The provided document is a Statement of Work (SOW) for a state and local contract opportunity issued by Fort Barfoot for the renovation of 6 barracks facilities within the 2200 area. The project will include HVAC, plumbing, electrical, painting, and carpentry work to address heating renovations, bathroom upgrades, and lighting/painting. A mandatory pre-bid conference will be held on July 2, 2024, at 10:00 AM in Building 2208. The contract will be awarded by the State of Virginia and Nottoway County. The work is expected to be completed within the awarded contract term.
The SOW outlines the detailed scope of work, including demolition, construction, painting, and specialty requirements. Pricing and funding information is not provided. The contract opportunity is open to all qualified bidders, and there is no mention of any set-asides or incumbents. Bidders will need to provide their own means and methods for furniture removal, storage, and protection of floors during construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BID FORM for 2200 Barracks repairs.pdf | ||
| Question Form for IFB - 2200 Barracks repairs.pdf | ||
| IFB-2200 Barracks.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
2200 Area
(2208, 2209, 2210, 2217, 2218, & 2219)
Ft. Barfoot is inviting your company to participate in bidding on the following project intended for the lower 2200 area. (6 barracks)
Ft. Barfoot DPW is proposing projects to include heating renovations, bathroom upgrades and Lighting/Painting within the 2200 area facilities. This project will consist of the below listed renovations in 6 barracks.
Below are the intended renovations that will be expected to be performed within these projects.
Contractor shall provide submittals for all replacement equipment for approval prior to preforming the task. DPW can provide specs from prior jobs if requested.
General Conditions:
• Supply own dumpsters for demolished materials and trash, excluding sheet metal. Dumpsters for sheet metal shall be provided by DPW.
• Any leaks or structural damage discovered during construction will be addressed via change order.
• Hazardous Materials Abatement is excluded.
• Owner to remove and reinstall LM Series Surge Suppression panel, fire alarm devices, and fire alarm piping in Mechanical Rooms.
• All floors are to be protected from damage during work.
• Contractor is to provide means and method for furniture removal and storage during work to allow for painting and installations.
Demolition:
• Remove and dispose of all fuel oil piping, associated fittings, and controls.
• Remove existing exterior doors.
• Demolish concrete floor in the mechanical room for the new 2" copper water pipe into the building. (Typical of 4 Barracks)
• Remove louver in exterior wall of Mechanical Room. (REMOVE THIS)
• For the walls marked on the attached floor plan, remove the existing wood slats and drywall. Leave the existing wood slat at the floor level so the existing base and shoe molding are not disturbed.
• Remove interior wall (drywall and insulation) of Mechanical Room to structure.
• Remove all mechanical and plumbing equipment, including ductwork, piping, and controls. Remove existing electrical connections.
• Remove return filter grille.
• Remove all plumbing fixtures and associated waste and water piping.
Patch all unneeded wall, floor, and ceiling penetrations.
• Remove water cooler and associated piping.
• Remove all lights and receptacles, including puck lights in the barracks. Puck lights are to be turned over to DPW.
• Remove and replace portion of foundation skirting for access to crawlspace for new plumbing.
• Remove chimney to roof level.
• Remove (2) windows in Latrine and salvage to DPW.
• Remove concrete floor slab and curbs in existing Latrine.
• Remove any rotten floor joists in the Latrine.
• Frame new wall opening for new door into Latrine.
• Remove existing second floor ceiling and insulation.
• Remove conduit mounted to any walls and ceilings that are to be demolished. Where possible, save conduit for re-use.
• Remove rotten thresholds and fascia boards at exterior doors.
Fuel Oil Tank Removal Notes:
• DMA will be responsible for removing any fuel oil remaining in the tanks.
• Once tanks are empty, dispose of any remaining sludge from the tank, perform soil testing, and submit any required DEQ documentation.
• Remove fuel oil tanks and place them in the designated storage area at Fort Barfoot.
• Remove concrete pads and bollards.
Construction:
• Replace all stair treads in Barracks 2208
• Install new 5/8" sheet rock ceiling and R-38 batt attic insulation on second floor
• Install new walls and ceiling in mechanical room with double layered 5/8" sheet rock and R-19 batt insulation.
