22-512 Roof Renovation to Quai

107 KB Posted

Attached to
Roof Renovation to Quail Run Elementary School
Solicitation number
22-512
Issued by
Bartow County, Georgia

About this file

This is an Invitation to Bid issued by Altman + Barrett Architects on behalf of the Houston County School District for a roof renovation project at Quail Run Elementary School located at 250 Smithville Church Rd., Warner Robins, Georgia. The project involves the installation of a new roofing system over the original metal roof system and metal roof replacement. Sealed bids will be received until July 21, 2022 at 2:00 p.m. local time at the Houston County Board of Education Facilities Building, 1100 Main Street, Perry, Georgia. A mandatory prebid conference for all prospective bidders is scheduled for July 14, 2022 at 10:00 a.m. at Quail Run Elementary School. The successful bidder shall begin work upon receipt of the Notice to Proceed (estimated August 2022) and must complete all work within 90 days of beginning onsite construction. Procurement and contracting documents are available for purchase after June 22, 2022 from Print Life Printing and Supplies, Inc. for $150.00, and may also be viewed at www.altmanbarrettarchitects.com. Bidders must submit an estimated material procurement timeline and construction timeline with their bid form.

The project cost is estimated at approximately $1.50 million. Bid security in the amount of 5 percent of the bid amount must be submitted with each bid, and bids may not be withdrawn for 60 days after opening. All bidders must be properly licensed under applicable trade laws and capable of obtaining the required Performance Bond, Labor and Material Payment Bond, and insurance acceptable to the Owner. The Owner reserves the right to reject any and all bids and to waive informalities and irregularities. This is a General Contract procurement for all trades.

Text of this file

21046 Quail Run Elementary Roof Altman + Barrett Architects 001116-1

SECTION 001116

INVITATION TO BID

1.01 PROJECT INFORMATION

A. Notice to Bidders: Qualified bidders are invited to submit bids for Project as de-scribed in this Document according to the Instructions to Bidders.

B. Project Identification: 21046 Roof Renovation to Quail Run Elementary School.

1. Project Location: Quail Run Elementary School, 250 Smithville Church Rd., Warner Robins, GA 31088.

C. Owner: Houston County School District.

1. Owner's Representative: Forrest Walker, Director of Facilities.

D. Architect: Altman + Barrett Architects, P.O. Box 665 Hahira, GA 31632.

E. Project Description: Project consists of the installation of a new roofing system over the original metal roof system and metal roof replacement.

1. Project cost range is approximately $1,500,000.00.

F. Construction Contract: Bids will be received for the following Work:

1. General Contract (all trades).

1.02 BID SUBMITTAL AND OPENING

A. Owner will receive sealed bids until the bid time and date at the location indicated below. Owner will consider bids prepared in compliance with the Instructions to Bidders issued by Owner, and delivered as follows:

1. Bid Date: July 21, 2022.

2. Bid Time: 2:00 p.m., local time.

3. Location: Houston County Board of Education – Facilities Building, 1100

Main Street, Perry, GA 31069.

B. Bids will be thereafter publicly opened and read aloud.

2.02 BID SECURITY

A. Bid security shall be submitted with each bid in the amount of [5] percent of the bid amount. No bids may be withdrawn for a period of [60] days after opening of bids. Owner reserves the right to reject any and all bids and to waive informalities and irregularities.

2.03 MANDATORY PREBID CONFERENCE

A. A mandatory prebid conference for all bidders will be held at Quail Run Elemen-tary School on July 14, 2022 at 10:00 a.m., local time. Prospective bidders are required to attend.

2.04 DOCUMENTS

A. Printed Procurement and Contracting Documents: Obtain after June 22, 2022, by contacting Print Life Printing and Supplies, Inc., 1006 Williams St. Valdosta, GA 31601 or by calling (229)244-5598. Documents will be provided to prime bidders only; only complete sets of documents will be issued.

1. Payment: $150.00 made payable to Print Life Printing and Supplies.

2. Shipping: Additional shipping charges may apply.

B. Viewing Procurement and Contracting Documents: Examine after June 22, 2022, at the locations below:

1. www.altmanbarrettarchitects.com

1.01 TIME OF COMPLETION

A. Successful bidder shall begin the Work on receipt of the Notice to Proceed (est.

August 2022) and shall complete the Work within 90 days of beginning work on-site. Bidder shall submit with the bid form an estimated material procurement timeline along with an estimated construction timeline.

21046 Quail Run Elementary Roof Altman + Barrett Architects 001116-2

1.02 BIDDER'S QUALIFICATIONS

Bidders must be properly licensed under the laws governing their respective trades and be able to obtain insurance and bonds required for the Work. A Per-formance Bond, separate Labor and Material Payment Bond, and Insurance in a form acceptable to Owner will be required of the successful Bidder.

1.03 NOTIFICATION

A. This Invitation to Bid document is issued by Altman + Barrett Architects, P.C..

END OF DOCUMENT 001116

Other files

File Type Posted
Award Information —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .