224632 Proposal PMC flattened (11).pdf
PDF 7 MB Posted
- Solicitation number
- RFP-591-250000002791-3
- Issued by
- Eaton County, Michigan
About this file
This document is a Michigan Department of Transportation (MDOT) contract opportunity for bridge painting work on Creyts Road over Westbound I-496 in Delta Township, Eaton County. The project involves maintaining traffic during bridge painting operations, with specific maintaining traffic requirements including lane closures, speed reductions, and detailed traffic control measures. The project number is 224632, and work will be conducted on westbound I-496 from approximately east of Creyts Road to west of Creyts Road. The contract includes provisions for traffic shifts, ramp closures, and specific holiday work restrictions, with work to be completed in 2025.
The contract includes numerous miscellaneous quantities such as mobilization, barricades, plastic drums, connected arrow boards, pavement markings, and traffic control devices. The work involves partial cleaning and coating of the bridge structural steel, with approximately 286 square feet of structural steel to be coated. Specific traffic maintenance stages are detailed in the documents, including lane closures, speed limit reductions to 60 mph, and use of temporary concrete barriers and signage. The project will require careful coordination with traffic flow, emergency services, and local agencies, with specific requirements for maintaining at least one lane of traffic in each direction throughout the project duration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PMC Bridge painting cleaning, coat and maintenance.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
V4.0
MICHIGAN
DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISION
FOR
MAINTAINING TRAFFIC
LAN:NMV 1 of 7 APPR:LAN:ZAR:04-24-2025
a. Description. This special provision consists of requirements and restrictions to maintain traffic for Job Number 224632 on WB I-496 within Delta Township, Eaton County.
b. General. Maintain traffic throughout the project in accordance with the standard specifications, typicals, and supplemental specifications in the contract and as described on the plans for this project.
c. Construction Influence Area (CIA). The CIA includes the right-of-way of the following roadways, within the approximate limits described below:
1. On WB I-496 from approximately ½ miles east of Creyts Rd to ½ miles west of Creyts Rd.
2. In addition, the CIA includes the right-of-way of any designated detour route or alternate route, intersecting roads and ramps adjacent to the work zone for a distance of approximately ¼ mile in advance of the work zone or as far as the construction or detour signing extends.
The roads include but are not limited to Creyts Rd and WB I-496.
d. Traffic Restrictions. Maintain traffic in accordance with the Maintaining Traffic Typicals contained herein, except as noted below. Changes or adjustments to the Maintaining Traffic Typicals may be necessary to fit field conditions, subject to approval of the Engineer or as determined by the Engineer.
1. Utilize the following Maintaining Traffic Typicals:
A. 100-GEN-KEY – Typical Numbering Key
B. 101-GEN-SPACING-CHARTS – L, D and B values
C. 102-GEN-NOTES – General typical notes
D. 103-GEN-SIGN – Sign legend
E. 104-GEN-AB – Use of arrow board on a hill or curve and work zone layout
F. 105-GEN-SPEED-FW – Supplemental speed limit treatment on Limited Access Roadways
G. 205-FW-1LC-(L)-SHIFT – Single Lane Closure with Shift on a Freeway or Divided Roadway
LAN:NMV 2 of 7 04-23-2025
H. 230-FW-ExR-C – Freeway Exit Ramp Closure
I. WZD-125-E – Temporary traffic control devices
J. WZD-150-A – Impact attenuator object marking
2. Do not deliver material or close lanes during the holiday periods as defined in Table 1.
Table 1: 2025 Holiday Periods
Holiday Start Date and Time End Date and Time
Memorial Day 3:00 p.m. Friday, May 23rd 7:00 a.m. Tuesday, May 27th
Independence Day 3:00 p.m. Thursday, July 3rd 7:00 a.m. Monday, July 7th
Labor Day 3:00 p.m. Friday, August 29th 7:00 a.m. Tuesday, September 3rd
3. Perform work and lane closures within the allowable time frames as shown in Table 3, unless otherwise approved by the Engineer. Traffic switch operations on freeways may take place within the allowable times listed below in the traffic restriction tables and/or as otherwise approved by the Engineer. Additional lane, ramp, and/or roadway closures and shifts may be implemented during maintaining traffic stage and traffic switch operations with prior Engineer approval.
4. Traffic switch operations are exempt from lane rental assessments or liquidated damage assessments for 8 hours for each traffic switch. Perform traffic switch operations within the allowable “traffic restriction tables” as shown below.
A. A traffic switch is defined as a change in the existing (original or staged) traffic configuration which requires multiple (more than one) lane lines and/or edge lines to be relocated in a new location and the old lines to be removed either between construction stages, or maintenance of traffic stages.
Table 3: I-496 Westbound Traffic Restrictions
Closure Type Start Time
End Time
M Tu W Th F Sa Su
Shoulder Closures 00:00 24:00 ∞ ∞ ∞ ∞ ∞ ∞ ∞
Single Lane Closures 00:00 24:00 2 2 2 2 2 1 1
☼ = half hour before sunrise as defined by the National Oceanic and Atmospheric Administration (NOAA) ▼ = half hour after sunset as defined by NOAA ∞ = Closure is allowed, and the frequency is not limited during the project timeframe # = The number of times closures can take place during the project timeframe.
5. Maintain a minimum of one lane(s) of traffic in each direction at all times on I-496. (And all intersecting roads and ramps, except where detoured.)
6. No more than 1 closure is allowed in each direction of travel at the same time.
A. The maximum closure length is 1 mile unless otherwise approved by the Engineer.
LAN:NMV 3 of 7 04-23-2025
7. Close any dedicated lanes (exit, ramp, turn, etc.) prior to the location under construction.
8. Close the ramps below during a time frame that does not conflict with holidays or special events.
A. The following ramps can be closed for the project duration.
(1) Westbound I-496 to Southbound Creyts Rd Exit Ramp (Exit 1A).
9. Unless otherwise directed by the Engineer, close entrance and exit ramps when working in the vicinity of the ramp(s).
10. Coordinate work such that no two adjacent interchange ramps that operate in the same direction are closed simultaneously unless otherwise approved by the Engineer.
11. Obtain written approval for any requested full freeway closure dates and approval for a freeway closure plan from the Engineer a minimum of 7 calendar days prior to the requested full freeway closure dates. The full freeway closure plan must include but is not limited to advance notification to the public, freeway closure coordination, coordination with other projects in the area, and coordination with first responders, especially the law enforcement agency having jurisdiction.
e. Traffic General.
1. For any lane open to traffic, provide a minimum lane width of 11 feet with 2 feet of shy distance on both sides unless identified otherwise on plans.
2. Do not close lanes or utilize traffic regulation sequences where work can be accomplished with a shoulder closure. Do not occupy any part of the active traffic lane with personnel or equipment when utilizing a shoulder closure. Place lane closures and traffic regulation operations only in areas as show on the plans unless otherwise directed by the Engineer.
3. Prior to shifting traffic onto shoulders or opening any lanes/shoulders and/or ramps, remove, by sweeping all accumulated debris that has collected within the shoulder and/or within the closed lane/shoulder.
4. A speed reduction will be used. Set the work zone speed limit on I-496 to 60 miles per hour (mph).
5. Develop and submit to the Engineer an Internal Traffic Control Plan (ITCP) per subsection 104.11.B of the Standard Specifications for Construction. The requirements listed herein are the requirements for a Type A ITCP. Submit the Type A ITCP at the preconstruction meeting. The Engineer will have 7 calendar days to review the ITCP for approval or provide comments for revisions required to obtain approval. Include in the ITCP, at a minimum, the proposed ingress/egress locations for construction equipment and vehicles, traffic control devices that will be utilized to warn the motoring public of ingress/egress locations, and measures that will be taken to ensure compliance with the ITCP. Ensure that the ITCP minimizes conflicts between construction vehicles and motorists and maintains overall safety and mobility within the work zone. No work may begin prior to approval of the ITCP. Additional
LAN:NMV 4 of 7 04-23-2025 time required to obtain an approved ITCP will not be cause for delay or impact claims. All costs associated with obtaining an approved ITCP, providing and executing all parts of the approved ITCP including required traffic control devices, or resolving an incomplete or unacceptable ITCP will be borne by the Contractor.
6. Upon approval of the ITCP, complete and submit the “Lane Closure Notification/Request Form or approved equal” to the Engineer for approval prior to the actual closure date. Submit the lane closure request 7 calendar days in advance of the lane closure for approval. This includes all shifts/shoulder/lane/ramp closures as stated per the proposal or any new lane closure requests submitted by the Contractor. The Engineer will have 4 calendar days to review the lane closure request for approval or provide comments for revisions required to obtain approval. Do not implement a lane closure prior to approval by the Engineer. In addition, notify the Engineer when the lane closure is removed or cancelled. See Lane Closure Notification/Request Form contained in the proposal.
7. Protect the work area at the end of each day. Close all open access points on the project to traffic with Type III barricades or other devices approved by the Engineer.
8. The Engineer will be responsible for notifying emergency services, transit agencies, law enforcement and schools prior to any lane closures, detours or major traffic shifts. In addition, the Contractor will be responsible for working with and complying with any coordination that is necessary with the Department and emergency services, transit agencies, law enforcement and schools. All costs associated with these coordination efforts will be considered included in the pay item “Minor Traf Devices”.
9. Obtain all necessary permits from local governments within areas of local jurisdiction, including noise/dust ordinance waivers when required, prior to placing construction signing on local roads.
