22-B-0002 SF1442 Final.pdf
PDF 2 MB Posted
- Attached to
- Open-End Flooring USAG-HI Federal contract opportunity
- Solicitation number
- W912CN22B0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 01 Excel Bid Sheet Attachment.xlsx | XLSX spreadsheet | |
| 6 - 01026 SUMMARY OF WORK.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011761099
PROJECT TITLE: Open-end Replace/Repair Flooring/Carpeting and Related Work at Various Army Installations
FEWR: RN001842J
MAGNITUDE OF CONSTRUCTION: Betw een $5,000,000 AND $10,000,000
NAICS: 228330
SMALL BUSINESS SIZE STANDARD: $16.5M
X
MARK R. DAHILIG 808.656.0995
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
04-Aug-2022
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
X
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______ calendar days and complete it w ithin ________ calendar days af ter receiving aw ard, notice to proceed. This performance period is mandatory, X negotiable. (See _________________________per task order
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________23 Aug 2022 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
413 CSB
413TH CSB, RCO-HAWAII,
742 SANTOS DUMONT AVENUE
BLDG 108, 3RD FLOOR (WAAF)
SCHOFIELD BARRACKS HI 96857-5026
W912CN
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
09:30 AM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W912CN22B0002 251
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00 10 00 - Solicitation
SUBMISSION REQUIREMENT
1. 100% SET-ASIDE FOR 8(A) COMPETITIVE FIRMS. The proposed contract is limited to qualifying 8(a) firms serviced by the Hawaii District Office (HDO) of the Small Business Administration. The Government will not consider offers from firms other than 8(a) firms or from 8(a) firms outside of the HDO. 8(a) firms that are not serviced by the HDO, but have a bona fide place of business (as defined by SBA) within the geographic area served by the HDO are also eligible to submit offers. An 8(a) firm not serviced by the HDO must consult its servicing District Office regarding the establishment of a bona fide place of business or status of a previously established bona fide place of business. All other firms are deemed ineligible to submit offers.
2. CONTRACT TYPE: The Government intends to award a firm fixed price requirements-type construction contract. Split or multiple awards will not result from this acquisition.
3. PERIOD OF PERFORMANCE: The anticipated period of performance will be a base year and three (3) one-year option periods as shown below:
Base Year: 15 NOV 2022 – 14 NOV 2023 Option 1: 15 NOV 2023 – 14 NOV 2024 Option 2: 15 NOV 2024 – 14 NOV 2025 Option 3: 15 NOV 2025 – 14 NOV 2026 52.517-8 6 Months
4. QUESTIONS. Questions must be submitted by email to Chelsea Smith, chelsea.p.smith4.civ@army.mil with CC to Mark Dahilig Mark.r.dahilig.civ@army.mil with the IFB number W912CN-22-B-0002 in the subject line. Telephone and faxed inquires will not be accepted. In order in ensure a timely response, questions must be submitted no later than 10:00am, seven (7) days after the date of IFB issuance as identified in Block 3 of the solicitation. Questions and responses will be issued on an amendment. Any questions received after the due date may not be answered.
5. AWARD. Award will be made to the responsible bidder whose bid is responsive to the terms and conditions of the IFB and is most advantageous to the Government.
6. BID OPENING DATE AND TIME. A face to face public bid opening will be conducted with a telphone confrence option (see detail belwo). To attend the Bid Opening either in-person or via telephone, offerors must notify Chelsea Smith, chelsea.p.smith4.civ@army.mil with CC to Mark Dahilig Mark.r.dahilig.civ@army.mil no later than seven days prior to the Bid Opening date. List the name, phone number, number of personnel attending and if joining in person or via teleconfrence. The conference call number and password will be provided via email.
Date & Time: 8/23/2022 at 10:00am Location:
Regional Contracting Office, Hawaii Bldg 108, 3rd Floor (Located on Wheeler Army Airfield (WAAF)) Schofield Barracks, HI 96857
Teleconfrence Number: Will be emailed upon notfication.
INSTRUCTION TO OFFEROR
1. PROPOSAL SUBMITTAL. Contractor shall provide a complete breakdown of cost proposal to include any subcontractors costs (type, quantities, unit price, extended price for materials, labor, and equipment, etc), profit, overhead, bonds, taxes, etc. Breakdown shall include a detailed description such as make and model number, amount of labor, labor class, labor hours, wages, labor burden, etc. See Price Schedule (Attachment 3).
2. (a) Proposal Submission Requirement:
Proposals will be submitted via email to chelsea.p.smith4.civ@army.mil. Recommend to contact the Contract Specialist and Contracting Officer on record to ensure that the documents are received via email.
