22822605_FY27 Network Switches RFP.pdf
PDF 2 MB Posted
- Attached to
- FY27 Network Switches
- Solicitation number
- PE-55125-NONST-2027-000000033
- Issued by
- Georgia
About this file
This Request for Proposals (RFP) is issued by Oconee County Schools in Georgia for the procurement of network switches and related equipment under E-Rate funding. The project involves replacement and installation of network switches at eight school and district locations: Colham Ferry Elementary School, Oconee County Middle School, High Shoals Elementary School, Oconee County Primary School, Oconee County Elementary School, Oconee County High School, the Maintenance and Transportation Department, and the School Street Campus. The RFP requires submission of proposals including equipment, cabling, software, and installation services. Specific equipment quantities include 95 HPE Aruba CX6300M 48-port switches, 97 HPE Aruba 1050W power supplies, 2 HPE Aruba CX6300M 24-port SFP+ switches, and copper cables with quantities determined by bidder configuration. Proposals must be received by Monday, November 30, 2026, at 3:00 PM, with award notifications expected by Friday, December 4, 2026, at 5:00 PM. The RFP was issued on Wednesday, October 28, 2026. The contract term is not specified in the document, though pricing must be honored throughout the E-Rate funding timeline.
Proposals will be evaluated based on price (50 percent weight), compatibility with existing infrastructure (30 percent), vendor ability to provide equipment and installation support (10 percent), and vendor K-12 experience and references (10 percent). Vendors must provide detailed itemized pricing with E-Rate eligibility percentages for each item and comply with all mandatory E-Rate requirements, including possessing a valid SPIN number, maintaining FCC/USAC good standing, and adhering to the Lowest Corresponding Price rule. The project is funded through E-Rate, specifically the Universal Service Administrative Company Schools and Libraries Program under Category 2—Internal Connections. Vendors must provide a Certificate of Insurance naming Oconee County Schools as an additional insured and an HB 87 Immigration Affidavit. All pricing must remain firm throughout the E-Rate funding cycle, and vendors must retain records for a minimum of 10 years. Proposals are binding for 90 days from the due date, and late submissions will not be accepted.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Oconee County Schools
Request for Proposals (RFP) for Network Switches
Project Title: FY27 Network Switches RFP Number: Tech-FY27-001-Switches Deadline: Monday, November 30, 2026 at 3:00pm
Inquiries and requests regarding this RFP should be directed to:
Tony McCullers Chief Technology Officer Oconee County Schools 71 North Main Street Watkinsville, GA 30677
706.769.5130 ext. 1304
706.310.1988 fax tmccullers@oconeeschools.org
Proposals and bids must be delivered no later than 3:00 PM on Monday, November 30, 2026 to:
Oconee County Schools Technology Services Attn: Tony McCullers, CTO RFP Number: Tech-FY27-001-Switches 71 North Main Street Watkinsville, GA 30677
Please note that all proposals must be received at the designated location by the stated deadline.
Late proposals will be returned unopened and shall be considered void and unacceptable. After the deadline, proposals will be evaluated for this RFP. Not all proposal information is considered public, and only the final contract and costs of award will be available to the public. No proposal information will be shared until after the award.
OCONEE COUNTY SCHOOLS RESERVES THE RIGHT TO REJECT ANY AND ALL BIDS
AND PROPOSALS AND TO AWARD IN PART OR IN TOTAL WHICHEVER IS DEEMED TO
BE IN THE BEST INTEREST OF THE SCHOOL DISTRICT.
FY27 Network Switches - 1 mailto:tmccullers@oconeeschools.org mailto:mhale@oconeeschools.org
Profile of Oconee County Schools
Oconee County is located approximately eight miles from Athens, Georgia and the University of Georgia. This nationally renowned county is considered both a rural and suburban community. Parental support for the school system is strong, and the Board of Education is positive and constructive in support of the academic and extracurricular programs in all Oconee schools. Our schools continue to lead Georgia in academics, the arts, and athletics.
Oconee County has been mentioned by several national publications as one of the top places to live in the entire United States. We have seven elementary schools, three middle schools, and two high schools in our school system. We have three administrative locations: Instructional Support Center (ISC), School Street Complex, and Transportation/Maintenance Complex. We enroll over 8200 students. Oconee County Schools (OCS) serves as Oconee County’s largest employer, employing approximately 1100 people.
OCS invites vendors to submit proposals in accordance with the terms and conditions of this Request for Proposal (RFP).
Goals of the RFP
It is the intent of this Request for Proposal (RFP) to provide bidders with sufficient information to prepare a proposal for E-Rate-eligible replacement and installation of the Network Switches at half of our school and district locations. The response should include all equipment, cabling, software, and installation services to meet the RFP’s goals.
The locations of the switch installations will take place at these sites:
Colham Ferry Elementary School 191 Colham Ferry Road Watkinsville, GA 30677
Oconee County Middle School 1101 Mars Hill Road Watkinsville, GA 30677
High Shoals Elementary School 401 Hopping Road Bishop, GA 30621
Oconee County Primary School 2290 Hog Mountain Road Watkinsville, GA 30677
Oconee County Elementary School 2230 Hog Mountain Road Watkinsville,GA 30677
Oconee County Schools - Maintenance and Transportation Department 1421 Rays Church Road Bishop, GA 30621
Oconee County High School 2721 Hog Mountain Road Watkinsville, GA 30677
Oconee County Schools - School Street Campus 34 School Street Watkinsville, GA 30677
FY27 Network Switches - 2
Proposal Details
The following items need to be addressed as part of a response to this RFP:
Item Description SKU # Quantity
HPE Aruba CX6300M 48 Port Switch (32 1G Ports & 16 5G Ports)
HPE Networking CX6300M 32p 1G 16p SmtRt 5G Class8 PoE 2p SFP56 50G 2p SFP28 25G MACsec Switch
S4P41A 95
HPE Aruba 1050W Power Supply
HPE Aruba Networking X372
54VDC 1050W
110‑240VAC Power Supply
JL087A 97
HPE Aruba CX6300M 24 Port SFP+ Switch
HPE Networking CX6300M 24p SFP+ LRM support and 2p 50G and 2p 25G MACSec Switch
R8S92A 2
HPE Aruba 0.65m Copper Cable
HPE Aruba Networking 50G SFP56 to SFP56 0.65m Direct Attach Copper Cable
R0M46A
Quantity Determined by Bidder’s Configuration of Each Rack - Please refer to the Switches by MDF/IDF section
HPE Aruba 3m Copper Cable
HPE Aruba Networking 50G SFP56 to SFP56 3m Direct Attach Copper Cable
R0M47A
Quantity Determined by Bidder’s Configuration of Each Rack - Please refer to the Switches by MDF/IDF section
Installation, Setup, and Configuration
Please refer to the Installation Expectations section
FY27 Network Switches - 3 https://buy.hpe.com/us/en/networking/switches/fixed-port-l3-managed-ethernet-switches/hpe-networking-cx6300m-32p-1g-16p-smtrt-5g-class8-poe-2p-sfp56-50g-2p-sfp28-25g-macsec-switch/p/s4p41a https://buy.hpe.com/us/en/networking/switches/fixed-port-l3-managed-ethernet-switches/hpe-networking-cx6300m-32p-1g-16p-smtrt-5g-class8-poe-2p-sfp56-50g-2p-sfp28-25g-macsec-switch/p/s4p41a https://buy.hpe.com/us/en/networking/switches/fixed-port-l3-managed-ethernet-switches/hpe-networking-cx6300m-32p-1g-16p-smtrt-5g-class8-poe-2p-sfp56-50g-2p-sfp28-25g-macsec-switch/p/s4p41a https://buy.hpe.com/us/en/networking/switches/fixed-port-l3-managed-ethernet-switches/hpe-networking-cx6300m-32p-1g-16p-smtrt-5g-class8-poe-2p-sfp56-50g-2p-sfp28-25g-macsec-switch/p/s4p41a https://buy.hpe.com/us/en/networking/switches/fixed-port-l3-managed-ethernet-switches/hpe-networking-cx6300m-32p-1g-16p-smtrt-5g-class8-poe-2p-sfp56-50g-2p-sfp28-25g-macsec-switch/p/s4p41a https://buy.hpe.com/us/en/networking/switches/fixed-port-l3-managed-ethernet-switches/hpe-networking-cx6300m-32p-1g-16p-smtrt-5g-class8-poe-2p-sfp56-50g-2p-sfp28-25g-macsec-switch/p/s4p41a https://buy.hpe.com/us/en/options/power-management-options/power-options/hpe-aruba-networking-x372-54vdc-1050w-110%E2%80%91240vac-power-supply/p/jl087a https://buy.hpe.com/us/en/options/power-management-options/power-options/hpe-aruba-networking-x372-54vdc-1050w-110%E2%80%91240vac-power-supply/p/jl087a https://buy.hpe.com/us/en/options/power-management-options/power-options/hpe-aruba-networking-x372-54vdc-1050w-110%E2%80%91240vac-power-supply/p/jl087a https://buy.hpe.com/us/en/options/power-management-options/power-options/hpe-aruba-networking-x372-54vdc-1050w-110%E2%80%91240vac-power-supply/p/jl087a https://buy.hpe.com/us/en/options/power-management-options/power-options/hpe-aruba-networking-x372-54vdc-1050w-110%E2%80%91240vac-power-supply/p/jl087a https://buy.hpe.com/us/en/networking/switches/fixed-port-l3-managed-ethernet-switches/hpe-networking-cx6300m-24p-sfp-lrm-support-2p-50g-2p-25g-macsec-switch/p/r8s92a https://buy.hpe.com/us/en/networking/switches/fixed-port-l3-managed-ethernet-switches/hpe-networking-cx6300m-24p-sfp-lrm-support-2p-50g-2p-25g-macsec-switch/p/r8s92a https://buy.hpe.com/us/en/networking/switches/fixed-port-l3-managed-ethernet-switches/hpe-networking-cx6300m-24p-sfp-lrm-support-2p-50g-2p-25g-macsec-switch/p/r8s92a https://buy.hpe.com/us/en/networking/switches/fixed-port-l3-managed-ethernet-switches/hpe-networking-cx6300m-24p-sfp-lrm-support-2p-50g-2p-25g-macsec-switch/p/r8s92a https://buy.hpe.com/us/en/networking/switches/fixed-port-l3-managed-ethernet-switches/hpe-networking-cx6300m-24p-sfp-lrm-support-2p-50g-2p-25g-macsec-switch/p/r8s92a https://buy.hpe.com/us/en/options/transceiver-options/networking-transceiver-options/hpe-aruba-networking-50g-sfp56-to-sfp56-0-65m-direct-attach-copper-cable/p/r0m46a https://buy.hpe.com/us/en/options/transceiver-options/networking-transceiver-options/hpe-aruba-networking-50g-sfp56-to-sfp56-0-65m-direct-attach-copper-cable/p/r0m46a https://buy.hpe.com/us/en/options/transceiver-options/networking-transceiver-options/hpe-aruba-networking-50g-sfp56-to-sfp56-0-65m-direct-attach-copper-cable/p/r0m46a https://buy.hpe.com/us/en/options/transceiver-options/networking-transceiver-options/hpe-aruba-networking-50g-sfp56-to-sfp56-0-65m-direct-attach-copper-cable/p/r0m46a https://buy.hpe.com/us/en/options/transceiver-options/networking-transceiver-options/hpe-aruba-networking-50g-sfp56-to-sfp56-0-65m-direct-attach-copper-cable/p/r0m46a https://buy.hpe.com/us/en/options/transceiver-options/networking-transceiver-options/hpe-aruba-networking-50g-sfp56-to-sfp56-3m-direct-attach-copper-cable/p/r0m47a https://buy.hpe.com/us/en/options/transceiver-options/networking-transceiver-options/hpe-aruba-networking-50g-sfp56-to-sfp56-3m-direct-attach-copper-cable/p/r0m47a https://buy.hpe.com/us/en/options/transceiver-options/networking-transceiver-options/hpe-aruba-networking-50g-sfp56-to-sfp56-3m-direct-attach-copper-cable/p/r0m47a https://buy.hpe.com/us/en/options/transceiver-options/networking-transceiver-options/hpe-aruba-networking-50g-sfp56-to-sfp56-3m-direct-attach-copper-cable/p/r0m47a https://buy.hpe.com/us/en/options/transceiver-options/networking-transceiver-options/hpe-aruba-networking-50g-sfp56-to-sfp56-3m-direct-attach-copper-cable/p/r0m47a
Switches by MDF/IDF
This chart details the number of switch installs at each site and room location.
Site Room -
Location
HPE Aruba CX6300M 48 Port Switch (32 1G Ports & 16 5G Ports)
HPE Aruba CX6300M 24 Port SFP+ Switch
CFES MDF 5 1
CFES IDF D 1
CFES IDF A1 1
CFES IDF Art 1
CFES IDF C 1
CFES IDF E 1
CFES IDF F 1
CFES IDF G 2
CFES IDF Server 1
HSES MDF 4
HSES IDF A 4
HSES IDF C 3
FY27 Network Switches - 4
Location
HPE Aruba CX6300M 48 Port Switch (32 1G Ports & 16 5G Ports)
HPE Aruba CX6300M 24 Port SFP+ Switch
HSES IDF D 2
OCES MDF 5
OCES IDF F 1
OCES IDF A 3
OCES IDF E 1
OCHS MDF 3 1
OCHS IDF O 2
OCHS IDF FH 1
OCHS IDF A 2
OCHS IDF B 2
OCHS IDF C 2
OCHS IDF D 2
OCHS IDF G 1
OCHS IDF H 1
FY27 Network Switches - 5
Location
HPE Aruba CX6300M 48 Port Switch (32 1G Ports & 16 5G Ports)
HPE Aruba CX6300M 24 Port SFP+ Switch
OCHS IDF J 1
OCHS IDF K 5
OCHS IDF KB 1
OCHS PAC 1
OCHS PAC Booth 1
OCMS MDF 5
OCMS IDF TV 2
OCMS IDF Gym 1
OCMS IDF 100 3
OCMS IDF 700 1
OCMS IDF 800 2
OCMS IDF 900 2
OCMS Tech Barn 1
OCPS MDF 4
FY27 Network Switches - 6
Location
HPE Aruba CX6300M 48 Port Switch (32 1G Ports & 16 5G Ports)
HPE Aruba CX6300M 24 Port SFP+ Switch
OCPS IDF A 2
OCPS IDF B 3
Maintenance MDF 1
Maintenance Grounds 1
School St.
Network Services 2
School St. Admin 1
School St. ITS 1 Transportati on
MDF 1
FY27 Network Switches - 7
Installation Expectations
Installation of all new network switches and associated equipment shall adhere to the following requirements:
● Rack Organization: Install switches and patch panels in an alternating configuration within each rack, maintaining a consistent and organized layout.
● Color-Coded Cabling: Use provided color-coded patch cables to identify the intended use of each connection, as follows:
○ Blue: Data, phones, projectors, and printers
○ Red: Access control, cameras, and security systems
○ Green: Intercom systems
○ White: Wireless access points (WAPs)
● Equipment Removal: Remove outdated or decommissioned equipment and materials from each rack. Collect and organize removed items for surplus in accordance with the organization's direction.
● Waste Removal and Recycling: Remove all installation-related trash and debris. Break down and recycle cardboard packaging and other recyclable materials in accordance with applicable requirements.
● MDF/IDF Cleanliness: Maintain a clean, neat, and organized work area within each MDF and IDF throughout the installation. Upon completion, leave each space clean and free of installation debris.
● Final Inspection: Ensure all installed equipment and cabling are neatly arranged and that each MDF/IDF is left in an orderly condition upon completion of the work.
FY27 Network Switches - 8
Timeframe and Key Dates
Activity Date
RFP Issued Wednesday, 10/28/2026
Vendor RFP Responses Due Monday, 11/30/2026 at 3:00pm
Award Notification(s) By Friday, 12/4/2026 at 5:00pm
Response Format
Proposals submitted in response to this RFP are to be sent in a Word document or Adobe PDF format as an attachment to an email to tmccullers@oconeeschools.org and tarcher@oconeeschools.org.
Questions
Oconee County Schools will help clarify any issues or questions regarding this RFP. It is the vendor’s responsibility to seek this clarification. Please direct all questions via email to tmccullers@oconeeschools.org.
Proposal Preparation
Where signatures are required, the signatory must be authorized to act on behalf of the vendor, including, without limitation, authority to sign contracts on the vendor’s behalf.
Late Submissions
Oconee County Schools has established the RFP process and timeline in a manner that is intended to benefit all participants. Please respect all dates and times, and adhere to established guidelines. Late submissions WILL NOT be considered for this RFP process.
Proposal Pricing
Vendors shall submit complete itemized pricing encompassing all products and services in the proposal. The vendor MUST provide the E-Rate eligibility percentage for each item proposed. Pricing MUST be honored throughout the duration of the E-Rate timeline.
FY27 Network Switches - 9 mailto:tarcher@oconeeschools.org
E-Rate Requirements
This RFP is part of an application for E-Rate funding under the Universal Service Administrative Company (USAC) Schools and Libraries Program. All vendors submitting proposals must adhere to the following mandatory guidelines:
1. Service Provider Eligibility and Qualifications
a. SPIN Identification: Vendors must possess a valid Service Provider
Identification Number (SPIN) issued by USAC and submit it with their proposal.
b. FCC/USAC Good Standing: The vendor must be in good standing with the FCC and USAC, with no active red-light status. Any change in status during the bidding or contract execution phase must be immediately disclosed to Oconee County Schools.
c. FCC Form 470 Reference: Proposals must directly reference the district's FY27 FCC Form 470 number associated with this procurement.
2. Pricing and Cost Allocation
a. Lowest Corresponding Price (LCP): Vendors must comply with the FCC's
LCP rule and guarantee that all prices quoted are the lowest prices offered to similarly situated non-residential customers for similar services.
b. E-Rate Eligibility Breakdown: Vendors MUST provide a detailed line-item cost breakdown specifying the E-Rate eligibility percentage (Category 2 - Internal Connections) for every item and service proposed. Any non-eligible items, components, software licenses, or maintenance services must be clearly separated and labeled.
c. Price Guarantee: Quoted pricing MUST remain firm and honored throughout the entire E-Rate funding cycle, including any approved implementation extensions.
3. Invoicing and Billing Options
a. The district reserves the right to select either the Service Provider
Invoice (SPI - FCC Form 474) or the Billed Entity Applicant Reimbursement (BEAR - FCC Form 472) method for billing.
b. If the district selects the SPI method, the winning vendor agrees to invoice USAC directly for the discounted portion of eligible equipment/services and bill Oconee County Schools only for the non-discounted local share.
4. Documentation and Recordkeeping
a. Asset Tagging and Serial Numbers: Upon delivery and installation, the vendor must provide a complete inventory manifest containing the make, model, serial numbers, physical installation location (building, room, MDF/IDF rack), and E-Rate eligibility percentage for all equipment.
b. 10-Year Record Retention: The vendor agrees to retain all books, documents, papers, invoices, and records related to this procurement and project execution for a minimum of 10 years from the last date of service, in accordance with FCC rules.
FY27 Network Switches - 10
Proposal Evaluation
Proposals will be evaluated and scored by Oconee County Schools. Vendors are urged to make their most attractive offer, since each vendor’s ability to satisfy Oconee County Schools requirements as described in the RFP will be evaluated and scored based on the proposal and presentation submitted. Upon completion of the evaluation, each vendor will be advised as to whether or not it has been selected to move forward in the process.
Award Criteria
Category Weight
Price 50% Compatibility with Existing Infrastructure 30% Vendor Ability to Provide Equipment and Install/Support/Documentation 10% Vendor K-12 Experience and References 10%
Bid Validity
Any proposal submitted by vendor(s) during this process is considered legally binding and valid for the terms set forth in this document. Proposals will be considered an offer to do business with Oconee County Schools, and shall be binding for a period of 90 days from the proposal due date.
Company Experience and/or References
OCS reserves the right to fully investigate the qualifications of any bidder(s) based on references supplied and publicly available information. Vendors are encouraged to supply evidence of experience on projects of similar nature and/or magnitude.
Provide references listing: customer name, address, contact names, and telephone/fax numbers. The vendors may also supply third party ratings to demonstrate their success in the IT marketplace. The winning respondent must provide:
1. Certificate of Insurance naming Oconee County Schools as an additional insured.
2. HB 87 Immigration Affidavit (copies available to download).
FY27 Network Switches - 11
Switches by MDF/IDF
Installation Expectations
Response Format
File details come from the government source that posted it. Updated .