Justification for Other than Full and Open Competition – FAR Part 13 Acquisitions under the SAT

V 1.3 (28 June 2018)

MEMORANDUM TO THE FILE

Subj: JUSTIFICATION FOR USE OF OTHER THAN FULL AND OPEN

COMPETITION

FOR A FAR PART 13 ACQUISITION UNDER THE SIMPLIFIED

ACQUISITION THRESHOLD

I. BACKGROUND:

1. FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contracting Officers may solicit from one source if the Contracting Officer determines that the circumstances of the contract action deem only one source reasonably available (e.g., urgency, exclusive licensing agreements, brand-name or industrial mobilization).

2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition, as only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement (or portion of the requirement to be sole-sourced) is not expected to exceed the simplified acquisition threshold.

II. DESCRIPTION OF ITEM OR SERVICE:

This requirement is for an Allen Bradley PowerFlex 753 series, Variable Frequency Drive (AC Drive), part number ALBR20F1AND248AA0NNNNN and (4) Allen Bradley Top Push Roller Limit Switches, part number 802T-DTP. The hardware is an integrated replacement part of the sewage system that control the speed of the motor starter located at Bldg. TT99 Tarawa Terrace, aboard Camp Lejeune Marine Corps Installation. The required delivery date August 30, 2022.

III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN

COMPETITION IS BASED ON THE FOLLOWING (select all that apply):

A. ___ ONLY ONE RESPONSIBLE SOURCE (select all that apply):

1. ___ RESTRICTIVE RIGHTS. The source has established proprietary rights, limited rights in data, patent rights, copyrights or secret processes in the item or service required.

2. ___ EXCLUSIVE LICENSING AGREEMENTS. The item or service is only available from the Original Equipment Manufacturer (OEM), or there is only one authorized distributor or technical representative for the OEM.

3. ___ OTHER REASONS.

B. _X__ BRAND NAME

Item required must be a brand name, product, or feature of a product, particular to one manufacturer.

Justification for Other than Full and Open Competition – FAR Part 13 Acquisitions under the SAT

V 1.3 (28 June 2018)

This integrated part is required to be of the same manufacturer as the larger sewage system components that run using Rockwell Automation software. All components of this brand work together to prevent clogging of Camp Lejeune sewage station. Use of the Allen Bradley AC Drive and switchers will allow the mechanic to efficiently connect hardware and wiring to the existing larger sewage system and ensure compatibility with Rockwell software. Using a different make and model would not be compatible with the existing system.

C. ___URGENT AND COMPELLING. The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits bids or proposals. Urgent requirements are supplies or services that will result in a work stoppage, or are mission critical and the routine processing time would result in injury to the Government. The determination that the procurement for the above item/service is an urgent and compelling requirement is based on the following:

1. Date on which the requirement was first identified:

2. Required delivery date/period of performance:

3. Explanation of why delivery/commencement of services by the date mentioned above is required:

V. CERTIFICATIONS:

A. Technical / Requirements Certification: I certify that the facts and representation under my cognizance which are included in this justification are complete and accurate to the best of my knowledge and belief.

Signature Name (Printed) / Phone # Date

B. Contracting Officer Certification: I certify that this justification is accurate and complete to the best of my knowledge and belief.

Signature Name (Printed) / Phone # Date