SUBMISSION REQUIREMENT
1. Offers shall include the following:
a. Completed Standard Form 1442.
b. Completed Schedule of offer/bids/prices. All unit price and estimated amount filled out.
c. Completed Attachment 1 Bid Attachment.
d. Signed or other acknowledgement of all amendments.
e. Completed Representation and Certifications.
f. Bid Guarantee in accordance with FAR 52.228-1.
2. Offerors shall furnish unit prices and extended total for all items listed on the schedule of bid items in
Section 00 10 00. In the event there is a difference between the unit price and the extended total, the unit price will be the intended bid. In the event the unit price or extended total are omitted for any item, the bid will be deemed non-responsive.
3. Facsimile proposals/Bids will not be considered.
4. Telegraphic proposals/Bids will not be considered.
5. Proposals must be submitted by see box 13 on SF 1442.
GENERAL INFORMATION:
1. Scope of Work: This is a (firm fixed price requirements-type construction) contract to furnish all labor, equipment, materials, and all incidental related services to perform Replacement of Repair of Floor Covering and Carpeting of Miscellaneous Buildings in accordance with the technical provisions prepared by the Directorate of Public Works, U.S. Army Garrison, at various Army Installations on the Island of Oahu, Hawaii. The scope of work covered by this contract does not cover floor covering and or carpet work, which might arise as part of the contract to repair or renovate a building or group of buildings. The work covered by this contract does not include projects awarded by The U.S. Army Engineering District, Honolulu, or the Medical Facilities under Tripler (TAMC), to be designated during the contract period.
All CLINS listed below are in support of flooring and repair work for this contract and issued via task orders.
2. The contractor shall submit a safety plan within 30 days of award or 7 days prior to commencement of on-site work, whichever occurs first in accordance with the AR 385-10, Construction Safety, US Army Corps of Engineers "Safety and Health Requirements Manual (EM 385-1-1)" and Occupational -CSty and Health Administration (OSHA) regulations.
3. To assure compliance with general construction trade practice, the contractor shall establish and maintain quality control for materials and work. The Government may perform inspections and conduct tests while the contractor's work is in process to assure compliance to performance standards.
4. Existing conditions or areas damaged or disturbed by the contractor's operation shall be restored to their original condition, or near original condition as possible, to the satisfaction of the Contracting Officer at no additional cost to the Government.
5. Prior to start of any excavation or trenching work, the contractor shall obtain clearance, in writing, from the appropriate communications agency and from the Directorate of Public Works.
6. Interruptions to existing utilities shall be held to a minimum. A schedule for any required power or water outages shall be submitted to the Contracting Officer a minimum of four weeks prior to the intended outage.
7. The contractor shall establish work procedures and methods to prevent interference with existing operations within or adjacent to the construction area.
8. The Contractor’s normal working hours will be 7:30 a.m. – 4:30 p.m. Monday thru Friday. The Contractor will not normally work on Saturdays, Sundays, or Holidays. If the Contractor chooses to work outside the normal working hours, Contractor must submit an application to the Contracting Officer in writing one week prior to the requested work for approval.
9. Rubbish and debris shall be removed from Government-controlled property daily unless otherwise directed, so as not to allow accumulation inside or outside the building. Materials that cannot be removed daily shall be stored in areas designated by the Contracting Officer.
10. The contractor shall provide, install, and maintain all necessary signs, lights, barricades, markers, cones, flagmen, and other protective facilities and shall take all necessary precautions for the protection and for the convenience and safety of military and public traffic (vehicular and pedestrian).
11. The amount of dust resulting from the contractor's work shall be controlled to prevent the spread of dust and to avoid creation of a nuisance in the surrounding area. Use of water will not be permitted when it will result in, or create, hazardous or objectionable conditions such as flooding and pollution.
12. The contractor shall obtain the necessary hot work permit from the appropriate Fire Department prior to any welding, burning, and torching operations.
13. Daily Clean-up - During the course of the work, the Contractor shall keep the entire premises free from any accumulation of empty cans, rags, etc. or rubbish that constitutes a fire hazard. At the end of each days work, the Contractor shall remove all debris. The entire area shall be cleaned and left in a condition acceptable to the Technical Representative of the Contracting Officer.
14. Storage area will not be provided.
15. When available, the Government may provide a reasonable amount of water and electricity. If not available or cannot be provided it shall be specified in the task order documents.
16. The Contractor shall be responsible to have a quality control program to ensure services are performed in accordance with the Scope of Work and commonly accepted commercial practices.
17. The Contractor is required to follow DPW’s Best Management Practice (BMP) of Storm Water Compliance.
Copy will be provided at the pre-construction conference, if requested.
18. The work shall be constructed using best practices per industry standards. The Contractor shall abide by all applicable regulations to include Federal, State, local requirements.
19. Progress of Work. Contractor shall submit all proposed work schedules to the Contracting Officer for review/approval within ten (10) calendar days after issuance of the Notice to Proceed (NTP) unless otherwise specified.
20. Contractor shall submit schedule of values as a material submittal within 21 days of contract award for projects at or above $250,000. Schedule of values will be sent with requested billings to the project inspector and CC the COR to justify billing requests.
21. All materials used under this project shall be Energy Star compliant. The following website lists all energy star compliant materials. www.energystar.gov .
22. If a dumpster is provided for this contract, contractor shall include a sign on the dumpster with their name/address/phone and indicate the dumpster is only used for construction debris.
23. Abbreviations used in the Unit column: (use if applicable)
CY = Cubic Yard; LH = Labor Hours; SF = Square Foot; EA = Each; LF = Linear Foot; SY = Square Yard
24. Contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes."
25. Identification of Contractor Employees.
a. Provide each employee with identification (ID) badge made of nonmetallic material, easily readable and including employee’s name, contractor’s name, functional area of assignment, with recent color photograph of the employee.
b. All contractor personnel shall wear the ID badge at all times when performing work under this contract at a Government site, including while attending Government meetings that may take place outside the Government facility. Contractor employee shall wear the ID badge in a conspicuous place on the front of exterior clothing above the waist except when safety or health reasons prohibit such placement.
26. ESTIMATED QUANTITIES: All quantities are estimated and are stated for the information of the prospective contractors. The actual quantities ordered may be more or less than the estimated quantities. (See clause at 52.216- 21, Section 00 70 00 entitled “Requirements”). As a prerequisite, there must be (i) adequate and sufficient funds available to cover the order, and (ii) an administrative determination by the Government that the requirement exists.
27. ISSUANCE OF TASK ORDERS
(a) The work to be accomplished under this contract will be performed via issuance of a task order. The Contractor shall coordinate all work with the Contracting Officer in order that there will be a minimum of interruption and inconvenience to the Government. Scheduling and programming of work shall be arranged during the pre-construction conference.
(b) Survey of Unit Price Items: At least ten (10) workdays prior to the issuance of a task order, a joint inspection by the Contractor and the Contracting Officer Representative shall be made to determine the work to be accomplished therein. Survey will be conducted within two (2) workdays of notification by the COR. During the inspection and survey, both parties will jointly annotate on the order form to be prescribed by the Contracting Officer, the quantity for each unit price item that is to be utilized. The Contracting Officer will confirm the starting and completion date of work for each unit in the task order.
(c) HARDWARE, PAINT and items on the mandatory procurement list are to be purchased from AbilityOne.
Please refer to FAR Clause 52.208-9. See website http://www.abilityone.com for ordering instructions.
(d) Unless otherwise specified herein, the contractor shall furnish all supplies, material and equipment necessary for the performance of work under this contract. The contractor shall utilize products and materials made from biobased materials (e.g. biobased degreasers and biobased toilet bowl cleaner) to the maximum extent practical without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. The EPA’s
Comprehensive Procurement Guidelines and product list can be found at http://www.epa.gov/epawaste/conserve/tools/cpg/index.htm.
(e) Upon request of the COR, the contractor shall submit a list indicating the name of the manufacturer, the brand name, and the intended use of each of the materials used in the performance of its work. The Contractor shall not use any materials, chemicals, or compound which the COR determines would be unsuitable for the intended purpose or harmful to the surfaces to which applied or, as might be the case for such items as paper or soap products, unsatisfactory for use by occupants. For biobased content products evaluation, all non-chemical products proposed for use under this contract must conform to the Department of Agriculture (USDA) Designated Biobased Products List (DBPL) whenever practicable.
28. Service Contract Reporting (SCR) in the System for Award Management (SAM)
Effective in FY20, the Department of Army will no longer require contractors to report into the ECMRA.
Contractors will begin reporting manpower data relating to the performance for service/construction contracts into SAM, consistent with existing service/construction contract reporting requirements under FAR Subpart 4.17.
SCR is a business process that has been approved by the Army as a means for collecting information on contracts that provide services to the Department of the Army. SAM portal to SCR will allow industry to report all manpower data into a single Federal-wide portal, removing duplicative requirements, one for DoD and another for the rest of the Federal Government, which requires the same data elements to be reported for service/construction contracts performed for both DoD and Federal civilian agencies that essentially perform the same function. The outcome will be a process that is less burdensome on both industry and Government while improving data integrity and accuracy.
The reporting period for contractors in SAM generally is open from mid-October to mid-December for reporting against the prior government fiscal year. SAM will only enable reporting for entities with contracts that meet the SCR thresholds
Contractors must have an entity registered in SAM, an individual SAM user account with the Entity Administrator, Entity Registration Representative or Reporter roles for that entity and one or more contracts awarded to that entity, which meet the SCR reporting thresholds. For further information go to http://sam.gov
Detailed descriptions of Reporting Thresholds are available in the Service Contracting Reporting guidebook located at: https://dodprocurementtoolbox.com/site-pages/service-contract-report-sci
The Federal schedule for FY2020 for Contractor Service Reporting in SAM can be found in “Deploying Contractor Service Contract Reporting Memorandum” located in the procurement toolbox:
https://dodprocurementtoolbox.com/site-pages/service-contract-report-sci
29. APPLICABLE CODES AND REGULATIONS
29.1. The latest edition of the following Codes, regulations, guides, and criteria shall be used for all design and construction under this contract. If there is a conflict between these codes or regulations and these contract specifications the Unified Facility Criteria will override. The Contractor shall have a copy of each of these documents available for use during the term of this contract.
The Unified Facility Criteria (UFC) documents including, but not limited to:
UFC 3-410-01 Design: Heating, Ventilating, And Air Conditioning UFC 4-010-01 Dod Minimum Antiterrorism Standards For Buildings UFC 3-600-01 Design: Fire Protection Engineering For Facilities UFC 1-200-01 DoD Building Code (General Building Requirements
A complete listing can be obtained at http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
29.2. The Unified Facility Guide Specifications are mandatory for all work required under this contract. The contractor is responsible for obtaining the Unified Facility Guide Specifications and for maintaining updates to the specifications. The specifications whether referenced or not (in whole or part), shall be considered to be a part of all task orders issued under this contract. Where two specifications are listed for a certain item of work the Army section as denoted by an “A” shall be used. When there is no Army designated spec use the Navy (denoted by “N”) or in the absence of either use an industry standard specifications or others listed in the Construction Criteria Base CCB. A complete listing of the UFGS Division 01 - General Requirements can be obtained at https://wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs
29.3. The following are additional criteria, codes, regulations and guides which shall be incorporated into all designs and used for construction:
ASHRAE 90.1 Energy Standard for Buildings Except Low-Rise Residential Buildings EPACT 2005 Energy Policy Act of 2005, Public Law 109-58.
IBC, International Building Code IEEE C2, National Electrical Safety Code IESNA Illuminating Engineering Society of North America MIL HDBK 1190, Military Handbook for Facility Planning and Design Guide MIL HDBK 1191, Military Handbook for Medical and Dental Treatment Facilities, Design and Construction Criteria Guide National Electrical Contractors Association (NECA) National Electrical Installation Standards (NEIS) TI 800-01, Design Criteria TI 800-03, Technical Requirements for Design-Build TM 5-811-3, Electrical Design: Lightning and Static Electricity Protection •USDA – Rural Utility Service (RUS) RUS 1728F-310 Drawing Index 35.5 to 69 kV RUS 1728F-804 Drawing Index 12.5 & 7.2 kV RUS 1724D-101B System Planning Guide RUS 1724D-104 Econ Worksheet RUS 1724E-152 OH Dist. Line Conductors Mechanics RUS 1724E-153 Guys and Anchors RUS 1724E-154 Distribution Conductor Clearances and Span Limitations RUS 1724E-200 Design Manual HV Transmission Lines RUS 1724E-203 Upgrading RUS Transmission Lines RUS 1724E-204 Specs Steel Pole H Frame RUS 1724E-205 Embedment Depths RUS 1724E-214 Guide Specifications For Standard Class Steel Transmission Poles RUS 1724E-300 Rural Sub Station Design RUS 1724E-224 Specifications and Drawings for Steel Poles RUS 1728F-804 Specifications and Drawings for 12.47/7.2 kV Line Construction RUS 1728F-806 Specifications for Underground Distribution RUS 1728F-810 Specifications and Drawings for 34.5 to 69 kV RUS 1730B-121 Pole Inspection and Maintenance RUS 1751F-650 Aerial Plant Guying and Anchoring UEP-steel poles Guidelines for the Use Steel Distribution Poles Uniform Building Code Uniform Mechanical Code Uniform Plumbing Code Standard Building Code National Electrical Code (NEC) American National Standards Institute (ANSI) C-2, national Electrical Safety Code (QIESC) Life Safety Code, National Fire Protection Association (NFPA) 101 National Fire Protection Association (NFPA) 70 MIL Handbook 1190
