23_1010 Addendum No. 01_Jester Park Addition.pdf
PDF 82 KB Posted
- Attached to
- Jester Park Nature Center Addition
- Solicitation number
- 2023-008
- Issued by
- Dallas County, Iowa
About this file
This document is Addendum No. 1 for the Jester Park Nature Center Addition project, issued by Polk County, Iowa on October 10, 2023. The addendum provides critical updates for a construction project with a total valuation of $326,207.68, including modifications to architectural drawings and specifications. A pre-bid meeting is scheduled for October 12, 2023, at 1:30 pm at the Jester Park Nature Center located at 12130 NW 128th Street in Granger, Iowa. Interested bidders are directed to obtain bid packets through BidNetDirect.com under ITB 2023-008, with no printed documents available for a refundable deposit.
The addendum includes specific technical revisions, such as updates to architectural drawing notes regarding aluminum sill extensions and window systems, and changes to specification section 09 51 00 related to tile edge details. All questions and substitution requests for the project should be submitted through BidNetDirect.com or emailed to specific county and architectural contacts, including Adam Fendrick from Polk County and Jessica Terrill from MA Architecture. The addendum emphasizes that contractors must incorporate these changes into their work and acknowledge receipt of the addendum on their bid form, with potential disqualification for failure to do so.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OCTOBER 1O, 2023
Jester Park Nature Center Addition ADDENDUM NO. 1
ADDENDUM NO. 1
To Contract Documents for:
JESTER PARK NATURE CENTER ADDITION
MA Architecture Project No. 061.23
DATE: OCTOBER 10, 2023
ARCHITECT:
MA ARCHITECTURE
1201 Keosauqua Way, Ste 101 Des Moines, IA 50309 515.554.3564 Contact: Jessica Terrill, AIA jessica@architecturema.com
MEP ENGINEERS :
KCL ENGINEERING
300 4TH St.
West Des Moines, IA 50265 515.724.7938 Contact : Andy Versluys aversluys@kclengineering.com
This addendum is issued to modify, clarify, or amend the original Drawings and is hereby made part of the Contract Documents dated September 20th, 2023. The Contractor shall be responsible for incorporating items in this Addendum to the Work. Attach this addendum to the Project Manual(s) in your possession. Acknowledge receipt of this Addendum by number where indicated on the Bid Form. Failure to do so may subject Bidder to disqualification. The following shall take precedence over anything to the contrary in the Project Manual, in the Drawings, or in prior Addenda.
This Addendum consists of 2 pages and no attachements.
GENERAL INFORMATION / CLARIFICATIONS
1. All questions and substitution requests for the project should be submitted through https://www.bidnetdirect.com/iowa/polkcounty or emailed to the attention of Adam Fendrick at adam.fendrick@polkcountyiowa.gov or Jessica Terrill at MA Architecture jessica@architecturema.com
2. Q. When is the Pre-Bid?
A. October 12, 2023 at 1:30 pm. at Jester Park Nature Center 12130 NW 128th Street, Granger, Iowa 50109.
3. Q. What is the valuation for this project?
A. $326,207.68
4. Q. Will Polk County have the Jester Park Nature Center Addition project printed documents available with a refundable deposit?
A. No, printed documents are not available. Interested bidders may obtain bid packets from Polk County BidNetDirect.com https://www.bidnetdirect.com/iowa/polkcounty under ITB 2023-008 Jester Park Nature Center Addition.
CHANGES TO THE DRAWINGS
Architectural drawings
1. A5.02 – DETAILS, DRAWINGS A12, F5, E12, H12
A. REVISE Note to read “ALUMNINUM SILL EXTENSION TO MATCH STOREFRONT ALUMINUM
CLAD WOOD WINDOW SYSTEM”
B. REVISE Note to read “ALUMINUM CLAD WOOD STOREFRONT WINDOW SYSTEM W/ 1”
INSULATED GLAZING”
OCTOBER 1O, 2023
Jester Park Nature Center Addition ADDENDUM NO. 1
CHANGES TO THE SPECIFICATIONS
Architectural Specifications
1. SECTION 09 51 00
A. REVISE paragraph 2.02 B.7 to read: “7. Tile Edge: as indicated on Interior finish schedule Beveled reveal edge – tegular”.
END OF ADDENDUM 01
File details come from the government source that posted it. Updated .