This is a construction document set prepared by the Iowa Department of Natural Resources Engineering Services for road maintenance at Cedar Rock State Park in Buchanan County, Iowa. The project scope includes granular roadway maintenance consisting of blading and shaping the roadway, shoulder work, pothole repair, minor ditch cleaning, spreading and rolling new rock, and replacement of one 18-inch concrete culvert. Key estimated quantities include 29.4 station miles of roadway reconstruction blading/shaping, 29.4 station miles of shoulder reconstruction, 0.5 station miles of ditch reshaping and cleaning, 343 tons of granular surfacing (Class A crushed stone), 3 tons of granular backfill, 2 concrete culvert aprons (18 inch), 12 concrete culvert pipe sections (18 inch), 10 tons of erosion stone, 1 lump sum for traffic control, 1 lump sum for mobilization, and 0.25 acres for seed and fertilize work. The project has an approximate start date of September 30, 2026, with 25 working days allocated for completion. The bid closing date is June 25, 2026, at 3:00 PM, with bids to be submitted electronically.
The construction plans were prepared by Bruce L. Flippin, a licensed professional engineer with the Iowa Department of Natural Resources, and are dated January 2024. Project management and construction inspection will be overseen by Ken Howe (319-240-3553) and Daniel Pfeifer (515-901-6261) of the Iowa Department of Natural Resources. The contractor is required to coordinate with TNT Tuckpointing regarding an ongoing tuckpointing and retaining wall project and may have the opportunity to start work earlier than the approximate start date. The contractor must conduct a site visit to familiarize themselves with conditions and verify dimensions and elevations. All work must conform to applicable codes and ordinances, follow Iowa DOT Standard Specifications (Series 2023, Section 1108), and be subject to approval by the DNR Engineer. The contractor is responsible for identifying and protecting existing utilities, providing erosion control measures, and identifying appropriate waste disposal or material haul sites.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 23-03-10-02 Bid Package.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C O
V E R S
H E E T
SHEET INDEX
PROJECT DESCRIPTION AUTHORIZATION TO BID
DATEENGINEERING BUREAU CHIEF
DATEAUTHORIZATION - PARKS | WILDLIFE | FISHERIES | LAW ENFORCEMENT | FORESTRY
DIRECTORY
COMPANY
ADDRESS
CITY,STATE,ZIP
TELEPHONE
FAX
CONTACT
COMPANY
ADDRESS
CITY,STATE,ZIP
TELEPHONE
FAX
CONTACT
PROJECT MANAGER CONSTRUCTION INSPECTOR
BRUCE L.
FLIPPIN
19513
AWOI
G R
E E
NI
N
E
L O
ANISSEFOR
P
D E
S N
E
CI
L
UNDER THE LAWS OF THE STATE OF IOWA.
DECISIONS WITH REGARD TO THE DESIGN WERE MADE BY ME
PREPARED UNDER MY SUPERVISION AND THAT ENGINEERING
I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT WAS
PAGES COVERED BY THIS SEAL:
MY LICENCE RENEWAL DATE IS DECEMBER 31, 20
PRINTED OR TYPED NAME
SIGNATURE DATE
BRUCE L. FLIPPIN
A.01bruce.flippin@dnr.iowa.gov
515-281-8685
515-689-8009
BRUCE L. FLIPPIN
DES MOINES, IA, 50319
502 EAST 9TH STREET
IOWA DEPARTMENT OF NATURAL RESOURCES
kenneth.howe@dnr.iowa.gov
319-240-3553
KEN HOWE
IOWA DEPARTMENT OF NATURAL RESOURCES
23-03-10-01DNR PROJECT #
DOT PROJECT #
BUCHANAN COUNTY, IOWA
ROAD MAINTENANCE
CEDAR ROCK STATE PARK
FOR
CONSTRUCTION DOCUMENTS
IOWA DEPARTMENT OF NATURAL RESOURCES
D.01
C.01
B.06
B.05
B.04
B.03
B.02
B.01
A.02
A.01
SITE PLAN
QUANTITIES AND GENERAL INFORMATION
TYPICAL CROSS SECTIONS AND DETAILS
TYPICAL CROSS SECTIONS AND DETAILS
TYPICAL CROSS SECTIONS AND DETAILS
TYPICAL CROSS SECTIONS AND DETAILS
TYPICAL CROSS SECTIONS AND DETAILS
TYPICAL CROSS SECTIONS AND DETAILS
LOCATION MAP
COVER SHEET
repair, minor ditch cleaning, spreading/blading/rolling new rock, and the replacement of one culvert.
This project consists of granular roadway maintenance - blading/shaping roadway, shoulder work, pothole
PROJECT NUMBER:
DATE:
NO.
DATE
BY
REVISION
DRAWN BY:
CHK'D BY:
SHEET No:
N A
T U
R A
L R
E S
O U
R C
E S
IO
W
A D
E P
A R T
M E
N T
F
E T H S
T D
E S M
O
IN
E S
IA
-0
E N
G
IN
E E R
IN
G S
E R
V
IC
E S W
A L L A
C E B
U
IL
IN
G
C O
N S
U L T A
N T
BLF
R O
A D M
A
IN
T E
N A
N C
E F
O R
C E
D A
R R
O C
K S
T A
T E P
A R
K
B U
C H
A N
A N C
O U
N T Y
JAN 2024
23-03-10-01
ALL
6200 PARK AVE, STE. 200
DES MOINES, IA, 50321
DANIEL PFEIFER
515-901-6261 daniel.pfeifer@dnr.iowa.gov
PROJECT NUMBER:
DATE:
NO.
DATE
BY
REVISION
DRAWN BY:
T U
R A
L R
E S
O U
R C
E S
IO
W
A D
E P
A R T
M E
N T
E T H S
T D
E S M
O
IN
E S
IA
-0
E N
G
IN
E E R
IN
G S
E R
V
IC
E S W
A L L A
C E B
U
IL
IN
G
C O
N S
U L T A
N T
BLF
R O
A D M
A
IN
T E
N A
N C
E F
O R
C E
D A
R R
O C
K S
T A
T E P
A R
K
B U
C H
A N
A N C
O U
N T Y
JAN 2024
23-03-10-01
B.01
T Y P
IC
A L C
R O
S S S
E C
T
IO
N S A
N D D
E T A
IL
S
Normal Subgrade Limit
Profile Grade
Typical Roadway Section - Center Crown
V A
R I
E S
E X I
S T I
G
S U
B G
R A
D E by the Engineer.
areas specifically designated appropriately modified for
Normal sections shown may be
Note:
EXISTING FORESLOPE
EXI
ST
IN
G
FORE
SL
OP
E
R
C K
VARIES
WIDTH
VARIESVARIES
WIDTH
2.0%2.0%
1% 1%
PROJECT
MATERIAL FROM
AND REMOVE EXCESS
DAYLIGHT SHOULDERS
PROJECT
MATERIAL FROM
AND REMOVE EXCESS
DAYLIGHT SHOULDERS
10'HEADING SOUTH 103+60 100+00
10'HEADING SOUTH 25+79 0+00
WIDTHLOCATIONSTATION TO STATION
NO.
DATE
BY
REVISION
DRAWN BY:
T U
R A
L R
E S
O U
R C
E S
IO
W
A D
E P
A R T
M E
N T
E T H S
T D
E S M
O
IN
E S
IA
-0
E N
G
IN
E E R
IN
G S
E R
V
IC
E S W
A L L A
C E B
U
IL
IN
G
C O
N S
U L T A
N T
BLF
R O
A D M
A
IN
T E
N A
N C
E F
O R
C E
D A
R R
O C
K S
T A
T E P
A R
K
B U
C H
A N
A N C
O U
N T Y
JAN 2024
23-03-10-01
B.02
T Y P
IC
A L C
R O
S S S
E C
T
IO
N S A
N D D
E T A
IL
NO.
DATE
BY
REVISION
DRAWN BY:
T U
R A
L R
E S
O U
R C
E S
IO
W
A D
E P
A R T
M E
N T
E T H S
T D
E S M
O
IN
E S
IA
-0
E N
G
IN
E E R
IN
G S
E R
V
IC
E S W
A L L A
C E B
U
IL
IN
G
C O
N S
U L T A
N T
BLF
R O
A D M
A
IN
T E
N A
N C
E F
O R
C E
D A
R R
O C
K S
T A
T E P
A R
K
B U
C H
A N
A N C
O U
N T Y
JAN 2024
23-03-10-01
B.03
T Y P
IC
A L C
R O
S S S
E C
T
IO
N S A
N D D
E T A
IL
NO.