Occupational safety and Health Administration (OSHA) Regulation www.OSHA.gov National Fire protection Association (NFPA) Regulations www.NFPA.org Directorate of Public Works, Environmental Division, US Army Garrison Hawaii (USAG-HI) https://home.army.mil/hawaii/index.php/garrison/dpw/environmental-a-z
29.4. Workmanship shall be governed by the preceding documents and National Electrical Contractors Association (NECA) listed below:
NECA 100-2006 - Electrical Symbols Set © 2006, NECA NECA 100-2006 - Symbols for Electrical Construction Drawings (ANSI) © 2006, NECA NECA 101-2006 - Standard for Installing Steel Conduit (Rigid, IMC, EMT) (ANSI) © 2006, NECA NECA 102-2004 - Standard for Installing Aluminum Rigid Metal Conduit (ANSI) © 2004, NEIS NECA 111-2003 - Standard for Installing Nonmetallic Raceways (RNC, ENT, LFNC) (ANSI) © 2003, NECA NECA 1-2010 - Standard Practice of Good Workmanship in Electrical Construction (ANSI) © 2010, NECA NECA 120-2006 - Standard for Installing Armored Cable (Type AC) and Metal-Clad Cable (Type MC) (ANSI) ©
2006, NECA
NECA 121-2007 - Standard for Installing Nonmetallic-Sheathed Cable (Type NM) and Underground Feeder and Branch-Circuit Cable (Type UF) (ANSI) © 2007, NECA NECA 130-2010 - Standard for Installing and Maintaining Wiring Devices © 2010, NECA NECA 169 - Standard for Installing and Maintaining Arc-Fault Circuit Interrupters © 2010, NECA NECA 200-2010 - Recommended Practice for Installing and Maintaining Temporary Electric Power at Construction Sites (ANSI) © 2010, NECA NECA 202-2006 - Standard for Installing and Maintaining Industrial Heat Tracing Systems (ANSI) © 2006, NECA NECA 230-2010 - Standard for Selecting, Installing, and Maintaining Electric Motors and Motor Controllers
(ANSI) © 2010, NEIS
NECA 303-2005 - Standard for Installing Closed-Circuit Television Systems (CCTV) (ANSI) © 2005, NECA NECA 305-2010 - Standard for Fire Alarm System Job Practices (ANSI) © 2010, NECA NECA 331-2009 - Standard for Building and Service Entrance Grounding and Bonding (ANSI) © 2009, NECA NECA 400-2007 - Standard for Installing and Maintaining Switchboards (ANSI) © 2007, NECA NECA 402-2007 - Standard for Installing and Maintaining Motor Control Centers (ANSI) © 2007, NECA NECA 406-2003 - Standard for Installing Residential Generator Sets (ANSI) © 2003, NECA NECA 407-2009 - Recommended Practice for Installing and Maintaining Panelboards (ANSI) © 2009, NECA NECA 408-2009 - Standard for Installing and Maintaining Busways (ANSI) © 2009, NECA NECA 409 – 2009 - Standard for Installing and Maintaining Dry-Type Transformers (ANSI) © 2009, NECA NECA 410-2005 - Standard for Installing and Maintaining Liquid-Filled Transformers (ANSI) © 2005 NECA 411-2006 - Standard for Installing and Maintaining Uninterruptible Power Supplies (UPS) (ANSI) © 2006 NECA 420-2007 - Standard for Fuse Applications (ANSI) © 2007, NECA NECA 430-2006 - Standard for Installing Medium-Voltage Metal-Clad Switchgear (ANSI) © 2006, NEIS NECA 503-2005 - Standard for Installing Fiber Optic Lighting Systems © 2005, NECA NECA 505 Standard for Installing and Maintaining High Mast, Roadway and Area Lighting © 2010, NECA NECA 700-2010 - Standard for Installing Overcurrent Protection to Achieve Selective Coordination • © 2010, NECA NECA 90 Recommended Practice for Commissioning Building Electrical Systems (ANSI) © 2009, NECA NECA/AA 104-2006 - Standard for Installing Aluminum Building Wire and Cable (ANSI) © 2006, NEIS NECA/BICSI 568-2006 - Standard for Installing Building Telecommunications Cabling (ANSI) © 2006, NECA NECA/BICSI 607-2011 - Standard for Telecommunications Bonding and Grounding Planning and Installation Methods for Commercial Buildings © 2011, NECA/BICSI NECA/EGSA 404-2007 - Standard for Installing Generator Sets (ANSI) © 2007, NECA NECA/FOA 301-2009 - Standard for Installing and Testing Fiber Optics (ANSI) © 2009, NEIS NECA/IESNA 500-2006 - Standard for Installing Indoor Lighting Systems (ANSI) © 2006, NECA, NECA/IESNA 501-2006 - Standard for Installing Exterior Lighting Systems (ANSI) © 2006, NEIS NECA/IESNA 502-2006 - Standard for Installing Industrial Lighting Systems (ANSI) © 2006, NECA NECA/MACSCB 600-2003 - Recommended Practice for Installing and Maintaining Medium- Voltage Cable
(ANSI) © 2003, NECA
NECA/NEMA 105-2007 - Standard for Installing Metal Cable Tray Systems (ANSI) © 2007, NECA NECA/NEMA 605-2005 - Recommended Practice for Installing Underground Nonmetallic Utility (ANSI) © 2005, NECA
EM 385-1-1 Corps of Engineers Manual, - Safety and Health Requirements Manual Additional publications and regulatory documents may be identified as required for individual task orders.
