This document is a set of engineering plans and specifications for the "MSP Parking Lot Replacements - Bid Pack 2 Lapeer" project issued by the Michigan Department of Technology, Management and Budget (DTMB) State Facilities Administration Design and Construction Division. The project consists of removing and replacing concrete sidewalks, repaving asphalt within the parking lot, removing existing landscaping and replacing with proposed asphalt pavement to include the addition of 12 parking spaces, and other associated improvements at the Lapeer Post #34 facility located at 975 S. Main St. in Lapeer, Michigan. The project plans are issued for bid with a bid due date of 2023-04-06. The project will be located within Lapeer County and the City of Lansing.
The construction plans provide detailed information on the existing site conditions, demolition requirements, proposed site layout and utility plans, grading, and civil details. The contractor is responsible for all permitting fees and shall conform to the City of Lapeer and Lapeer County's current standards and specifications. Funding for the project will be provided by the State of Michigan, and the contract will be awarded to the lowest responsive and responsible bidder.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COVER SHEET
C-100
MICHIGAN
APPROX SCALE 1"= 50 MILES
LAPEER COUNTY
SCALE: 1"=2000'
N
ADDENDUM
NTH Consultants, Ltd.
Infrastructure Engineering Environmental Services Facilities Engineering
Northville, MI Lansing, MI Detroit, MI Grand Rapids, MI
PROJECT NAME:
REV DATE: DESCRIPTION
REVISION BLOCK
PROJECT LOCATION:
SHEET TITLE:
NTH PROJECT NO.:DESIGNED BY:
SHEET NUMBER:
DATE:
CAD FILE NAME:
SHEET SIZE:
22000364-COV
22000364
SEAL/STAMP:
KEY MAP:
DRAWN BY:
CHECKED BY:
ARCH D (24"x36")
NORTH ARROW:
3 WORKING DAYS
1-800-482-7171
CALL MISS DIG
BEFORE YOU DIG
N
Livonia, MI (Laboratory) www.nthconsultants.com
SUBMITTAL LOG
DATE PACKAGE NAME
JBB
JBB
SLG
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE OF MICHIGAN
ADAM P. LACH, RA, DIRECTOR
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
C
LA
R K
R D
BA
LD
W
IN
R D
McCORMICK DR
SITE
MSP PARKING LOT
REPLACEMENTS - BID
PACK 2 LAPEER
LAPEER POST #34
975 S. MAIN ST.
LAPEER, MI 48446
4/6/2023
2022-11-04 30% DRAWINGS
50% DRAWINGS
90% DRAWINGS
100% DRAWINGS
2022-12-07 2023-01-13 2023-02-21
ISSUED FOR BID2023-03-09
2023-04-06: REVISIONS PER PRE-BID
MEETING DISCUSSION
PROJECT LOCATION:
LAPEER FACILITY
ADDRESS:
975 S. MAIN ST.
LAPEER, MI 48446
TOWNSHIP AND RANGE:
T7N R10E S8
PROJECT DESCRIPTION:
THE MSP PARKING LOT REPLACEMENTS - BID PACK 2 LAPEER PROJECT
CONSISTS OF:
· REMOVE AND REPLACE EXISTING CONCRETE SIDEWALK
· REPAVE ASPHALT WITHIN PARKING LOT
· REMOVE EXISTING LANDSCAPE AND REPLACE WITH PROPOSED
ASPHALT PAVEMENT TO INCLUDE THE ADDITION OF 12 PARKING SPACES
· OTHER IMPROVEMENTS ASSOCIATED TO THE ITEMS ABOVE
EXISTING ZONING:
M-1 LIGHT INDUSTRIAL
SETBACKS:
FRONT YARD: 30 FEET
SIDE AND REAR YARD
FROM ADJACENT INDUSTRIAL: 10 FEET
FROM ADJACENT COMMERCIAL: 20 FEET
FROM ADJACENT RESIDENTIAL: 50 FEET
CITY OF LAPEER ZONING ORDINANCE RESOLUTION
#11-322 EFFECTIVE 11-30-2011, (8-9)
@ AT
℄ CENTERLINE
° DEGREE OR DEGREES
Ø DIAMETER
' FOOT, FEET
" INCH, INCHES
# NUMBER OR POUND
± PLUS OR MINUS
A
B
C
D
E
F
G
H
I
J
L
M
N
O
P
R
S
T
U
V
W
Y
Sheet List Table
C-100 COVER SHEET
C-101 TOPOGRAPHIC SURVEY (BY OTHERS)
C-102 EXISTING CONDITIONS AND DEMOLITION
C-103 SOIL EROSION AND SEDIMENT CONTROL PLAN
C-104 PROPOSED SITE AND UTILITY PLAN
C-105 PROPOSED GRADING PLAN
C-501 CIVIL DETAILS (SHEET 1 OF 2)
C-502 CIVIL DETAILS (SHEET 2 OF 2)
MSP PARKING LOT REPLACEMENTS -
BID PACK 2 LAPEER
ENGINEERING SITE PLANS - ISSUED FOR BID
LAPEER POST #34: 975 S. MAIN ST. LAPEER, MI 48446
DTMB PROJECT NO. 551/22225.MNB
NTH PROJECT NO. 22000364
CONSTRUCTION NOTES:
1. ALL WORK PROVIDED SHALL CONFORM TO THE CITY OF LAPEER
AND LAPEER COUNTY'S CURRENT STANDARDS AND
SPECIFICATIONS.
