NAVAL SURFACE WARFARE CENTER CRANE DIV
M/F: RUSSELL MEADOWS (3330C)
BLDG 41 SE CENTRAL RECEIVING
300 HWY 361
CRANE IN 47522-5001
TEL: 812-381-0537 FAX:
REQUEST FOR QUOTATIONS
(THIS IS NOT AN ORDER) 1
PAGE OF PAGES
1. REQUEST NO. 2. DATE ISSUED RATING
DO-A7N0016422Q0225 10-Aug-2022 5a. ISSUED BY
8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this
Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State, and local taxes)
ITEM NO.
(a)
SUPPLIES/ SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e) (f)
SEE SCHEDULE
AMOUNT
% No. %
NOTE: Additional provisions and representations [ ] are [ ] are not attached.
13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
15. DATE OF
QUOTATION
16. NAME AND TITLE OF SIGNER (Type or print) (Include area code)
TELEPHONE NO.
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)
PREVIOUS EDITION NOT USABLE Prescribed by GSA FAR (48 CFR) 53.215-1(a)
THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE
6. DELIVER BY (Date)
SEE SCHEDULE
AND/OR DMS REG. 1
UNDER BDSA REG. 2
4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE
REQUEST NO.
NAVAL SURFACE WARFARE CENTER CRANE DIV
A. YOO (812-854-8001)
BLDG 121
300 HWY 361
CRANE IN 47522-5001
9. DESTINATION (Consignee and address, including ZIP Code)
7. DELIVERY
[ ]X FOB
DESTINATION
[ ] OTHER
(See Schedule)
17-Aug-2022(Date)
PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.
812-854-8001ALEXIA D YOO
(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:
d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS
N0016422Q0225
Section A - Solicitation/Contract Form
NOTICE
Contractors must be properly registered in the System for Award Management (SAM). Offerors may obtain information on SAM registration and annual confirmation requirements by calling 866-606-8220 or via the internet at https://www.sam.gov .
Contractors must be properly registered in the System for Award Management (SAM) and the Joint Certification Program (JCP) in order to receive the controlled attachments. Offerors may obtain information on SAM registration and annual confirmation requirements by calling 1-866-606-8220 or via the internet at https://www.sam.gov.
Information about the JCP is located at https://public.logisticsinformationservice.dla.mil/PublicHome/jcp/default.aspx . The controlled attachments will be posted at the same time the solicitation is posted.
STATEMENT OF WORK, DRAWINGS AND CDRLs ARE DISTRIBUTION D:
Distribution Statement D. Distribution authorized to the DoD and U.S. DoD contractors only (PROCUREMENT SENSITIVE 17 DEC 2017) . Other requests shall be referred to Commanding Officer, Naval Surface Warfare Center (NSWC Crane Division), 300 Highway 361, Crane, IN 47522-5001, ATTN: Maritime Division.
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QTY U/I UNIT PRICE AMOUNT
1001 Labor for SLQ-59
1 Lot
Labor for Unrestricted-Installation Services to support AN/SLQ-59 Installation Aboard CVN-73 IAW Statement of Work (SOW).
PSC: N020
FOB: Destination
FFP
1002 ODC for SLQ-59
Unrestricted-Installation Support Costs (Subcontractor/Travel/Incidental Material) for Services to support AN/SLQ-59 Installation Aboard CVN-73 IAW Statement of Work (SOW).
1003 Material for SLQ-59
Unrestricted-Installation Supplies/Materials Costs to support AN/SLQ-59 Installation Aboard CVN-73.
Supplies - Materials needed to perform services IAW SOW.
1004 Growth Reservation Labor
OPTION Growth Reservation Labor associated with CLINs 1001 for Unrestricted-Installation Services to support AN/SLQ-59 Installation Aboard CVN-73 IAW Statement of Work (SOW) that is a result of Condition Found Report (CFR).
This CLIN is level of effort Not-To-Exceed. See Section B Notes.
1005 Growth Reservation ODCs and
Material
OPTION Growth Reservation ODCs associated with CLINs 1002 and 1003 for Unrestricted-Installation Support Costs (Subcontractor/Travel/Incidental Material) and IAF Material for Services to support AN/SLQ-59 Installation Aboard CVN-73 IAW Statement of Work (SOW) that is a result of Condition Found Report (CFR).
This CLIN is Not-To-Exceed. See Section B Notes.
7999 Data
Technical Data Requirements for CLIN(s) 0001 thru 1006 in accordance with (IAW) the Statement of Work (SOW) and CDRL(s) A001 thru A006.
SECTION B NOTES
NOTE A:
LEVEL OF EFFORT TO COMPLETION –SHIP REPAIR
1. The Contractor agrees to provide the level of effort to completion in the performance of growth work (CLINs 1004 and 1005) for the CVN-73 SLQ-59 installation.
• 358 Hours
• $3,000 ODCs/Materials
2. The total level of effort to completion for the performance of the above CLINs shall be man-hours of direct labor and the associated material and ODCs required to support that labor and effort. The labor and material not exceed the dollar value of each CLIN listed above in Section B.