29.5. DPW requirements
a. Federal Fire. Electrical installation must be in accordance with NFPA 70E for electrical safety in the workplace.
b. Electrical. Power assessment as well as installation is to be done by a certified electrician/contractor, to determine existing power availability, assess whether existing infrastructure needs to be upgraded to accommodate those requirements and provide installation as required in compliance with NEC, NESC and UFC 3-520-01.
c. Environmental. Prior to disturbance of existing building materials, ensure asbestos, containing materials are identified in accordance with Army Regulation 200-1, Ch 9-2(b), Hawaii Administrative Rule Ch, 11-501, and 40 Code of Federal Regulations 61.140-156. Ensure all asbestos and lead paint are removed by a qualified and licensed contractor. Handling, storing and disposal of hazardous materials must be done in accordance with local, state and federal laws and regulations.
30. SF 1442 Attachment(s) Attachment 1: Excel Sheet Bid Attachment
STATEMENT OF WORK
SECTION 01026
SUMMARY OF WORK
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
Furnish all labor, equipment, materials, and all incidental related services to perform Replacement of Repair of Floor Covering and Carpeting of Miscellaneous Buildings in accordance with the technical provisions prepared by the Directorate of Public Works, U.S. Army Garrison, at various Army Installations on the Island of Oahu, Hawaii. The scope of work covered by this contract does not cover floor covering and or carpet work, which might arise as part of the contract to repair or renovate a building or group of buildings. The work covered by this contract does not include projects awarded by The U.S. Army Engineering District, Honolulu, or the Medical Facilities under Tripler (TAMC), to be designated during the contract period.
1.2 ESTIMATED QUANTITIES
The estimated quantities of work, indicated herein, are for information of the prospective Contractors. The actual quantities ordered may be more or less than the estimated quantities.
LOCATIONS
The location of work sites shall be as follows:
Fort Shafter Areas Fort Shafter, Fort DeRussy, Tripler Army Medical Center, (Except for the main Medical Bldg.)
Aliamanu Military Reservation Schofield Barracks Area Schofield Barracks (includes East Range & Leilehua Golf Course, Wheeler Army Airfield, Helemano Military Reservation) The exact locations will be shown by the Contracting Officer.
1.3 ITEMS OF WORK – See CLINs 0001-3062 for details.
1.4 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
ITEM NO SUPPLIES/SERVICES ESTIMATED
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0001 12,000 Square Foot
0001 Z2AA - REPAIR OR ALTERATION OF
FFP
: CLIN 0001; (NON-ASBESTOS) VINYL AND VINLY COMPOSITION TILE
removal and disposal. Excludes stairway Treads and Risers. Remove and dispose of existing single-layer floor tile covering in various down to wood underlayment or bare concrete.
FOB: Destination
PURCHASE REQUEST NUMBER: 0011761099
PSC CD: Z2AA
ESTIMATED
NET AMT
UNIT UNIT PRICE ESTIMATED AMOUNT
0002 100 Square
0002 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0002; (NON-ASBESTOS) VINYL AND VINYL COMPOSITION TILE
removal and disposal on stairway Treads and Risers. Remove and dispose of existing single-layer floor tile covering in various down to wood underlayment or bare concrete.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0003 100 Square
0003 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0003; (NON-ASBESTOS) VINYL AND VINYL COMPOSITION TILE
removal and disposal on floors for multi-layered floor covering. Remove and dispose of existing multi-layered floor tile covering in various down to wood underlayment or bare concrete.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0004 100 Square
0004 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0004; (NON-ASBESTOS) VINYL AND VINYL COMPOSITION TILE
removal and disposal on stairway Treads and Risers for multi-layered floor covering. Remove and dispose of existing multi-layered floor tile covering in various down to wood underlayment or bare concrete.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0005 3,000 Square
0005 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0005; VINYL TILE installation on floors. Excludes stairway Treads and Risers. Repair cracks, holes, rough areas, depressions and other surface defects prior to new tile installation.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0006 100 Square
0006 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0006; VINYL TILE installation on stairway Treads & Risers. Repair cracks, holes, rough areas, depressions and other surface defects prior to new tile installation.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0007 30,000 Square
0007 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0007; VINYL COMPOSITION TILE installation on floors. Excludes stairway Treads and Risers. Repair cracks, holes, rough areas, depressions and other surface defects prior to new tile installation.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0008 100 Square
0008 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0008; VINYL COMPOSITION TILE installation on stairway Treads & Risers. Repair cracks, holes, rough areas, depressions and other surface defects prior to new tile installation.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0009 30,000 Square
0009 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0009; POLISH VINYL COMPOSITION TILE FLOORING. Polish pre-waxed/no wax flooring in various buildings following installation.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0010 5 Each
0010 Z2AA - REPAIR OR ALTERATION OF
FFP
: CLIN 0010; SAMPLING & TESTING OF ASBESTOS (NON-FRIABLE) IN
VINYL, VINYL COMPOSITION TILE, AND ADHESIVE. Collection and laboratory analysis of samples.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0011 5,000 Square
0011 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0011; Asbestos Containing Material (ACM). Vinyl and Vinyl Composition tile removal and disposal from floors. Excludes stairway Treads and Risers.
