22RWP89_sol.pdf
PDF 803 KB Posted
- Solicitation number
- N0016422RWP89
About this file
This is a solicitation for evaluation, overhaul, supplemental repair, and testing services for alternating current motors used in various radar antenna systems. The Naval Surface Warfare Center Crane is seeking these services over a five-year period and intends to issue an indefinite-delivery, indefinite-quantity contract in the second quarter of fiscal year 2022. Interested parties must submit proposals by January 18, 2022 utilizing the Standard Form 1449. The solicitation covers evaluation and repair of motors for systems including AN/SPS-49, AN/SPS-48E, AN/SPS-67(V)1, AN/SPS-67(V)3/5, AN/SPS-40, AN/SPQ-9B, AN/SPS-55A, and AN/SPS-55. Delivery is required FOB destination.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 22RWP89_0002_sol.pdf | ||
| 22RWP89_SOL_0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
N0016422RWP89 15-Dec-2021
b. TELEPHONE NUMBER
812-854-8466
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 18 Jan 2022
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
N001649. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
JOLYNN S SLAVEN
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
NAVAL SURFACE WARFARE CENTER CRANE DIV
J. SLAVEN (812-854-8466)
BLDG 121
300 HWY 361
CRANE IN 47522-5001
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS AX
13b. RATING
DO-A7
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: 812-854-8466 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$8,000,000
NAICS:
811310
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF116
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
N0016422RWP89
Section 1.0 - Schedule/Inspection & Acceptance/Delivery
ITEM NO SUPPLIES/SERVICES MAX QTY U/I UNIT PRICE MAX AMOUNT
0001 AN/SPS-49 AC Motor
Evaluation
UNDEFINED Each
IAW Statement of Work (SOW) Section 3.2.1
SEE PRICE MATRIX BELOW
PSC: J020
FOB: Destination
FFP
0002 AN/SPS-49 AC Motor Standard
Overhaul
IAW Statement of Work (SOW) Section 3.2.2
0003 AN/SPS-49 AC Motor Non-
Standard Overhaul
(Stator Rewind)
IAW Statement of Work (SOW) Section 3.2.3
0004 AN/SPS-49 AC Motor Non-
(Armature Shaft Overhaul/Replacement)
IAW Statement of Work (SOW) Section 3.2.4
0005 AN/SPS-49 AC Motor Non-
(Housing Bearing Bracket Overhaul/Replacement)
IAW Statement of Work (SOW) Section 3.2.5
0006 AN/SPS-49 AC Motor Non-
(Thermal Sensor Replacement)
IAW Statement of Work (SOW) Section 3.2.6
0007 AN/SPS-49 AC Motor
Supplemental Repair
Services
IAW Statement of Work (SOW) Section 3.2.7
To be negotiated at the delivery order level when applicable.
0008 AN/SPS-48E AC Motor
IAW Statement of Work (SOW) Section 3.3.1
0009 AN/SPS-48E AC Motor Standard
IAW Statement of Work (SOW) Section 3.3.2
0010 AN/SPS-48E AC Motor
NonStandard Overhaul
IAW Statement of Work (SOW) Section 3.3.3
0011 AN/SPS-48E AC Motor
(Bell Housing Overhaul/Replacement)
IAW Statement of Work (SOW) Section 3.3.4
0012 AN/SPS-48E AC Motor
(Rotor Shaft Overhaul/Replacement)
IAW Statement of Work (SOW) Section 3.3.5
0013 AN/SPS-48E AC Motor
(Pinion Gear Overhaul/Replacement)
IAW Statement of Work (SOW) Section 3.3.6
0014 AN/SPS-48E AC Motor
IAW Statement of Work (SOW) Section 3.3.7
0015 AN/SPS-67(V) 3/5 AC Motor
IAW Statement of Work (SOW) Section 3.4.1
0016 AN/SPS-67(V) 3/5 AC Motor
Standard
IAW Statement of Work (SOW) Section 3.4.2
0017 AN/SPS-67(V) 3/5 AC Motor
Non-Standard
Overhaul (Stator Rewind)
IAW Statement of Work (SOW) Section 3.4.3
0018 AN/SPS-67(V) 3/5 AC Motor
Overhaul (Bell Housing Overhual)
IAW Statement of Work (SOW) Section 3.4.4
0019 AN/SPS-67(V) 3/5 AC Motor
Overhaul (Rotor Shaft Overhual)
IAW Statement of Work (SOW) Section 3.4.5
0020 AN/SPS-67(V) 3/5 AC Motor Supplemental
Repairs
IAW Statement of Work (SOW) Section 3.4.6
0021 AN/SPS-40 AC Motor
IAW Statement of Work (SOW) Section 3.5.1
0022 AN/SPS-40 AC Motor Standard
IAW Statement of Work (SOW) Section 3.5.2
0023 AN/SPS-40 AC Motor Non-
(Rewind and Impregnate Stator)
IAW Statement of Work (SOW) Section 3.5.3
0024 AN/SPS-40 AC Motor Non-
(Bell Housing Overhaul)
IAW Statement of Work (SOW) Section 3.5.4
0025 AN/SPS-40 AC Motor Non-
(Rotor Shaft Overhaul Overhaul)
IAW Statement of Work (SOW) Section 3.5.5
0026 AN/SPS-40 AC Motor
IAW Statement of Work (SOW) Section 3.5.6
0027 AN/SPQ-9B AC Motor
IAW Statement of Work (SOW) Section 3.6.1
0028 AN/SPQ-9B AC Motor Standard
IAW Statement of Work (SOW) Section 3.6.2
0029 AN/SPQ-9B AC Motor Non-
IAW Statement of Work (SOW) Section 3.6.3
0030 AN/SPQ-9B AC Motor Non-
(Bell Housing Overhaul/Replacement)
IAW Statement of Work (SOW) Section 3.6.4
0031 AN/SPQ-9B AC Motor Non-
(Rotor Shaft Overhaul)
IAW Statement of Work (SOW) Section 3.6.5
0032 AN/SPQ-9B AC Motor
IAW Statement of Work (SOW) Section 3.6.6
0033 AN/SPS-55A AzimuthDrive
Motor Evaluation
IAW Statement of Work (SOW) Paragraphs 3.7.2
0034 AN/SPS-55A Azimuth Drive
Standard Motor
IAW Statement of Work (SOW) Paragraphs 3.7.2.6, 3.7.2.7, 3.7.2.8, 3.7.2.9, 3.7.2.10, 3.7.2.11, 3.7.2.12, and 3.7.2.12.1.
0035 AN/SPS-55A Azimuth Drive
Motor Overhaul
IAW Statement of Work (SOW) Section 3.7.3.
0036 AN/SPS-55A Azimuth Drive
Motor Supple-mental Repair Services
IAW Statement of Work (SOW) Section 3.7.4.
