22015 Vault Toilet (Wheeler).pdf
PDF 919 KB Posted
- Attached to
- PMAA, RMSB, Vault Toilet Replacement (Wheeler)
- Solicitation number
- DQ1 PMAA 2015001619 1
- Issued by
- Colorado
About this file
This is a technical drawing document for a vault toilet facility project at Wheeler located within Steamboat Lake Parks. The project consists of design drawings and specifications for the construction of a vault toilet installation, as evidenced by the three sheet set including a cover sheet, site plan, and construction details. The document references project files dated June 12, 2015, and appears to be part of the design phase documentation for this park infrastructure improvement. The drawings were prepared using AutoCAD and contain comprehensive site and construction detail information necessary for bidding and construction purposes.
The document does not contain information regarding pricing terms, bidding deadlines, set-asides, funding sources, or contract award dates. As a design drawing set, it serves as the technical specification basis for the vault toilet construction project rather than as a procurement notice or contract solicitation document. The three sheets—cover sheet, site plan, and details—provide the graphic and technical requirements that would form part of a larger project package for contractors to use in preparing bids for the construction work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1Steamboat Lake State Park - Wheeler Vault Toilet Replacement.pdf | ||
| 3tioga_dwgs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q
P R
O J
E C
T S
_P ar ks
\S te am bo at L ak e\
V au lt To ile t (
W he el er
)\1 -D
ES
IG
N \7
- D ra w in gs \2
V au lt To ile t (
W he el er
).d w g, /1 2/
0:
:3
A
M
P R
O J
E C
T S
_P ar ks
\S te am bo at L ak e\
V au lt To ile t (
W he el er
)\1 -D
ES
IG
N \7
- D ra w in gs \2
V au lt To ile t (
W he el er
).d w g, /1 2/
0:
:0
P R
O J
E C
T S
_P ar ks
\S te am bo at L ak e\
V au lt To ile t (
W he el er
)\1 -D
ES
IG
N \7
- D ra w in gs \2
V au lt To ile t (
W he el er
).d w g, /1 2/
0:
:1
| 2015 Vault Toilet (Wheeler)-1 Cover Sheet |
| 2015 Vault Toilet (Wheeler)-2 Site Plan |
| 2015 Vault Toilet (Wheeler)-3 Details |
File details come from the government source that posted it. Updated .