About this file

This document is an Iowa Communications Network (ICN) post-construction punchlist for the Manchester Hwy 13 Relocation project, Project # 28230101. The project involves relocating approximately 8,471 feet of new fiber optic cable installation in 1-inch conduit and 38,265 feet of new direct-bury cable installation along Hwy 13 from Firefly Rd to Hwy 3 in Manchester, Iowa. The punchlist covers requirements for the contractor such as restoring soil, tamping, installing locate markers, ensuring proper conduit depth, and other construction activities.

The related state and local contract opportunity involves the State of Iowa's Iowa Telecommunications and Technology Commission, operating the ICN, seeking bids from vendors to complete this fiber optic relocation project in Delaware County, Iowa. There are no details provided on pricing terms, set-asides, funding requirements, or contract duration.

View the file

Other files

File Type Posted
23-070 ITB OSP Project# 28230101 Delaware Co - Manchester Hwy 13 relocation.dat —
23-070_DOT NHSX-013-2(42)--3H-28 U4Planset013(42) Construction-part9.pdf PDF
23-070_DOT NHSX-013-2(42)--3H-28 U4Planset013(42) Construction-part3.pdf PDF
23-070_DOT NHSX-013-2(42)--3H-28 U4Planset013(42) Construction-part7.pdf PDF
23-070_DOT NHSX-013-2(42)--3H-28 U4Planset013(42) Construction-part6.pdf PDF
23-070_DOT NHSX-013-2(42)--3H-28 U4Planset013(42) Construction-part2.pdf PDF
23-070_DOT NHSX-013-2(42)--3H-28 U4Planset013(42) Construction-part1.pdf PDF
23-070_DOT NHSX-013-2(42)--3H-28 U4Planset013(42) Construction-part11.pdf PDF
23-070_28230101 Manchester Hwy 13 Reloc Constr SOW.docx DOCX document
23-070_28230101 Manchester Hwy 13 Reloc Constr Permit Plan Set-part1.pdf PDF
23-070_28230101 Manchester Hwy 13 Reloc Constr Permit Plan Set-part3.pdf PDF
23-070_DOT NHSX-013-2(42)--3H-28 U4Planset013(42) Construction-part8.pdf PDF
23-070_DOT NHSX-013-2(42)--3H-28 U4Planset013(42) Construction-part13.pdf PDF
23-070_DOT NHSX-013-2(42)--3H-28 U4Planset013(42) Construction-part14.pdf PDF
23-070_DOT NHSX-013-2(42)--3H-28 U4Planset013(42) Construction-part5.pdf PDF
23-070_DOT NHSX-013-2(42)--3H-28 U4Planset013(42) Construction-part10.pdf PDF
23-070_DOT NHSX-013-2(42)--3H-28 U4Planset013(42) Construction-part15.pdf PDF
23-070_DOT 28-0132-048_Clearing & Grubbing Current_Plan.pdf PDF
23-070_28230101 Manchester Hwy 13 Reloc Constr Permit Plan Set-part2.pdf PDF
23-070_DOT NHSX-013-2(42)--3H-28 U4Planset013(42) Construction-part12.pdf PDF
23-070_DOT NHSX-013-2(42)--3H-28 U4Planset013(42) Construction-part4.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ICN OSP Construction Punchlist Rev 1.2.xlsx 1 December 7, 2017

Request Date:

Completion Date:

Contractor Contact/#

County Township/Range/Section City or Nearest City Distance to City Street/Highway or Address Nearest Cross Street

Acceptable Y/N or NA

Locations of Issue (use station #)

If buried; depth:

Crushed rock base for handholes:

Wire mesh on top of rock:

Conduits:

Conduits plugged:

Pull rope in conduit:

Locate wire conduit plugged:

Minimum of 6" above rock:

Cables properly coiled (not protruding into lid):

Backfilled and Compacted:

Sufficiently Tamped (no settling):

Marker/TriView set with 5' height in DOT ROW:

ICN placard installed in lid

ICN cable tags on cable.

Handholes set level to grade:

Concrete resotred:

Located within ROW:

Warning Markers Placed (5' height in DOT ROW):

Trash & Debris Removed:

PROJECT LOCATION

Iowa Communciations Network OSP Post-Construction Punch List

Comment: (provide labeled pictures of any issues)Installation / Items

Backfilled:

Soil restored:

Sufficiently Tamped (no settling):

Equipment damage to lawn restored:

Conduit installed at proper depths:

Handhole Installation:

Bore Pits, Trenches, and Excavations:

Project Name:

OSP Log # and/or RFS #:

Requested by:

Completed by:

Contractor:

ICN OSP Construction Punchlist Rev 1.2.xlsx 2 December 7, 2017

Acceptable Y/N or NA

Locations of Issue (use station #) Comment: (provide labeled pictures of any issues)Installation / Items

Bulk Head Installed.