2. PROVIDE A FULL-TIME FOREMAN OR SUPERINTENDENT THAT WILL
BE ON SITE WHILE PERFORMING ALL WORK ON THIS PROJECT.
3. NOTIFY DTMB'S PROJECT MANAGER AND NTH CONSULTANTS, LTD
(THE ENGINEER) WHEN FOREMAN OR SUPERINTENDENT CHANGES
ARE PLANNED. CHANGES IN FOREMAN OR SUPERINTENDENT
PERSONNEL MUST BE APPROVED BY OWNER IN ADVANCE.
4. PROVIDE WEEKLY PROGRESS REPORTS VIA EMAIL TO DTMB'S
PROJECT MANAGER AND NTH'S REPRESENTATIVE.
5. CONTRACTOR IS RESPONSIBLE FOR ALL PERMITTING FEES
ASSOCIATED WITH THIS PROJECT
6. CONTRACTOR TO INCLUDE CLEANING OF ALL STORM PIPING
WITHIN PROJECT SCOPE AREAS NOTED ON THE PLANS AS PART OF
BASE BID.
OWNER:
DTMB
State Facilities Administration Design and Construction Division 3111 W. St. Joseph Street Lansing, Michigan 48917 Owner Contact: Chris Bahjet, P.E.
Phone: 517-749-7519
ENGINEER:
NTH Consultants, LTD.
41780 Six Mile Road Northville, Michigan 48168 Contact: Brock Bosack, P.E.
Phone: 248-662-2039
NO EX. BASE FOUND. REMOVE EX.
ASPHALT (FULL DEPTH) AND ADD
AGGREGATE BASE PER PAVEMENT
SECTION (TYP.)
CLEAN OUT DEBRIS FROM PIPE AND INSPECT PIPE RUN USING CCTV (TYP.)
PROTECT EX. SHED AND CONCRETE
SLAB. REMOVE EX. CONCRETE UP TO
CURB AROUND SLAB.
PROTECT EX.
SIGN (TYP.)
PROTECT EX. LIGHT
POLE (TYP.)
REMOVE AND DISPOSE OF
DUMPSTER ENCLOSURE. RE-INSTALL
UPON COMPLETION OF PAVEMENT
REHABILITATION.
PROTECT EX. INFORMATION
STATION (TYP.)
EX. ASPHALT PAVEMENT
TO BE REMOVED: MILL
AND OVERLAY (TYP.)
EX. CONCRETE
PAVEMENT TO
REMAIN (TYP.)
EX. CONCRETE
SIDEWALK TO BE
REMOVED (TYP.)
PROTECT EX.
MAILBOX
EX. LANDSCAPE TO BE
REMOVED (TYP.)
EX. STONE TO
REMAIN (TYP.)
EX. TREE TO
REMAIN (TYP.)
EX. LANDSCAPE TO
REMAIN (TYP.)
EX. FENCE TO
REMAIN (TYP.)
EX. WALL TO REMAIN (TYP.)
PROTECT EX.
PROPANE TANK
EX. DRIVEWAY
APPROACH TO
REMAIN
PROTECT EX.
BUILDING (TYP.)