A. The Department will reimburse permit costs in accordance with subsection 107.02.A of the Standard Specification for Construction. Adhere to all requirements made by local maintaining agencies regarding placement of traffic control devices prior to closing lanes on roadways not under MDOT jurisdiction.
10. Remove all temporary traffic control devices from MDOT right-of-way during any shutdown periods unless needed for directly maintaining or channelizing traffic. No additional payment will be made for removal and/or redeployment of these devices except for in the case of an approved extension of time.
11. Cover or remove construction signing that refers to work zone speed when work at a location is planned to be inactive for a period greater than 2 days, unless otherwise specified on the plans or as directed by the Engineer.
12. Once work is initiated that includes any lane restrictions, that work must be continued daily until completed. A lack of work activity for more than 3 days will require the removal of lane closures at no expense to the Department.
LAN:NMV 5 of 7 04-23-2025
q. Traffic Control Devices. Ensure all traffic control devices are in accordance with the MMUTCD and must meet the “acceptable” criteria as defined in the ATSSA publication entitled “Quality Guidelines for Temporary Traffic Control Devices and Features” at the time of initial deployment and after each major stage change.
1. During non-working periods, place applicable advance signs and channelizing devices at specific locations, as directed by the Engineer, at no additional cost to the Department.
2. Notify the Engineer 24 hours in advance of when traffic control devices are being delivered to the project site, to allow for initial inspection of devices to take place.
3. Remove from the project site all traffic control devices (including detour signing) no longer needed for a particular operation and equipment for construction within 14 calendar days of reopening the shoulder/lane/roadway.
4. Channelizing Devices.
A. Ensure all devices have sufficient ballast to prevent moving or tipping. If moving or tipping occurs, place additional ballast, as directed by the Engineer, at no additional cost to the Department. No more than two ballasts are allowed on each channelizing device.
B. Do not use caution tape on channelizing devices for traffic control and/or pedestrian traffic control on this project.
5. Temporary Signs.
A. Additional W20-1 (ROAD WORK AHEAD) signs are included in the quantities to be placed on all intersecting or adjacent roads where construction activities may be encountered.
C. Fabricate, install, and remove temporary sign overlays on existing signs with the pay item for Sign, Type B, Temp, Prismatic, Furn. Attach the overlay in accordance with subsection 812.03.D.2 of the Standard Specifications for Construction.
6. Portable Changeable Message Signs (PCMS’s). Use PCMS’s to warn traffic of upcoming and changing traffic control during the life of the project. Obtain approval from the Engineer for all sign locations.
A. Install PCMS’s and make them operational a minimum of 7 calendar days prior to the start of work, unless otherwise directed by the Engineer. Messages displayed on the PCMS’s must conform to MDOT’s policy on PCMS’s. Notify the Engineer if displaying a different message than those listed below for the project.
B. Do not leave PCMS’s with a blank screen within the clear zone of any roadway at any time. Remove the PCMS or display flashing dots in each corner of the screen when there is no message to display. Update the PCMS messages at the end of each work period to reflect current traffic lane restrictions.
LAN:NMV 6 of 7 04-23-2025
C. Display the following two messages 6 days prior to a lane closure.
D. Display the following two messages 6 days prior to a ramp closure.
E. Display the following two messages during a single lane closure.
F. Display the following two messages during a ramp closure.
s. Temporary Barrier (TB).
1. Perform barrier operations such as slip forming or placing temporary concrete barrier with the flow of the traffic. Place the end treatment first when deploying the TB and remove the end treatment last when removing the TB.
2. Do not place TB on slopes that are steeper than 1:10.
3. Place TB in accordance with Standard Plan R-126 Series. At no time will traffic be exposed to the blunt end of TB or permanent barrier wall without proper attenuation.
t. Mobile Attenuators.
1. Mobile attenuators (MA’s) have been included in this project.
I-496
BRIDGE
WORK
TO START
“DAY OF
WEEK”
MM/DD/YY
EXIT 1A:
SOUTHBOUND
CREYTS RD
TO CLOSE
“DAY OF
WEEK”
MM/DD/YY
TRAFFIC
SHIFT
AHEAD
MERGE
RIGHT
EXIT 1A
CLOSED
FOLLOW
DETOUR
LAN:NMV 7 of 7 04-23-2025
u. Temporary Pavement Markings.
1. Remove conflicting pavement markings, pavement markings in taper/transition areas and other markings as directed by the Engineer, for operations occupying a location longer than 3 days. Durable markings in these areas should be covered rather than be removed.
2. Quantities for temporary tape to be placed during paving operations are based on the MDOT PAVE 900 Series standard plans.
3. When Type R or NR tape is used, ensure that all temporary pavement markings adhere to the pavement surface until permanent markings are installed.
4. Complete temporary pavement markings in each stage prior to shifting traffic as directed by the Engineer.
5. Replace all existing pavement markings that are removed for traffic control or obliterated during construction.
6. Delineate the edge line as show on the plans.
v. Measurement and Payment. Payment will be in accordance with the standard specifications unless otherwise specified. No additional payment will be made for the following activities:
1. Transporting traffic control items from site to site.
2. Providing sufficient vehicles and staff to make changes as-needed on site during work.
3. Providing sufficient vehicles and staff to remove closures from the roadway.
NOT TO SCALE
FILE:
Michigan Department of Transportation
MAY 2021
A DOUBLE LANE SHIFT
ON A 7-LANE UNDIVIDED ROADWAY
1 BOUND AND CLTL CLOSURE WITH DATE:
SHEET:
NO:
100-GEN-KEY.dgn 3(1R+2L)LC-2(L)SHIFT
152-CLT(7)-
MAINTAINING TRAFFIC TYPICAL
FILE:
Michigan Department of Transportation
DECEMBER 2021
TYPICAL NUMBERING KEY
DATE:
100-GEN-KEY.dgn
MAINTAINING TRAFFIC TYPICAL
100-GEN-KEY
NO:
TYPICAL NUMBER KEY
CODES
ZIP = ZIPPER MERGE
TS = TEMPORARY SIGNAL
TR = TRAFFIC REGULATOR
STA = STOPPED TRAFFIC ADVISORY
SPEED = SPEED
SP = SPECIAL
SIGN = SIGN
SHL = SHOULDER CLOSURE
SD = SHORT DURATION
RUM = RUMBLE STRIP
ROLL = ROLLING ROADBLOCK
(R) = RIGHT
PCMS = PORTABLE CHANGEABLE MESSAGE SIGN
PARK = PARKING LANE
NFW = NON-FREEWAY
MID = MIDDLE OF INTERSECTION OR ROAD
OUT = OUTSIDE OF SHOULDER
O = OUTSIDE (LANE CLOSURE)
LO = LANE OPEN
LD = LONG DURATION
LC = LANE CLOSURE
(L) = LEFT
L = LANE
INT = INTERSECTION
IN = INSIDE
GORE = FREEWAY GORE AREA
GEN = GENERAL INFORMATION
FW = FREEWAY
ExR = EXIT RAMP
EnR = ENTRANCE RAMP
EM = EARLY MERGE
CruSha = CRUSH AND SHAPE
CROSS = CROSSOVER
CLT = CENTER LEFT TURN LANE
C = CLOSURE
AW = ADVANCE WARNING
AB = ARROW BOARD
2(L)SHIFT = 2 LANES SHIFTED TO THE LEFT.
3(1R+2L)LC = 3 LANES CLOSED, (1 RIGHT LANE AND 2 LEFT LANES).
CTL(7) = CENTER LEFT TURN LANE, 7 LANES TOTAL.
152 - TYPICAL NUMBER
CODE: 152-CTL(7)-3(1R+2L)LC-2(L)SHIFT
EXAMPLE TYPICAL
5000 - SURVEY
4000 - MAINTENANCE
360 - ROLLING ROADBLOCK
350 - GORE LOCATIONS
340 - MERGE SYSTEMS
320 - CRUSH AND SHAPE
310 - CROSSOVER CLOSURE
300 - ADVANCE WARNINGS
230 - FREEWAY EXIT RAMPS
220 - FREEWAY ENTRANCE RAMPS
210 - FREEWAY LANE SHIFTS
200 - FREEWAY CLOSURES
160 - SIGNAL WORK
150 - CLT 7 LANE SECTIONS
140 - PARKING LANES
130 - CENTER LEFT TURN (CLT) LANES
120 - NON-FREEWAY
110 - TRAFFIC REGULATORS
100 - GENERAL NOTES
Michigan Department of Transportation
MAY 2021
"B", "D" AND "L" TABLES
CHANNELIZING DEVICE SPACING,
SIGN BORDER KEY, AND ROLL-AHEAD SPACING
101-GEN-SPACING-CHARTS.dgn
SPACING-CHARTS
101-GEN-
NO:
DISTANCE BETWEEN TRAFFIC SIGNS, "D"
POSTED SPEED LIMIT, MPH (PRIOR TO WORK AREA)
D (FEET)
DISTANCES
"D"
B (FEET)
GUIDELINES FOR LENGTH OF LONGITUDINAL BUFFER SPACE, "B"
LENGTHS
"B"
30 35 40 45 50 55 60 65 70
25 30 35 40 45 50 55 60 65 70
250 300 350 400 450 500 550 600 650 700
SPEED, MPH (PRIOR TO WORK AREA)
132 181 230 279 329 411 476 542 625
OPERATING SPEED.
* POSTED SPEED, OFF-PEAK 85TH PERCENTILE SPEED PRIOR TO WORK STARTING, OR THE ANTICIPATED
POSTED SPEED LIMIT, MPH (PRIOR TO WORK AREA)
25 30 35 40 45 50 55 60 65 70
1 11
2 100 110 120 130 140
3 135 150 165 180 195 210
4 107 180 200 220 240 260 280
5 103 134 225 250 300 325 350
6 123 160 270 300 330 360 390 420
7 143 187 315 350 385 420 455 490
8 164 214 360 400 440 480 520 560
(FEET)
OFFSET
MINIMUM MERGING TAPER LENGTH, "L" (FEET)
9 184 240 405 450 495 540 585 630
10 205 267 450 500 550 600 650 700
11 225 294 495 550 605 660 715 770
12 180 245 320 540 600 660 720 780 840
13 266 347 585 650 715 780 845 910
14 286 374 630 700 770 840 910 980
15 307 400 675 750 825 900 975 1050
15 21 27 45 50 55 60 65 70 75
90544130
32 45 62 80
42 60 82
53 75 275
63 90
33 83
Michigan Department of Transportation
MAY 2021
"B", "D" AND "L" TABLES
CHANNELIZING DEVICE SPACING
SIGN BORDER KEY AND ROLL-AHEAD SPACING
SPACING-CHARTS
101-GEN-
NO:
SHOWN IN THE ABOVE TABLES ARE AS FOLLOWS:
MERGING TAPER IN DERIVING THE "L" VALUES
THE FORMULAS FOR THE MINIMUM LENGTH OF A
60 THE WORK AREA IS 40 MPH OR LESS
WHERE POSTED SPEED PRIOR TO "L" = W X S
THE WORK AREA IS 45 MPH OR GREATER
WHERE POSTED SPEED PRIOR TO "L" = W X S
W = WIDTH OF OFFSET
S = POSTED SPEED LIMIT IN MPH PRIOR TO WORK AREA
L = MINIMUM LENGTH OF MERGING TAPER
UPSTREAM TAPERS
DOWNSTREAM TAPERS
TAPER LENGTHTYPES OF TAPERS
100' - MAXIMUM2 TO 1 LANE ROAD TAPER
1/3 L - MINIMUMSHOULDER TAPER
1/2 L - MINIMUMSHIFTING TAPER
L - MINIMUMMERGING TAPER
MAXIMUM SPACING FOR CHANNELIZING DEVICES
SPEED LIMIT
WORK ZONE
TAPERTAPER TANGENT TANGENT
< 45 MPH
> 45 MPH 25 FEET100 FEET50 FEET
1 x SPEED LIMIT 2 x SPEED LIMIT
100' (PER LANE)(USE IS RECOMMENDED)
DRUM AND 42" DEVICE SPACING (FT) NIGHTTIME 42" DEVICE SPACING (FT)
25 FEET 50 FEET
50 FEET
EXITEXIT
IS TO BE PLACED ON THE PROJECT
SOLID OUTLINES INDICATE A SIGN THAT
EXISTS ON SITE, AND NEEDS TO BE COVERED.
DASHED OUTLINES INDICATE A SIGN THAT
SIGN OUTLINE KEY
Michigan Department of Transportation
MAY 2021
"B", "D" AND "L" TABLES
CHANNELIZING DEVICE SPACING
SIGN BORDER KEY AND ROLL AHEAD SPACING
SPACING-CHARTS
101-GEN-
NO:
TO WORK ZONE)
(POSTED SPEED PRIOR
PREVAILING SPEED
25 FT
GUIDELINES FOR ROLL-AHEAD DISTANCES FOR TMA VEHICLES - TEST LEVEL 2
VEHICLE
TMA
WEIGHT OF
40 MPH OR LESS
(STATIONARY)
5.5 TONS
TO WORK ZONE)
(POSTED SPEED PRIOR
PREVAILING SPEED
50-55 MPH
100 FT
150 FT
175 FT
VEHICLE
TMA
WEIGHT OF
* ROLL-AHEAD DISTANCES ARE CALCULATED USING A 4,410 POUND IMPACT VEHICLE WEIGHT.
25 FT
25 FT
50 FT
(STATIONARY)
12 TONS
(MOBILE)
5 TONS
45 MPH
60-75 MPH
45 MPH
50-55 MPH
60-75 MPH
TMA VEHICLE TO WORK AREA)
(DISTANCE FROM FRONT OF
ROLL-AHEAD DISTANCE*
TMA VEHICLE TO WORK AREA)
(DISTANCE FROM FRONT OF
ROLL-AHEAD DISTANCE*
* ROLL-AHEAD DISTANCES ARE CALCULATED USING A 10,000 POUND IMPACT VEHICLE WEIGHT.
GUIDELINES FOR ROLL-AHEAD DISTANCES FOR TMA VEHICLES - TEST LEVEL 3
MAY 2022
TRAFFIC TYPICALS
NOTE SHEET
102-GEN-NOTES.dgn
102-GEN-NOTES
NO:
GENERAL NOTES
BUFFER AREAS.
DO NOT STORE EQUIPMENT, MATERIALS OR PERFORM WORK IN ESTABLISHEDG4:
BY MDOT WILL BE ALLOWED.
APPLICABLE SPECIAL PROVISIONS. ONLY DESIGNS AND MATERIALS APPROVED
STANDARD SPECIFICATIONS FOR CONSTRUCTION, THE STANDARD PLANS AND
MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, THE CURRENT EDITION OF THE
HARDWARE (MASH) TL-3 AS WELL AS THE CURRENT EDITION OF THE MICHIGAN
REPORT 350 (NCHRP 350) TEST LEVEL 3, OR MANUAL FOR ASSESSING SAFETY
LIGHTING MUST MEET NATIONAL COOPERATIVE HIGHWAY RESEARCH PROGRAM
ALL TEMPORARY SIGNS, TYPE III BARRICADES, THEIR SUPPORT SYSTEMS ANDG3:
ARE ADEQUATELY DELINEATED BY OTHER TRAFFIC CONTROL DEVICES.
WILL BE MADE FOR TRAFFIC PATTERNS FOR WORK LESS THAN THREE DAYS THAT
BE REMOVED BEFORE ANY CHANGE IS MADE IN THE TRAFFIC PATTERN. EXCEPTION
CHANGES IN TRAFFIC PATTERNS OR PROPOSED TEMPORARY TRAFFIC MARKINGS SHALL
ALL EXISTING PAVEMENT MARKINGS WHICH ARE IN CONFLICT WITH EITHER PROPOSED G5:
S9:
OF THE STOP SIGN OR IF SIGNALS ARE BEING USED TO CONTROL TRAFFIC.
STOP AHEAD SIGNS ARE NOT REQUIRED IF THERE IS ADEQUATE VISIBILITY
STOP SIGNS NOT REQUIRED IF SIGNALS ARE ON 4-WAY FLASHING RED.
S8:
PLACE THEM "D" DISTANCE APART.
WHEN SPEED LIMIT SIGNS CANNOT BE PLACED SIDE BY SIDE AS SHOWN,
S7:
THE WORK ZONE.
PLACE ADDITIONAL R8-3 SIGNS AT A MAXIMUM 500' SPACING THROUGHOUT
S6:
STANDARDS.
FABRICATE SPECIAL SIGNS IN ACCORDANCE WITH CURRENT SIGNING DESIGN
S4:
THE W20-5 SIGNS.
WHEN TRAFFIC VOLUMES ARE SIGNIFICANT ENOUGH TO CREATE BACKUPS BEYOND
ADDITIONAL SIGNING AND/OR ELONGATED SIGNING SEQUENCES SHOULD BE USED
S2:
AND CONSOLIDATE THE SEQUENCE AS APPROPRIATE.
OR LONGER. TO APPLY THIS TYPICAL WITHOUT R5-18b SIGNS, REMOVE THE SIGNS
15 DAYS OR LONGER OR NON-FREEWAY PROJECTS WITH A DURATION OF 90 DAYS
R5-18b SIGNS ARE ONLY REQUIRED ON FREEWAY PROJECTS WITH A DURATION OF
S3:
OMIT THIS SIGN IN SUBSEQUENT SEQUENCES IN THE SAME WORK ZONE.
R5-18c IS ONLY REQUIRED IN THE INITIAL SIGNING SEQUENCE IN THE WORK ZONE.
SIGN NOTES
S5:
ACCORDINGLY.
SPEED LIMIT ARE POSTED, OMIT ALL W3-5b AND R2-1 SIGNS AND REDUCE SPACING
OF THE WORK AREA AS INDICATED. IF PERMANENT SIGNS DISPLAYING THE CORRECT
SPEED LIMIT SIGNS RETURNING TRAFFIC TO ITS NORMAL SPEED BEYOND THE LIMITS
WHEN REDUCED SPEED LIMITS ARE UTILIZED IN THE WORK AREA, PLACE ADDITIONAL
ROADWAY SUCH THAT NO SPEED LIMIT SIGNS ARE MORE THAN 2 MILES APART.
IS IN EFFECT. PLACE ADDITIONAL SPEED LIMIT SIGNS AT INTERVALS ALONG THE
ENTRANCE RAMP THAT COMES ONTO THE FREEWAY WHERE THE REDUCED SPEED
EACH MAJOR CROSSROAD THAT INTERSECTS THE WORK ZONE, OR AFTER EACH
PLACE ADDITIONAL SPEED LIMIT SIGNS REFLECTING THE WORK ZONE SPEED AFTER
S1:
SAFETY AND MOBILITY MANUAL, SECTIONS 6.01.09 AND 6.01.10.
CONDITIONS, COVERED, OR REMOVED. FOR GUIDANCE SEE THE WORK ZONE
ALL NON-APPLICABLE SIGNING WITHIN THE CIA MUST BE MODIFIED TO FIT
TCD8:
REVERSE CURVE SIGN, AND THE SECOND REVERSE CURVE SIGN CAN BE OMITTED.
REVERSE CURVE SIGN (W24-1) CAN BE USED INSTEAD OF THE FIRST
WHERE THE SHIFTED SECTION IS SHORTER THAN 600 FEET, A DOUBLE
TYPE III BARRICADES MUST BE LIGHTED FOR OVERNIGHT CLOSURES.TCD3:
"ROAD CLOSED" EXTENDING COMPLETELY ACROSS THE HAUL ROAD.
WHEN THE HAUL ROAD IS NOT IN USE, PLACE LIGHTED TYPE III BARRICADES WITHTCD4:
TEMPORARY TRAFFIC CONTROL DEVICE NOTES
TCD7:
OFF ROAD FROM EDGE OF PAVEMENT TO EDGE OF PAVEMENT.
ADDITIONAL TYPE III BARRICADES MAY BE REQUIRED TO COMPLETELY CLOSE
TCD9:
ARE NOT TO EXCEED 50 FEET AT NIGHT.
45 MPH OR GREATER. THE SPACING FOR 42 INCH CHANNELIZING DEVICE TANGENTS
EXCEED 100 FEET ON ROADWAYS WITH A POSTED WORK ZONE SPEED LIMIT OF
WITH A POSTED WORK ZONE SPEED LIMIT LESS THAN 45 MPH AND SHOULD NOT
SHOULD NOT EXCEED TWICE THE WORK ZONE SPEED LIMIT IN MPH FOR ROADWAYS
THE MAXIMUM DISTANCE IN FEET BETWEEN CHANNELIZING DEVICES IN A TANGENTTCD2:
TAPERS ARE NOT TO EXCEED 25 FEET AT NIGHT.
LIMIT OF 45 MPH OR GREATER. THE SPACING FOR 42 INCH CHANNELIZING DEVICE
SHOULD NOT EXCEED 50 FEET ON ROADWAYS WITH A POSTED WORK ZONE SPEED
ROADWAYS WITH A POSTED WORK ZONE SPEED LIMIT LESS THAN 45 MPH AND
SHOULD NOT EXCEED 1.0 TIMES THE WORK ZONE SPEED LIMIT IN MPH FOR
THE MAXIMUM DISTANCE IN FEET BETWEEN CHANNELIZING DEVICES IN A TAPERTCD1:
AT A CONSISTENT DISTANCE, BETWEEN 10' AND 20' APART.
THREE RUMBLE STRIPS. PLACE THE RUMBLE STRIPS IN THE ARRAY
RECOMMENDATIONS. AN ARRAY OF RUMBLE STRIPS CONTAINS
SHOWN, AND IN ACCORDANCE WITH THE RUMBLE STRIP MANUFACTURER'S
IF NOT SPECIFIED IN THE CONTRACT, PLACE RUMBLE STRIPS AS
RUMBLE STRIPS ARE TO BE PLACED AS SPECIFIED IN THE CONTRACT.
RAMP NOTES
DIVERGE IN A FREE MANNER
CHANELIZING DEVICES MUST BE POSITIONED TO ENABLE RAMP TRAFFIC TO
WHEN CONDITIONS ALLOW, E5-1 SIGNS MUST BE REMOVED OR COVERED ANDRMP1:
WORK SHOULD BE EXPEDITED TO AVOID THE STOP AND/OR YIELD CONDITIONS.
THE RAMP TO COMPLETE WORK TO ALLOW AN ADEQUATE MERGE DISTANCE.
IN PLACE OF W3-2 SIGNS. CONSIDERATION SHOULD BE GIVEN TO CLOSING
R1-2 SIGNS. WHEN R-1 SIGNS ARE USED, W3-1 SIGNS MUST BE USED
WHEN CONDITIONS WARRANT, R1-1 SIGNS MAY BE USED IN PLACE OF
STOP AND YIELD CONDITIONS SHOULD BE AVOIDED WHENEVER PRACTICAL.RMP2:
G2:
THE ENGINEER.
GEN-KEY ARE APPROXIMATE AND MAY NEED ADJUSTING AS DIRECTED BY
DISTANCE BETWEEN SIGNS, "D", THE VALUES FOR WHICH ARE SHOWN IN TYPICAL
BOARD IN THE CLOSED LANE AS CLOSE TO THE BEGINNING OF TAPER AS POSSIBLE.
SECTIONS, IF ARROW BOARD CANNOT BE PLACED BEHIND CURB, PLACE ARROW
MOTORISTS WHEN PHYSICAL LIMITATIONS RESTRICT PLACEMENT. IN CURBED
PRACTICAL, BUT NOT IN A MANNER THAT WILL OBSCURE OR CONFUSE APPROACHING
PLACE LIGHTED ARROW PANELS AS CLOSE TO THE BEGINNING OF TAPERS AS TCD6:
S10:
A SPEED REDUCTION IN THIS DIRECTION.
PLACE REDUCED SPEED ZONE AHEAD SIGN (W3-5b) HERE WHEN USING
TCD10:
SIDES OF THE ROAD 1000 FEET FROM EACH OTHER.
CORRECT PCMS MESSAGING. STAGGER PCMS THAT ARE ON OPPOSING
CHANGEABLE MESSAGE SIGN GUIDELINES FOR RECCOMENDED AND
SEE THE WORK ZONE SAFETY AND MOBILITY MANUAL, PORTABLE
AN ANGLE OF 45 DEGREES IN THE DIRECTION VEHICULAR TRAFFIC IS TO PASS.
HAVE ALTERNATING DIAGONAL ORANGE AND WHITE STRIPES SLOPING DOWNWARD AT
AND WHITE RETROREFLECTIVE SHEETING. THE RETROREFLECTIVE SHEETING MUST
A MINIMUM OF 12 INCHES IN WIDTH AND 36 INCHES IN HEIGHT AND HAVE ORANGE
WHEN USED WITH A TEMPORARY SIGNAL SYSTEM. THE OBJECT MARKERS MUST BE
IN THE STANDARD PLAN FOR TEMPORARY CONCRETE BARRIER (R-53, AND R-126)
USE OBJECT MARKER SIGNS IN LIEU OF THE TYPE B HIGH INTENSITY LIGHT SHOWNTCD5:
ROLL AHEAD DISTANCE
B = LENGTH OF LONGITUDINAL BUFFER
L = MINIMUM LENGTH OF TAPER
D = DISTANCE BETWEEN TRAFFIC CONTROL DEVICES
SEE GEN-SPACING-CHARTS FOR COMMON VALUES INCLUDING:G1:
TRAFFIC REGULATOR NOTES
TR1:
BY THE ROADWAY ADT, GEOMETRICS, AND AS DIRECTED BY THE ENGINEER.
THE MAXIMUM DISTANCE BETWEEN THE TRAFFIC REGULATORS IS DETERMINED
AND THE VIDEO "HOW TO SAFELY REGULATE TRAFFIC IN MICHIGAN".
THE CURRENT VERSIONS OF THE TRAFFIC REGULATOR'S INSTRUCTION MANUAL
SPECIFICATIONS, THE STANDARD PLANS AND APPLICABLE SPECIAL PROVISIONS,
TRAFFIC REGULATORS MUST FOLLOW ALL THE REQUIREMENTS IN THE STANDARD
TR2:
THE HOURS OF DARKNESS.
REGULATOR'S STATIONS WHEN TRAFFIC REGULATING IS ALLOWED DURING
PROVIDE APPROPRIATE BALLOON LIGHTING TO SUFFICIENTLY ILLUMINATE TRAFFIC
S11:
LENGTH OF SHIFT AND AS PER THE ENGINEER.
SHIFTS MORE THAN 12FT, PLACE THREE OR MORE W1-6(R)(L) SIGNS DEPENDING UPON
SHIFTS 5FT TO 12FT, PLACE TWO W1-6(R)(L)
SHIFTS 4FT OR LESS, PLACE ONE W1-6(R)(L)
THE NUMBER OF W1-6 SHIFT SIGNS TO PLACE FOR A SHIFT IS AS FOLLOWS:
S12:
IN THIS DIRECTION
PLACE R2-1 SIGNS AS DETAILED IN NOTE S5 WHEN THERE IS A SPEED REDUCTION
THE FOLLOWING NOTES APPLY IF CALLED FOR ON THE TRAFFIC TYPICAL
THE REQUIREMENTS OF THE MMUTCD
PROVIDE EITHER A STOP/SLOW AFAD OR A RED/YELLOW LENS AFAD, MEETINGTR3:
MAY 2022
TRAFFIC TYPICALS
NOTE SHEET
102-GEN-NOTES.dgn
102-GEN-NOTES
NO:
SIGNAL NOTES
TRUCK IS LOCATED OVER ACTIVE TRAVEL LANES.
THE CONTRACTOR MUST HAVE A DESIGNATED SPOTTER IF THE AERIAL BUCKETSIG4:
INTERSECTION WHEN TRAFFIC IS PLACED IN A 4 WAY STOP.
COMPROMIZED. USE TRAFFIC REGULATORS TO CONTROL TRAFFIC THROUGH THE
THE INTERSECTION IN A 4 WAY STOP IF THE 14 FOOT VERTICAL CLEARANCE IS
CLEARANCE. THE CONTRACTOR MUST UTILIZE AN ALTERNATE SET UP, OR PLACE
THE LOWEST POINT OF THE BUCKET MAY NOT TRAVEL BELOW 14 FOOT VERTICALSIG5:
TRUCK MAY BE MOVED TO FACILITATE WORK.
