THE INTENT OF THIS PROPOSED SCOPE OF WORK IS TO PROVIDE ENGINEERING AND DESIGN SERVICES TO PORTSMOUTH NAVAL SHIPYARD FOR THE DEVELOPMENT OF A REPAIR/MODIFICATION WORK PACKAGE FOR NAVY

BARGE YFNB 41.

PROVIDE WRITTEN WORK SPECIFICATION ITEMS, FORMATTED IAW NAVSEA JFMM APPENDIX 4E, DESIGNS, MATERIAL LISTS, AND ENGINEERING DRAWINGS TO NAVSEA TECHNICAL SPECIFICATION 9090-600, FOR YFNB 41, LOCATED AT SUBMARINE BASE, NEW LONDON, CT.

DRAWINGS SHOULD BE DEVELOPED USING IDEAS TYPE LAYERING STANDARDS USING AUTOCAD RELEASE 13 OR

HIGHER.

THE WRITTEN ITEMS, ASSOCIATED DRAWINGS, AND MATERIAL LISTS, WILL BE USED TO EXECUTE A “DEPOT LEVEL” SHIPYARD AVAILABILITY ON YFNB 41. A SHIP-CHECK IS REQUIRED, AND WILL BE COORDINATED THROUGH THE

PORTSMOUTH NAVAL SHIPYARD BARGE/SERVICE CRAFT PROGRAM MANAGER.

PROVIDE A CLASS “C” COST ESTIMATE FOR EACH ITEM, IAW NAVSEA JFMM VOL VII, CHAP 5.

THE OFFEROR SHALL HAVE AT LEAST 5 YEARS OF EXPERIENCE WITH THE DESIGN AND ENGINEERING ON US NAVY SERVICE CRAFT INCLUDING THE SIZING, EQUIPMENT SELECTION AND INTERFACE OF EXISTING SYSTEMS ON THE

BARGES.

THE OFFEROR SHALL PUBLISH ALL COMPLETED ITEMS TO THE NAVY MAINTENANCE DATABASE RE-PLATFORM

(NMDR).

THE VESSEL IS LOCATED AT SUBMARINE BASE, NEW LONDON, CT. THE FOLLOWING IS A LIST OF ITEMS THAT

REQUIRE WORK ITEMS, AND/OR DRAWINGS:

1. TOWING SERVICES

2. HAZARDOUS WASTE

3. TEMPORARY SERVICES

4. DRYDOCK/FLEET/UNDOCK

5. CLEANING AND PUMPING

6. PRESERVE UNDERWATER HULL, FREEBOARD

7. UNDERWATER HULL, INSPECT/REPAIR

8. VOID, CLEAN, REPAIR, AND PRESERVE

9. PROVIDE HULL ZINC ANODE, REPLACE

10. MANHOLE COVERS, CLEAN AND PRESERVE

11. ASBESTOS MATERIALS IN FLOORING, REMOVE

12. LIGHTING FIXTURES, REPLACE

13. MITSUBISHI CITY-MULTI HVAC SYSTEM, REPAIR

14. NDT INSPECTION ON MOORING/TOWING ATTACHMENTS.

15. VANEAXIAL FAN, REPAIR

16. STEAM SYSTEM, REMOVE

17. DRINKING FOUNTAINS, REPLACE

18. ELECTRICAL DISTRIBUTION SYSTEM, REPLACE

19. HAZMAT ROOM, WITH VENTILATION, INSTALL

20. LEAD PAINT REMEDIATION

21. INTERIOR BULKHEADS, PRESERVE

22. STANCHIONS/LIFELINES, REPAIR

23. FIRE/FLOODING ALARM SYSTEM, INSTALL

24. INTERIOR DECKS, LEVEL AND INSTALL NONSKID

BASIC SCOPE OF SERVICES

TASK 2: DELIVERABLES

1. SHIPCHECK REPORT

2. WORK ITEMS, INCLUDING CLASS “C” COST ESTIMATE

3. 2-KILO PACKAGE

4. GUIDANCE SHIPCHECK SKETCHES/DRAWINGS FOR WORK ITEMS WHERE REQUIRED

5. PUBLISH ALL WORK ITEMS, IN JFFM 4E FORMAT TO NMDR.

TASK 1: SHIPCHECK

CONDUCT A SHIPCHECK OF THE VESSEL AND GATHER INFORMATION FOR THE DEVELOPMENT OF THE OVERHAUL

PACKAGE. THE INFORMATION GATHERED SHALL INCLUDE THE FOLLOWING:

1. PERFORM A VISUAL INSPECTION OF THE CRAFT WITH THE SUPERVISOR AND OR CRAFT REPRESENTATIVE. CHECK THE ENTIRE ACCESSIBLE HULL, DECK FITTINGS, DECK PLATING, RAILS, STANCHIONS AND LIFE LINES, FENDERS, DECK COATINGS INCLUDING EXISTING PRESERVATION SYSTEMS, LOOSE COATINGS, AND CONDITION OF DECK PLATING, CHOCKS, BITTS, CLEATS, FOUNDATIONS, BULWARK AND DECK PLATING. NOTE AREAS OF CORROSION, EROSION, EVIDENCE OF STRUCTURAL DEFECTS AND DAMAGE. OBTAIN “AS BUILT” AND OTHER REFERENCE DRAWINGS OR

DOCUMENTS TO BE USED DURING PACKAGE DEVELOPMENT.

2. CONDUCT A MEETING WITH THE SUPERVISOR OR CRAFT REPRESENTATIVE TO COLLECT DATA AND OBTAIN INFORMATION FOR THE DEVELOPMENT OF TOWING, DRY DOCK, CLEANING AND BLASTING OF HULL, UT INSPECTION, TEMPORARY SERVICES, CLEANING AND PUMPING, CLEAN, PAINT AND PRESERVE AND ZINC REPLACEMENT WORK ITEMS. DISCUSS WITH CRAFT REPRESENTATIVE AMOUNTS OF FRONT LOADS FOR PLATING AND STIFFENER REPLACEMENTS TO PUT IN WORK ITEMS BASED ON HISTORICAL KNOWLEDGE. DETERMINE IF 3, 7 OR 12 YEAR SERVICE LIFE PAINT SYSTEM IS WHAT IS APPROPRIATE FOR UNDERWATER HULL.

TASK 2: DELIVERABLES

1. SHIPCHECK REPORT.

2. WORK ITEMS, INCLUDES CLASS “C” COST ESTIMATE.

3. 2-KILO PACKAGE.

4. GUIDANCE SHIPCHECK SKETCHES/DRAWINGS FOR WORK ITEMS WHERE REQUIRED.

5. PUBLISH ALL WORK ITEMS, IN JFFM 4E FORMAT TO NMDR.