PROTECT EX.
SEWER CLEANOUT
MILL AND OVERLAY EX. ASPHALT
(3" DEPTH)
MILL AND OVERLAY EX. ASPHALT
(4" DEPTH)
MILL AND OVERLAY EX. ASPHALT
(3" DEPTH)
REMOVE EX. SIGN
AND RELOCATE
REMOVE EX. COVER AND REPLACE
WITH NEW COVER. SEE SITE PLAN
FOR MORE INFORMATION
SAWCUT EX.
PAVEMENT
REMOVE EX. SIGN
AND RELOCATE
EXISTING CONDITIONS AND
DEMOLITION
C-102
ADDENDUM
NTH Consultants, Ltd.
Infrastructure Engineering Environmental Services Facilities Engineering
Northville, MI Lansing, MI Detroit, MI Grand Rapids, MI
PROJECT NAME:
REV DATE: DESCRIPTION
REVISION BLOCK
PROJECT LOCATION:
SHEET TITLE:
NTH PROJECT NO.:DESIGNED BY:
SHEET NUMBER:
DATE:
CAD FILE NAME:
SHEET SIZE:
22000364 - DEMO
22000364
SEAL/STAMP:
KEY MAP:
DRAWN BY:
CHECKED BY:
ARCH D (24"x36")
NORTH ARROW:
3 WORKING DAYS
1-800-482-7171
CALL MISS DIG
BEFORE YOU DIG
N
Livonia, MI (Laboratory) www.nthconsultants.com
SUBMITTAL LOG
DATE PACKAGE NAME
JBB
JBB
SLG
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE OF MICHIGAN
ADAM P. LACH, RA, DIRECTOR
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
C
LA
R K
R D
BA
LD
W
IN
R D
McCORMICK DR
SITE
MSP PARKING LOT
REPLACEMENTS - BID
PACK 2 LAPEER
LAPEER POST #34
975 S. MAIN ST.
LAPEER, MI 48446
4/6/2023
2022-11-04 30% DRAWINGS
50% DRAWINGS
90% DRAWINGS
100% DRAWINGS
2022-12-07 2023-01-13 2023-02-21
ISSUED FOR BID2023-03-09
2023-04-06: REVISIONS PER PRE-BID
MEETING DISCUSSION
N
EXISTING AIR CONDITIONING UNIT
EXISTING FIRE HYDRANT
EXISTING LIGHT POLE
SOIL BORING LOCATION
EXISTING MANHOLE
EXISTING TRANSFORMER
EXISTING WATER VALVE
EXISTING GAS METER
EXISTING UTILITY POLE
EXISTING BOLLARD
EXISTING HANDICAP PARKING
EXISTING SIGN
EXISTING CATCH BASIN
PARCEL BOUNDARY LINE
EXISTING BUILDING OVERHANG
EXISTING BUILDING
EXISTING EDGE OF PAVEMENT
EXISTING CONCRETE CURB
EXISTING FENCE
EXISTING PARKING STRIPE
EXISTING TREE
EXISTING LANDSCAPE TO REMAIN
EXISTING TELEPHONE RISER
LEGEND
EXISTING WATER LINE
EXISTING STORM LINE
EXISTING SANITARY LINE
EXISTING OVERHEAD UTILITY LINE
EXISTING GAS LINE
EXISTING ELECTRIC LINE
EXISTING UNDERGROUND CABLE
EXISTING LANDSCAPING TO BE REMOVEDDEMOLITION NOTES
1. TOPOGRAPHIC SURVEY WAS PERFORMED BY KEM-TEC DATED
SEPTEMBER 29, 2022. ALL EXISTING INFORMATION SHOWN IS FROM
THIS SURVEY OF RECORD OR WAS SUPPLEMENTED BY INFORMATION
FROM SITE VISITS, PREVIOUSLY-SUBMITTED SITE PLANS, OR
HISTORICAL DRAWINGS.
2. ALL SITE FEATURES AND UTILITIES TO BE DEMOLISHED ARE SHOWN
IN BOLD. CONTRACTOR TO PROTECT ALL EXISTING ITEMS TO REMAIN.
3. PRIOR TO COMMENCING ANY WORK, THE CONTRACTOR SHALL
OBTAIN ALL PERMITS REQUIRED BY AUTHORITIES HAVING
JURISDICTION (AHJ).