DELINEATE THE TRUCK WITH CHANNELIZING DEVICES. THE POSITION OF THESIG6:
42 INCH CHANNELIZING DEVICES FOR NIGHTTIME WORK.
DELINEATE THE WORK ZONE AREA WITH 28 INCH CONES FOR DAYTIME WORK, ORSIG3:
SIGNAL IS IN OPERATION.SIG2:
EXISTING SIGNAL MUST BE EITHER 4-WAY FLASHING RED, BAGGED, OR TURNED OFF.SIG1:
MAINTENANCE AND SURVEYING NOTES
ACTIVATED AMBER BEACON.
WORK AND SHADOW VEHICLES SHALL BE APPROPRIATELY EQUIPPED WITH AN MS4:
SIGHT DISTANCE IN ADVANCE OF VERTICAL OR HORIZONTAL CURVES.
SLOW DOWN AND TRAVEL AT A FARTHER DISTANCE TO PROVIDE ADEQUATE
AREA AND PROCEEED AT THE SAME SPEED. THE SHADOW VEHICLE SHOULD
VEHICLES SHOULD MAINTAIN THE RECOMENDED DISTANCE FROM THE WORK
WHENEVER STOPPING SIGHT DISTANCE EXISTS TO THE REAR, THE SHADOW MS1:
TABLES.
SHOULD BE PARKED ACCORDING TO THE ROLL AHEAD DISTANCE
SEPARATE THE WORK SPACE FROM TRAFFIC. IF USED, THE VEHICLES
WORK OR SHADOW VEHICLES WITH OR WITHOUT A TMA MAY BE USED TO MS3:
TO) IS THE LAYOUT OF CONCRETE PATCHES.
SPACING MUST BE USED. AN EXAMPLE OF AN OPERATION (BUT NOT LIMITED
CHANNELIZING DEVICES TO DELINEATE OPEN OR CLOSED LANES AT 50 FT
A MOBILE OPERATION IS OCCURRING DURING THE NIGHTTIME HOURS,
WHEN WORKERS ARE OUTSIDE THEIR VEHICLES IN AN EXISTING LANE WHILEMS5:
TYPE OF WORK TAKING PLACE AS PER THE ENGINEER.
W21-6 AND W20-1 SIGNS MAY BE SUBSTITUTED AS DETERMINED BY THE MS6:
"END ROAD WORK" SIGN.
AND THE "END WORK CONVOY" SIGN, OR BETWEEN THE "WORK ZONE BEGINS" AND
WITH AN ACTIVATED BEACON, BETWEEN THE "BEGIN WORK CONVOY" SIGN
WORKERS OUTSIDE OF VEHICLES SHOULD WORK WITHIN 150' OF WORK VEHICLES MS2:
THE FOLLOWING NOTES APPLY IF CALLED FOR ON THE TRAFFIC TYPICAL
10/17/24
103-GEN-SIGN
PILOT CAR
FOLLOW ME
WEST
EASTNORTH
DETOUR
SOUTH
XX
MONTMORENCY>
COUNTY
XX
XX
INTERSTATE
XXX
INTERSTATE
XX
BUSINESS
LOOP
XX
BUSINESSBUSINESS
SPURSPUR
ALTERNATE ALT PASSBY BUSINESS TRUCK TO
END TEMPORARY
XX
TEMP
FOLLOW
XXX
COUNTY
BARAGA
XXX
MPH
2030 MPH
EXIT EXIT
OPEN
EXIT
CLOSED
EXIT
ONLY
ROAD WORK
NEXT XX MILES ROAD WORK
END
u
XXX
DETOURDETOUR
END
END
DETOUR
DETOUR
DETOUR DETOUR DETOUR
END END
DETOUR DETOUR
XXX
BUSINESS
LOOP
XXX
BUSINESS
SPUR
DETOUR
12" x 18" 12" x 24"
48" x 18"48" x 18"
48" x 36" 48" x 36" 48" x 36" 48" x 24"
36" x 18"
24" x 18" 24" x 12"
60" x 48"
48" x 36"
30" x 24"
12" x 18"
12" x 18" 12" x 18" 12" x 18"
60" x 24"
M4-9f
M6-1L M6-1R
M6-2R
M6-2L
M6-6L M6-6R M6-7L M6-7RM6-3 M6-5
M3-1 M3-2
M3-3 M3-4
M1-1 M1-1 M1-2 M1-2 M1-3 M1-3
M1-4 M1-4
M4-9kL
M1-5
M4-1 M4-2 M4-3 M4-4 M4-5
M4-6 M4-7
M4-1a
30" x 15"
24" x 12"
18" x 9"
12" x 6"
12" x 18" 12" x 18"
M4-7a
M1-5a
24" x 24"
18" x 18"
M1-6
M4-11a
M5-1L M5-1R M5-2L M5-2R
36" x 24"
E13-1aP
48" x 48"
36" x 36"
24" x 24"
18" x 18"
60" x 48"
45" x 36"
30" x 24"
22.5" x 18"
48" x 48"
36" x 36"
24" x 24"
18" x 18"
48" x 48"
36" x 36"
24" x 24"
18" x 18"
48" x 48"
36" x 36"
24" x 24"
18" x 18"
60" x 48"
45" x 36"
30" x 24"
22.5" x 18"
60" x 48"
45" x 36"
30" x 24"
22.5" x 18"
60" x 48"
45" x 36"
30" x 24"
22.5" x 18"
36" x 36"
30" x 30"
24" x 24"
18" x 18"
M1-6
45" x 36"
30" x 24"
22.5" x 18"
36" X 36"
24" x 24"
18" x 18"
36" x 18"
30" x 15"
24" x 12"
18" x 9"
12" x 6"
36" x 18"
30" x 15"
24" x 12"
18" x 9"
36" X 18"
30" X 15"
24" X 12"
18" x 9"
12" X 6"
60" x 54"
48" x 42"
30" x 30"
36" X 18"
30" X 15"
24" X 12"
18" x 9"
12" X 6"
30" x 21"
21" x 15"
12" x 9"
30" x 21"
21" x 15"
12" x 9"
30" x 21"
21" x 15"
12" x 9"
30" x 21"
21" x 15"
12" x 9"
30" x 21"
21" x 15"
18" x 12"
12" x 9"
30" x 21"
21" x 15"
18" x 12"
12" x 9"
30" x 21"
21" x 15"
18" x 12"
12" x 9"
30" x 21"
21" x 15"
18" x 12"
12" x 9"
30" x 21"
21" x 15"
18" x 12"
12" x 9"
30" x 21"
21" x 15"
18" x 12"
12" x 9"
30" x 21"
21" x 15"
18" x 12"
12" x 9"
30" x 21"
21" x 15"
18" x 12"
12" x 9"
30" x 21"
21" x 15"
18" x 12"
12" x 9"
30" x 21"
21" x 15"
18" x 12"
12" x 9"
36" x 18"
30" x 15"
24" x 12"
18" x 9"
12" x 6"
36" x 18"
30" x 15"
24" x 12"
18" x 9"
12" x 6"
36" x 18"
30" x 15"
24" x 12"
18" x 9"
12" x 6"
36" x 18"
30" x 15"
24" x 12"
18" x 9"
12" x 6"
36" x 18"
30" x 15"
24" x 12"
18" x 9"
12" x 6"
36" x 18"
30" x 15"
24" x 12"
18" x 9"
12" x 6"
36" x 18"
30" x 15"
24" x 12"
18" x 9"
12" x 6"
36" x 18"
30" x 15"
24" x 12"
18" x 9"
12" x 6"
36" x 18"
30" x 15"
24" x 12"
18" x 9"
12" x 6"
36" x 18"
30" x 15"
24" x 12"
18" x 9"
12" x 6"
E13-1P
G20-4
M5-3
30" x 21"
21" x 15"
12" x 9"
M6-4
30" x 21"
21" x 15"
18" x 12"
12" x 9"
VAR x 24"
60" x 54"
48" x 42"
30" x 30"
60" x 54"
48" x 42"
30" x 30"
M4-9mL M4-9mR
SIGN NUMBER KEY
60" x 48"
48" x 48"
E5-1f E5-2 E5-2a E5-3 G20-1 G20-2
I-6a
30" x 30"
24" x 24"
18" x 18"
M4-9RM4-9LM4-8bM4-8a M4-8
M4-9j M4-9kR
M4-9dL M4-9dR M4-9e
M4-9gL M4-9gR M4-9h M4-9i
M4-10L M4-10R
60" x 48"
48" x 36"
30" x 24"
60" x 48"
48" x 36"
30" x 24"
60" x 48"
48" x 36"
30" x 24"
SEE MDOT SHS 13-WORK ZONE FOR SIGN DETAILS
STANDARD HIGHWAY SIGNS
NO SCALE
CODE:
CLOSED
CROSSOVER
ONE
RIGHT
FORM
LANE
CLOSED
RAMP
FOLLOW
TRUCKS
INTO
DO NOT
WORK ZONE
STOP
YIELD
ONLY
RUT N
ON
S
WHERE
WORKERS
PRESENT
LIMIT
SPEED
XX
TO
ONCOMING
TRAFFIC
NO LYY NO LYY
TURN RIGHT
MUST