DATE
BY
REVISION
DRAWN BY:
T U
R A
L R
E S
O U
R C
E S
IO
W
A D
E P
A R T
M E
N T
E T H S
T D
E S M
O
IN
E S
IA
-0
E N
G
IN
E E R
IN
G S
E R
V
IC
E S W
A L L A
C E B
U
IL
IN
G
C O
N S
U L T A
N T
BLF
R O
A D M
A
IN
T E
N A
N C
E F
O R
C E
D A
R R
O C
K S
T A
T E P
A R
K
B U
C H
A N
A N C
O U
N T Y
JAN 2024
23-03-10-01
B.04
T Y P
IC
A L C
R O
S S S
E C
T
IO
N S A
N D D
E T A
IL
NO.
DATE
BY
REVISION
DRAWN BY:
T U
R A
L R
E S
O U
R C
E S
IO
W
A D
E P
A R T
M E
N T
E T H S
T D
E S M
O
IN
E S
IA
-0
E N
G
IN
E E R
IN
G S
E R
V
IC
E S W
A L L A
C E B
U
IL
IN
G
C O
N S
U L T A
N T
BLF
R O
A D M
A
IN
T E
N A
N C
E F
O R
C E
D A
R R
O C
K S
T A
T E P
A R
K
B U
C H
A N
A N C
O U
N T Y
JAN 2024
23-03-10-01
B.05
T Y P
IC
A L C
R O
S S S
E C
T
IO
N S A
N D D
E T A
IL
NO.
DATE
BY
REVISION
DRAWN BY:
T U
R A
L R
E S
O U
R C
E S
IO
W
A D
E P
A R T
M E
N T
E T H S
T D
E S M
O
IN
E S
IA
-0
E N
G
IN
E E R
IN
G S
E R
V
IC
E S W
A L L A
C E B
U
IL
IN
G
C O
N S
U L T A
N T
BLF
R O
A D M
A
IN
T E
N A
N C
E F
O R
C E
D A
R R
O C
K S
T A
T E P
A R
K
B U
C H
A N
A N C
O U
N T Y
JAN 2024
23-03-10-01
B.06
T Y P
IC
A L C
R O
S S S
E C
T
IO
N S A
N D D
E T A
IL
NO.
DATE
BY
REVISION
DRAWN BY:
T U
R A
L R
E S
O U
R C
E S
IO
W
A D
E P
A R T
M E
N T
E T H S
T D
E S M
O
IN
E S
IA
-0
E N
G
IN
E E R
IN
G S
E R
V
IC
E S W
A L L A
C E B
U
IL
IN
G
C O
N S
U L T A
N T
BLF
R O
A D M
A
IN
T E
N A
N C
E F
O R
C E
D A
R R
O C
K S
T A
T E P
A R
K
B U
C H
A N
A N C
O U
N T Y
JAN 2024
23-03-10-01
Q U
A N
T
IT
IE
S A
N D G
E N
E R
A L I
N F O
R M
A T
IO
N
ITEM
NO.
ESTIMATE REFERENCE INFORMATION
DESCRIPTION
ESTIMATED PROJECT QUANTITIES
ITEM NO. ITEM UNIT TOTAL
GENERAL NOTES
C.01 fence, rock ditch checks, silt basins or silt dikes.
to install and maintain erosion control features on the project. This may involve seeding, silt The contractor is expected to have materials, equipment, and labor available on a daily basis finish grade.
