22PW06 - Airport Standby Power - Project Drawings.pdf

PDF 5 MB Posted

Attached to
X-RAY SCANNING MACHINE - SRCI
Solicitation number
S-29100-00008154
Issued by
Marion County, Oregon

About this file

22PW06 - Airport Standby Power - Project Drawings

The file consists of project drawings for the 22PW06 Airport Standby Power project. The document contains technical drawings and specifications spanning multiple pages (325-331) that detail the design and layout requirements for a standby power system installation at an airport facility. These drawings serve as the primary technical reference documents for contractors bidding on or executing this airport infrastructure project. The specific drawings illustrate the electrical configurations, equipment placement, interconnections, and installation requirements necessary for the standby power system. No specific response dates, bid deadlines, site visit requirements, or bidder conference information is provided within the drawing document itself, as project drawings function as supporting technical specifications rather than standalone solicitation documents.

The drawings do not contain pricing information, set-aside designations, incumbent vendor details, contract term specifications, or funding source documentation. As technical drawings, this document is intended to complement a broader invitation to bid or contract solicitation that would contain procurement timeline, budgetary parameters, and award criteria. Contractors utilizing these drawings would need to reference the associated ITB or contract opportunity documents for complete procurement requirements, submission deadlines, and evaluation procedures. The comprehensive nature of the technical specifications suggests this represents a significant capital infrastructure project requiring specialized expertise in airport power systems and generator installation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

22PW06 - Airport Standby Power (Complete) 325

22PW06 - Airport Standby Power (Complete) 326
22PW06 - Airport Standby Power (Complete) 327
22PW06 - Airport Standby Power (Complete) 328
22PW06 - Airport Standby Power (Complete) 329
22PW06 - Airport Standby Power (Complete) 330
22PW06 - Airport Standby Power (Complete) 331

File details come from the government source that posted it. Updated .