HQ0858-21-R-0010_TN-FLE_RFP_Industry_Comment_Matrix Govt Response.xlsx
XLSX spreadsheet 27 KB Posted
- Solicitation number
- 21MDA107254Mar21
- Issued by
-
DOD Missile Defense Agency
About this file
This document contains a matrix of industry comments and government responses to a solicitation for facilities, logistics, and environmental services. The Missile Defense Agency seeks to procure these services in support of its TEAMS-Next program through a full and open competition with a proposal due date of April 30, 2021. Key details include clarification that offerors need only submit an OCI disclosure form for currently awarded contracts, correction of page limits for the environmental management and logistics management mission capability subfactors, and extension of the proposal due date from April 12 to April 30, 2021 to allow for responses to industry comments.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FLE
| # | Document | Page # | Paragraph /Figure | ||||
| Number | Comment/ Rationale | Proposed Resolution(s) | MDA Response | ||||
| 1 | HQ0858-21-R-0010_Attachment_L-07_OCI_Disclosure_Form.pdf | The OCI Disclosure Form states, "NOTE: One Attachment to the OCI Disclosure Form shall be submitted for each MDA, Ballistic Missile Defense System (BMDS) related, or MDA funded contract either being bid or has already been awarded and is currently being performed. Fill in the number and the short official title by which the contract or subcontract requiring analysis and determination is formally known. Place an "X" inside the appropriate box to indicate your responses" | Can the Government please clarify if we need to submit an L-07 attachment for each contract currently being bid or just the contracts that have been awarded? | Offerors should submit an L-07 attachment for Contracts which have been awarded. | |||
| 2 | Section L | 14 | 4.4 | The order of the Mission Capability Subfactors (MCS) changed so that MCS2 is now Environmental Management and MCS3 is now Logistics Management (aligning to the Section M evaluation criteria), however, the respective page limitations were not updated. | Please update the corresponding page limits in Table L-1 so that MCS2 Environmental Management remains 15 pages and MCS3 Logistics Management remains 20 pages in accordance with the original page limitations accommodating the specific Elements Offerors must write to within each section. | Section L, Table L-1 has been corrected to reflect a 15 page limitation for MCS2 Environmental Management and a 20 page limit for MCS3 Logistics Management. | |
| 3 | |||||||
| 4 | |||||||
| 5 | |||||||
| 6 | |||||||
| 7 | |||||||
| 8 | |||||||
| 9 | |||||||
| 10 | |||||||
| 11 | |||||||
| 12 | |||||||
| 13 | |||||||
| 14 | |||||||
| 15 | |||||||
| 16 | |||||||
| 17 | |||||||
| 18 | |||||||
| 19 | |||||||
| 20 | |||||||
| 21 | |||||||
| 22 | |||||||
| 23 | |||||||
| 24 | |||||||
| 25 | |||||||
| 26 | |||||||
| 27 | |||||||
| 28 | |||||||
| 29 | |||||||
| 30 | |||||||
| 31 | |||||||
| 32 | |||||||
| 33 | |||||||
| 34 | |||||||
| 35 | |||||||
| 36 | |||||||
| 37 | |||||||
| 38 | |||||||
| 39 | |||||||
| 40 | |||||||
| 41 | |||||||
| 42 |
FLE Draft RFP HQ0147-21-R-0010 MDA Government Comment Matrix Compilation
Approved for Public Release 21-MDA-10725 (4 Mar 21)
File details come from the government source that posted it. Updated .