0037 AN/SPS-55 Azimuth Drive
Motor Evaluation
IAW Statement of Work (SOW) Paragraphs 3.8.2
0038 AN/SPS-55 Azimuth Drive
Standard Motor
IAW Statement of Work (SOW) Paragraphs 3.8.2.6, 3.8.2.7, 3.8.2.8, 3.8.2.9, 3.8.2.10, and 3.8.2.11.
0039 AN/SPS-55 Azimuth Drive Non-
Motor Overhaul
IAW Statement of Work (SOW) Section 3.8.3.
0040 AN/SPS-55 Azimuth Drive
Motor Supple-mental Repairs
IAW Statement of Work (SOW) Section 3.8.4.
0041 AN/SPS-67(V) 1 AC Motor
IAW Statement of Work (SOW) Section 3.9.1
0042 AN/SPS-67(V) 1 AC Motor
StandardOverhaul
IAW Statement of Work (SOW) Section 3.9.2
0043 AN/SPS-67(V) 1 AC Motor Non-
Overhaul (Stator Rewind)
IAW Statement of Work (SOW) Section 3.9.3
0044 AN/SPS-67(V) 1 AC Motor Non-
Overhaul (Armature Shaft Overhaul/Replacement)
IAW Statement of Work (SOW) Section 3.9.4
0045 AN/SPS-67(V) 1 AC Motor
Supplemental
Repairs
IAW Statement of Work (SOW) Section 3.9.5
0046 Data
UNDEFINED Lot
Technical Data Requirements for CLINs 0001 through 0045 IAW the SOW Sections 3.1 through 3.9, CDRLS A001 through A003 provided in Section 4, and applicable DIDs.
NSP = Not sperately priced.
PSC: R425
PRICE MATRIX
CLIN 0001 PRICE MATRIX
Quantity Year 1 Price (Each)
Year 2 Price (Each)
Year 3 Price (Each)
Year 4 Price (Each)
Year 5 Price (Each)
2-5
6-10 11+
CLIN 0002 PRICE MATRIX
Quantity Year 1 Price (Each)
Year 2 Price (Each)
Year 3 Price (Each)
Year 4 Price (Each)
Year 5 Price (Each)
2-5
CLIN 0003 PRICE MATRIX
(Each) Year 2 Price
(Each) Year 3 Price
(Each) Year 4 Price
(Each) Year 5 Price
(Each)
2-5
CLIN 0004 PRICE MATRIX
(Each)
Year 2 Price (Each)
Year 3 Price (Each)
Year 4 Price (Each)
Year 5 Price (Each)
2-5
CLIN 0005 PRICE MATRIX
(Each)
Year 2 Price (Each)
Year 3 Price (Each)
Year 4 Price (Each)
Year 5 Price (Each)
2-5
CLIN 0006 PRICE MATRIX
(Each)
Year 2 Price (Each)
Year 3 Price (Each)
Year 4 Price (Each)
Year 5 Price (Each)
2-5
CLIN 0007 PRICE MATRIX
CLIN 0008 PRICE MATRIX
Quantity Year 1 Price (Each)
Year 2 Price (Each)
Year 3 Price (Each)
Year 4 Price (Each)
Year 5 Price (Each)
2-5
CLIN 0009 PRICE MATRIX
(Each)
Year 2 Price (Each)
Year 3 Price (Each)
Year 4 Price (Each)
Year 5 Price (Each)
2-5
CLIN 00010 PRICE MATRIX
Quantity Year 1 Price Year 2 Price Year 3 Price Year 4 Price Year 5 Price
(Each) (Each) (Each) (Each) (Each)
2-5
CLIN 0011 PRICE MATRIX
(Each)
Year 2 Price (Each)
Year 3 Price (Each)
Year 4 Price (Each)
Year 5 Price (Each)
2-5
CLIN 0012 PRICE MATRIX
(Each)
Year 2 Price (Each)
Year 3 Price (Each)
Year 4 Price (Each)
Year 5 Price (Each)
2-5
CLIN 0013 PRICE MATRIX
(Each)
Year 2 Price (Each)
Year 3 Price (Each)
Year 4 Price (Each)
Year 5 Price (Each)
2-5
CLIN 0014 PRICE MATRIX
CLIN 0015 PRICE MATRIX
Quantity Year 1 Price (Each)
Year 2 Price (Each)
Year 3 Price (Each)
Year 4 Price (Each)
Year 5 Price (Each)
2-5
CLIN 0016 PRICE MATRIX
(Each)
Year 2 Price (Each)
Year 3 Price (Each)
Year 4 Price (Each)
Year 5 Price (Each)
2-5
CLIN 0017 PRICE MATRIX
(Each)
Year 2 Price (Each)
Year 3 Price (Each)
Year 4 Price (Each)
Year 5 Price (Each)
2-5
11+
CLIN 00018 PRICE MATRIX
Quantity Year 1 Price
(Each) Year 2 Price
(Each) Year 3 Price
(Each) Year 4 Price
(Each) Year 5 Price
(Each)
2-5
CLIN 0019 PRICE MATRIX
(Each)
Year 2 Price (Each)
Year 3 Price (Each)
Year 4 Price (Each)
Year 5 Price (Each)
2-5
CLIN 0020 PRICE MATRIX
CLIN 0021 PRICE MATRIX
Quantity Year 1 Price (Each)
Year 2 Price (Each)
Year 3 Price (Each)
Year 4 Price (Each)
Year 5 Price (Each)
2-5
CLIN 0022 PRICE MATRIX
(Each)
Year 2 Price (Each)
Year 3 Price (Each)
Year 4 Price (Each)
Year 5 Price (Each)
2-5
CLIN 0023 PRICE MATRIX
(Each)
Year 2 Price (Each)
Year 3 Price (Each)
Year 4 Price (Each)
Year 5 Price (Each)
2-5
CLIN 0024 PRICE MATRIX
(Each)
Year 2 Price (Each)
Year 3 Price (Each)
Year 4 Price (Each)
Year 5 Price (Each)
2-5
CLIN 0025 PRICE MATRIX
(Each)
Year 2 Price (Each)
Year 3 Price (Each)
Year 4 Price (Each)
Year 5 Price (Each)
2-5
CLIN 0026 PRICE MATRIX
CLIN 0027 PRICE MATRIX
Quantity Year 1 Price (Each)
Year 2 Price (Each)
Year 3 Price (Each)
Year 4 Price (Each)
Year 5 Price (Each)
2-5
CLIN 0028 PRICE MATRIX
(Each)
Year 2 Price (Each)
Year 3 Price (Each)
Year 4 Price (Each)
Year 5 Price (Each)
2-5
CLIN 0029 PRICE MATRIX
(Each)
Year 2 Price (Each)
Year 3 Price (Each)
Year 4 Price (Each)
Year 5 Price (Each)
2-5
CLIN 0030 PRICE MATRIX
(Each)
Year 2 Price (Each)
Year 3 Price (Each)
Year 4 Price (Each)
Year 5 Price (Each)
2-5
CLIN 0031 PRICE MATRIX
(Each)
Year 2 Price (Each)
Year 3 Price (Each)
Year 4 Price (Each)
Year 5 Price (Each)
2-5
CLIN 0032 PRICE MATRIX
CLIN 0033 PRICE MATRIX
Quantity Year 1 Price (Each)
Year 2 Price (Each)
Year 3 Price (Each)
Year 4 Price (Each)
Year 5 Price (Each)
2-5
CLIN 0034 PRICE MATRIX
(Each)
Year 2 Price (Each)
Year 3 Price (Each)
Year 4 Price (Each)
Year 5 Price (Each)
2-5
6-10 11+
CLIN 0035 PRICE MATRIX
Quantity Year 1 Price
(Each) Year 2 Price
(Each) Year 3 Price
(Each) Year 4 Price
(Each) Year 5 Price
(Each)
2-5