Remove and dispose of existing single layer floor tile covering in various buildings down to wood underlayment or bare concrete.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0012 100 Square
0012 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0012; Asbestos Containing Material (ACM). Vinyl and Vinyl Composition tile removal and disposal from stairway Treads and Risers. Remove and dispose of existing single layer floor tile covering in various buildings down to wood underlayment or bare concrete.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0013 100 Square
0013 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0013; Asbestos Containing Material (ACM). Vinyl and Vinyl Composition tile removal and disposal of multi-layered tiles from f loors. Excludes stairway Treads and Risers. Remove and dispose of existing multi-layered floor tile covering in various buildings down to wood underlayment or bare concrete.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0014 100 Square
0014 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0014; Asbestos Containing Material (ACM). Vinyl and Vinyl Composition tile removal and disposal of multi-layered tiles from s tairway Treads and Risers.
Remove and dispose of existing multi-layered floor tile covering in various buildings down to wood underlayment or bare concrete.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0015 1,000 Square
0015 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0015; Resilient Sheet Vinyl Floor removal and dispose from floors.
Excludes stairway Treads and Risers. Remove and dispose of existing floor covering in various buildings down to underlayment of bare concrete.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0016 50 Square
0016 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0016; Resilient Sheet Vinyl Floor removal and disposal from Stairway Treads and Risers. Remove and dispose of existing floor covering in various buildings down to underlayment of bare concrete.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0017 1,000 Square
0017 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0017; Resilient Sheet Vinyl (with backing) Floor installation. Excludes stairway Treads and Risers. Repair cracks, holes, rough areas, depressions and other surface defects prior to installation.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0018 50 Square
0018 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0018; Resilient Sheet Vinyl (with backing) Floor installation on Stairway Treads and Risers. Repair cracks, holes, rough areas, depressions and other surface defects prior to installation.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0019 100 Square
0019 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0019; Resilient Sheet Vinyl (without backing) Floor installation. Excludes stairway Treads and Risers. Repair cracks, holes, rough areas, depressions and other surface defects prior to installation.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0020 20 Square
0020 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0020; Resilient Sheet Vinyl (without backing) Floor installation on Stairway Treads and Risers. Repair cracks, holes, rough areas, depressions and other surface defects prior to installation.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0021 2,000 Square
0021 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0021; Rubber Floor Tile installation on Floor. Excludes stairway Treads and Risers. Repair cracks, holes, rough areas, depressions and other surface defects prior to installation.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0022 40 Square
0022 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0022; Polish Resilient Sheet Vinyl Flooring. Polish pre-waxed/no wax flooring in various buildings following installation.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0023 1,000 Square
0023 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0023; Ceramic Tile Floor and Mortar Bed Removal and Disposal. Remove Ceramic Tile and Mortar Bed in various buildings down to underlayment or bare concrete.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0024 250 Square
0024 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0024; Ceramic Tile Floor Installation. (Mosaic 1"X1", 1"X2", or 2"X2").
Repair cracks, holes, rough areas, depressions and other surface defects prior to installation of Ceramic Tile Floor and Mortar Bed in various buildings.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0025 250 Square
0025 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0025; Ceramic Tile Floor Installation. (Mosaic 6"X6"). Repair cracks, holes, rough areas, depressions and other surface defects prior to installation of Ceramic Tile Floor and Mortar Bed in various buildings.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0026 100 Square
0026 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0026; Ceramic Tile Floor Installation. (Mosaic 8"X8"). Repair cracks, holes, rough areas, depressions and other surface defects prior to installation of Ceramic Tile Floor and Mortar Bed in various buildings.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0027 4,000 Square
0027 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0027; Ceramic Tile Floor Installation. (Mosaic 12"X12"). Repair cracks, holes, rough areas, depressions and other surface defects prior to installation of Ceramic Tile Floor and Mortar Bed in various buildings.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0028 500 Square
0028 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0028; Quarry Tile Floor and Mortar Bed Removal and Disposal. Remove Quarry Tile and Mortar Bed in various buildings down to u nderlayment or bare concrete.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0029 500 Square
0029 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0029; Quarry Tile Floor and Mortar Bed Installation. Repair cracks, holes, rough areas, depressions and other surface defects prior to installation of Quarry Tile Floor and Mortar Bed in various buildings.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0030 8,000 Square Yard
0030 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0030; Carpet Removal and Disposal, Excludes Stairway Treads and Risers.
Remove carpet in various buildings down to underlayment or bare concrete.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0031 100 Square
0031 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0031; Carpet Removal and Disposal from Stairway Treads and Risers.
Remove carpet in various buildings down to underlayment or bare concrete.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0032 150 Square
0032 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0032; Commercial "Severe" Grade Carpet Installation Excludes Stairway Treads and Risers. Clean Floor surface of all foreign materials prior to installation of new carpet. Includes Urethane carpet cushion installation. Installation process in various buildings includes stretching in over cushion (tack down).
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0033 50 Square
0033 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0033; Commercial "Severe" Grade Carpet Installation on Stairway Treads and Risers. Clean Floor surface on all foreign materials prior to installation of new carpet. Includes Urethane carpet cushion installation. Installation process in various buildings includes stretching in over cushion (tack down).
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0034 50 Square
0034 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0034; Exterior "Heavy" Grade Carpet Installation Excludes Stairway Treads and Risers. Clean floor surface of all foreign materials prior to installation of new carpet. Installation is direct glue down between carpet and floor (no cushion).
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0035 500 Square
0035 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0035; Remove and Dispose of Existing Particle Board or Plywood Floor Underlayment in various buildings.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0036 500 Square
0036 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0036; Provide and Install Plywood Floor Underlayment in various buildings.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0037 40 Square
0037 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0037; Remove and Dispose of Existing Membrane Waterproofing in various buildings.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0038 2,000 Square
0038 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0038; Install New Waterproofing Membrane in various buildings.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0039 1,500 Linear
0039 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0039; Remove and Dispose of Existing Wood Base in various buildings.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0040 10,000 Linear
0040 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0040; Remove and Dispose of Existing Resilient Base in various buildings.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0041 50 Linear
0041 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0041; Reinstall Existing Wood Base in various buildings.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0042 50 Linear
0042 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0042; Install New Wood Base in various buildings.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0043 15,000 Linear
0043 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0043; Install New 4-inch Resilient Base in various buildings.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0044 1,500 Linear
0044 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0044; Install New 6-inch Resilient Base in various buildings.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0045 50 Linear
0045 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0045; New 10ƒ??inch Resilient Stringer Base in various buildings.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0046 20 Each
0046 Z2AA - REPAIR OR ALTERATION OF
FFP
: CLIN 0046; Trim bottom of Doors in various buildings.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0047 50 Square
0047 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0047; Paint Existing 6" Concrete Wall Base in various buildings.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0048 1,000 Linear
0048 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0048; Install New Vinyl Edge Strips in various buildings.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0049 200 Linear
0049 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0049; Install New Aluminum Binder Edge Strips in various buildings.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0050 200 Linear
0050 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0050; Install New Aluminum / Vinyl Stair Nosing in various buildings.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0051 200 Linear
0051 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0051; Install New Rubber Molded Stair Tread and Nosing in various buildings.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0052 200 Linear
0052 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0052; Install New Rubber Molded Cover Stair Nosing in various buildings.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0053 100 Square
0053 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0053; Install Concrete Sealant in various buildings.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0054 30,000 Square
0054 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0054; Prepare Concrete Floor, Moderate (includes grinding, sanding & scraping) in various buildings.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0055 500 Square
0055 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0055; Prepare Concrete Floor, Heavy (includes "shot blasting" or similar methods).
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0056 1,000 Square
0056 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0056; Installation of flooring outside of normal working hours as requested by the government. Job to be determined on each task order. CLIN to be used in conjunction CLINS for removal and installation of flooring during normal working hours. For example CLINS 0001, 0007, and 0056 would be included in a project to be performed after hours or on weekends.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0057 20 Each
0057 Z2AA - REPAIR OR ALTERATION OF
FFP
: CLIN 0057; Remove and Re-install Bathroom Fixtures and Partitions and Miscellaneous Labor.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0058 2,000 Square
0058 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0058; "Function Modular" or approved equal, 1/10 gauge Modular Tufted Textured Patterned Loop, solution dyed nylon, 24"X24" Carpet Squares with Severe Traffic CRI rating, vinyl, modular backing system. Flammability conforming to ASTM 648 Class 1 (Glue down), Smoke Density conforming to ASTM 662 less than 450. Static Propensity conforming to AATCC-134 under 3.5 KV. IAQ Green label certified. Clean floor surface of all foreign materials prior to installation. Installation is direct glue down between carpet and floor.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0059 50 Square
0059 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0059; Provide Carpet with Pad attached at various buildings.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0060 15,000 Square
0060 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0060; Install Carpet with Furniture in place. Lift Jack system to lift modular furniture or temporarily relocate furniture and replace after installation of carpet.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0061 12,500 Square
0061 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0061; Provide moving furniture prior to and after installation of flooring.
Includes…