• Frame in openings of exterior doors to fit new 42” doors.
• Install PVC trim around new exterior doors.
• Repair and patch wall at removed return grille location. (Mechanical Room Wall)
• Install wall framing for (2) 20”W x 25”H return grilles.
• Install New 4” walls in Latrine with 7/16" plywood and FRP to ceiling.
• Frame existing door opening to Latrine.
• Infill wall and metal siding in Latrine where 2 windows were removed.
Include R-19 insulation.
• Frame for qty (2) wall mounted exhaust fans in Latrine.
• Replace rotten floor joist in Latrine with new joist and install 2 layers of 3/4” plywood over entire Latrine floor area.
• Install metal thresholds at all exterior doors and latrine door. Replace rotten wood at threshold supports.
• Frame and install 22"x30" pull down stair attic access door near furnace installation in attic
• Install minimum 24" wide 3/4" plywood catwalk and service platform for 30" service clearance to furnace location in attic.
• Replace (4) 32” W x 78” H rear exterior doors with hollow metal doors and frames.
• Replace front and side doors with 42” W x 78” H hollow metal exterior doors and frames.
• Install DPW selected door hardware with Best 7 pin, Type K lock cores on all new exterior and interior doors. Front door to have panic bar with core and side doors to have latches.
• Install new 36"Wx80"H wood door with hardware at Latrine.
Swing toward barracks
• Replace both gable end louvers (approximately 2’x3’)
• Install epoxy floor with 4" wall base in latrine. DuraFlex
MacroChip. Color -Cobblestone
• Install rubber stair treads on wood stairs in Barracks 2208
• Install 2'x2' ceiling grid and moisture resistant lay-in ceiling tile in latrine
• Install new mechanical room walls with (2) 5/8" layers of sheet rock and R-19
• Replace plaster walls with 5/8" sheet rock in areas designated by
DPW
• Patch and caulk at all new floor-ceiling penetrations of new plumbing vent pipes
Painting:
• Paint all interior doors and frames Sherwin Williams Network Gray and exterior doors, steps, and landings to match existing.
• Paint new drywall at wall repairs (floor to ceiling) at the interior walls noted by DPW
• Paint new sheet rock second floor ceiling
• Paint new exposed duct on first floor.
• Paint mechanical room.
• Paint the new drywall ceiling on the second floor (entire second floor area)
• Paint exterior metal siding at infill locations.
Specialties:
• Install toilet partitions for (4) water closets per drawing provided by DPW. The partitions are to be a complete product with doors, door hardware, trim pieces, and toilet paper holders. ASI Global Partitions -color - Caramel
• Install mirrors and toiletry shelving at each lavatory. DPW to confirm selections.
Plumbing:
• Consult DPW for new latrine fixture layout to include: (2) urinals, (4) showers, (5) lavatories, (4) water closets with partitions. Showers to be 36" stalls. New fixtures to be vented with schedule 40 PVC pipe connected to existing vent through roof. Move interior wall for clearances. All existing piping to be removed back to exterior shut-off and replaced with new schedule 40 PVC waste piping and PEX water pipe with shut off valves from 1-1/2" hot and 2" cold copper pipe manifold.
• Fixture models are as follows: Urinal - Kohler Bardon K-4991-ET; Water closet -Kohler Wellcomme Ultra - comfort height; Flush valves - Sloan;
Lavatory - Kohler Chesapeake 1724; Faucet - T&S BA-2711-VF05; Shower - Oasis Legacy SH-3636; Shower Fixture - Symmons Origins S9601-PLR with integral service stops; Wall hydrant near urinals - Woodford 26
• Install 1" copper ells at urinal and 1" water closet copper stub outs.
The ells can be secured with clamps or install ells with ear fasteners.
• Install (2) new floor drains in Latrines with 3" PVC sewer pipe. (1) at the shower area and (1) near urinals and sinks.
• Install new bottle fill water cooler Elkay model LZS8WSSP with filter.
