23-001 Exhibit A- Materials Location and Identification.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- TECHNICIAN LABOR AND MATERIALS FOR CABLE INSTALLATION AND TERMINATION WITHIN THE ANAMOSA STATE PENNITENTIARY
- Solicitation number
- 23-001
- Issued by
- Jones County, Iowa
About this file
The document is an Exhibit A - Materials Location and Identification for an Invitation to Bid (ITB) issued by the Iowa Communications Network (ICN) on behalf of the Anamosa State Penitentiary (ASP). The ITB seeks bids from qualified vendors to provide technician labor and materials for horizontal and vertical copper and fiber optic cable installation and termination within the Anamosa State Penitentiary campus. The exhibit details the materials required, including quantities of various conduit sizes, cable types, and termination components. No specific bid due date or award date is provided, but the order in which the buildings are to be cabled has yet to be determined, and ICN/ASP reserves the right to add or delete drops in any of the buildings.
The pricing terms and funding sources are not explicitly stated, but the vendor is expected to provide a quote for each material quantity. There is no mention of set-asides, incumbents, or specific funding requirements. The current environment appears to involve the need to upgrade and expand the cabling infrastructure across multiple buildings and campuses within the Anamosa State Penitentiary.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 1 to ITB 23-001.pdf | ||
| 23-001 Exhibit C - Contractor Blank Form for background check.docx | DOCX document | |
| 23-001 Anamosa Wiring ITB FINAL.dat | — | |
| 23-001 Exhibit B - ASP Bldg. Numbers.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Materials
ASP ITB Exhibit A - Materials Location and Identification
Cabel location Building # Phones Provided by ICN/Lumen, for information only Cable Only Analog for information only PVC Conduit 3/4" in Feet **PER ASP** * All tunnel conduit need to be PVC, CE4X1C or the equivalent EMT Conduit 3/4" in Feet Rigid Conduit 3/4" in Feet EMT Conduit 1" in Feet Rigid Conduit 1" in Feet EMT Conduit 1.5" in Feet Rigid Conduit 1.5" in Feet EMT Conduit 2" in Feet EMT Conduit 4" in Feet Surface mount Raceway: Legrand V700 Series Wiremold Steel Raceway in Feet or the equivalent PANDUIT CAT6 PLENUM BLUE - PUP6004BU-W (6P4P24-BL-P-PAN-TP) Single Mode inside / outside OS2 6 or 12 strand Fiber Optic cable 6 strd= PDP006AB0707-I/O-C4(YEL) and 12 strd= PDP012AB0707-I/O-C4(YEL) or the equivalent SM OS2 Fiber Jumper 1-meter LC to LC OR-810-LL7-003 / Graybar part # or the equivalent Panduit Cat6 Blue 3' patch cord (UTP28SP3BU) Panduit 24 port Patch Panel (CPPL24WBLY) Surge protector / power strip for cabinets - Provided by Lumen or ICN Weather Proof boxes 10"x 6"x 6" for Tunnel phones (JBXH12126=box / LPCG507=sealent for the box) or equivalent Chatworth 6RU wall mount (11754-719) Panduit Fiber adapter panel (FAP6WBUDLCZ) or Corning Fiber adaptor panel (CCH-CP06-A9) Panduit Rack mount Fiber Dist. Panel (FCE1U) Allen Tel 25 pair Male AMP end (25-3-PX-10-GY) Panduit 24 port punch down (DP245E88TGY) Panduit LC single mode OS1/OS2 fiber ends (FLCSSCBUY) or equivalent Panduit Cat6 Blue Jacks (CJ688TGBU) Panduit Cat6 Blue 14' patch cord (UTPSP14BUY) Pentair/Caddy J-Hooks (appropriate type and size TBD while on site by vendor) Panduit faceplates (CFP1IW / CFP2IW / CFP4IW - to be determined while on site by vendor)
| 448 | 200 | |||||||||||||||||||||
| Social services closet 2nd Fl Bldg#2 | 3 | 54 | 3 | 1 | 1 | 1 | 1 | 1 | 12 | |||||||||||||
| Conduit or MPLS in walls | 2A | 10 | 3 | 1 | 120 | 20 | 1800 | |||||||||||||||
| Conduit or MPLS in walls | 2B | 19 | 7 | 210 | 3250 | |||||||||||||||||
| 2B.1 | 2 | 0 | 50 | 475 | ||||||||||||||||||
| Conduit or MPLS in walls | 1C | 5 | 1 | 60 | 10 | 720 | ||||||||||||||||
| Conduit or MPLS in walls | 1D | 2 | 2 | 30 | 800 | |||||||||||||||||
| 55 (Towers 5 & 6) | 2 | 0 | 1400 | |||||||||||||||||||
| 55 (Towers 5 & 6) | 2 | 25 | 750 | 1400 | 4 | 2 | 2 | 2 | 12 |
| Admin MDF Basement Bldg#1 | 2 | 36 | 2 | 1 | 1 | 1 | |||||||||
| NOTE: 4" conduit & Pull Box from Basement to 3rd floor with 2" stubs North & South each floor into drop ceilings. | 1A | 5 | 2 | 60 | 80 | 60 | 875 | ||||||||
| 1B | 13 | 3 | 140 | 2400 | |||||||||||
| 1C | 10 | 90 | 1700 | ||||||||||||
| 1D | 2 | 2 | 30 | 900 | |||||||||||
| Security Office 2fl Bldg#3 | 1 | 14 | 1 | 1 | |||||||||||
| 1B | 5 | 70 | 10 | 375 | |||||||||||
| 1C ASP Pulled | 4 | ||||||||||||||
| 3A | 1 | 50 | 200 |
| Upper Rotunda 2nd Fl Bldg# 3 | 1 | 8 | 1 | 1 | |||||||||||||||||
| 1C ASP Pulled | 3 | ||||||||||||||||||||
| 3C | 2 | 35 | 15 | 325 | |||||||||||||||||
| Rotunda Gates 3&4 1st Fl Bldg#3 | 1 | 9 | 1 | 1 | |||||||||||||||||
| 1B | 7 | 1 | 30 | 10 | 1000 | ||||||||||||||||
| 4/5A | 1 | 20 | 100 | ||||||||||||||||||
| Chapel Mechanical Rm 3rd Fl Bldg#3 | 1 | 12 | 1 | 1 | |||||||||||||||||
| ES1.1 | 5 | 200 | 40 | 875 | |||||||||||||||||
| 3A | 1 | 100 | 12 | 200 | |||||||||||||||||
| 3C ASP Pulled | 3 | ||||||||||||||||||||
| Store Rm 1st Fl Bldg# 6 | 5 | 22 | 1 | 1 | 1 | 1 | 1 | 1 | 12 | ||||||||||||
| 6A/B | 2 | 1 | 100 | 250 | |||||||||||||||||
| 6C/D/E | 5 | 1 | 450 | 60 | 480 | ||||||||||||||||
| 7A | 3 | 1 | 250 | 1000 | |||||||||||||||||
| Building 5 & Tower 1 share conduit | 4/5A | 2 | 1 | 275 | 275 | 1 | |||||||||||||||
| 54 (Towers 1, 2, 3,4) | 5 | 0 | 1000 | 2250 | |||||||||||||||||
| 54 (Towers 1, 2, 3,4) | 5 | 1000 | 1600 | 8 | 4 | 2 | 2 | 4 | 2 | 12 |
| Green house Bldg#10 | 1 | 1 | 1 | 1 | |||||||||||||||||||||||||
| 10A | 1 | 150 | 150 | ||||||||||||||||||||||||||
| Clothing Rm 1st Fl Bldg#11 | 2 | 10 | 1 | 1 | 1 | 1 | |||||||||||||||||||||||
| 11A | 6 | 600 | 600 | ||||||||||||||||||||||||||
| 11B | 2 | 2 | 500 | 500 | |||||||||||||||||||||||||
| Basement Bldg# 12 | 2 | 8 | 1 | 1 | 1 | 1 | |||||||||||||||||||||||
| 12B/C | 1 | 2 | 250 | 400 | |||||||||||||||||||||||||
| 13A | 1 | 1 | 1 | 300 | 430 | ||||||||||||||||||||||||
| Tunnel | 2 | 450 | 450 | 2 | |||||||||||||||||||||||||
| Soap Factory 2fl Bldg#14 | 2 | 3 | 1 | 1 | |||||||||||||||||||||||||
| 14A/B | 3 | 375 | 375 | ||||||||||||||||||||||||||
| License Plate 2nd Fl Bldg#15 | 1 | 3 | 1 | 1 | |||||||||||||||||||||||||
| 15 | 3 | 300 | 300 | 1 | 1 | ||||||||||||||||||||||||
| Furniture Shop 2nd Fl Bldg#17 | 1 | 10 | 1 | 1 | 1 | 1 | |||||||||||||||||||||||
| Bldg. 17, 18, 19, NEED LIFT | 17A | 3 | 200 | 200 | |||||||||||||||||||||||||
| 18A | 2 | 1 | 100 | 225 | 450 | ||||||||||||||||||||||||
| 19A | 2 | 150 | 75 | 560 | |||||||||||||||||||||||||
| Tunnel | 2 | 600 | 1100 | 2 | |||||||||||||||||||||||||
| Maint/Carpentry 1stfl Bldg#22 | 1 | 15 | 1 | ||||||||||||||||||||||||||
| LIFT WILL BE NEEDED | 20, 21, 22, 23A | 7 | 3 | 650 | 175 | 1525 | |||||||||||||||||||||||
| 21, 22, 23B | 3 | 1 | 750 | 750 | |||||||||||||||||||||||||
| LUD Basement Bldg# 8 | 1 | 15 | 1 | ||||||||||||||||||||||||||
| 8A | 4 | ||||||||||||||||||||||||||||
| All phones need 2' patch cord in Cab. | 8B | 3 | |||||||||||||||||||||||||||
| 2nd Fl to Basement Tie = Cables 4 cables | 8C | 2 | 50 | 200 | |||||||||||||||||||||||||
| 8D | 2 | ||||||||||||||||||||||||||||
| Power House Basement Bldg#25 | 1 | 3 | 1 | ||||||||||||||||||||||||||
| 25 | 2 | 175 | 300 | ||||||||||||||||||||||||||
| 25A | 1 | 200 | 200 | ||||||||||||||||||||||||||
| IPI Warehouse1 upper level Bldg#26 | 2 | 6 | 1 | 1 | 1 | ||||||||||||||||||||||||
| 26A | 3 | 1 | 200 | 200 | |||||||||||||||||||||||||
| 26 B, C share conduit | 26B | 1 | 65 | 65 | |||||||||||||||||||||||||
| 26C | 1 | 65 | 130 | ||||||||||||||||||||||||||
| Pump House 1st Fl Bldg#32 | 1 | 1 | 1 | ||||||||||||||||||||||||||
| 32 | 1 | 30 | 30 | ||||||||||||||||||||||||||
| Dairy Barn 1st Fl Bldg#36 | 1 | 4 | 1 | ||||||||||||||||||||||||||
| 36 | 2 | 125 | 250 | ||||||||||||||||||||||||||
| TOTAL MATERIAL QUANTITY | 162 | 38 | 24 | 1050 | 6985 | 1000 | 575 | 750 | 225 | 1000 | 237 | 80 | 320 | 30815 | 3000 | 42 | 234 | 26 | 16 | 4 | 4 | 8 | 5 | 8 | 8 | 48 | 448 | 200 |
VENDOR ESTIMATED PRICE FOR EACH MATERIAL QUANTITY COLUMN TOTAL $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
| NOTES: |
| 1) Where applicable, a part number has been provided. If vendor proposes an alternative, vendor shall provide a cut sheet for ICN, ASP consideration. |
| 2) Some conduits will need pull boxes and/or junction boxes / the conduit connecting floors in the Admin building will need pull boxes on every floor to acomadat the 4" conduit pathway. |
| 3) Conduit size may vary depending on the cable type/brand installed, vendor to adjust as needed. |
| 4) All outdoor conduit requires rigid and attached to handrails unless approved by ASP staff . |
| 5) All indoor conduit requires EMT. |
| 6) All Tunnel conduit requires PVC. |
| 7) Unless identified otherwise, Vendor shall quote and use Panduit products. |
| 8) There are locations Vendor will need to provide a lift to reach the installation point. |
| 9) The order in which the buildings are to be cabled has yet to be determined. |
| 10) ICN or ASP reserves the right to add/delete drops in any of the buildings. |