Panel Labeled

Fibers Spliced and Stored Properly

Exterior Conduit secured:

Penetrations Sealed:

Locate pedestal installed if required:

Armored cable:

Fiber Panel:

#10 ground extended to ground bar:

#10 grounded properly (lug):

Installed level:

Comments:

Cable Routed Correctly (on outside of ladder rack)

#6 Bare Copper bonded to rod with Ground Clamp:

#10 or #12 Tracer Wire bonded within splice enclosure:

All wires bonded at pedestal:

Directions Labeled:

Cable(s) locate appropriately:

TriView ____ SIP ____ Hideout ____ Tii ____ Other ____

Ground rod installed in Handhole:

Bend radius' maintained:

ICN cable tags on cable.

Slack loops installed per SOW.

Building Entrance/Terminations: (if two sites note location)

Locate Facilities:

Cable Installation:

Coils/Meter marks verified against redlines.

Any cable damage:

Locate materials per ICN standards.

PROJECT DESCRIPTION: Manchester Hwy 13 Relocation Firefly Road to Hwy 3
LOG # / RFS #: 28230101
Engineer: [Flickinger]
Date:
COMPLETED BY:
CONTRACTOR NAME:
CONTRACTOR CONTACT #:
County: [Delaware]
T - S - R:
DISTANCE TO CITY:
CROSS STREET: Firefly Road & Hwy 3
CITY: Manchester
STREET: Hwy 3
SoilRestored: []
Tamped: []
Sod: []
Trash: []
ConduitDepth: []
Concrete: []
ROW: []
Markers: []
BackfilledStation:
SoilRestoredStation:
TampedStation:
SodStation:
ConduitDepthStation:
ConcreteStation:
ROWStation:
MarkersStation:
TrashStation:
BackfilledComment:
SoilRestoredComment:
TampedComment:
SodComment:
TrashComment:
MarkersComment:
ROWComment:
ConcreteComment:
ConduitDepthComment:
HHtoGrade: []
HHDepth: []
Crushed Rock: []
Mesh: []
Conduit6": []
ConduitPlug: []
ConduitRope: []
ConduitLocWire: []
Coiled: []
Backfill: []
Tamp: []
MarkerHeight: []
ICNPlacard: []
ICNTag: []
HHtoGradeStation:
HHtoGradeComment:
HHDepthStation:
HHDepthComment:
Crushed Rock Station:
Crushed Rock Comment:
MeshStation:
MeshComment:
Conduit6"Station:
Conduit6"Comment:
ConduitPlugStation:
ConduitPlugComment:
ConduitRopeStation:
ConduitRopeComment:
ConduitLocWireStation:
ConduitLocWireComment:
CoildStation:
CoiledComment:
BackfillStation:
BackfillComment:
TampStation:
TampComment:
MarkerHeightStation:
MarkerHeightComment:
ICNPlacardStation:
ICNPlacardComment:
ICNTagStation:
ICNTagComment:
Backfilled: []
Select1: []
CoilStation:
CoilComment:
Select2: []
DamageStation:
DamageComment:
Select3: []
BendStation:
BendComment:
Select4: []
TagStation:
TagComment:
Select5: []
SlackStation:
SlackComment:
Check BoxTriView: Off
Check BoxSIP: Off
Check BoxHideout: Off
Check BoxTii: Off
Check BoxOther: Off
Select6: []
LocPedStation:
LocPedComment:
Select7: []
GrdRodStation:
GrdRodComment:
Select8: []
BareCopperWireStation:
BareCopperWireComment:
Select9: []
TracerWireStation:
TracerWireComment:
Select10: []
BondedStation:
BondedComment:
Select11: []
DirectionStation:
DirectionComment:
Select12: []
LocateStation:
LocateComment:
Select13: []
LocMatStation:
LocMatComment:
Select14: []
ExtConduitStation:
ExtConduitComment:
Select15: []
PenStation:
PenComment:
Select16: []
PedInstallStation:
PedInstallComment:
Select17: []
WireGndBarStation:
WireGndBarComment:
Select18: []
GroundedStation:
GroundedComment:
Select19: []
FiberPanelLevelStation:
FiberPanelLevelComment:
Select20: []
BulkHeadStation:
BulkHeadComment:
Select21: []
PanelLabelStation:
PanelLabelComment:
Select22: []
FiberStoreStation:
FiberStoreComment:
Select23: []
RoutedStation:
RoutedComment:
Other Comments:

File details come from the government source that posted it. Updated .