22-2F8 PWS_IREM_StageMaint.pdf

PDF 74 KB Posted

Attached to
IREM-II Stage Preventative Maintenance and Service Contract
Solicitation number
HQ072722QNR05
Issued by

View the file

Other files

File Type Posted
Combined Synopsis and Solicitation 22-2F8.pdf PDF
JA PWS 22-2F8 - Redacted.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

DMEA 22-2F8

August 9, 2022

Project Engineer/COR:

1.0 SCOPE:

1.1 TITLE: IREM-II Stage Preventative Maintenance and Service Contract

1.2 APPLICABILITY: Defense Microelectronics Activity (DMEA), Radiation Testing and Validation Branch

1.3 BACKGROUND: The IREM-II is a tool the SAFE group uses for Fault Isolation (FI) and Failure Analysis (FA) of semiconductors. The tool is composed of an Indium Gallium Arsenide (InGaAs) camera and a precision stage and motor controller system. The tool needs to be in precise calibration at all times. The overall tool is manufactured by two separate companies, with the stage and control system made by one company, and the camera, software and remaining components of the system made by another.

1.4 PURPOSE: To purchase a preventative maintenance service contract to ensure the proper function and maximum accuracy and precision of the tool to minimize downtime. The purchase shall include one (1) year and may include up to four (4) option years.

2.0 REFERENCED GOVERNMENT PROVIDED RESOURCES:

2.1 GOVERNMENT DOCUMENTS:

2.2 OTHER DOCUMENTS:

2.3 GOVERNMENT FURNISHED EQUIPMENT: NONE

2.4 GOVERNMENT FURNISHED INFORMATION:

2.5 GOVERNMENT FURNISHED FACILITIES/ACCESS:

Facility/Access Date Building 620, Room 134 (Lab 1) As scheduled under the contract

3.0 REQUIREMENTS:

3.1 GENERAL REQUIREMENTS:

3.1.1 RESERVED

3.2 PROGRAM MANAGEMENT: None

3.3 TASK REQUIREMENTS:

3.3.1 REQUIREMENT:

3.3.1.1 PREVENTATIVE MAINTENANCE: The contractor shall provide at least one (1) preventative maintenance (PM) visit to tool listed in table below, at a time agreed upon by the contractor and DMEA. During the PM visit, the contractor shall ensure that the system is back to full operational condition meeting OEM specifications.

Equipment Name Serial Number IRLabs IREM-II NGSE-3

3.3.1.2 ON-SITE HARDWARE SUPPORT: The contractor shall provide one year of coverage for labor and parts listed below. Contract price will include one preventative maintenance trip and one service/repair trip annually.

Travel and Per Diem charges beyond these covered trips will be invoiced separately. Components to be covered include:

3.3.1.2.1 24 Volt Servo Power Supply

3.3.1.2.2 4-Axis PMAC DSP Motion Controller

3.3.1.2.3 AQB Resolution Multiplier

3.3.1.2.4 Differential AQB CMAP Axis Card

3.3.1.2.5 Dual-Axis Joystick

3.3.1.2.6 Leadscrew with 4” Travel, 10 Pitch

3.3.1.2.7 Limit Cable

3.3.1.2.8 Linear Encoder

3.3.1.2.9 Linear Motor

3.3.1.2.10 Model 40/6 +/- Volt 6 Amp 3-Phase Amplifier for Trilogy Hall-Effect Commutated Linear Motors

3.3.1.2.11 Rotary DC Servo Motor

3.3.1.2.12 Servo Motor Amplifier with Personality Card

3.3.1.2.13 Total Power Brand Power Supply

3.3.1.3 REMOTE TECHNICAL SUPPORT: The contractor shall provide email and telephone support for the IREM-II Monday through Friday between the hours of 0800 to 1700 Pacific Time, except on Federal Holidays. If a site visit is required to return the tool to full operational condition meeting OEM specifications, the contractor shall report to DMEA within two (2) business days of the reported issue.

3.3.1.4 SECURITY:

3.3.1.4.1 The contractor must provide DMEA at least two (2) business days advance notification prior to conducting any on-site inspection, installation, maintenance, modification, repair, or training.

3.3.1.4.2 All services shall be performed by US citizens.

3.3.1.4.3 Prior to being allowed entry to the DMEA facility, all contractor personnel shall provide proof of citizenship in according with the DMEA visitor approval process in effect at the time that the visit is requested.

3.3.1.4.4. During periods of exceptionally heightened security, additional advanced notice and background investigations of contractor personnel may be required prior to gaining entry to DMEA.

3.3.1.4.5 If the contractor requires the use of a laptop during the service visit, DMEA must be notified prior to the visit and laptop must be checked by DMEA Security prior to entering the laboratory. All recording devices and wireless communications must be disabled, including but not limited to the camera, microphone, wireless internet, Bluetooth, etc.

3.3.1.4.6 The on-site contractor personnel will be issued a badge each day that they are required to be on-site and shall return the badge to DMEA security personnel at the end of each work day.

3.3.1.4.7 Contractor personnel must comply with all DMEA Security policies and instructions at all times.

3.4 PROGRAM SUMMARY: None

4.0 POINTS OF CONTACT:

DMEA/MEBC Project Engineer/COR:

Address: 4234 54th Street McClellan, CA 95652-2100

Voice:

E-Mail:

File details come from the government source that posted it. Updated .