LANERIGHTLEFT LANE
MUST
TURN LEFT
ONLYONLY
DO
NOT
PASS
PASS
WITH
CARE
STAY
IN
LANE
DO NOT
ENTER WAY
WRONG
INJURE /
KILL A
WORKER
7500$
15 YEARS
WAYONEEND WORK CONVOYBEGIN WORK CONVOY
BEGINS
ZONE
WORK
WAYONE
ONE
WAY
ONE
WAY
CROSSWALK
PEDESTRIAN
CLOSED
SIDEWALK SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
AHEAD
CROSS HERE
CLOSED
EXIT
CLOSED
ROADON
STOP
HERE
RED
SIDEWALK CLOSED
CROSS HERE
SIDEWALK CLOSED
CROSS HERE
SIDEWALK CLOSED
AHEAD
CROSS HERE
ROAD CLOSED
10 MILES AHEAD
LOCAL TRAFFIC ONLY
BRIDGE OUT
10 MILES AHEAD
LOCAL TRAFFIC ONLY
ROAD CLOSED
TO
THRU TRAFFIC
NORTH SOUTH
KEEP
FLE T
ORTHN
KEEP
GRIHT
OUTHS
STOP
FRONT BACK
SLOW
USE ALL
LANES
DURING
BACKUPS
NO LYY NO LYY
M8-1gL M8-1gR
48" x 60"
36" x 30"36" x 30"
48" x 60"
48" x 48"
36" x 18"
48" x 24"
24" x 12"
48" x 24"
24" x 12"
48" x 24"
24" x 12" 36" x 54" 48" x 30" 48" x 30"
60" x 30" 60" x 30" 60" x 30"
60" x 30"
48" x 60" 30" x 42"
R11-2c
R5-18g
R11-2a
36" x 66" 36" x 66" 60" x 48"
48" x 36"
36" x 30"
24" x 18"
48" x 36"
24" x 12"
48" x 36"
24" x 12"
36" x 72"
24" x 48"
12" x 36"
36" x 72"
24" x 48"
12" x 36"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
18" x 18"
60"
48"
36"
30"
24"
18"
48" x 60"
36" x 48"
30" x 36"
24" x 30"
18" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
36" x 48"
30" x 36"
36" x 48"
30" x 36"
36" x 48"
30" x 36"
42" x 48"
30" x 36"
42" x 48"
30" x 36"
36" x 36"
30" x 30"
36" x 36"
30" x 30"
48" x 60"
36" x 48"
24" x 30"
18" x 24"
12" x 18"
48" x 60"
36" x 48"
24" x 30"
18" x 24"
12" x 18"
48" x 60"
36" x 48"
24" x 30"
18" x 24"
12" x 18"
48" x 60"
36" x 48"
24" x 30"
18" x 24"
48" x 60"
36" x 48"
24" x 30"
18" x 24"
48" x 48"
36" x 36"
30" x 30"
42" x 30"
36" x 24"
30" x 18"
54" x 18"
36" x 12"
54" x 18"
36" x 12"
48" x 60"
36" x 48"
24" x 30"
18" x 24"
12" x 16"
48" x 60"
36" x 48"
24" x 30"
18" x 24"
12" x 16"
30" x 18"
24" x 12"
48" x 48"
36" x 36"
24" x 24"
18" x 18"
12" x 12"
M8-2d
OM-3L OM-3R R1-1
R1-2
R3-5L
R3-4R3-3R3-2R3-1R2-1a R2-1R1-2aP
R3-8dR3-7RR3-7LR3-6RR3-6LR3-5aR3-5R
R4-1 R4-2 R4-7 R4-8 R4-9 R5-1 R5-1a R5-18b
R6-1L
R5-18f72" x 12"
R5-18e
78" x 12"
R5-18dR5-18c
R6-1R R6-2L R6-2R R8-3 R9-8 R9-9 R9-10 R9-11L
48" x 30"
R11-2bR11-2R10-6bR9-11aRR9-11aLR9-11R
R11-3a R11-3b R11-4
R5-18h
48" x 60"
R1-1a
24" x 24"
18" x 18"
R3-8c
SIGN NUMBER KEY
TOSTOP
PREPARED
BE
ZONE
AHEAD
REDUCED
SPEEDZONE
AHEAD
SPEED
XX MPH
SPEED
XX
LIMIT
PREPARE
TO STOP WHEN
FLASHING
ROAD
NARROWS
NO
MERGE
AREA
NARROW
BRIDGE
ONE LANE
BRIDGE
THRU
TRAFFIC
MERGE
LEFT
THRU
TRAFFIC
MERGE
RIGHT
NARROWS
RAMP
BUMP
%8
ALL
LANES
12" x 18"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
18" x 18"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
18" x 18"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
18" x 18"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
18" x 18"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
18" x 18"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
18" x 18"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
18" x 18"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
18" x 18"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
96" x 48"
60" x 30"
48" x 24"
36" x 18"
24" x 12"
96" x 48"
60" x 30"
48" x 24"
36" x 18"
24" x 12"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
18" x 18"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
18" x 18"
48" x 48"
36" x 36"
30" x 30"
18" x 18"
60" x 60"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
60" x 60"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
24" x 30"
18" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
60" x 60"
48" x 48"
36" x 36"
30" x 30"
60" x 60"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
18" x 18"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
18" x 18"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
30" x 24"
24" x 18"
36" x 48"
30" x 36"
24" x 30"
18" x 24"
12" x 18"
36" x 48"
30" x 36"
24" x 30"
18" x 24"
12" x 18"
SIGN NUMBER KEY
W1-2bL
48" x 48"
36" x 36"
48" x 48"
36" x 36"
W1-2bRW1-2RW1-2LW1-1RW1-1L W1-3L W1-3R
W1-4bL W1-4bRW1-4L W1-4R W1-4cL W1-4cR
W24-1L
W24-1R
W24-1bL W24-1bR
W1-6L W1-6R W1-8L W1-8R W24-1aRW24-1aL
W3-2 W3-3 W3-4 W3-5bW3-1 W3-5aW3-5W3-4b
W4-1L W4-1R W4-2L W4-2R W4-3L W4-3R W4-5RW4-5L
W4-6RW4-6L W5-1W4-5P W5-2 W5-3W4-7L W4-7R
W6-1 W6-2 W6-3 W7-1W5-4 W6-4 W8-1W7-1a
W24-1cP
FEET
500 WHEN
FLASHING
RAMP
MPH
RAMP
MPH
EXIT
MPH
EXIT
MPH
CLOSED
AHEAD
RIGHT
LANE
ROAD
WORK
AHEAD
ROAD
CLOSED
AHEAD
DETOUR
AHEAD
STREET
CLOSED
AHEAD
R
WORK
AHEAD
ST EET RA
WORK
AHEAD
MP G
WORK
AHEAD
SINAL R
WORK
AHEAD
SU VEY
NO
PASSING
ZONE
TRAFFIC
CIRCLE
ENDS
PAVEMENTDIP SHOULDER
SOFT
GRAVEL
LOOSE ROUGH
ROAD
LOW
SHOULDER
WHEN
WET
NO
CENTER
LINE
UNEVEN
LANES
FALLEN
ROCKS
SHOULDER
DROP-OFFPAVEMENT
GROOVED
ROAD
MAY
FLOOD
SHOULDER
NO STEEL
PLATE
AHEAD
LEFT
ENDSLANE
MERGE
LEFT
LANE
ENDS
LANE
ENDS
RIGHTRUMBLE
STRIPS
AHEADENDS
SHOULDER
CLOSED
AHEAD
LEFT
LANE
CLOSED
AHEAD
CENTER
& LEFT LANE
CLOSED
AHEAD
CENTER &
LEFT 2 LANES
CROSSING
TRUCK
CLOSED
AHEAD
CENTER
LANE
MERGE
RIGHT
LANE ENDS
RAMP
XX
M P H
ON
RAMP
M . P . H .
3512 6
WATCH
FOR RAMP
TRAFFIC
EXIT
XX
M P H
X
NEXT
MILES
W16-4aPW16-2P W16-13P
24" x 18"
W13-6a W13-7 W13-7a
W13-6
W9-3L W9-3R
48" x 48"
36" x 36"
30" x 30"
24" x 24"
18" x 18"
48" x 48"
36" x 36"
30" x 30"
18" x 18"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
18" x 18"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
36" x 30"
30" x 24"
24" x 18"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
36" x 30"
30" x 24"
24" x 18"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
24" x 24"
48" x 48"
36" x 36"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
60" x 60"
48" x 48"
36" x 36"
30" x 30"
60" x 60"
48" x 48"
36" x 36"
30" x 30"
60" x 60"
48" x 48"
36" x 36"
30" x 30"
60" x 60"
48" x 48"
36" x 36"
30" x 30"
60" x 60"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
48" x 48"
36" x 36"
30" x 30"
18" x 18"
30" x 30"
24" x 24"
18" x 18"
48" x 60"
36" x 48"
24" x 30"
W13-3
48" x 60"
36" x 48"
24" x 30" 36" x 36"
24" x 24"
48" x 84"
36" x 60"
24" x 42"
48" x 84"
36" x 60"
24" x 42"
48" x 84"
36" x 60"
24" x 42"
64" x 48"
48" x 36"
40" x 30"
36" x 24"
30" x 24"
24" x 18"
18" x 12"
36" x 30"
30" x 24"
24" x 18"
18" x 12"
30" x 24"
24" x 18"
60" x 60"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
60" x 60"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
60" x 60"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
60" x 60"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
60" x 60"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 84"
36" x 60"
24" x 42"
SIGN NUMBER KEY
W20-1 W20-3W20-1dW20-1b W20-1c W20-2 W20-3aW20-1a
W14-3 W16-12P
W8-3 W8-5W8-2 W8-4 W8-7 W8-8 W8-9W8-5P
W8-12W8-11 W8-14 W8-15PW8-15 W8-17L W8-17R
36" x 30"
30" x 24"
24" x 18"
W8-17P
W8-18 W8-23 W8-24 W9-2LW9-1L W9-1RW8-26W8-25
W11-10W9-3a W9-3b W11-10aW9-3CW9-2R
W13-4PW13-1PW12-2W12-1W11-24
W13-2
CROSSOVER
CLOSED
USENEXT
CROSSOVER
TAKE TURNS
LEFT LANE
PINE GROVE PINE GROVE
CLOSED
MILE
LEFT LANE
CLOSED
MILE
LEFT LANE
S2
CLOSED
AHEAD
LEFT LANE RIGHT LANE
CLOSED
AHEAD
ONE LANE
ROAD
AHEAD
WATCH
FOR
EMERGENCY
VEHICLES
CENTER LANE
CLOSED
AHEAD
R
CLOSED
AHEAD
AMP
LEFT
TWO LANES
CLOSED
AHEAD
RIGHT
TWO LANES
CLOSED
AHEAD
CLOSED
SIDEWALK
AHEAD
RIGHT LANE
CLOSED
MILE1
RIGHT LANE
CLOSED
MILES2
CLOSED
AHEAD
THREE LANES
LEFT RIGHT
CLOSED
AHEAD
THREE LANES
MERGE MERGE
STOP
BUS
TEMP
CURING
CONCRETE
AREA
500 FT
EMERGENCY
PULL OFF
AREA
1/2 MILE
EMERGENCY
PULL OFFSTAY
IN YOUR
LANE
EXIT
OPEN
AHEAD
WORKERS
SHOULDER
CLOSED
LEFT
SHOULDER
RIGHT
CLOSED
SHOULDER
CLOSED
AHEAD
LEFT
SLOW MOVING
VEHICLE
ROAD
MACHINERY
AHEAD
FRESH
OIL
FRESH
TAR
SHOULDER
WORK
SHOULDER
RIGHT
CLOSED
AHEAD
UTILITY
WORK
AHEAD
MOWING
AHEAD
TURN OFF
2-WAY RADIO
AND
CELL PHONE
SURVEY
CREW
BLASTING
AHEAD
ZONE
ZONE
END
BLASTING
SLOW TRAFFIC
AHEAD
AHEAD
NEW
TRAFFIC
PATTERN
ENTERING
EXITING
ROADWAY
TRUCKS
36" x 18"
42" x 36"
42" x 36"
36" x 30" 48" x 24"
12" x 18"
W20-9
W20-14bP
54" x 48"
W20-17
48" x 12"
36" x 12"
24" x 18"
W20-12P W20-14aP
48" x 12"
36" x 12"
W20-5L1 W20-5L2
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
66" x 30"
48" x 24" VARIABLE x 12"
W20-14L
48" x 48"
36" x 36"
48" x 48"
36" x 36"
48" x 48"
36" x 36"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
60" x 60"
48" x 48"
36" x 36"
30" x 30"
60" x 60"
48" x 48"
36" x 36"
30" x 30"
60" x 60"
48" x 48"
36" x 36"
30" x 30"
60" x 60"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
SIGN NUMBER KEY
W20-13P
VARIABLE x 12"
48" x 48"
36" x 36"
48" x 48"
36" x 36"
W20-5L W20-5RW20-4 W20-4c W20-5CW20-3b
W20-5aL2 W20-5aR2 W20-5aR3 W20-8W20-5R1 W20-5R2 W20-5aL3 W20-7a
W20-14RW20-11W20-10
W21-1W20-15 W20-18a
48" x 54"
W20-18
48" x 54"
W20-16
48" x 48"
36" x 36"
W21-5aL W21-5aR W21-5bLW21-4W21-3
W21-2
W21-2 W21-5 W21-5bR
W21-7 W21-8 W22-2W21-6 W22-1 W22-3 W23-1 W23-2
Michigan Department of Transportation
MAY 2021
USE OF ARROW BOARD ON HILL OR CURVE
AND WORK ZONE LAYOUT
104-GEN-AB.dgn
104-GEN-AB
NO:
USAGE
INCORRECT
USAGE
CORRECT
USAGE
CORRECT
USAGE
INCORRECT
USAGE
CORRECT
USAGE
INCORRECT
500' OR MORE
PLACEMENT ON A CREST VERTICAL CURVE
PLACEMENT ON A SAG VERTICAL CURVE
PLACEMENT ON A HORIZONTAL CURVE
MIGHT INTERFERE WITH THIS LEGIBILITY REQUIREMENT.
LANES AND ROADWAY ENTRANCES. DO NOT PLACE THE LIGHTED ARROW ON A HORIZONTAL OR VERTICAL CURVE THAT
ENSURE THE ARROW REMAINS CLEARLY LEGIBLE AT DISTANCES FROM 2,500 FEET TO 200 FEET, FROM ALL TRAFFIC
NOTE:
MAY 2021
SUPPLEMENTAL SPEED LIMIT
TREATMENT ON LIMITED ACCESS ROADWAYS
105-GEN-SPEED-FW.dgn
105-GEN-SPEED-FW
NO:
ENTRANCE RAMP
SHOULDER
CROSSROAD
SHOULDER
ENTRANCE RAMP
D D D
D
SHOULDER
SHOULDER
SHOULDER
SHOULDER
T H
E S
E
S P
E E
D
L
IM
IT
S
IG
N S
A R
V
E R
P
L A
C
M O
A
IL
P
A R
T
E N
T R
A N
C
M
A
IL
A R
T
S U
S
F
U P P
L E
M E
N T
A L
S
F
S P
E
IM
IT
S
IG
Q U
IR
W
KEY
DEVICES:
SIGNING:
GENERAL:
TCD2
S1, S5, S8
G1, G2, G3, G4
STANDARD NOTES
(SEE GEN-NOTES)
WHERE
WORKERS
PRESENT
R2-1a
LIMIT
SPEED
XX
R2-1
WHERE
WORKERS
PRESENT
R2-1a
LIMIT
SPEED
XX
R2-1
WHERE
WORKERS
PRESENT
R2-1a
LIMIT
SPEED
XX
R2-1
WHERE
WORKERS
PRESENT
R2-1a
LIMIT
SPEED
XX
R2-1
WHERE
WORKERS
PRESENT
R2-1a
LIMIT
SPEED
XX
R2-1
R2-1a OPTIONAL
PLACE AS INDICATED IN NOTE S5
TRAFFIC FLOW
CHANNELIZING DEVICE
WHERE
WORKERS
PRESENT
R2-1a
LIMIT
SPEED
XX
R2-1
MAY 2021
SINGLE LANE CLOSURE WITH SHIFT
ON A FREEWAY OR DIVIDED ROADWAY
205-FW-1LC-(R)-SHIFT.dgn
FW-1LC-(R)-SHIFT
205-
NO:
1/2 L
1/2 L
W1-4R
W1-4L
W4-2R W4-2R
W3-5b
ZONE
AHEAD
REDUCED
SPEED
W3-5b
ZONE
AHEAD
REDUCED
SPEED
LIMIT
SPEED
XX
R2-1
LIMIT
SPEED
XX
R2-1
LIMIT
SPEED
XX
R2-1
BEGINS
ZONE
WORK
R5-18c
BEGINS
ZONE
WORK
R5-18c
W20-5R
RIGHT LANE
CLOSED
AHEAD
W20-5R
RIGHT LANE
CLOSED
AHEAD
ROAD
WORK
AHEAD
W20-1
ROAD
WORK
AHEAD
W20-1
I R
E C
T
B Y
G I N
E E
R
A
A
K G
R E
M O
X
K G
D D
D D
L
L
D
V A
R I E
S
W O
K
E A
D
S H
O U
L D
E R
S H
O U
L D
E R
INJURE /
KILL A
WORKER
7500$
15 YEARS
R5-18b
INJURE /
KILL A
WORKER
7500$
15 YEARS
R5-18b
F T
WHERE
WORKERS
PRESENT
R2-1a
WHERE
WORKERS
PRESENT
R2-1a
KEY
D
D
LIMIT
SPEED
XX
R2-1
ROAD WORK
END
G20-2
ROAD WORK
END
G20-2
SEE NOTE TCD8
SEE NOTE TCD8
TO DELINEATE THE EDGE LINE.
WHEN TEMPORARY PAVEMENT MARKINGS ARE USED
ON THE LEFT SIDE OF THE TRAVEL LANE,
CHANNELEZING DEVICES ARE NOT REQUIRED
DIVIDED ROADWAYS AND 2D ON FREEWAYS
PLACE SIGNS AT A SPACING OF D ON
R2-1a OPTIONAL
PLACE SIGN AS INDICATED IN NOTE S2
PLACE SIGN AS INDICATED IN NOTE S5
REFLECTS EXISTING SPEED LIMIT
TRAFFIC FLOW
LIGHTED ARROW PANEL
CHANNELIZING DEVICES
SEE NOTE S11
W1-6L
SIGNING:
GENERAL:
TCD1, TCD2, TCD6, TCD8
S1, S2, S3, S5, S8, S11
G1, G2, G3, G5
STANDARD NOTES
(SEE 102-GEN-NOTES)
LIMIT
SPEED
XX
R2-1
WHERE
WORKERS
PRESENT
R2-1a
B
MAY 2021
FREEWAY
EXIT RAMP CLOSURE
230-FW-ExR-C.dgn
230-FW-ExR-C
NO:
CROSSROAD
S H
O U
L D
E R
S H
O U
L D
E R
D
TYPE III BARRICADES
KEY
IN NOTE TCD7
PLACE TYPE III BARRICADES AS INDICATED
TRAFFIC FLOW
CHANNELIZING DEVICES
(COVER EXISTING)
EXIT
E5-1
CLOSED
RAMP
R11-2a
R
CLOSED
AHEAD
AMP
W20-3b
SIGNING:
GENERAL:
TCD1, TCD2, TCD3, TCD7
S1, S6
G1, G2, G3, G4
STANDARD NOTES
(SEE 102-GEN-NOTES)
ECH
MWB
Traffic Control Devices
Temporary
WZD-125-E 1 3
6" MIN.
12" MAX.1
8'-0" o
(12 REQUIRED)
1" MIN. O.D. STEEL FLAT LOCK WASHER
⅜" - 16 STEEL HEX NUT
⅜" - 16 STEEL HEX BOLT
6" 6"
6" MIN.
12" MAX.1
8'-0" o
(12 REQUIRED)
1" MIN. O.D. STEEL FLAT LOCK WASHER
⅜" - 16 STEEL HEX NUT
⅜" - 16 STEEL HEX BOLT
FRONT ELEVATION SIDE VIEW
FRONT ELEVATION SIDE VIEW
PERFORATED SQUARE STEEL TUBE OPTION
BI-DIRECTIONAL RIGHT DIRECTIONALLEFT DIRECTIONAL
T Y
P
T Y
P
ANGLE IRON OPTION
(12 GAGE)
SQUARE STEEL TUBE
1¾" PERFORATED
(10 GAGE)
1½" x 1½" ANGLE
C -C
C -C
C -C
C -C
¾" HOLLOW EXTRUDED RIGID POLYOLEFIN
¾" HIGH DENSITY POLYETHYLENE OR
¾" ACX PLYWOOD OR
BARRICADE RAIL MAY BE
¾" HOLLOW EXTRUDED RIGID POLYOLEFIN
¾" HIGH DENSITY POLYETHYLENE OR
¾" ACX PLYWOOD OR
BARRICADE RAIL MAY BE
CLOSURES
(TYPICAL)
ORANGE
REFLECTORIZED
(TYPICAL)
SILVER (WHITE)
REFLECTORIZED
(TYPICAL)
SILVER (WHITE)
REFLECTORIZED
(TYPICAL)
ORANGE
REFLECTORIZED
BARRICADE RAIL SHEETING OPTIONS
TYPE III BARRICADES
(12 GAGE)
2" SQUARE STEEL TUBE
4'-0" - 6'-0"
4'-0" - 6'-0"
(12 GAGE)
2" SQUARE STEEL TUBE8
O
R
2" x 2" x �" ANGLE 2" x 2" x ¼" ANGLE OR OF BASE
WELD TO CENTER
OF BASE
WELD TO CENTER
" 1½" x 1½" ANGLE (10 GAGE)
2" x 2" x �" ANGLE OR 2" x 2" x ¼" ANGLE OR http://safety.fhwa.dot.gov/roadway_dept/road_hardware/wzd.htm
Other Type III Barricades meeting current NCHRP crash worthy criteria can be found on the FHWA Safety website at
(SPECIAL DETAIL) 6/16/22
THROUGH UPRIGHT AND RAIL
WITH VANDAL RESISTANT HARDWARE
LIGHTWEIGHT WARNING LIGHT ATTACHED
THROUGH UPRIGHT
WITH VANDAL RESISTANT HARDWARE
LIGHTWEIGHT WARNING LIGHT ATTACHED
DEPARTMENT DIRECTOR MICHIGAN DEPARTMENT OF TRANSPORTATION
OF
SHEET
PLAN DATEF.H.W.A. APPROVALCHECKED BY:
DRAWN BY:
Michigan Department of Transportation
APPROVED BY:
APPROVED BY:
Paul C. Ajegba
BY
PREPARED
DIRECTOR, BUREAU OF FIELD SERVICES
DIRECTOR, BUREAU OF HIGHWAY DEVELOPMENT
FIELD SERVICES
OPERATIONS
BUREAU OF FIELD SERVICES SPECIAL DETAIL FOR
Traffic Passing on Left
Traffic Passing on Both Sides
Traffic Passing on Right
SCT
1 1
CT
IMPACT ATTENUATOR
OBJECT MARKER
USE APPROPRIATE SIGN ACCORDING TO CONDITIONS
24"
24"
24"
NOTES:
3" (TYP.)
3" (TYP.)
OM-3La OM-3Ca OM-3Ra
PW:DOC/RD/TS/TYP/SIGNS/WORK ZONE/WZD-150-A.dgn
WZD-150-A
10/21/2008 JT
1. ALTERNATE BLACK 3-INCH AND YELLOW 3-INCH STRIPES AT A
45-DEGREE ANGLE.
2. THE YELLOW STRIPES SHALL MEET ASTM D4956 SPECIFICATIONS
FOR TYPE IX RETROREFLECTIVE SHEETING.
3. THE OBJECT MARKER SHALL BE MADE OF 0.040-INCH THICK
ALUMINUM.
4. ATTACH OBJECT MARKER TO ATTENUATOR NOSE WITH TWO
5/16-INCH DIAMETER HEX BOLTS, NUTS AND WASHERS (PREFERRED
METHOD) OR OTHER METHOD APPROVED BY THE ATTENUATOR
MANUFACTURER.
09/21/08(SPECIAL DETAIL)
Michigan Department of Transportation
DRAWN BY:
CHECKED BY: PLAN DATE
SHEET
BUREAU OF HIGHWAYS DELIVERY STANDARD PLAN FOR
FHWA APPROVAL DATE
ENGINEER OF DEVELOPMENT
ENGINEER OF DELIVERY
PREPARED BY
TRAFFIC AND SAFETY
File: Rev.NOT TO SCALE of
NOTE: THE ORIGINAL SIGNED COPY IS KEPT ON FILE AT THE MICHIGAN DEPARTMENT OF TRANSPORTATION.
6'-0"
(4 REQUIRED)
STEEL HEX BOLT WITH �" NUT
⅜" x 2½" - 16 ZINC COATED
1" ON CENTER, ALL FOUR SIDES
PSST STEEL TUBING WITH ⅜" HOLES
12 OR 14 GAGE GALVANIZED UPRIGHT
1¾" x 1¾" x 9'-0"
REFLECTIVE SHEETING
3'-4"
PLACED 6" FROM BOTTOM OF UPRIGHT
1" ON CENTER, ALL FOUR SIDES
PSST STEEL TUBING WITH ⅜" HOLES
12 GAGE GALVANIZED SLEEVE
2" x 2" x 3'-0"
ON THREE SIDES
IRON BY ¼" x 2" WELDS
ATTACH STUB TO ANGLE
FOR INSERTING UPRIGHT
6" HIGH (12 GAGE)
2" SQUARE STEEL TUBE
FRONT ELEVATIONSIDE VIEW
TEMPORARY SIGN SUPPORT
(WARNING LIGHT PLACED ON SIDE CLOSEST TO TRAFFIC)
(T Y
P
Z-BRACKET DETAIL
1¼"
1¾"
14 GAGE STEEL
3"
1½"1½"
�" DIA. HOLE
⅞
⅞
¾
PLACED IN OUTERMOST SLOT
AND BATTERY MUST BE
OF SIGN A MINIMUM OF 1"
MUST PROTRUDE FROM EDGE
WARNING LIGHT HOUSING
FROM THE EDGE LINE OF THE PANEL
WITH BOLT PROTECTION CUP. LOCATE BOLT 2" IN
Z-BRACKET ATTACHED WITH ½" x 4" HALF MOON BOLT
WITH 6 VOLT SINGLE LANTERN TYPE BATTERY HELD BY
LIGHTWEIGHT (3.3 LBS. MAX.) WARNING LIGHT TYPE A
2" x 2" x �" ANGLE * 2" x 2" x ¼" ANGLE OR
* SIGN STAND IS BALLASTED WITH FOUR OR MORE 35 LB SANDBAGS. A MINIMUM OF ONE ON EACH END.
UPRIGHTS SHALL NOT EXTEND ABOVE THE SIGN PANEL.
(OPTIONAL)
INSERTED IN THE HOLE OF PANEL
NYLON WASHER (SEE DETAIL BELOW)
TIGHTENED TO CUP WASHER
AND 1½" FLAT WASHER �" THICK
STEEL HEX BOLT WITH �" NUT
⅜" x 3" - 16 ZINC COATED
1¼" DIA. HOLE IN PANEL FOR
OPTIONAL NYLON WASHER
⅜" DIA. HOLE
⅛"1⅛"
(MEDIUM DENSITY OVERLAY PLYWOOD)
48" x 48" x ½" PANEL http://safety.fhwa.dot.gov/roadway_dept/road_hardware/wzd.htm
Other temporary sign supports meeting current NCHRP crash worthy criteria can be found on the FHWA Safety website at
(R U
R A
L
O R
(U R
B A
N
6/16/22SPECIAL DETAIL WZD-125-E 2 3
MICHIGAN DEPARTMENT OF TRANSPORTATION
PLAN DATEF.H.W.A. APPROVAL
SHEET
OF
BUREAU OF FIELD SERVICES SPECIAL DETAIL
WZD-125-E
NOTES:
PLASTIC DRUM
A
P P
R O
X
REMAINDER…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .