22-01464 New FA 4710-00-515-0330NZ.pdf
PDF 748 KB Posted
- Attached to
- Tube Assembly, Metal NSN 4710005150330NZ
- Solicitation number
- FA8121-24-R0014
About this file
This document is an AFMC Form 260, which provides instructions for the First Article Test requirements for a government contract. The key details are:
The contract is for the procurement of Tube Assembly, Metal, NSN 4710-00-515-0330NZ. Three first article parts are required, with two as part of the production quantity and one additional to the production quantity. The first article parts must undergo various inspections and one part will be destructively tested. Approved first articles will be forwarded for disposition, while the destructively tested part will be condemned. First article testing can be waived if the offeror is the prime contractor, Pratt & Whitney, as this is a critical part used in the F100 series turbine engine. The cognizant government engineering authority will make the final determination on whether the first article testing requirement can be waived.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE BLOCK 12 OF THIS FORM
AFLCMC/LZPED FA Monitor DODAAC FA8111 3001 Staff Drive, STE 1AB85A
TINKER AFB, OK 73145-3041
N/A
1. DATE
2. P/R/MIPR NUMBER 3. PART NUMBER 4. NSN
UNIT(S) OF LOT/ITEM
AND WILL BE: PART OF PRODUCTION QUANTITY IN ADDITION TO PRODUCTION QUANTITY
6. ARTICLES 7. LONG LEAD TIME ITEMS
REQUIRED NOT REQUIREDWILL WILL NOT
REQUIRED NOT REQUIRED
9. TEST/INSPECTION REQUIREMENTS F. FIRST ARTICLE DELIVERY:
A. CONTRACTOR TESTING GOVERNMENT TESTING
(1) Due within calendar days from date contract.
(2) Notifyare
B.
(Set Forth Consignee and Address)(Cite Spec and Para number)
(4)C. TEST PLAN REQUIRED
(1) DD Form 1423 ELIN
(2) Delivery due calendar days from date of contract.
(3) Number of days for government approval/disapproval days.
D. Contractor's notification to ACO and
(Requesting Activity) of test time and location due days prior to start of testing.
E. TEST REPORT REQUIRED
(1) DD Form 1423 ELIN
(2) Due
(3) Forwarded to
10. DISPOSITION OF FIRST ARTICLES
will be retained by pending Approved First Articles will be forwarded to disposition instructions from the contractor will be will be retained byreturned to the contractor/ the contractor.
Other Disposition:
V-3 PREVIOUS EDITION IS OBSOLETEAFMC IMT 260, 20200403
Prescribed by: AFMCI23-110
20220502
FD203022-01464-00 4080337 4710-00-515-0330NZ
3 Each
IDENTIFIED IN DRAWING, SUB-TIER
DRAWINGS, AND SPECIFICATIONS THEREIN.
BLOCK 12 OF THIS FORM AND LPF-
QAR-003
$2,500.00
PCO
2. P/R/MIPR NUMBER 3. PART NUMBER 4. NSN
11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL
a.
Government, DoD, Air Force.
Offerors currently in production of the same or similar article for a received First Article approval under the existing contract.
Government, DoD,b.
Government, DoD, c.
d. Provided not more than e.
f.
NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:
B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISIONA. PROCURING OFFICE
12. REMARKS
13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING
AND/OR APPROVING TEST (Name, Organization, Phone)
AFLCMC/LPSEA
Block 5. First Article Quantity is 3 parts:
-2 parts will be part of production quantity -1 part will be in addition to production quantity
Block 9.B First article test requirements shall be per LPF-QAR-003 and the following:
-a. All three first articles shall be inspected in accordance with the requirements of paragraphs 3.1, 3.2, 3.3, 3.4, and 3.5 of LPF-QAR-003.
-b. The assembly detail part numbers (if an assembly), shall be inspected per paragraphs 3.1, 3.2, 3.3, 3.4, and 3.5 of LPF-QAR-003 prior to assembly.
-c. After completion of inspections per 9.B.a above, one article shall be destructively tested/evaluated in accordance with the requirements of paragraph 3.6 of LPF-QAR-003.
-NOTE: Deliveries (FAT test plan and Reports) are preferably submitted on ISO-10149 compliant CD-ROM in Adobe Acrobat Portable Document Format.
Block 10. Disposition of First Articles:
-1 First Article part will be destructively tested. This item will be condemned and disposed of at vendor's facility.
Block 11. The cognizant Government engineering authority shall be the final authority for determining if a contractor meets the conditions of waiver identified in 11.a and/or 11.c.
First article testing is waived if the offeror is the prime contractor, Pratt & Whitney.
This is a critical part used in the F100 series turbine engine. Poor quality parts will have an adverse effect on mission capability and system safety. For this reason, First Article Testing is required to insure first time manufacturers or manufacturers that have not produced the item within three years manufacture parts in accordance with the drawing and specification requirements.
William Lance McCaughan, AFLCMC/LPEA2 Angela Davis 430 SCMS/GUIB 405-622-7337
FD203022-01464-00 4080337 4710-00-515-0330NZ
AFMC IMT 260, 20200403
Prescribed by: AFMCI23-110
INSTRUCTIONS FOR COMPLETION OF FIRST ARTICLE TEST REQUIREMENTS
(AFMC Form 260)
9.306)
AFMC IMT 260, 20200403
Prescribed by: AFMCI23-110
File details come from the government source that posted it. Updated .