3. Effort performed in fulfilling the level of effort to completion obligations specified above shall only include effort performed in direct support of this contract and shall not include time and effort expended on such things as local travel to and from an employee' s usual work location, truncated lunch periods, work (actual or inferred) at an employee' s residence or other non-work locations.
4. LOE to Completion labor hours and material are within the general scope of the work stated in the contract and may not be used to: (1) direct a change as defined in, "FAR 52.243-1 CHANGES FIXED -PRICE clause of this contract or (2) change any of the terms or conditions of the contract.
NOTE B:
FIXED SHIP ALTERATION LABOR AND MATERIAL BURDEN RATES FOR GROWTH WORK
1. The Contractor’s fully burdened ship alteration labor rate will be used for negotiating growth work to be performed under this effort (CLINs 1004 and 1005). The fully burdened ship alteration labor rate is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM) and profit.
2. Consumable materials are goods used in the ordinary course of work performance such as office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing, etc. that are consumed/used in the process of repair and do not become an integral part of the repaired vessel. Consumable material shall be included in the contractor’s fully burdened ship alteration labor rate and not separately priced.
3. Physical materials are goods that become an integral part of the vessel in the course of the alteration, such as equipment, replacement parts, pipes, paint, and fasteners. The material burden rates apply to physical materials but not to consumable materials. The material burden rate will be applied to the actual cost of the physical material.
Actual cost does not include handling charges, general and administrative cost, overhead, profit, or any other indirect cost.
4. For growth work involving subcontractors, subcontracts quotes will be treated as ODCs and will be subject to the contract material burden rate shown in paragraph (5) below.
5. The contract fixed fully burdened ship alteration labor rate and material burden rate are shown below. These fixed rates shall be used for negotiating/executing growth work during the entire availability including any extension to the delivery date:
Fully burdened Ship alteration labor Rate: * Material Burden Rate: *
*To be completed by Offeror*
NOTE C:
GROWTH RESERVATION
The growth reservation man-hours and material dollar requirements listed in Section B, NOTE A are a part of this contract under the original solicitation and award. The reservation shall include both prime contractor and subcontractor efforts. The balance of hours and material remaining in the reservation CLINs after negotiations have concluded, and when it is evident that no additional growth will be directed in accordance with NOTE A, is subject to a decrease change order. Only actual production man-hours expended will be considered towards the contractor’s obligation to provide the defined reservation man-hour effort. Material dollars shall be based on actual costs to the Contractor of acquiring the materials provided. Material dollars may include freight or duties which would be reflected on the invoice for the material.
This reservation is Level of Effort to Completion. Once the scope of work for a task has been listed and a mutually agreeable number of man-hours or materials has been agreed to, neither party will be entitled to an adjustment based on actual man-hours or material dollars required.
NOTE D:
NTE LIMITATIONS (CLINs 1004 and 1005)
The contractor is required to provide a firm fixed price invoice and supporting documentation to finalize the Not- To-Exceed (NTE) amount for the growth CLINs listed herein within 30 days from effective date of the Purchase Order or as otherwise agreed to based on the performance period.
Performance resulting in expenses beyond the NTE amounts authorized in Section B is not to be completed if additional funding beyond the price listed for the installation is required until authorization from the Contracting Officer is received. Authorization will normally be in the form of a written modification. However, verbal Authorization from the Contracting Officer only may occur under urgent and compelling circumstances. A written modification will follow any verbal authorization.
If the contractor proceeds beyond the scope of the contract and incurs costs in excess of the funding authorized under this order, the government shall not be obligated under any of the provisions of this agreement to provide additional funding or pay the contractor any amount in excess of the monetary limitation stated in the order if the prices on the order have not been approved by the PCO/ACO.
Section C - Descriptions and Specifications
STATEMENT OF WORK
1.0 INTRODUCTION/SCOPE
This Statement of Work (SOW) sets forth the requirements and tasks to be performed in support of the installation of the AN/SLQ-32A(V)4 and AN/SLQ-59 Maritime Electronic Warfare (MEW) systems aboard United States Naval ship, USS George Washington (CVN-73). The industrial support shall be executed at Newport News Naval Shipyard, Newport News, VA.
2.0 APPLICABLE DOCUMENTS
The following documents of the revision or issue in effect at the date of award form a part of this SOW for reference. The contractor shall use the current revision when the referenced version has been superseded. Wherever MILSPECS and MIL Standards are cited, it shall be understood it is for guidance only. Utilize the latest revision of specifications. In the event of conflict between the documents referenced herein and the contents of this SOW, the contents of this SOW shall prevail.