The contractor shall shape graded area to maintain surface drainage. All elevations are to caused by such work.
additional compensation will be allowed to the contractor for any interference or delay determine their existence and exact location and to avoid damage thereto. No claims for existence of which is presently not known or shown. It is the contractor’s responsibility to their locations must be considered approximate only. It is possible there may be others, the structures and utilities have been plotted from available surveys and records and therefore access to these facilities for necessary modification of services. Underground facilities, of those utilities prior to the beginning of any construction. The contractor shall be afforded construction area, it shall be the responsibility of the contractor to notify the DNR Engineer Where utilities and fixtures are shown as Existing on the plans or encountered within the will be subject to the approval of the DNR Engineer.
equipment or use these areas for storage of materials. Storage, parking and service areas construction limits. The contractor will not be permitted to park or service vehicles and The contractor shall not disturb desirable grass areas and desirable trees outside the stated in the plans or approved by the DNR Engineer.
hauled to these sites. No material shall be placed within the right-of-way, unless specifically into the work involved on this project. No payment for overhaul will be allowed for material material (excavated material or broken concrete) which is not desirable to be incorporated It shall be the contractor’s responsibility to provide waste areas or disposal sites for excess proceeding with the work.
shall notify the DNR Engineer of any discrepancies, omissions, and/or conflicts prior to The contractor shall verify, at the site, all dimensions and conditions shown on the plans and to the plans, specification, special provisions and contract.
visit the project site shall not relieve the contractor from performing the work in accordance themselves with the actual job conditions prior to bidding and the start of work. Failure to The contractor shall visit the site and inspect the project area and thoroughly familiarize ordinances.
All work shall conform to and be performed in accordance with all applicable codes and
Verify actual locations and elevations with DNR Engineer.
2601 - SEED+FERTILIZE (RURAL)
2533 - MOBILIZATION
2528 - TRAFFIC CONTROL
2518 - SAFETY CLOSURE
2507 - EROSION STONE
2416 - CULV, CONC RDWY PIPE, 18"
2416 - APRON, CONC, 18"
2402 - GRANULAR BACKFILL
2312 - GRANULAR SURFACING ON ROAD, CLASS A CRUSHED STONE
2127 - RECONSTRUCTION OF ROADBED - BLADING/SHAPING - SHOULDERS
2127 - RECONSTRUCTION OF ROADBED - BLADING/SHAPING - ROADWAY
2125 - RESHAPING DITCHES - CLEANING
ACRE
LS
LS
EACH
TON
EACH
EACH
TON
TON
STA
STA
STA
0.25
29.4
29.4
0.5
B. DOT approved source.
A. Seed and fertilize all disturbed areas - culvert replacement, ditch cleaning and shoulder blading.12
A. Follow Iowa DOT specificaion 2518 for safety closure set-up.10
C. DOT approved source.
B. Place at the direction of the DNR Field Engineer.
A. 5 ton each at inlet and outlet.8
G. Remove existing culvert from project site.
F. DOT approved source.
E. Type 3 pinned connections - See sheets B.05 and B.06 for details.
D. Wrap and pin all joints.
C. Match existing flowline.
B. DNR Field Engineer will mark location of inlet.
A. Remove and replace existing culvert.6/7
D. Dot approved source.
C. Backfill each end of culvert with soil to prevent piping.
B. Bed pipe halfway up with rock.
A. Use for pipe bedding.5
C. THERE ARE SOME LOW HANGING LIMBS ON PORTIONS OF THE ROADWAY THAT WILL NOT CLEAR A FULLY RAISED TWIN SCREW.
B. DOT approved source.
A. Spread and roll rock after dumping.4
D. See sheet B.01 for typical roadway cross section.
C. Remove any high shoulder areas before spreading new rock. Remove spoil for project location.
B. DO NOT waste material in ditch. Blade/drag/scoop onto roadway and remove from project site.
A. Remove any material higher than the roadway: 1% from edge of roadway to where it daylights the ditch foreslope.3
C. See sheet B.01 for typical roadway cross section.
B. Re-establish roadway crown - 2% positive drainage each way from centerline; 2% across the width in banked sections.
A. Repair all potholes by scarifying surrounding area to depth of pothole and recompacting.2
D. Remove spoil for project location.
C. Limits of cleaning will be marked by DNR Field Engineer.
B. 10" culvert - ditch only needs to be that deep.
A. Clean ditch at the indicated location on plans.1
16LF
A tuckpoint and retaining wall project is currently ongoing. Coordinate with Josh Smyser of TNT Tuckpointing on possibility of starting work earlier that approximate start date.
Office: 563-723-8428 Mobile: 563-381-7779
A tuckpoint and retaining wall project is currently ongoing. Coordinate with Josh Smyser of TNT Tuckpointing on possibility of starting work earlier than approximate start date.
Office: 563-723-8428 Mobile: 563-381-7779