• Install Rheem Triton model GHE100CU-200(A) 199 MBH LP Gas Fired Tank Type Water Heater, Rheem model ST120(A) 120 gallon storage tank, Bell & Gossett Series 100 Pump -1/12 hp with Aquastat control, Mainline model MLST25V, PVC Wall Concentric Vents. Retain existing for DPW.
Consult DPW for placement and piping layout.
• Install Fiat model MSB2424 Mop Receptor and T&S model BA-0665- BSTR wall hung faucet fixture in hallway under staircase.
• Fire caulk pipe penetrations from mechanical room.
• Jet or flush waste pipe to main sewer pipe
• Install new 2" water pipe (copper or schedule 80 PVC pipe) from corp-stop valve to Mechanical Room at (3) of the barracks. The water service has already been replaced at the other (3) barracks.
HVAC:
• First Floor: Install new 1/2" lined exposed lined ductwork (10"H inside clear) and air distribution (Price model 520D double deflection grilles) on first floor. Install tapered take-offs with volume dampers. No grille shutters. Ductwork transitions may be required for side wall grilles in latrine to clear ceiling height. Install (2) Price model 530FF 20"Wx25"H filter grilles per system. Install fire dampers and access doors at mechanical room duct penetrations.
• Second Floor:
• Ensure new ductwork and air distribution do not interfere with the existing fire alarm equipment. Clearance between air distribution and smoke detectors to be 3 foot minimum.
• Install (2) LP fired 95% efficiency vertical furnaces, 100 MBH each, with cased A-frame 5 ton cooling coils Goodman model GM9C961005CNA.
Provide 2"x2" angle metal stand for mechanical room, block support and drain pan with float shut-off switch for attic mounting, Honeywell non-programmable password protected dual fuel thermostats, 3/4" furnace condensate drains, and 2" PVC flues. Connect 8" diam. outside air duct to return duct. Install Ruskin model ARD25 motorized damper in outside air duct interlocked with return duct mounted CO2 sensor.
• Install gable end attic fan MasterFlow model EGV6 – control via thermostat.
• Install (2) Broan model 508 wall mount exhaust fans in the Latrine at showers and water closets. Control via light switch.
• Install QMark model CWH1202DSF 240V/1 2 kW wall heaters in shower area and mechanical room. Heaters to have dial thermostat
• Install 1000 gallon LP tank, sleeved piping with grounding wire, high pressure regulator, and 2 psi regulators on the exterior of the building. All pipe and fittings to be schedule 40 steel. Install 1/4 turn shut-off valve, union, and dirt leg at each appliance. Consult DPW for pipe sizes.
Electrical:
• Install (4) 4 foot strip LED lights and (3) 2 foot LED vanity lights, wet rated in Latrine.
• Latrine fixtures are: ILP model VVT4L-U-35-FRL for ceiling and FailSafe model BAA-FVS4P-3-LD4-1LO-30-UNV-P125-EDD1-WL for vanity
• Replace mop receptor fixture Metalux model TAA-2SNLED-LD5-48HL-
SLC-UNV-L840-CD1-U
• Install 8 foot strip LED light for mechanical room ILP model VS8-8L-U- 40-FRL. Control via wall switch.
• Replace all emergency lights with SureLite model APELMINI
• Install switches and receptacles with white covers throughout.
Receptacles in latrine and at water cooler are to be GFCI rated or protected via breaker. Verify existing breaker condition.
• Provide 20 amp breaker, new power and disconnect switch for 120V attic fan, second floor furnace, and (2) latrine exhaust fans. Wall toggle switches for furnace, water heater, and circulation pump are permitted within mechanical room.
• Provide power and 20 amp breaker for 240V wall heaters.
• Remove and reinstall electrical devices on interior walls that will get new drywall. Refer to the attached floor plan for the affected walls.
• Ensure any conduit passing through the mechanical room wall is fire caulked.
• Install qty (1) SureLite model AWPR1 exterior remote head emergency lights at all (3) exits
• Trace and label all circuits.
Propane Tank Pad:
• 30’ L x 7’ W
• 6” Deep 4000 PSI Concrete Pad
• 6x6-1.4x1.4 Wire Mesh
• 4” Deep Compacted #21.1 Crushed Stone
• Add topsoil and finish grade, seed, and mulch around concrete pad.