2.1 SPECIFICATIONS/STANDARDS
ANSI Z49.1:2012 SAFETY IN WELDING, CUTTING AND ALLIED PROCESSES
AWS A3.0M/A3.0:2010 STANDARD WELDING TERMS AND DEFINITIONS
AWS B4.0:2007 STANDARD METHODS FOR MECHANICAL TESTING OF
WELDS
COMFLTFORCOMINST JOINT FLEET MAINTENANCE MANUAL (JFMM) 4790.3
COMPACFLT 4720.3 C5ISR MODERNIZATION POLICY
EPA 20T-2003 MANAGING ASBESTOS IN PLACE
EPA 560-OPTS-86-001 A GUIDE TO RESPIRATORY PROTECTION FOR ASBESTOS
ABATEMENT INDUSTRY
FLEET MODERNIZATION PROGRAM MANAGEMENT AND OPERATIONS MANUAL
ISO 9001 QUALITY MANAGEMENT SYSTEMS - REQUIREMENTS
MIL-STD-1310 DEPARTMENT OF DEFENSE STANDARD PRACTICE
SHIPBOARD BONDING, GROUNDING, AND OTHER
TECHNIQUES FOR ELECTROMAGNETIC COMPATIBILITY,
ELECTROMAGNETIC PULSE (EMP) MITIGATION, AND
SAFETY
MIL-STD-1686 ELECTROSTATIC DISCHARGE CONTROL PROGRAM FOR
PROTECTION OF ELECTRICAL AND ELECTRONIC PARTS,
ASSEMBLIES AND EQUIPMENT (EXCLUDING ELECTRICALLY
INITIATED EXPLOSIVE DEVICES)
MIL-STD-2042 FIBER OPTIC CABLE TOPOLOGY INSTALLATION STD
METHODS FOR NAVAL SHIPS
NAVSEA S0400-AD TAG-OUT USER’S MANUAL (TUM) URM-(Current Revision)
NAVSEAINST 4700.17 PREPARATION AND REVIEW OF TROUBLE REPORTS
NAVSEAINST 5400.95 NAVAL SHIPYARD, SUPSHIP AND FLEET ENGINEERING AND
TECHNICAL AUTHORITY POLICY
NAVSEA 9210.4A C (Ser 08J/C90-
740691LD4541600)
CHANGES, REPAIR AND MAINTENANCE TO NUCLEAR
POWERED SHIPS (U)
NAVSEA S9074-AQ-GIB-010/248 REQUIREMENTS FOR WELDING AND BRAZING PROCEDURE
AND PERFORMANCE QUALIFICATION
NAVSEA 0900-LP-001-7000 FABRICATION AND INSPECTION OF BRAZED PIPING
SYSTEMS, W/CHG 1
NAVSEA S9074-AR-GIB-010/278 REQUIREMENTS FOR FABRICATION WELDING AND
INSPECTION, AND CASTING INSPECTION AND REPAIR FOR
MACHINERY, PIPING, AND PRESSURE VESSELS
NAVSEA T9074-AS-GIB-010/271 REQUIREMENTS FOR NONDESTRUCTIVE TESTING METHODS
NAVSEA 0905-LP-485-6010 MANUAL FOR CONTROL OF TESTING AND SHIP CONDITIONS
NAVSEA 0948-LP-045-7010 MATERIAL CONTROL STANDARD VOLUME 1
NAVSEA INST 4790.23 BASELINE PROJECT MANAGEMENT PLAN
NAVSEA S0300-B2-MAN-010 SUPSHIP OPERATIONS MANUAL (SOM)
SL720-AA-MAN-010 Rev 2 w/Change 3 NAVSEA Standard Items FY-17 HTTP://WWW.NAVSEA.NAVY.MIL/HOME/RMC/CNRMC/INSTR
UCTIONS.ASPX
NNS Procedure M-151 SHIPBOARD ELECTRICAL CABLE TEST
OPNAVINST 4700.7 MAINTENANCE POLICY FOR U.S. NAVY SHIPS
OPNAVINST 5100.19 NAVY SAFETY AND OCCUPATION HEALTH (SOH)
OPNAVINST 5100.23 NAVY SAFETY AND OCCUPATIONAL HEALTH PROGRAM
OPNAVISNT 4790.4 SHIPS MAINTENANCE AND MATERIAL MANAGEMENT (3M)
SYSTEM POLICY (HTTP://DONI.DAPS.DLA.MIL)
OSHA 1910.1200 TOXIC AND HAZARDOUS SUBSTANCES
OSHA 29 CFR 1915 OCCUPATIONAL SAFETY AND HEALTH STANDARDS FOR
SHIPYARD EMPLOYMENT
S9086-KC-STM-010 NAVAL SHIPS’ TECHNICAL MANUAL ELECTRIC PLANT –
GENERAL
S9086-VD-STM-010/VOLUMES 1, 2
AND 3
PRESERVATION OF SHIPS IN SERVICE – GENERAL CH 631
SSPC-QP 2 STANDARD FOR EVALUATING PAINTING CONTRACTORS
(REMOVAL OF HAZARDOUS COATINGS FROM
INDUSTRIAL/MARINE STEEL STRUCTURES)
TS9090-100A LIASON ACTION RECORD (LAR)
TS9090-310(SERIES) ALTERATIONS TO SHIPS ACCOMPLISHED BY ALTERATION
INSTALLATION TEAM
TS9090-600 SHIP ALTERATION (SHIPALT) INSTALLATION DRAWING
(SID) PREPARATION
TS9090-700 SHIP CONFIGURATION AND LOGISTICS SUPPORT
INFORMATION SYSTEMS (SCLSIS)
S9AA0-AB-GOS-010/GSO GENERAL SPECIFICATIONS FOR OVERHAUL OF SURFACE
SHIPS
2.2 DRAWINGS
NAVSEA DRAWINGS FOR AN/SLQ-59
81995-574594-481-2 Installation Control Drawing AN/SLQ-59 Countermeasures Set
404-8574831 B AN/SLQ-59 TEWM BWD
404-8574832 B AN/SLQ-59 TEWM LOC
445-8574835 B ARR MOD INCD AN/SLQ-59 TEWM
445-8671788 E ELECTRONIC WARFARE (EW) ARRANGEMENT OF EQUIPMENT
445-8694703 D TOPSIDE ANTENNA ARR INCID FY17 RCOH
509-8716890 A AN/SLQ-59 ECW INSTL 3-67-1-Q & 03-71-2-Q
509-8716891 A AN/SLQ-59 ECW INSTL AFT PORT & STBD
502-8716892 A AN/SLQ-59 CHW INST 03-67-1-Q & 03-71-2-Q
502-8716893 A AN/SLQ-59 CHW MOD AFT PORT & STBD
113-8743289 AN/SLQ-59 INFRA INSTL- FDN INSTL ECM RM NO.1 (03-74-12-C)
& (03-71-2-Q)
113-8743290 A AN/SLQ-59 INFRA INSTL-FDN INSTL ECM RM NO. 4 (03-246-3-Q)
113-8743291 – AN/SLQ-59 INFRA INSTL-FDN INSTL ECM RM NO. 5 (03-259-2-Q)
113-8743292 - AN/SLQ-59 INFRA INSTL-FDN INSTL FAN ROOM (03-67-1-Q)
803-8743294 - AN/SLQ-59 INFRASTRUCTURE INSTL-FDN ENGR CALCS
605-8743494 - AN/SLQ-59 INFRASTR-C&A & LABLE PLATE MODS
605-8743495 - AN/SLQ-59 INFRASTR - PID MODS
513-8743878 A AN/SLQ-59 INSTL-LP AIR INSTL FWD/PORT
513-8743880 A AN/SLQ-59 INSTL-LP AIR INSTL AFT/PORT
513-8743882 A AN/SLQ-59 INSTL-LP AIR INSTL AFT/STBD
513-8743883 A AN/SLQ-59 INSTL-LP AIR INSTL FWD/STBD
302-8744813 B AN/SLQ-59 INFRASTRUCTURE INSTL POWER SYS INSTL
303-8744815 A AN/SLQ-59 INFRASTRUCTURE INSTL LTG SYS INSTL
401-8765334 - AN/SLQ-59 - IC CKT 7AD DEW POINT ALARM INSTL B&EWD
113-8817072 - AN/SLQ-59 INSTL - MISC FDN
LAR NNSY-0530-19 AN/SLQ-59 CKT XJ MOD B EWD
NRL-0002-20 AN/SLQ-59 CKT X6J5 Install B & EWD
2.3 TEST PROCEDURES
574594-908-1 CVN INFRASTRUCTURE INSTALLATION CHECK OUT (ICO)
574594-908-2 CVN INFRASTRUCTURE ICO APPENDIX A
574594-908-3 CVN INFRASTRUCTURE ICO APPENDIX B
3.0 REQUIREMENTS
3.1 Ship remove and replace support
The Contractor shall provide the required labor, materials, tools and resources necessary to meet the requirements of this SOW in accordance with (IAW) the specifications, drawings, and procedures referenced in Section 2.2.
The Contractor shall perform all work and provide the necessary material to finish the tasks described below.
The Government On-Site Installation Coordinator (OSIC) will participate in a walk-through with the Contractor Program Manager and Alteration Installation Team (AIT) Lead on Day 1 to discuss details of the tasking required to complete the installation of the systems.
3.2 SLQ-59 PERFORMANCE REQUIREMENTS:
Contractor shall procure, install, wrap, paint and stencil approximately 60 feet of ¾’ electronic cooling water pipe insulation IAW Drawing 8716890 REV A for the STBD Aft SLQ-59 sponson. This will require removing the access plates to perform the work and closing after work is complete.
Contractor shall procure, install, wrap, paint and stencil approximately 60 feet of ¾’ electronic cooling water pipe insulation IAW Drawing 8716891 REV A for the port FWD SLQ-59 sponson. This will require removing the access plates to perform the work and closing after work is complete.
Contractor shall procure, install, wrap, paint and stencil approximately 80 feet of ¾’ electronic cooling water pipe insulation IAW Drawing 8716891 REV A for the STBD FWD SLQ-59 sponson. This will require removing the access plates to perform the work and closing after work is complete
Contractor shall paint and label all SLQ 59 Low Pressure air piping and dry air piping IAW Drawings 8743878 REV A, 8743880 REV A, 8743882 REV A, and 8743883 REV A.
Contractor shall troubleshoot and repair incorrect power to the control and display unit in the Electronic Warfare Area IAW Drawing 8744813 REV B. Power Cable (03-164-8)-1P-F5 has power but power on each conductor is incorrect.
Contractor shall procure material, install and test the X6J5 circuits for SLQ-59 IAW LAR NNSY-0530-19 AN/SLQ-59 CKT XJ MOD B EWD and NRL-0002-20 AN/SLQ-59 CKT X6J5 Install B & EWD
Contractor shall procure correct hardware and install for the STBD AFT, Port AFT, STBD FWD and Port FWD remote interface units. Current hardware is not grade 5 or better and bolt threads do not protrude through the nylon nuts to meet installation requirements. Refer to drawing 574594-481-2 Installation Control Drawing AN/SLQ-59 Countermeasures Set.
Contractor shall make and install cable tags for the following cables IAW Drawing 8744813 REV B and Drawing 8574831 REV A
• Power cable (03-164-8)-1P-F5 (2) to Control and Display Unit in the Electronic Warfare Area
• Power cable (03-169-16)-1P-F(2) to System Interface Unit in the Electronic Warfare Area
• Power cable (03-254-6)-2P-B(3)(W403) to the Port AFT Embarkable Assembly
• Power cable (03-78-8)-2P-B(3)(W203) to the Port FWD Embarkable Assembly
• Power cable (03-78-8)-2P-A(3)(W103) to the STBD FWD Embarkable Assembly
• System Interface Fiber cables R-CI-SLQ59-107A, R-CI-SLQ59-207A, R-CI-SLQ59- 307A, R-CI-SLQ59-407A and R-CI-SLQ59-501 in the Electronic Warfare Area
• Port FWD Embarkable Assembly fiber optic cables R-CI-SLQ59-201, R-CI-SLQ59- 202A and R-CI-SLQ59-202B
• STBD FWD Embarkable Assembly fiber optic cables R-CI-SLQ59-101, R-CI-SLQ59- 102A and R-CI-SLQ59-102B
• Port AFT Embarkable Assembly fiber optic cables R-CI-SLQ59-401, R-CI-SLQ59-402A and R-CI-SLQ59-402B
• STBD AFT Embarkable Assembly fiber optic cables R-CI-SLQ59-301, R-CI-SLQ59- 302A and R-CI-SLQ59-302B
Contractor shall troubleshoot and repair power to the dry air panel dew point alarms in Electronic Countermeasures RM 1 and Electronic Countermeasures RM 5 IAW Drawing 8765334.
Contractor shall test, troubleshoot and repair dry air and low pressure air leaks for the SLQ-59 system to include repair of the dry air panels IAW Drawings 8743878 REV A, 8743880 REV A, 8743882 REV A, and 8743883 REV A.
Contractor shall troubleshoot and if required coordinate with Norfolk Naval Shipyard to repair fiber optic communications issues with the remote interface units IAW Drawing 8574831 REV B.
3.3 Material Requirements
Contractor shall procure/provide all necessary material identified in the SID package and referenced in SOW 3.2 as Installation Activity Furnished (IAF). This includes items that become an integral part of the installed system and/or vessel in the course of the repair/install, such as equipment, replacement parts, pipes, paint, and fasteners.
Contractor shall procure/provide any required consumables or miscellaneous installation material that is incidental to the installation of the systems. Consumable materials are goods used in the ordinary course of work performance such as office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing, etc. that are consumed/used in the process of repairs/installation and do not become an integral part of the systems/vessel.
3.4 Installation Support, Reporting, and Closeout
Contractor shall provide a daily status report, by 10 am the following day (CDRL A004).
Contractor shall provide a quality assurance workbook that meets the requirements of Technical manual 9090.310 (Series) to the NSWC Crane Alteration Installation Team Manager for review.
(CDRL A001)
All contractor employees shall possess necessary security clearance to access ship (Secret) and Newport News Shipyard.
Contractor shall clean all work areas at the end of each workday and upon completion of the installation.
Contractor shall provide support to closeout spaces.
Contractor shall prepare redlined SID package at completion of the installation in accordance with CDRL A005.
Contractor shall perform the AN/SLQ-59 Installation Checkout Procedures in accordance with
CDRL A006.
3.5 Condition Found Report (CFR)
In accordance with the requirements of NAVSEA Standard Item 009-01, the Contractor shall report and recommend corrective action during performance for work/deficiencies discovered which are not covered by the tasking set forth in the existing work package.
As required during installation performance, conditions found, repairs and corrective action reports will be submitted to the Government in the form of a Condition Found Report (CFR).
The Contractor’s conditions found reporting shall be IAW that set forth in Standard Item 009-01.
(CDRL A002)
3.5.1 Identification of Condition Found
For conditions that impact the critical path(s) /controlling item(s), the contractor shall notify the Government via electronic media within 24-hours of discovery. This initial notification need not include all content required for a Condition Found Report (CFR), but must include a description of the condition/deficiency and an estimated timeframe for the offeror's professional recommendation for resolution, which shall not exceed five (5) working days as specified below.
Recommended repairs and corrective actions shall be submitted to the Government in the form of a CFR per CDRL A002.
3.5.2 Condition Found Notification to Government
CFRs shall be submitted to the Technical Representative and Procuring Contracting Officer within five (5) working days of discovery of the condition. At a minimum, the CFR will include the following:
(1) Identify contract, ship, and hull number
(2) Serialized by CFR number
(3) Date requirement was discovered
(4) Description of the work requirement
(5) Specific location of the work
(6) Recommendation for corrective action. Provide supporting rationale for the recommendation, such as cost efficiencies, availability of work force, availability of material, etc.
