21R0011_DRAFT_Attachment_2_CNRMAINST 11262.1B Contractor Oversight.pdf

PDF 2 MB Posted

Attached to
DRAFT RFQ Mobile Crane and Qualified Crane Operator Services IDIQ Federal contract opportunity
Solicitation number
N3904022RCIDIQMCRC700
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to DRAFT RFQ Mobile Crane and Qualified Crane Operator Services IDIQ, newest first.
File Type Posted
N3904021R0011_DRAFT_RFQ_05Oct21.pdf PDF
21R0011_DRAFT_Attachment_4_Wage_Rates.pdf PDF
21R0011_DRAFT_Attachment_3_Sample Lifting Requirements.pdf PDF
21R0011_DRAFT_Attachment_1_ 01 35 26_Governmental Safety Requirements.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CNRMAINST 11262.1B

27 Mar 2020

Enclosure (2)

CONTRACTOR CRANE/ L H E ENTRY PACKAGE CHECKLIST

Name of Crane/LHE Company & Eq uip ment Number

Company

Equipment Manufacturer/Equipment Model/Equipment Number

2 Date of Annual Inspection Expiration

3 Date of Quadrennial Inspection E xpiration

4 Name & phone number of Contracting Official

(or designated local representative)

Contracting Official

Phone Number

Does the package include a routine or critical lift plan? YES NO

6 Location of lift site

7 Duration crane will be continuously on the job site (hrs, days, weeks…)

Does plan include certification from contractor that the crane complies with ASME B30 standard [B30.5

(mobile cranes), B30.8 (floating cranes), B30.22 (articulating boom cranes), or B30.3 (construction tower cranes)] as applicable? YES NO

Does plan include a certificate of compliance per CNRMAINST 11262.1B [enclosure (1)]? YES NO

Which OSHA regulations does the certificate of compliance indicate? (For cranes used in cargo transfer, 29 CFR 1917 applies; for cranes used in construction, demolition, or maintenance, 29 CFR 1926 applies; for cranes used in shipbuilding, ship repair, or ship breaking, 29 CFR 1915 applies).

Does plan include valid medical certificate and proof of operator qualification from a source that qualifies crane operators (union, governmental agency, or an organization that tests and qualifies crane operators)? Verify qualification for each back-up operator (if provided) on the certificate of compliance. YES NO N/A

12 Does the plan include designate a Rigger-in-Charge? YES NO

13 What is the weight of the heaviest load to be lifted? lbs.

14 What is the weight of the rigging gear? lbs.

What are the crane /LHE components (and their weights) that add to the weight of the load (hook, jib, etc.)?

Main Block lbs.

Aux. Block lbs.

Jib (Stowed) lbs.

Jib (Erected) lbs.

Other lbs.

16 What is the maximum total crane/LHE lift (sum of 13, 14 & 15 above)? TOTAL lbs.

17 What is the capacity of the crane/LHE as configured? lbs.

18 What percentage of crane/LHE capacity does this lift represent? %

What is the main boom length? If a jib will be utilized, indicate the length and offset.

Boom Mode/

Counterweight

Used Main Jib Offset

For Multipurpose Equipment : boom working height

20 What are the minimum and maximum load radii? Min Max

21 Does the plan include the manufacturer's load chart for entire range of lift(s)? YES NO

Does plan include ground loading and outrigger reaction data to determine cribbing requirements, or a Waterfront Operational Permit? YES NO N/A

CNRMAINST 11262.1B

27 Mar 2020

2 Enclosure (2)

CONTRACTOR CRANE / LHE ENTRY PACKAGE CHECKLIST (Cont.)

23 For crawler crane, does the plan indicate area restrictions for operation? YES NO N/A

24 For floating crane, does plan include maximum allowable list? YES NO N/A

For mobile crane mounted on barge, is crane equipped with load indicating device? wind indicating device? marine type list and trim indicator (readable in one-half degree increments)? YES NO N/A

26 For mobile crane mounted on barge, does plan include revised load chart? YES NO N/A

What are the environmental conditions under which crane operations are to be stopped?

Will the crane perform critical lifts per CNRMAINST 11262.1B? (If no, skip items 29 -49.) YES NO

What circumstances require this lift to be classified as a critical lift? (Blind lift, 75% of load chart non-routine rigging, etc.)

30 What are the exact dimensions of the load? (L x W x H)

Does the plan indicate the crane position? (Overhead view) YES NO

32 What is the maximum lift height of the lift?

33 What is the minimum boom angle?

34 What is the maximum boom angle?

35 What is the name of the operator?

36 Indicate name(s) of backup operator (if required).

37 Does the plan show lift points? YES NO

Does the plan describe the rigging procedures? YES NO

Does the plan indicate rigging hardware requirements? YES NO

40 For personnel lifts, does the plan demonstrate compliance with 29 CFR 1926.550? YES NO N/A

41 Does EM 385-1-1 govern this lift? YES NO N/A

42 What are the coordination and communication requirements for the lift (e.g., radio and hand signals)?

For tandem or tailing crane lifts, does the plan indicate the make and model of the crane, the line, boom, and swing speeds, and the requirement for an equalizer beam? YES NO N/A

Has FAA Form 7460-1, Notice of Proposed

Construction of Alteration, in accordance with CFR

Title 14 Part 77 been submitted?

Ref:

https://oeaaa.faa.gov/oeaaa/external/gisTo ols/gisAction.jsp?action=showNoNoticeR equiredToolForm YES NO N/A

45 What is the name of the lift supervisor?

Does the plan indicate the qualifications of the lift supervisor? YES NO

47 What are the names of the riggers?

48 Does the plan indicate the qualifications of the riggers? YES NO

49 Did all involved personnel (Operator, Riggers, Lift Supervisor, etc.) sign the critical lift plan? YES NO

Signature below verifies LHE package complies with CNRMAINST 11262.1B

Contracting Official:

Organization: Signature: Date: Phone: