23-070_28230101 Manchester Hwy 13 Reloc Constr Punch List.pdf
PDF 162 KB Posted
- Solicitation number
- 23-070
- Issued by
- Delaware County, Iowa
About this file
This document is an Iowa Communications Network (ICN) post-construction punchlist for the Manchester Hwy 13 Relocation project, Project # 28230101. The project involves relocating approximately 8,471 feet of new fiber optic cable installation in 1-inch conduit and 38,265 feet of new direct-bury cable installation along Hwy 13 from Firefly Rd to Hwy 3 in Manchester, Iowa. The punchlist covers requirements for the contractor such as restoring soil, tamping, installing locate markers, ensuring proper conduit depth, and other construction activities.
The related state and local contract opportunity involves the State of Iowa's Iowa Telecommunications and Technology Commission, operating the ICN, seeking bids from vendors to complete this fiber optic relocation project in Delaware County, Iowa. There are no details provided on pricing terms, set-asides, funding requirements, or contract duration.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ICN OSP Construction Punchlist Rev 1.2.xlsx 1 December 7, 2017
Request Date:
Completion Date:
Contractor Contact/#
County Township/Range/Section City or Nearest City Distance to City Street/Highway or Address Nearest Cross Street
Acceptable Y/N or NA
Locations of Issue (use station #)
If buried; depth:
Crushed rock base for handholes:
Wire mesh on top of rock:
Conduits:
Conduits plugged:
Pull rope in conduit:
Locate wire conduit plugged:
Minimum of 6" above rock:
Cables properly coiled (not protruding into lid):
Backfilled and Compacted:
Sufficiently Tamped (no settling):
Marker/TriView set with 5' height in DOT ROW:
ICN placard installed in lid
ICN cable tags on cable.
Handholes set level to grade:
Concrete resotred:
Located within ROW:
Warning Markers Placed (5' height in DOT ROW):
Trash & Debris Removed:
PROJECT LOCATION
Iowa Communciations Network OSP Post-Construction Punch List
Comment: (provide labeled pictures of any issues)Installation / Items
Backfilled:
Soil restored:
Sufficiently Tamped (no settling):
Equipment damage to lawn restored:
Conduit installed at proper depths:
Handhole Installation:
Bore Pits, Trenches, and Excavations:
Project Name:
OSP Log # and/or RFS #:
Requested by:
Completed by:
Contractor:
ICN OSP Construction Punchlist Rev 1.2.xlsx 2 December 7, 2017
Acceptable Y/N or NA
Locations of Issue (use station #) Comment: (provide labeled pictures of any issues)Installation / Items
Bulk Head Installed.
Panel Labeled
Fibers Spliced and Stored Properly
Exterior Conduit secured:
Penetrations Sealed:
Locate pedestal installed if required:
Armored cable:
Fiber Panel:
#10 ground extended to ground bar:
#10 grounded properly (lug):
Installed level:
Comments:
Cable Routed Correctly (on outside of ladder rack)
#6 Bare Copper bonded to rod with Ground Clamp:
#10 or #12 Tracer Wire bonded within splice enclosure:
All wires bonded at pedestal:
Directions Labeled:
Cable(s) locate appropriately:
TriView ____ SIP ____ Hideout ____ Tii ____ Other ____
Ground rod installed in Handhole:
Bend radius' maintained:
ICN cable tags on cable.
Slack loops installed per SOW.
Building Entrance/Terminations: (if two sites note location)
Locate Facilities:
Cable Installation:
Coils/Meter marks verified against redlines.
Any cable damage:
Locate materials per ICN standards.
| PROJECT DESCRIPTION: Manchester Hwy 13 Relocation Firefly Road to Hwy 3 |
| LOG # / RFS #: 28230101 |
| Engineer: [Flickinger] |
| Date: |
| COMPLETED BY: |
| CONTRACTOR NAME: |
| CONTRACTOR CONTACT #: |
| County: [Delaware] |
| T - S - R: |
| DISTANCE TO CITY: |
| CROSS STREET: Firefly Road & Hwy 3 |
| CITY: Manchester |
| STREET: Hwy 3 |
| SoilRestored: [] |
| Tamped: [] |
| Sod: [] |
| Trash: [] |
| ConduitDepth: [] |
| Concrete: [] |
| ROW: [] |
| Markers: [] |
| BackfilledStation: |
| SoilRestoredStation: |
| TampedStation: |
| SodStation: |
| ConduitDepthStation: |
| ConcreteStation: |
| ROWStation: |
| MarkersStation: |
| TrashStation: |
| BackfilledComment: |
| SoilRestoredComment: |
| TampedComment: |
| SodComment: |
| TrashComment: |
| MarkersComment: |
| ROWComment: |
| ConcreteComment: |
| ConduitDepthComment: |
| HHtoGrade: [] |
| HHDepth: [] |
| Crushed Rock: [] |
| Mesh: [] |
| Conduit6": [] |
| ConduitPlug: [] |
| ConduitRope: [] |
| ConduitLocWire: [] |
| Coiled: [] |
| Backfill: [] |
| Tamp: [] |
| MarkerHeight: [] |
| ICNPlacard: [] |
| ICNTag: [] |
| HHtoGradeStation: |
| HHtoGradeComment: |
| HHDepthStation: |
| HHDepthComment: |
| Crushed Rock Station: |
| Crushed Rock Comment: |
| MeshStation: |
| MeshComment: |
| Conduit6"Station: |
| Conduit6"Comment: |
| ConduitPlugStation: |
| ConduitPlugComment: |
| ConduitRopeStation: |
| ConduitRopeComment: |
| ConduitLocWireStation: |
| ConduitLocWireComment: |
| CoildStation: |
| CoiledComment: |
| BackfillStation: |
| BackfillComment: |
| TampStation: |
| TampComment: |
| MarkerHeightStation: |
| MarkerHeightComment: |
| ICNPlacardStation: |
| ICNPlacardComment: |
| ICNTagStation: |
| ICNTagComment: |
| Backfilled: [] |
| Select1: [] |
| CoilStation: |
| CoilComment: |
| Select2: [] |
| DamageStation: |
| DamageComment: |
| Select3: [] |
| BendStation: |
| BendComment: |
| Select4: [] |
| TagStation: |
| TagComment: |
| Select5: [] |
| SlackStation: |
| SlackComment: |
| Check BoxTriView: Off |
| Check BoxSIP: Off |
| Check BoxHideout: Off |
| Check BoxTii: Off |
| Check BoxOther: Off |
| Select6: [] |
| LocPedStation: |
| LocPedComment: |
| Select7: [] |
| GrdRodStation: |
| GrdRodComment: |
| Select8: [] |
| BareCopperWireStation: |
| BareCopperWireComment: |
| Select9: [] |
| TracerWireStation: |
| TracerWireComment: |
| Select10: [] |
| BondedStation: |
| BondedComment: |
| Select11: [] |
| DirectionStation: |
| DirectionComment: |
| Select12: [] |
| LocateStation: |
| LocateComment: |
| Select13: [] |
| LocMatStation: |
| LocMatComment: |
| Select14: [] |
| ExtConduitStation: |
| ExtConduitComment: |
| Select15: [] |
| PenStation: |
| PenComment: |
| Select16: [] |
| PedInstallStation: |
| PedInstallComment: |
| Select17: [] |
| WireGndBarStation: |
| WireGndBarComment: |
| Select18: [] |
| GroundedStation: |
| GroundedComment: |
| Select19: [] |
| FiberPanelLevelStation: |
| FiberPanelLevelComment: |
| Select20: [] |
| BulkHeadStation: |
| BulkHeadComment: |
| Select21: [] |
| PanelLabelStation: |
| PanelLabelComment: |
| Select22: [] |
| FiberStoreStation: |
| FiberStoreComment: |
| Select23: [] |
| RoutedStation: |
| RoutedComment: |
| Other Comments: |
File details come from the government source that posted it. Updated .