(7) Identification of related changes,
3.5.3 Government Review and Response to CFR
The Requirements Team will review the CFR. If the CFR is inadequate or incomplete, it will be rejected with time continuing to accrue (relative to five (5) working day requirement). As appropriate, the Government and contractor will need to meet, conduct ship checks and/or discuss the recommendation for corrective action further to determine the full scope of work required prior to final approval of the CFR.
3.6 Safety and Environmental Requirements
The Contractor shall have an approved Safety Plan IAW CDRL A003, and shall present it to the Regional Maintenance and Modernization Coordination Office at check-in.
Contractor shall provide necessary Personal Protection Equipment (PPE) and safety equipment required to accomplish the installations covered by this SOW.
The contractor shall be familiar with and adhere to OSHA 29 CFR 1915 – OCCUPATIONAL
SAFETY AND HEALTH STANDARDS FOR SHIPYARD EMPLOYMENT.
The contractor shall adhere to the procedures established in OSHA 1910.1200, Toxic and Hazardous Substances, and be prepared to present copies of Material Safety Data Sheets upon request.
The contractor shall develop and implement a written fire safety plan IAW OSHA 1915.502 that covers the actions that must be taken to ensure contractor employee safety in the event of a fire.
(CDRL A003).
The contractor shall provide a trained and certified fire watch at affected areas where hot work is being accomplished IAW NAVSEA SI 009-07.
The contractor shall adhere to the Tag-Out procedures referenced in TS 9090-310 (Series), NAVSEA S0400-AD- URM-010/TUM, and NAVSEA SI 009-24.
Each contractor employee working onboard ship shall possess a valid 10-Hour OSHA Maritime Shipyard Employment Course #7615 Completion Card and Fall Protection Training.
3.7 Security Requirements
Facility Security Clearance Required: The contractor is required to maintain a SECRET facility clearance.
Level of Safeguarding for Classified Information/Material Required at Contractor Facility: The contractor is required to maintain a level of safeguarding for classified information/material at the SECRET level.
Controlled Unclassified Information (CUI)(Formerly for Official Use Only Information): The contractor will be required to have access to CUI with developers and integrators.
Operations Security Requirements: The contractor is required to protect critical information associated with this contract to prevent unauthorized disclosure and will observe OPSEC requirements.
Receive, Store, or Generate Controlled Unclassified Information (CUI): The contractor will be required to have access to CUI with developers and integrators.
4.0 Government Furnished Information (GFI)
The Government will provide applicable program technical documentation and information as defined in Section J herein as GFI. This includes technical manuals, training materials and information, drawings, specifications, procedures, processes, and quality system documents required for the performance of engineering, logistics, and technical support. Additional GFI will be provided as required or at the request of the contractor.
5.0 CDRLS
Contractor shall submit the following CDRLs:
CDRL A001 Alteration Installation Team Quality Assurance Workbook CDRL A002 Condition Found Reports CDRL A003 Safety Plan CDRL A004 Production Status Reports CDRL A005 Updates to Government Documents CDRL A006 Acceptance Test Report - AN/SLQ-59 Installation Checkout Procedure
CLAUSES INCORPORATED BY FULL TEXT
C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (NAVSEA)
(OCT 2018)
(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.
(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:
(1) The support contractor not disclose any information;
(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;
(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,
(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.
(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.
(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.
(End of text)
C-211-H016 SPECIFICATIONS AND STANDARDS (NAVSEA) (OCT 2018)
(a) Definitions.
(i) A "zero-tier reference" is a specification, standard, or drawing that is cited in the contract (including its attachments).
(ii) A "first-tier reference" is either: (1) a specification, standard, or drawing cited in a zero-tier reference, or (2) a specification cited in a first-tier drawing.
(b) Requirements. All zero-tier and first-tier references, as defined above, are mandatory for use. All lower tier references shall be used for guidance only unless specifically identified below.
None
C-211-H017 UPDATING SPECIFICATIONS AND STANDARDS (NAVSEA) (DEC 2018)
The contractor may request that this contract be updated to include the current version of the applicable specification or standard if the update does not affect the form, fit or function of any deliverable item or increase the cost/price of the item to the Government. The contractor should submit update requests to the Procuring Contracting Officer with copies to the Administrative Contracting Officer and cognizant program office representative for approval. The contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval of its request to update by the Procuring Contracting Officer. Any approved alternate specifications or standards will be incorporated into the contract.
C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019)
Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.
C-227-H006 DATA REQUIREMENTS (NAVSEA) (OCT 2018)
The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD Form 1423, Exhibit(s) A , attached hereto.
(End of Text)
Section D - Packaging and Marking
D-211-H001 PACKAGING OF DATA (NAVSEA) (FEB 2022)
Data to be delivered by Integrated Digital Environment (IDE) or other electronic media shall be as specified in the contract.
All unclassified data to be shipped shall be prepared for shipment in accordance with best commercial practice.
Classified reports, data, and documentation shall be prepared for shipment in accordance with National Industrial Security Program Operating Manual (NISPOM), 32 CFR Part 117.
D-211-H002 MARKING OF REPORTS (NAVSEA) (OCT 2018)
All reports delivered by the Contractor to the Government under this contract shall prominently show on the cover of the report:
(1) name and business address of the Contractor
(2) contract number
(3) sponsor:
(Name of Individual Sponsor)
(Name of Requiring Activity)
(City and State)
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
1001 Destination Government Destination Government 1002 Destination Government Destination Government 1003 Destination Government Destination Government 1004 Destination Government Destination Government 1005 Destination Government Destination Government 7999 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-1 Contractor Inspection Requirements APR 1984
E-246-H013 INSPECTION AND ACCEPTANCE OF DATA (NAVSEA) (OCT 2018)
Inspection and acceptance of all data shall be as specified on the attached Contract Data Requirements List(s), DD Form 1423.
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
1001 POP 22-AUG-2022 TO
07-OCT-2022
N/A NAVAL SURFACE WARFARE CENTER
CRANE DIV
M/F: RUSSELL MEADOWS (3330C)
BLDG 41 SE CENTRAL RECEIVING
300 HWY 361
CRANE IN 47522-5001
812-381-0537
N00164
1002 POP 22-AUG-2022 TO
07-OCT-2022
N/A (SAME AS PREVIOUS LOCATION)
1003 POP 22-AUG-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
1004 POP 22-AUG-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
1005 POP 22-AUG-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
7999 POP 22-AUG-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
52.211-8 TIME OF DELIVERY (JUN 1997)
(a) The Government requires delivery to be made according to the following schedule:
REQUIRED DELIVERY SCHEDULE
Item No. Quantity Period of Performance CLINs 1001-1003 1 Lot Date Of Award through
07OCT2022
CLINs 1004-1005 (Option) 1 Lot Upon Exercise of CLIN through
07OCT2022
CLIN 7999 – CDRL 1 Lot (NSP) IAW with SOW and specific
CDRLs Requirements
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
OFFEROR'S PROPOSED DELIVERY SCHEDULE
Item No. Quantity Period of Performance CLINs 1001-1003 1 Lot [*] CLINs 1004-1006 (Option) 1 Lot [*] CLIN 7999 – CDRL 1 Lot (NSP) IAW with SOW and specific
CDRLs Requirements [*] this is for the offeror to fill out.
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term "working day" excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.
(End of clause)
F-247-H001 DELIVERY OF DATA (NAVSEA) (OCT 2018)
All data to be furnished under this contract shall be delivered prepaid to the destination(s) and at the time(s) specified on the Contract Data Requirements List(s), DD Form 1423.
(End of Text)
Section G - Contract Administration Data
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items—
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
(Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial item financing, submit a commercial item financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC ____
Issue By DoDAAC ____
Admin DoDAAC** ____
Inspect By DoDAAC ____
Ship To Code ____
Ship From Code ____
Mark For Code ____
Service Approver (DoDAAC) ____
Service Acceptor (DoDAAC) ____
Accept at Other DoDAAC ____
LPO DoDAAC ____
DCAA Auditor DoDAAC ____
Other DoDAAC(s) ____
(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert “See Schedule” or “Not applicable.”)
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
(Contracting Officer: Insert applicable information or “Not applicable.”)
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
G-232-H005 SUPPLEMENTAL INSTRUCTIONS REGARDING INVOICING (NAVSEA) (JAN 2019)
(a) For other than firm fixed priced contract line item numbers (CLINs), the Contractor agrees to segregate costs incurred under this contract/task order (TO), as applicable, at the lowest level of performance, either at the sub line item number (SLIN) or CLIN level, rather than at the total contract/TO level, and to submit invoices reflecting costs incurred at that level. Supporting documentation in Wide Area Workflow (WAWF) for invoices shall include summaries of work charged during the period covered as well as overall cumulative summaries by individual labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of other direct costs (ODCs), materials, and travel, by technical instruction (TI), SLIN, or CLIN level. For other than firm fixed price subcontracts, subcontractors are also required to provide labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of ODCs, materials, and travel invoiced. Supporting documentation may be encrypted before submission to the prime contractor for WAWF invoice submittal.
Subcontractors may email encryption code information directly to the Contracting Officer and Contracting Officer Representative (COR). Should the subcontractor lack encryption capability, the subcontractor may also email detailed supporting cost information directly to the Contracting Officer and COR; or other method as agreed to by the Contracting Officer.
(b) Contractors submitting payment requests and receiving reports to WAWF using either Electronic Data Interchange (EDI) or Secure File Transfer Protocol (SFTP) shall separately send an email notification to the COR and Contracting Officer on the same date they submit the invoice in WAWF. No payments shall be due if the contractor does not provide the COR and Contracting Officer email notification as required herein.
G-242-H001 GOVERNMENT CONTRACT ADMINISTRATION POINTS-OF-CONTACT AND
RESPONSIBILITIES (NAVSEA) (OCT 2018)
(a) The Government reserves the right to administratively substitute any of the points of contact listed below at any time.
(b) The contracting officer is the only person authorized to change this contract or orders issued thereunder. The Contractor shall not comply with any order, direction or request of Government personnel
- that would constitute a change - unless it is issued in writing and signed by the Contracting Officer or is pursuant to specific authority otherwise included as part of this contract. If, in the opinion of the contractor, an effort outside the existing scope of this contract is requested, the contractor shall promptly comply with the Notification of Changes clause of this contract.
(c) The points of contact are as follows:
(i) The Procuring Contracting Officer (PCO) is:
Name: Casandra O’Neall
Address:
Code 024, Bldg. 121
300 Highway 361 Crane, IN 47522-5001
Phone: (812) 854-3765 E-mail: casandra.e.oneall.civ@us.navy.mil
(ii) The Contract Specialist is:
Name: Alexia Yoo Address:
Code 024, Bldg. 121
300 Highway 361 Crane, IN 47522-5001
Phone: (812) 854-8001 E-mail: alexia.d.yoo.civ@us.navy.mil
(iii) The Administrative Contracting Officer (ACO) is:
Name: [ * ] Address:
[ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx];
E-mail: [ * ]
(d) The Technical Point of Contact (TPOC) is the contracting officer’s representative for technical matters when a COR is not appointed. The TPOC is responsible for technical issues of contract administration, such as providing all items of Government Furnished Information (GFI), Government Furnished Material (GFM) and Government Furnished Equipment (GFE) if specified in the contract as well as the inspection and acceptance of all contract deliverables.
The Technical Point of Contact (TPOC) is:
Address: [ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx]; FAX: (Area Code) xxx- [xxxx]
(g) The Contractor's point of contact for performance under this contract is:
Title: [ * ] Address:
[ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx]; FAX: (Area Code) xxx- [xxxx]
[ * ] To be completed at contract award
G-242-W001 CONTRACT ADMINISTRATION FUNCTIONS (NAVSEA) (OCT 2018)
(a) In accordance with FAR 42.302(a) all functions listed are delegated to the ACO except the following items to be retained by the PCO:
No additional functions to be retained by the PCO.
(b) In accordance with FAR 42.302(b), the following additional functions are delegated to the ACO:
No additional functions.
Section I - Contract Clauses
52.204-2 Security Requirements MAR 2021 52.204-13 System for Award Management Maintenance OCT 2018 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.204-22 Alternative Line Item Proposal JAN 2017 52.204-23 Prohibition on Contracting for Hardware, Software, and
Services Developed or Provided by Kaspersky Lab and Other Covered Entities
NOV 2021
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment
NOV 2021
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.211-2 Availability of Specifications, Standards, and Data Item Descriptions Listed in the Acquisition Streamlining and Standardization Information System (ASSIST)
JUL 2021
52.211-15 Defense Priority And Allocation Requirements APR 2008 52.219-6 Notice Of Total Small Business Set-Aside NOV 2020 52.219-28 Post-Award Small Business Program Rerepresentation SEP 2021 52.222-19 Child Labor -- Cooperation with Authorities and Remedies JAN 2022 52.222-26 Equal Opportunity SEP 2016 52.222-36 Equal Opportunity for Workers with Disabilities JUN 2020 52.222-41 Service Contract Labor Standards AUG 2018 52.222-50 Combating Trafficking in Persons NOV 2021 52.223-18 Encouraging Contractor Policies To Ban Text Messaging
While Driving
JUN 2020
52.232-23 Assignment Of Claims MAY 2014 52.232-25 Prompt Payment JAN 2017 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
NOV 2021
52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.237-2 Protection Of Government Buildings, Equipment, And
Vegetation
APR 1984
52.243-1 Alt I Changes--Fixed Price (Aug 1987) - Alternate I APR 1984 52.246-1 Contractor Inspection Requirements APR 1984 52.247-34 F.O.B. Destination NOV 1991 52.249-1 Termination For Convenience Of The Government (Fixed
Price) (Short Form)
APR 1984
252.203-7000 Requirements Relating to Compensation of Former DoD Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.204-7000 Disclosure Of Information OCT 2016 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Antiterrorism Awareness Training for Contractors. FEB 2019 252.204-7009 Limitations on the Use or Disclosure of Third-Party
Contractor Reported Cyber Incident Information
OCT 2016
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting
DEC 2019
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support
MAY 2016
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services
JAN 2021
252.204-7020 NIST SP 800-171 DoD Assessment Requirements MAR 2022 252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or
Hazardous Materials
SEP 2014
252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.225-7001 Buy American And Balance Of Payments Program-- Basic JUN 2022 252.225-7002 Qualifying Country Sources As Subcontractors MAR 2022 252.225-7048 Export-Controlled Items JUN 2013 252.227-7013 Rights in Technical Data--Noncommercial Items FEB 2014 252.227-7016 Rights in Bid or Proposal Information JAN 2011 252.227-7017 Identification and Assertion of Use, Release, or Disclosure
Restrictions
JAN 2011
252.227-7028 Technical Data or Computer Software Previously Delivered to the Government
JUN 1995
252.227-7030 Technical Data--Withholding Of Payment MAR 2000 252.227-7037 Validation of Restrictive Markings on Technical Data APR 2022 252.232-7003…