CLIN 0036 PRICE MATRIX
CLIN 0037 PRICE MATRIX
Quantity Year 1 Price (Each)
Year 2 Price (Each)
Year 3 Price (Each)
Year 4 Price (Each)
Year 5 Price (Each)
2-5
CLIN 0038 PRICE MATRIX
(Each)
Year 2 Price (Each)
Year 3 Price (Each)
Year 4 Price (Each)
Year 5 Price (Each)
2-5
CLIN 0039 PRICE MATRIX
(Each)
Year 2 Price (Each)
Year 3 Price (Each)
Year 4 Price (Each)
Year 5 Price (Each)
2-5
CLIN 0040 PRICE MATRIX
CLIN 0041 PRICE MATRIX
Quantity Year 1 Price (Each)
Year 2 Price (Each)
Year 3 Price (Each)
Year 4 Price (Each)
Year 5 Price (Each)
2-5
CLIN 0042 PRICE MATRIX
(Each)
Year 2 Price (Each)
Year 3 Price (Each)
Year 4 Price (Each)
Year 5 Price (Each)
2-5
CLIN 0043 PRICE MATRIX
(Each)
Year 2 Price (Each)
Year 3 Price (Each)
Year 4 Price (Each)
Year 5 Price (Each)
2-5
CLIN 0044 PRICE MATRIX
(Each)
Year 2 Price (Each)
Year 3 Price (Each)
Year 4 Price (Each)
Year 5 Price (Each)
2-5
CLIN 0045 PRICE MATRIX
STATEMENT OF WORK (SOW)
STATEMENT OF WORK
FOR
EVALUATION AND OVERHAUL OF ALTERNATING CURRENT MOTORS
08 September 2021
1.0 SCOPE
This statement of work (SOW) defines requirements for evaluation, overhaul, supplemental repair, and testing of Alternating Current (AC) Motors used in the AN/SPS-49, AN/SPS-48E, AN/SPS-67(V)1, AN/SPS-67(V)3/5, AN/SPS-40, AN/SPQ-9B, AN/SPS-55A, and AN/SPS-55 radar antenna systems.
1.1 Background
This SOW is to maintain AC motors belonging to the AN/SPS-49, AN/SPS-48E, AN/SPS- 67V(1), AN/SPS-67(V)3/5, AN/SPS-40, AN/SPQ-9B, AN/SPS-55A, and AN/SPS-55 radar antenna systems. The documentation lists the overarching requirements that characterize the AC motors. After completing the overhauls and supplemental repairs, the AC motors are to be returned in a repaired state suitable for use within the radar antenna systems.
2.0 APPLICABLE DOCUMENTS
The following documents in effect at the date of award form a part of this SOW for reference.
In the event of conflict between the documents referenced herein and the contents of this SOW, the contents of this SOW shall prevail.
2.1 Military Standards
MIL-STD-2073/1E (W/Change- 4)
Standard Practice for Military Packaging
20 Nov 2018
MIL-STD-130N (W/Change 1) Department of Defense Standard Practice Identification Marking of U.S.
Military Property
16 Nov 2012
MIL-M-17059A (SHIPS) Motors, 60-Cycle, Alternating-Current, Fractional H.P. (Shipboard Use)
12 Oct 1965
MIL-DTL-917F Electric Power Equipment, Basic Requirements For
05 Aug 2014
MIL-DTL-5541F Chemical Conversion Coatings on Aluminum and Aluminum Alloys
11 Jul 2006
MIL-I-43553B Ink, Marking, Epoxy Base 16 Dec 1992
FF-B-171B, Notice 1 Bearings, Ball, Annular (General Purpose,) Metric
18 Aug 2003
2.2 Manuals/Procedures
SE110-A2-MMD-010 Overhaul and Repair Manual for
Antenna AS-3263/SPS-49(V), Vol. 1, Chapter 13
01 Jun 1990
SE213-UE-MDB-010 AN/SPS-48E, Pedestal Overhaul Manual, Chapter 03
01 Dec 1995
SE212-RB-PRO-010/SPS-40B, C,
D
Overhaul and Restoration Procedure for AS-2519B/SPS-40B Radar Antenna Reflector and AB-1144A/SPS-40B Radar Antenna Pedestal
31 Aug 1987
89 TRP 04 3622 AN/SPS-48 Motor Overhaul Procedure Rev B, Chg 00
13 Dec 2016
89 WIS 12 7820, Rev A, Chg 00
AN/SPS-67(V)3 & (V)5 AC Motor Overhaul Work Instruction (Historical)
03 Mar 2016
89 TRP 12 9240, Rev B, Chg 0 Physical Repair Procedure 01 Mar 2019
89 TPA 14 9407 AN/SPS-48 Azimuth Motor Test Stand Acceptance Test Procedure.
09 Jan 2017
NAVSHIPS 0967-LP-156-3040 AN/SPS-67(V)1 Technical Manual for Antenna Assembly AS-936
15 Apr 1970
S6260-BJ-GTP-010 US Navy Electric Motor Repair Manual
01 Jan 2019
Sumitomo Manual 04.301.60.005 SM-Cyclo Gearmotors Operating and Maintenance Manual, 4000 Series
20 Nov 2018
2.3 Drawings
Raytheon Drawing 914004, Rev T Motor, Alternating Current 01 Jul 1992
ITT Gilfillan Drawing 195955, Rev R
Motor, Antenna Drive, 15 HP, 440V, 3 Phase 60 Hz
25 Oct 1994
ITT Gilfillan Drawing 196428, Rev C
Pinion, Input
08 Aug 1984
United Technologies Drawing 177208, Rev Y
Motor AC 26 Aug 2015
NSWC Crane Drawing 80995405, Rev -
Motor, Alternating Current (AC) 21 Feb 2015
Tech Systems Drawing 01-0131, Rev A
A.C. Motor with Brake 11 Feb 1982
Cardion Electronics Drawing 411763, Rev E
Motor, Antenna Pedestal Drive 29 Feb 1988
Cardion Electronics Drawing 402356, Rev G
Motor, Alternating Current, Permanent- Split Capacitor
31 Mar 1987
Granite State Manufacture Drawing
C2253-02 REV D
Motor, AC 15 Oct 1962
2.4 Non-Government Documents
ISO 9001:2015 Quality Management Systems 16 Oct 2015
IEEE 112-2017 IEEE Standard Test Procedure for Polyphase Induction Motors and Generators
06 Dec 2017
EASA Standard AR100-2015 Recommended Practice for the Repair of Rotating Electrical Apparatus
Aug 2015
EIA-649-1 Configuration Management Requirements for Defense Contracts
Jan/Mar
3.0 REQUIREMENTS
3.1 General Requirements
3.1.1 The contractor shall furnish all equipment, tools, parts, materials, paint removal, paint prep, paint, consumables, and labor to meet the requirements of this SOW.
3.1.2 The contractor’s electric motor overhaul facilities shall meet the functional requirements of S6260-BJ-GTP-010, US Navy Electric Motor Repair Manual, Section 1-36 (Pages 1 - 21). The contractor shall overhaul motors using best practices defined in S6260-BJ- GTP-010. If referenced measurement equipment is not available, the contractor’s calibrated equipment shall be used.
3.1.3 The contractor shall adhere to turnaround time requirements for all AC Motors evaluated, overhauled, and tested. All turnaround requirements shall be calculated using calendar days.
3.1.4 Supplemental repairs for AC Motors shall be documented on Evaluation Reports and shall be executed via cost type orders. Supplemental repairs require processes, materials, and/or parts not already addressed in existing overhaul Contract Line Item Numbers (CLINs). (CDRL A001)
3.1.5 All parts and materials used in the overhaul of AC motors shall be high reliability, military grade parts as specified in motor drawings, or equivalent as determined by the Government.
3.1.6 AC motors deemed beyond economical repair (BER) shall be retained at the contractor’s facility until notified by the Government. The contractor shall only salvage parts from BER motors via Evaluation Report and approved by the Government. BER motors shall be in a secure and out-of-weather environment.
3.1.7 For any Standards called out in drawing that have been superseded the vendor shall use the superseding document.
3.2 AN/SPS-49 AC Motor Overhaul, Part Number 914004-2 (NSWC Crane)
3.2.1 AN/SPS-49 AC Motor Evaluation
NOTE: SE110-A2-MMD-010, Overhaul and Repair Manual for Antenna AS-3263/SPS-49(V), Volume 1, Chapter 13 contains multiple references to a brake assembly. AN/SPS-49 AC motors are provided to the contractor without the brake assembly. The contractor is responsible for AN/SPS-49 AC Motor evaluation, overhaul, and test. The contractor is not responsible for any “brake” repairs/overhauls.
3.2.1.1 The contractor shall evaluate AN/SPS-49 AC Motors In Accordance With (IAW) SE1110-A2-MMD-010 and S6260-BJ-GTP-010, Section 5. The contractor shall disassemble the motors per SE110-A2-MMD-010 Section 13-2 part B, up to Step 16 and including Step 18.
Steps 17 and 19 shall only be performed if the stator fails evaluation testing after any required reconditioning, or any frame is found to be damaged, or any thermal sensors are found to be closed. The contractor shall perform all specified testing and inspections called out in SE110- A2-MMD-010 Table 13-3 and S6260-BJ-GTP-010 Section 5, except core loss testing on stators to be rewound. All inspection and test results shall be documented in writing and non-conforming features documented with photographs. The Evaluation Report shall include condition of removed nameplates and any missing nameplates. The contractor shall recommend processes to refurbish or replace non-conforming parts. (CDRL A001)
3.2.1.2 The contractor shall document all test and inspection results from Section 3.2.1.1 including condition of nameplates and contractor’s recommendation for rewind when appropriate, including rewind materials and processes in an Evaluation Report. The contractor shall note any exceptions to using parts with the listed mandatory replacement part numbers and include reason and equivalent part data for Government evaluation. The report shall list all overhaul CLINs required to return the AC Motor to Ready for Issue (RFI) condition (refer to Sections 3.2.2 through 3.2.7 of this SOW). The Evaluation Report shall define any supplemental repairs and/or physical repairs required to return the motor to RFI condition. Supplemental repairs shall include additional labor and material data in order for the Government to make a BER determination. The Evaluation Report shall include narrative, photographic evidence, serial number of the motor, and failure test data. (CDRL A001)
3.2.1.3 The contractor shall submit the Evaluation Report to the Government within 14 days after receipt of motor. If multiple motors are provided to the contractor at the same time, the contractor shall have a maximum of 14 days to prepare and submit the first report and maximum of five days to submit each subsequent report. (CDRL A001)
3.2.1.4 After receipt and review of the Evaluation Report, the Government will authorize the contractor to execute the overhaul processes/repairs identified in the Evaluation Report or direct the contractor to place the AC Motor in BER stock.
3.2.2 AN/SPS-49 AC Motor Standard Overhaul
3.2.2.1 The contractor shall overhaul AN/SPS‐49 AC Motors within 14 days after approval of the Evaluation Report. The contractor shall reassemble the motor following steps listed in Section 13‐5a of Manual SE110‐A2‐MMD‐010 including rebalance of the armature shaft assembly. The contractor shall replace all mandatory parts designated in Table 1 and maintain records of Certificates of Compliance for all replacement parts. (CRDL A002) (CDRL A003)
Table 1: AN/SPS-49 Mandatory Parts
3.2.2.2 The contractor shall perform any required paint removal IAW 89 TRP 12 9240, Physical Repair Procedure, Paragraph 4.4.1 and/or 4.4.5. The contractor shall mask all motor openings to ensure no blast media or hand sanding residual materials can enter the motor.
3.2.2.3 Reference 3.2.1.2 of Raytheon Drawing 914004, Rev T, for “prior to painting” requirements. The contractor shall apply primer and paint IAW with 89 TRP 12 9240, Section
4.1.1 (gray paint) as part of the standard overhaul. The motor housing should be stripped down to bear metal prior to application of chemical conversion coating and painting. Degreasing of the motor housing may be necessary prior to application of chemical conversion coating and paint/primer. Painting may need to be done in stages or appropriate masking used to ensure no paint, primer, degreaser or chemical conversion coating come into contact with the internal components. (CDRL A002) With Government approval, the contractor shall apply refurbished or new identification markings, labels, and/or nameplates after painting completion.