4. PRIOR TO COMMENCING ANY WORK, THE CONTRACTOR SHALL
PHOTOGRAPH OR VIDEOTAPE ALL EXISTING CONDITIONS OF NEARBY
PUBLIC AND PRIVATE PROPERTY, INCLUDING STRUCTURES, ROADS,
EASEMENTS, SIDEWALKS, ETC.
5. PRIOR TO DEMOLITION, ALL REQUIRED SOIL EROSION AND SEDIMENT
CONTROL DEVICES ARE TO BE INSTALLED AND REQUISITE PART 91
PERMIT OBTAINED.
6. CONTRACTOR SHALL MAINTAIN ALL EXISTING ROADS, SIDEWALKS,
DRIVES, ETC. CLEAR AND FREE FROM ANY CONSTRUCTION ACTIVITY
AND/OR MATERIAL TO ENSURE EASY AND SAFE PEDESTRIAN AND
VEHICULAR TRAFFIC AT ALL TIMES.
7. CONTRACTOR MUST PROTECT THE PUBLIC AT ALL TIMES WITH
FENCING, BARRICADES, ENCLOSURES, TRAFFIC CONTROL, ETC.
CONFORMING T0 BEST PRACTICES AND LOCAL REQUIREMENTS.
8. THE LOCATIONS OF EXISTING UTILITIES SHOWN ON THIS PLAN ARE
GIVEN FOR THE CONVENIENCE OF THE CONTRACTOR. THE OWNER
AND OWNERS REPRESENTATIVE ASSUMES NO RESPONSIBILITY FOR
THEIR ACCURACY. CONTRACTOR SHALL BE RESPONSIBLE FOR
VERIFYING EXISTING CONDITIONS AND INFORMING OWNER OF ANY
DEVIATIONS PRIOR TO BEGINNING DEMOLITION WORK.
9. THE CONTRACTOR IS RESPONSIBLE FOR THE DEMOLITION, REMOVAL,
AND DISPOSAL OF ALL STRUCTURES, WALLS, ASPHALT AND
CONCRETE AND OTHER ITEMS SHOWN FOR DEMOLITION. ALL
EXISTING ASPHALT AND CONCRETE TO BE REMOVED SHALL BE
MILLED AND DISPOSED IN AN ENVIRONMENTALLY LEGAL MANNER OR
REUSED ON-SITE IN LOCATIONS DETERMINED BY THE OWNER.
10. ALL BUILDING STRUCTURES TO BE REMOVED SHALL BE BROUGHT TO
GRADE WITH SUITABLE FILL AND INSTALLED PER SPECIFICATIONS.
11. SHOULD REMOVAL AND/OR RELOCATION ACTIVITIES DAMAGE ANY
EXISTING STRUCTURE AND/OR ITEM PROPOSED T0 REMAIN ON
ADJACENT PROPERTIES, THEN THE CONTRACTOR SHALL MAKE ALL
NECESSARY REPAIRS AT THEIR OWN EXPENSE. ALL CONSTRUCTION
MATERIALS SHALL BE OF EQUAL OR HIGHER QUALITY AND SHALL BE
APPROVED BY OWNERS REPRESENTATIVE.
EXISTING CONCRETE TO REMAIN
EXISTING ASPHALT PAVEMENT TO REMAIN
EXISTING ASPHALT TO MILL AND OVERLAY
EXISTING CONCRETE TO BE REMOVED
REMOVE ASPHALT (FULL-DEPTH) AND ADD SUB-BASE
CLEAN OUT PIPE AND INSPECT WITH CCTV
SAWCUT LINE
EX:860.12
863863
860 858859
PR. PEDESTRIAN
RAMP. SEE DETAIL 17
ON SHEET C-502
PR. CONCRETE PAVEMENT AT
DUMPSTER LOCATION. SEE
DETAIL 6 ON SHEET C-501
RELOCATE EX. "DO NOT
ENTER" SIGNS
PR. ASPHALT PAVEMENT. SEE
DETAIL 5 ON SHEET C-501.PR. CONCRETE SIDEWALK. SEE
DETAIL 7 ON SHEET C-501
ADA STRIPING EAST OF
ADA-ACCESSIBLE SPACE. SEE
DETAIL 15 ON SHEET C-501. 2
COATS BLUE PAINT (TYP.)
PR. CONCRETE COLLAR (TYP.) SEE
DETAIL 13 ON SHEET C-501
PR. DETECTABLE
WARNING. SEE DETAIL
18 ON SHEET C-502
PR. CURB. SEE DETAIL
8 ON SHEET C-501
PR. ISOLATION JOINT
AROUND SHED CURB. SEE
DETAIL 11 ON SHEET C-501.
INSTALL NEW WOOD FENCE
ENCLOSURE. SEE DETAIL 19
ON SHEET C-502
PR. PAVEMENT STRIPING PER
SPECIFICATION SECTION 32 1723.13. 2
COATS YELLOW PAINT (TYP.)
CHANGE CATCH BASIN COVER FROM BEEHIVE
TO EJIW 1040 TYPE M3 OR ENGINEER-APPROVED
EQUIVALENT. ADJUST RIM ELEVATION PER PR.
GRADING PLAN ON SHEET C-105.
PR. ADA-ACCESSIBLE SPACE.
SEE MARKING SYMBOL DETAIL
16 ON SHEET C-501
PROPOSED SITE AND
UTILITY PLAN
C-104
ADDENDUM
NTH Consultants, Ltd.
Infrastructure Engineering Environmental Services Facilities Engineering
Northville, MI Lansing, MI Detroit, MI Grand Rapids, MI
PROJECT NAME:
REV DATE: DESCRIPTION
REVISION BLOCK
PROJECT LOCATION:
SHEET TITLE:
NTH PROJECT NO.:DESIGNED BY:
SHEET NUMBER:
DATE:
CAD FILE NAME:
SHEET SIZE:
22000364 - LAY
22000364
SEAL/STAMP:
KEY MAP:
DRAWN BY:
CHECKED BY:
ARCH D (24"x36")
NORTH ARROW:
3 WORKING DAYS
1-800-482-7171
CALL MISS DIG
BEFORE YOU DIG
N
Livonia, MI (Laboratory) www.nthconsultants.com
SUBMITTAL LOG
DATE PACKAGE NAME
JBB
JBB
SLG
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE OF MICHIGAN
ADAM P. LACH, RA, DIRECTOR
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
C
LA
R K
R D
BA
LD
W
IN
R D
McCORMICK DR
SITE
MSP PARKING LOT
REPLACEMENTS - BID
PACK 2 LAPEER
LAPEER POST #34
975 S. MAIN ST.
LAPEER, MI 48446
4/6/2023
2022-11-04 30% DRAWINGS
50% DRAWINGS
90% DRAWINGS
100% DRAWINGS
2022-12-07 2023-01-13 2023-02-21
ISSUED FOR BID2023-03-09
2023-04-06: REVISIONS PER PRE-BID
MEETING DISCUSSION
N
EXISTING AIR CONDITIONING UNIT
EXISTING FIRE HYDRANT
EXISTING LIGHT POLE
SOIL BORING LOCATION
EXISTING MANHOLE
EXISTING TRANSFORMER
EXISTING WATER VALVE
EXISTING GAS METER
EXISTING UTILITY POLE
EXISTING BOLLARD
PROPOSED HANDICAP PARKING
EXISTING SIGN
EXISTING CATCH BASIN
PARCEL BOUNDARY LINE
EXISTING BUILDING OVERHANG
EXISTING BUILDING
EXISTING EDGE OFPAVEMENT
EXISTING CONCRETE CURB
EXISTING FENCE
EXISTING PARKING STRIPE
EXISTING TREE
EXISTING CONCRETE TO REMAIN
PROPOSED CONCRETE
PROPOSED ASPHALT
EXISTING TELEPHONE RISER
LEGEND
EXISTINGPARKING SCHEDULE PROPOSED
EXISTING WATER LINE
EXISTING STORM LINE
EXISTING SANITARY LINE
EXISTING OVERHEAD UTILITY LINE
EXISTING GAS LINE
EXISTING UNDERGROUND ELECTRIC LINE
EXISTING UNDERGROUND CABLE
GENERAL NOTES
1. TOPOGRAPHIC SURVEY WAS PERFORMED KEM-TEC DATED SEPTEMBER 29, 2022.
ALL EXISTING INFORMATION SHOWN IS FROM THIS SURVEY OF RECORD OR WAS
SUPPLEMENTED BY INFORMATION FROM SITE VISITS, PREVIOUSLY-SUBMITTED
SITE PLANS, OR HISTORICAL DRAWINGS.
2. ALL UTILITY LOCATIONS ARE APPROXIMATE. VERIFY UTILITY LOCATIONS PRIOR TO
CONSTRUCTION. CONTACT MISS DIG A MINIMUM OF 3 WORKING DAYS PRIOR TO
CONSTRUCTION.
3. THE CONTRACTOR SHALL PROVIDE NECESSARY TRAFFIC CONTROL AND SIGNAGE
TO MAINTAIN ACCESS TO AND WITHIN PROPERTY THROUGHOUT CONSTRUCTION
IN ACCORDANCE WITH LOCAL, COUNTY AND STATE REQUIREMENTS OR AS
DIRECTED BY ENGINEER. CONTRACTOR SHALL PROVIDE APPROPRIATE
BARRICADES AROUND WORK AREAS FOR PEDESTRIAN AND VEHICULAR SAFETY.
4. THE CONTRACTOR SHALL AVOID DAMAGE TO THE EXISTING ITEMS DESIGNATED
TO REMAIN. ANY DAMAGE THAT OCCURS AS A RESULT OF THE CONTRACTOR'S
OPERATIONS SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST
TO THE OWNER.
5. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND MAINTAINING ALL
NECESSARY CONSTRUCTION STAKING AND GRADE AND ALIGNMENT CONTROLS.
6. ALL EXISTING SITE FEATURES SHALL BE PROTECTED UNLESS OTHERWISE
INDICATED ON PLANS.
7. ALL AREAS OF EARTH DISTURBANCE CAUSED BY CONSTRUCTION ACTIVITIES
SHALL BE SEEDED AND MULCHED WITH 3" TOPSOIL AND MDOT CLASS A SEED
WHERE FINAL EARTH STABILIZATION MEASURES ARE NOT SPECIFICALLY
DESIGNATED.
PROPOSED LANDSCAPE RESTORATION
CIVIL DETAILS (SHEET 1 OF
2)
C-502
22000364 - DET
ADDENDUM
NTH Consultants, Ltd.
Infrastructure Engineering Environmental Services Facilities Engineering
Northville, MI Lansing, MI Detroit, MI Grand Rapids, MI
PROJECT NAME:
REV DATE: DESCRIPTION
REVISION BLOCK
PROJECT LOCATION:
SHEET TITLE:
NTH PROJECT NO.:DESIGNED BY:
SHEET NUMBER:
DATE:
CAD FILE NAME:
SHEET SIZE:
22000364 - DET
22000364
SEAL/STAMP:
KEY MAP:
DRAWN BY:
CHECKED BY:
ARCH D (24"x36")
NORTH ARROW:
3 WORKING DAYS
1-800-482-7171
CALL MISS DIG
BEFORE YOU DIG
N
Livonia, MI (Laboratory) www.nthconsultants.com
SUBMITTAL LOG
DATE PACKAGE NAME
JBB
JBB
SLG
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE OF MICHIGAN
ADAM P. LACH, RA, DIRECTOR
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
C
LA
R K
R D
BA
LD
W
IN
R D
McCORMICK DR
SITE
MSP PARKING LOT
REPLACEMENTS - BID
PACK 2 LAPEER
LAPEER POST #34
975 S. MAIN ST.
LAPEER, MI 48446
4/6/2023
2022-11-04 30% DRAWINGS
50% DRAWINGS
90% DRAWINGS
100% DRAWINGS
2022-12-07 2023-01-13 2023-02-21
ISSUED FOR BID2023-03-09
2023-04-06: REVISIONS PER PRE-BID
MEETING DISCUSSION
SIDEWALK RAMP
SIDEWALK RAMP
DUMPSTER FENCE ENCLOSURE
| MSP Parking Lots 2023 Bid Pack 2 Addendum 1 2023-04-06 C-100 |
| MSP Parking Lots 2023 Bid Pack 2 Addendum 1 2023-04-06 C-102 |
| MSP Parking Lots 2023 Bid Pack 2 Addendum 1 2023-04-06 C-104 |
| MSP Parking Lots 2023 Bid Pack 2 Addendum 1 2023-04-06 C-502 |
File details come from the government source that posted it. Updated .