22377_ADD1_Narrative+Attachments_2023-0609.pdf
PDF 466 KB Posted
- Solicitation number
- RFP - 171 - 230000002253
- Issued by
- Kent County, Muskegon City, Michigan
About this file
This document is an Addendum to a Request for Proposal (RFP) issued by the Michigan Department of Technology, Management and Budget (DTMB) State Facilities Administration Design and Construction Division for the PJ Hoffmaster State Park Visitor Center Upgrades and Toilet Building Replacement project, file number 751/22377.HJD. The addendum provides clarifications, modifications, and additional information to the original RFP. Key details include the addition of design requirements for changing rooms/spaces in the Day Use Toilet Building, the elevated walkway/bridge connecting the parking lot to the Visitor Center building entrance, and masonry landscape/knee walls around the Visitor Center. The proposal due date is June 15, 2023.
The addendum also includes details on the availability of electronic templates for the required cost proposal forms, confirmation that there is no established project budget, and clarification that an automatic fire suppression system may not be required in the new toilet building. Interested firms must submit personnel billing rates, quantity of hours per phase, and professional fees per phase for each person assigned to the project.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 RFP (Rev 2/22) HJD 2023-0609
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
REQUEST FOR PROPOSAL
ADDENDUM NO. 1
This form identifies an Addendum to a Request for Proposal for Professional Services, and incorporates interpretations or clarifications, modifications, and other information into the Request for Proposals.
Addenda will be numbered by the Project Director and distributed through SIGMA Vendor VSS as an attachment.
TO: ALL PROPOSERS DATE ISSUED: June 9, 2023 PROJECT NAME: PJ Hoffmaster State Park
Visitor Center Upgrades and Toilet Building Replacement
FILE NUMBER: 751/22377.HJD
PROJECT DIRECTOR: Heather DeKorte PROPOSAL DUE DATE: June 15, 2023
ADDENDUM ITEMS:
Attachments:
1. Pre-proposal Sign-In Sheet dated 5/31/2023.
2. Elevator equipment warranty dated 10/27/2000.
Clarifications:
3. Gillette Visitor Center Addition and Renovation 1999 Preliminary Drawings (25 pages) will be provided to the awarded PSC. File size is too large to post with this Addendum. PSC must field verify existing conditions. Drawings include Site survey & site plan, demolition & new plans, exterior & interior elevations, building section, bridge renovation, foundation, framing, & roof plans, framing & structural details, mechanical demolition and proposed plans, plumbing plan, plumbing schedule/diagrams, electrical demolition, electrical and lighting plans, schedules, diagrams.
4. Section II, Part 1 Technical – do not provide a construction budget analysis for this Proposal request.
5. Section III, Part II Cost – for each consultant firm hired by the PSC, submit personnel billing rates, quantity of hours per phase, and professional fees per phase for each person assigned to this project.
Modifications:
6. Day Use Toilet Building: Include design for changing rooms/spaces in the scope of services.
7. Visitor Center: Include the elevated walkway/bridge that connects the parking lot to the building entrance in the scope of services.
8. Visitor Center: Include the masonry landscape/knee walls around the building in the scope of services.
Questions/Answers Q1. Are there available electronic 'templates' of Tables III-2-A ....III-2-B.....III-2-C and III-2-D that can be 'edited' for this specific Project? If so, could you please advise where they may be located on the website?
A1. Form DTMB-0430 RFP Billable Rate editable form is not available online, but I have included a blank word document form to this e-mail for your use with the tables.
Q2. Could you provide the Proposed Project Budget?
A2. There is no established budget for the project currently. The project budget will be established by the PSC with input from the DNR and Construction Manager during the initial phases of the design process.
Q3. Will an Automatic Fire Suppression system be required in the Picnic Shelter and the New Toilet Room Building?
A3. I am not aware of fire suppression being installed in any newly constructed DNR toilet/shower buildings in the recent past. Final determination is the responsibility of the PSC.
APPROVED BY: PROJECT DIRECTOR Heather DeKorte DATE 6/9/2023 http://www.buy4michigan.com/