3.2.2.4 Upon completion of the motor overhaul, the contractor shall perform all specified motor tests in Section 13-6 Table 7 and Table 8 of SE110-A2-MMD-010 for both two pole and four pole connections. A dynamometer other than that specified in SE110-AE-MMD-010 may be used. Tests are to be performed at rated voltage and frequency. Tests shall include measurement of lock rotor torque, locked rotor current, no load current, full load current, full load speed, breakdown torque, rotation direction, and vibration. Tests results shall be recorded in a formal test report and show the acceptable values found in Section 13-6 of SE110-A2- MMD-010 and in Drawing 914004. The contractor shall inspect the motor dimensions against Drawing 914004 and record findings in a formal Test/Inspection report. The overhauled motor shall have a like new appearance with no runs, no scratches, no bare metal (except as designated by the drawings), no primer showing, and no pitting or voids in the housing. (CDRL A002)
3.2.3 AN/SPS-49 AC Motor Non-Standard Overhaul (Stator Rewind)
3.2.3.1 The contractor shall identify AN/SPS-49 Motors that require Non-Standard Overhaul in an Evaluation Report. The contractor shall identify stator rewind actions during the evaluation. Upon Government approval, the contractor shall perform the stator rewind action/process, in addition to all standard overhaul and any other supplemental repair. The
ITEM DESCRIPTION MFR. PART NO. MFR CODE QTY.
80 OIL SEAL K87‐0079 20019 1
51 PREFORMED PACKING (O‐RING) K70‐0085 20019 2
54 BALL BEARING K51‐0022 20019 2
75 COVER GASKET 23200042‐2 20019 1
72 CONNECTOR GASKET 23200038‐34 20019 2
59 EYE BOLT MS51937‐3 20019 1
6 LINK CHAIN 19559‐9 20019 1
71 ELECTRIC RECEPTABLE CONNECTOR J1 MS3400D22‐23P 96906 1
70 ELECTRIC RECEPTABLE CONNECTOR J2 MS3400D22‐14P 96906 1
55 WASHER, BEARING SPACER 11600007‐38 20019 1
60 NUT, HEXAGON, CARBON STEEL, CADMIUM PLATED, 0.375‐16 UNC‐2B MS51967‐8 96906 1
48 NUT, HEXAGON, CARBON STEEL, CADMIUM PLATED, 0.312‐18 UNC‐2B MS51967‐5 96906 16
49 WASHER, LOCK‐SPRING, HELICAL, CARBON STEEL, CADMIUM PLATED, 0.323 ID, 0.586 OD, 0.078 THK MS35338‐45 96906 16
78 SCREW, PAN HEAD, CROSSRECESSED, CARBON STEEL, CADMIUM PLATED, 0.750 LG, 0.190‐32 UNF‐2A MS35207‐265 96906 8
77 WASHER, LOCK‐SPRING, HELICAL, CARBON STEEL, CADMIUM PLATED, 0.198 ID, 0.334 OD MS35338‐43 96906 8
7 SCREW, PAN HEAD, CROSSRECESSED, CARBON STEEL, CADMIUM PLATED, 0.750 LG, 0.164‐32 UNF‐2A SPP57‐608 20019 AR
4 WASHER, LOCK, STAINLESS STEEL, CADMIUM PLATED, 0.164 MIN ID SPP51‐103 20019 AR
73 SCREW, PAN HEAD, CROSSRESSESED, CARBON STEEL, CADMIUM PLATED, 0.500 LG, 0.112‐49 UNC‐2A MS35206‐217 96906 8
74 WASHER, LOCK‐SPRING, HELICAL, CARBON STEEL, CADMIUM PLATED, 0.118 ID, 0.209 OD MS35338‐40 96906 8
29 SCREW, DRIVE, ROUND HEAD, TYPE U, CARBON STEEL, CADMIUM PLATED, 0.114 BODY DIA, 0.250 LG MS21318‐21 96906 AR
84 WASHER, FLAT, 0.375 MIN ID NAS960C616 80205 6
85 WASHER, LOCK‐SPRING, HELICAL, CORROSION RESISTING STEEL, 0.388 ID, 0.683 OD, 0.094 THK MS35338‐141 96906 6
86 BOLT, MACHINE, AIRCRAFT, DRILLED HEAD, COARSE THREAD, STEEL, CADMIUM PLATED, 1.297 LG, 0.375‐16 UNC‐3A MS20074‐06‐12 96906 6
63 SADDLE GASKET 23200030‐36 20019 1
AN/SPS‐49 AC MOTOR MANDATORY REPLACEMENT
contractor shall certify the design, materials and processes specified in SE110-A2-MMD-010 were used. Equivalent winding materials may be used with Government approval. The contractor shall provide a Certification of Compliance to the rewind specifications, winding resistance measurements (to be within 2.5% of each other), passing surge test results, measured insulation resistance of the stator (to be greater than or equal to 200 Mohms for windings to ground) and results of a 1,200 VAC 60 Hz 1 minute dielectric test. The Dielectric Test shall be repeated again on the final assembly per Table 13.8. (CDRL A002) (CDRL A003)
3.2.4 AN/SPS-49 AC Motor Non-Standard Overhaul (Armature Shaft Overhaul/Replacement)
3.2.4.1 The contractor shall identify AN/SPS-49 AC Motors that require Non-Standard Overhaul in an Evaluation Report. The contractor shall identify armature shaft overhaul/replacement actions in the Evaluation Report. Upon Government approval, the contractor shall perform the armature shaft overhaul/replacement, in addition to all standard and any other supplemental repairs. (CDRL A001)
3.2.5 AN/SPS-49 AC Motor Non-Standard Overhaul (Housing Bearing Bracket
Overhaul/Replacement)
3.2.5.1 The contractor shall identify AN/SPS-49 AC Motors that require a Non-Standard Overhaul in an Evaluation Report. The contractor shall identify housing bearing bracket overhaul/replacement actions in the Evaluation Report. Upon Government approval, the contractor shall perform the housing bearing bracket overhaul/replacement, in addition to all standard and any other supplemental repairs. (CDRL A001)
3.2.6 AN/SPS-49 AC Motor Non-Standard Overhaul (Thermal Sensor Replacement)
3.2.6.1 The contractor shall identify AN/SPS-49 AC Motors that require a Non-Standard Overhaul in an Evaluation Report. The contractor shall identify thermal sensor replacement actions in the Evaluation Report. Upon Government approval, the contractor shall perform the thermal sensor replacement, in addition to all standard and any other supplemental repairs.
(CDRL A001)
3.2.7 AN/SPS-49 AC Motor Supplemental Repair Services
3.2.7.1 The contractor shall identify AN/SPS-49 AC Motors that require supplemental repair services in an Evaluation Report. Upon Government approval, the contractor shall perform the supplemental repair services in addition to all other overhaul repairs. (CDRL A001)
3.2.7.2 After concurrence of the Evaluation Report, the contractor shall perform external physical repairs IAW 89 TRP 12 9240, Section 4.5.
3.3 AN/SPS-48E AC Motor Overhaul, Part Number 195955-1(NSWC Crane)
3.3.1 AN/SPS-48E AC Motor Evaluation
3.3.1.1 The contractor shall evaluate the AN/SPS-48E AC Motors provided for overhaul with reference to SE213‐UE‐MDB‐010/AN/SPS‐48E, Pedestal Overhaul Manual, Chapter 03, Section II‐3.3 and Section III‐3.7; and S6260‐BJ‐GTP‐010 Section 5; and 89 TRP 04 3622, AN/SPS-48 Motor Overhaul Procedure Rev B, Chg 00. The contractor shall disassemble the motors per SE213‐UE‐MDB‐010/SPS‐48E Section II‐3.3. Cleaning methods cited in S6260‐BJ‐GTP‐010 or customary shop methods shall be used. The contractor shall perform all specified testing and inspections called out in SE213‐UE‐MDB‐010/SPS‐48E Section III‐3.7 and S6260‐BJ‐GTP‐010 Section 5 except core loss testing, which shall only be done on stators to be rewound. All inspection and test results, including parts identified for replacement, shall be documented in writing. Photographs shall document any non-conforming features. The contractor shall remove any nameplates, note condition of removed nameplates, and document any missing nameplates.
The contractor shall recommend processes to refurbish or replace non-conforming parts. (CDRL A001)
3.3.1.2 The contractor shall document all test and inspection results from Section 3.3.1.1 including condition of nameplates and recommendation for rewind when appropriate, including rewind materials and processes in the Evaluation Report. The contractor shall note exceptions to using parts with the listed mandatory replacement part numbers and include a reason and equivalent part data for Government evaluation. The report shall list all overhaul CLINs required to return the AC Motor to RFI condition (refer to Sections 3.3.2 through 3.3.7 of this SOW). The Evaluation Report shall define any supplemental repairs and/or physical repairs required to return the motor to RFI condition. Supplemental repairs shall include additional labor and material data in order for the Government to make a BER determination. The Evaluation Report shall provide narratives, photographic evidence, failure test data, and serial number of the motor. (CDRL A001)
3.3.1.3 The contractor shall submit an Evaluation Report within 14 days after receipt of the motor. If multiple motors are provided at the same time, the contractor shall have a maximum of 14 days to prepare and submit the first report and maximum of five days to submit each subsequent report. (CDRL A001)
3.3.1.4 After receipt and review of the Evaluation Report, the Government will authorize the contractor to execute the overhaul processes/repairs identified in the Evaluation Report or direct the contractor to place the AC Motor in BER stock.
3.3.2 AN/SPS-48E AC Motor Standard Overhaul
3.3.2.1 The contractor shall overhaul and refurbish AN/SPS-48E AC Motors within 14 days after approval of the Evaluation Report. All parts marked with an asterisk (*) in Table XIII of Document number 89 TRP 04 3622 shall be replaced as part of the standard overhaul.
3.3.2.2 The contractor shall perform any required paint removal IAW 89 TRP 12 9240, Paragraph 4.4.1 and/or 4.4.4. The contractor shall mask all motor openings to ensure no blast media or hand sanding residual materials can enter the motor.
3.3.2.3 The contractor shall apply primer and paint IAW 89 TRP 12 9240, Section 4.1.3 (white paint) as part of the standard overhaul. The contractor shall apply new identification markings, labels, and/or nameplates after painting is completed.
3.3.2.4 Upon completion of the motor overhaul, contractor shall perform all specified motor tests in Section VI of SE213‐UE‐MDB‐010/SPS‐48E. The contractor shall use a dynamometer for load testing. Testing shall be at rated voltage and frequency. The tests shall include measurement of locked rotor current, locked rotor torque, breakdown torque, no‐load current, full load current, full load speed, rotation direction, and vibration. Test results shall be recorded in a formal Test Report and provide the acceptable values found in Section VI of SE213‐UE‐ MDB‐010/SPS‐48E Chapter 3 and in ITT Gilfillan Drawing 195955, Rev R. The contractor shall inspect the motor dimensions IAW Drawing 195955 and record findings in a formal Test/Inspection Report. (CDRL A002)
3.3.2.5 The overhauled motor shall have a like new appearance with no scratches, no bare metal (except as designated by the drawing), no primer visible, no runs, and no pitting or voids in the housing. The motor housing should be stripped down to bare metal prior to application of chemical conversion coating and painting. Degreasing of the motor housing may be necessary prior to application of chemical conversion coating and paint/primer. Painting may need to be done in stages or appropriate masking used to ensure no paint, primer, degreaser or chemical conversion coating come into contact with the internal components.
3.3.3 AN/SPS-48E AC Motor Non-Standard Overhaul (Stator Rewind)
3.3.3.1 The contractor shall identify AN/SPS‐48E AC Motors that require a Non-Standard Overhaul in an Evaluation Report. The contractor shall identify stator rewind actions during evaluation. Upon Government approval, the contractor shall perform the stator rewind action/process in addition to all standard overhaul actions and any other supplemental repair actions. The contractor shall certify the design, materials, and processes specified in SE213‐UE‐ MDB‐010/SPS‐48E, Table 3.5 were used. Equivalent winding materials may be used with the Government’s approval. The contractor shall provide as part of the Certification of Compliance to the rewind specifications: winding resistance measurements (to be within 2.5% of each other), passing surge test results, measured insulation resistance of the stator (to be greater than or equal to 200 Mohms for windings to ground), and results of an 1,880VAC 60 Hz, 1 minute Dielectric test. The Dielectric test shall be repeated again on final assembly per SectionVI. (CDRL A001)
(CDRL A003)
3.3.4 AN/SPS-48E AC Motor Non-Standard Overhaul (Bell Housing Overhaul/Replacement)
3.3.4.1 The contractor shall identify AN/SPS-48E AC Motors that require a Non-Standard Overhaul in an Evaluation Report. The contractor shall identify bell housing overhaul/replacement actions during the evaluation. Upon Government approval, the contractor shall perform the bell housing overhaul/replacement, in addition to all standard and any other supplemental repairs. (CDRL A001)
3.3.5 AN/SPS-48E AC Motor Non-Standard Overhaul (Rotor Shaft
Overhaul/Replacement)
3.3.5.1 The contractor shall identify AN/SPS-48E AC Motors that require a Non-Standard Overhaul in an Evaluation Report. The contractor shall identify rotor shaft overhaul/replacement actions during the evaluation. Upon Government approval, the contractor shall perform the rotor shaft overhaul/replacement, in addition to all standard and any other supplemental repairs.
(CDRL A001)
3.3.6 AN/SPS-48E AC Motor Non-Standard Overhaul (Pinion Gear
Overhaul/Replacement)
3.3.6.1 The contractor shall identify AN/SPS-48E AC Motors that require a Non-Standard Overhaul in an Evaluation Report. The contractor shall identify pinion gear overhaul/replacement actions during the evaluation. Upon Government approval, the contractor shall perform the pinion gear overhaul/replacement, IAW, ITT Gilfillan Drawing196428, Rev C, in addition to all standard and any other supplemental repairs. (CDRL A001)
3.3.7 AN/SPS-48E AC Motor Supplemental Repair Services
3.3.7.1 The contractor shall identify AN/SPS-48E AC Motors that require supplemental repair services in an Evaluation Report. Upon Government approval, the contractor shall perform the supplemental repair services, in addition to all other overhaul actions. (CDRL A001)
3.3.7.2 After concurrence to evaluation, then the contractor shall perform internal and external physical repairs IAW 89 TRP 12 9240, Section 4.5.
3.4 AN/SPS-67(V)3/5 AC Motor Overhaul Part Number 177208 (NSWC Crane)
3.4.1 AN/SPS-67(V) 3/5 Evaluation
3.4.1.1 The contractor shall evaluate the AN/SPS‐67 (V) 3/5 AC motors provided for overhaul IAW Drawing 177208, United Technologies Drawing, Rev Y and S6260‐BJ‐GTP‐010, Sections 5 and 6. The contractor shall disassemble and clean the motors IAW S6260‐BJ‐GTP‐
010 Section 5, Section 7, and 89 WIS 12 7820, Rev A, Chg00, AN/SPS-67(V)3 and (V)5 AC Motor Overhaul Work Instruction (Historical). The contractor shall perform all specified testing and inspections in S6260‐BJ‐GTP‐010 Sections 5 and 6, except core loss testing, which shall only be performed on stators to be rewound. The contractor shall perform testing of winding thermal sensors for open circuit conditions. An Evaluation Report shall be provided that includes all inspection and test results. Non-conforming features shall be documented with photographs. The contractor shall provide the condition of removed nameplates, any missing nameplates and recommend processes to refurbish or replace non-conforming parts. (CDRL A001)
3.4.1.2 The contractor shall document all test and inspection results from Section 3.4.1.1, condition of nameplates, and contractor’s recommendation for rewind when appropriate, including rewind materials and processes in an Evaluation Report. The contractor shall note any exceptions to using parts with the listed mandatory replacement part numbers and include the reason and equivalent part data for Government evaluation. The report shall list all overhaul Contract Line Item Numbers (CLIN) required to return the AC Motor to RFI condition (refer to Sections 3.4.2 through 3.4.6 of this SOW). The Evaluation Report shall define any supplemental repairs and/or physical repairs required to return the motor to RFI condition. Supplemental repairs shall include additional labor and material data in order for the Government to make a BER determination. Narratives in the Evaluation Report shall include photographic evidence, failure test data, and serial number of the motor. (CDRL A001)
3.4.1.3 The contractor shall submit the Evaluation Report to the Government within 14 days after receipt of the motor. If multiple motors are provided to the contractor at the same time, the contractor shall have a maximum of 14 days to prepare and submit the first report and maximum of five days to submit each subsequent report. (CDRL A001)
3.4.1.4 After receipt and review of the Evaluation Report, the Government will authorize the contractor to execute the overhaul processes/repairs identified in the Evaluation report or direct the contractor to place the AC Motor in BER stock.
3.4.2 AN/SPS-67(V) 3/5 Standard Overhaul
3.4.2.1 The contractor shall overhaul AN/SPS-67(V) 3/5 AC Motors within 14 days after approval of an Evaluation Report. All mandatory parts listed in NSWC Crane Drawing 80995405, Rev -. shall be replaced as part of a Standard Overhaul.
3.4.2.2 The contractor shall refurbish the rotor shaft in areas of the bearing journals and sealing surfaces by metalizing and grinding as appropriate, or fitting sealing surfaces with a Speedie Sleeve, or equivalent. The contractor shall balance the rotor and armature IAW Drawing 177208. The contractor shall reassemble AC Motor IAW Drawing 177208 and S6260‐ BJ‐GTP‐010, Section 11, where bolt torque values can be found.
3.4.2.3 The contractor shall perform any required paint and adhesive removal IAW 89 TRP 12 9240, Paragraph 4.4.1 and/or 4.4.5. The contractor shall mask all motor openings to ensure no blast media or hand sanding residual materials can enter the motor. Reference Drawing 177208, Section 3.2.3.1 for conversion coating information.
3.4.2.4 The contractor shall apply primer and paint IAW 89 TRP 12 9240, Section 4.1.1 (gray paint) as part of the standard overhaul.
3.4.2.5 The contractor shall supply new or refurbished identification markings, labels, and/or plate with adhesive backing with completed motor to be installed at NSWC Crane after painting is completed.
3.4.2.6 The contractor shall perform inspection and testing on the assembled motor IAW Drawing 177208, Section 4.1.1 and 3.1.5 for 60 Hz values only, and 3.1.6 for 60 Hz values only, and include all test data in a Test Report. (CDRL A002)
3.4.3 AN/SPS-67(V) 3/5 Non-Standard Overhaul (Stator Rewind)
3.4.3.1 The contractor shall identify AN/SPS‐67(V) 3/5 AC Motors that require a Non- Standard Overhaul in an Evaluation Report. The contractor shall identify stator rewind actions during the evaluation. Upon Government approval, the contractor shall perform the stator rewind process, in addition to all standard overhaul, and any other supplemental repairs. The contractor shall supply the winding data, winding resistance measurements (to be within 2.5% of each other), passing surge test results, measured insulation resistance of the stator (to be greater than or equal to 200 Mohms for windings to ground), and the results of an 1,880 VAC 60 Hz, 1 minute Dielectric Test. The Dielectric Test shall be repeated on the final assembly. (CDRL
A001, CDRL A002)
3.4.4 AN/SPS-67(V) 3/5 Non-Standard Overhaul (Bell Housing Overhaul)
3.4.4.1 The contractor shall identify AN/SPS-67(V) 3/5 AC Motors that require a Non- Standard Overhaul in an Evaluation Report. The contractor shall identify if a bell-housing overhaul is required during the motor evaluation. Upon Government approval, the contractor shall perform the bell-housing overhaul, in addition to all Standard overhaul processes and any other actions approved via the Evaluation Report. The contractor shall overhaul bell housings IAW 89 WIS 12 7820 and United Technologies Drawing 177208 Rev Y. (CDRL A001)
3.4.5 AN/SPS-67(V) 3/5 Non-Standard Overhaul (Rotor Shaft Overhaul)
3.4.5.1 The contractor shall identify AN/SPS-67(V) 3/5 AC Motors that require a Non- Standard Overhaul in an Evaluation Report. The contractor shall identify if a rotor shaft overhaul is required during the evaluation. Upon Government approval, the contractor shall perform the rotor shaft overhaul, in addition to Standard overhaul processes, and any other actions approved via the Evaluation Report. The contractor shall overhaul the rotor’s shaft beyond metalizing/sleeve technology IAW 89 WIS 12 7820 and Drawing 177208. (CDRL A001)
3.4.6 AN/SPS-67(V) 3/5 AC Motor Supplemental Repairs
3.4.6.1 The contractor shall identify AN/SPS-67(V) 3/5 AC Motors that require supplemental repair in an Evaluation Report. Upon Government approval, a contract modification will be executed for the supplemental repairs. Upon receipt of modification, the contractor shall perform supplemental repairs, in addition to all other overhaul actions approved via the Evaluation Report. (CDRL A001)
3.4.6.2 After concurrence to evaluation of internal repair, then the contractor may perform external physical repairs IAW 89 TRP 12 9240, Section 4.5.
3.5 AN/SPS-40 AC Motor Overhaul, Part Number 01-0131(NSWC Crane)
3.5.1 AN/SPS-40 AC Motor Evaluation
Note: The motor will be supplied without the brake. All references in SE212‐RB PRO-10/SPS‐40B, C, D, Overhaul and Restoration Procedure for AS- 2519B/SPS40B Radar Antenna Reflector and AB-1144A/SPS-40B Radar Antenna Pedestal to the brake are to be ignored.
3.5.1.1 The contractor shall evaluate AN/SPS‐40 AC Motors IAW SE212‐RB‐PRO‐ 010/SPS‐40B, C, D, Tech Systems Drawing 01‐0131, Rev A and S6260‐BJ‐GTP‐010, Sections 5 and 6, for disassembly and motor component evaluation. The contractor shall disassemble the motors per SE212‐RB‐PRO‐010/SPS‐40B, C, D. Removal of the stator is only to be performed if the stator fails evaluation testing after any required reconditioning, the frame is found to be damaged, or any thermal sensors are found to be open. The contractor shall perform all specified evaluation testing and inspections in SE212‐RB‐PRO‐010/SPS‐40B, C, D and S6260‐BJ‐GTP‐ 010, Section 5 except for core loss testing on stators to be rewound. All inspection and test results shall be documented in writing and non-conforming features documented with photographs. The Evaluation Report shall contain the condition of removed nameplates, any missing nameplates, and recommend processes to refurbish or replace non-conforming parts.
(CDRL A001)
3.5.1.2 The contractor shall document all test and inspection results from Section 3.5.1.1, including condition of nameplates in an Evaluation Report. The contractor shall note exceptions to using parts with the listed mandatory replacement part numbers, include a reason, and equivalent part data for Government evaluation. The report shall list all overhaul CLINs required to return the AC Motor to RFI condition (refer to Sections 3.5.2 through 3.5.6 of this SOW). The Evaluation Report shall define any supplemental repairs and/or physical repairs required to return the motor to RFI condition. Supplemental repairs shall include additional labor and material data in order for the Government to make a BER determination. The Evaluation Report shall include narratives, photographic evidence, failure test data, and serial numbers. (CDRL A001)
3.5.1.3 The contractor shall submit the Evaluation Report within 14 days after receipt of the motor. If multiple motors are provided at the same time, the contractor shall have a maximum of 14 days to prepare and submit the first report and maximum of five days to submit each subsequent report. (CDRL A001)
3.5.1.4 After receipt and review of the Evaluation Report, the Government will authorize the contractor to execute the overhaul processes/repairs identified in the Evaluation Report or direct the contractor to place the AC Motor in BER stock.
3.5.2 AN/SPS-40 AC Motor Standard Overhaul
3.5.2.1 The contractor shall overhaul AN/SPS‐40 AC Motors within 14 days after approval of the Evaluation Report. All mandatory parts listed in Table 5‐7.2 of SE212‐RB‐PRO‐010/SPS‐ 40B, C, D Chapter 5 shall be replaced as part of a Standard Overhaul. Parts replaced shall be IAW Drawing 01‐0131, and Manual SE212‐RB‐PRO‐010/SPS‐40B, C, D Chapter 5.
3.5.2.2 The contractor shall perform any required paint removal IAW 89 TRP 12 9240, Paragraph 4.4.1 and/or 4.4.5. The contractor shall mask all motor openings to ensure no blast media or hand sanding residual materials can enter the motor.
3.5.2.3 The contractor shall apply primer and paint IAW 89 TRP 12 9240, Section 4.1.1 (gray paint) or 4.1.4 (black paint) as part of the standard overhaul. With Government approval, the contractor shall apply new or refurbished identification markings, labels, and/or plates after painting is completed.
3.5.2.4 Upon completion of the motor overhaul, the contractor shall perform all specified motor tests in SE212‐RB‐PRO‐010/SPS‐40B, C, D Chapter 5. A dynamometer shall be used to load test the motor. Testing shall be at rated voltage and frequency for both high speed and low speed connections. Tests shall include measurement of locked rotor current, locked rotor torque, breakdown torque, no‐load current, full load current, full load speed, rotation direction, and vibration. Test results shall be recorded in a formal Test Report showing the acceptable values found in SE212‐RB‐PRO‐010/SPS‐40B, C, D Chapter 5, and Drawing 01‐0131. The contractor shall inspect the motor dimensions IAW Drawing 01‐0131 and record findings in a formal
Test/Inspection Report. The overhauled motor shall have a like new appearance with no scratches, no bare metal (except as designated by the drawing), no primer visible, no runs, and no pitting or voids in the housing. The motor housing should be stripped down to bear metal prior to application of chemical conversion coating and painting. Degreasing of the motor housing may be necessary prior to application of chemical conversion coating and paint/primer. Painting may need to be done in stages or appropriate masking used to ensure no paint, primer, degreaser or chemical conversion coating come into contact with the internal components. (CDRL A002)
3.5.3 AN/SPS-40 AC Motor Non-Standard Overhaul (Rewind and Impregnate Stator)
3.5.3.1 The contractor shall identify AN/SPS-40 AC Motors that require Non-Standard Overhaul in an Evaluation Report. The contractor shall identify rewind and impregnation of the stator overhaul actions during the evaluation. Upon Government approval, the contractor shall perform rewind and impregnation of the stator, as part of the overhaul, in addition to all standard overhaul actions, and any other supplemental repairs approved via the Evaluation Report.
(CDRL A001)
3.5.4 AN/SPS‐40 Non-Standard Overhaul (Bell Housing Overhaul)
3.5.4.1 The contractor shall identify AN/SPS‐40 AC Motors that require a Non-Standard overhaul in an Evaluation Report. The contractor shall identify if a bell-housing overhaul is required during the motor evaluation. Upon Government approval, the contractor shall perform the bell housing overhaul IAW approved processes, in addition to all Standard overhaul, and any other actions approved via the Evaluation Report. (CDRL A001)
3.5.5 AN/SPS‐40 Non-Standard Overhaul (Rotor Shaft Overhaul)
3.5.5.1 The contractor shall identify AN/SPS‐40 AC Motors that require a Non-Standard overhaul in an Evaluation Report. The contractor shall identify if a rotor shaft overhaul is required during evaluation. Upon Government approval, the contractor shall perform the rotor shaft overhaul, in addition to standard overhaul processes, and any other actions approved via the Evaluation Report. The contractor shall overhaul the rotor’s shaft beyond metalizing/sleeve technology IAW the approved processes. (CDRL A001)
3.5.6 AN/SPS-40 AC Motor Supplemental Repair Services
3.5.6.1 The contractor shall identify AN/SPS‐40 AC Motors that require supplemental repair in an…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .