certified Historically Underutilized Businesses (HUBs) must complete and submit this State of Texas HUB Subcontracting Plan (HSP) with their response to the bid requisition (solicitation).
NOTE: Responses that do not include a completed HSP shall be rejected pursuant to Texas Gov’t Code §2161.252(b).
The HUB Program promotes equal business opportunities for economically disadvantaged persons to contract with the State of Texas in accordance with the goals specified in the 2009 State of Texas Disparity Study. The statewide HUB goals defined in 34 Texas Administrative Code (TAC) §20.284 are:
• 11.2 percent for heavy construction other than building contracts,
• 21.1 percent for all building construction, including general contractors and operative builders’ contracts,
• 32.9 percent for all special trade construction contracts,
• 23.7 percent for professional services contracts,
• 26.0 percent for all other services contracts, and
• 21.1 percent for commodities contracts.
- - Agency Special Instructions/Additional Requirements - -
Respondent (Company) Name:
Point of Contact:
State of Texas VID #:
Bid Open Date:
SECTION 1: RESPONDENT AND REQUISITION INFORMATION
(mm/dd/yyyy)
- Yes - No a.
b.
c.
In accordance with 34 TAC §20.285(d)(1)(D)(iii), a respondent (prime contractor) may demonstrate good faith effort to utilize Texas certified HUBs for its subcontracting opportunities if the total value of the respondent’s subcontracts with Texas certified HUBs meets or exceeds the statewide HUB goal or the agency specific HUB goal, whichever is higher. When a respondent uses this method to demonstrate good faith effort, the respondent must identify the HUBs with which it will subcontract.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .