8-2025 ADA Curb Ramp Project BT-26WX 1756231669.2768633.pdf
PDF 176 KB Posted
- Attached to
- 2025 ADA Curb Ramp Project
- Solicitation number
- US.195932
- Issued by
- Dauphin County, Pennside CDP, Pennsylvania
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 6-Proposal Contract.pdf | ||
| 5-MS944 Anti-Collusion Aff.pdf | ||
| 2-BID BOND.pdf | ||
| 4-Attach 1A Special Prov.pdf | ||
| 3-Workmens Comp Aff.pdf | ||
| 1-Employment Verification.pdf | ||
| 7-Paxtang Borough 2025 ADA Curb Ramp Project.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2025 ADA Curb Ramp Project (BT-26WX)
Legend
The green cells with bolded numbers indicate that this bid was the lowest price.
The orange cells indicate that this item from that vendor was selected.
The green cells with orange outline indicate that this item from that vendor was selected, and has the lowest price.
$ 123
Total Cost
Selected #
Selected ($)
# Locked Items Selected Lowest UnitofMeasure QuantityRequired UnitPrice TotalCost
#1-1 FALSE Mobilization and demobilization including bonds and insurances$ 0 $ 5,000.0 LS 1 $ 12,500.0 $ 12,500.0
#1-2 FALSE Work zone traffic control$ 0 $ 0 LS 1 $ 2,400.0 $ 2,400.0
#1-3 FALSE Concrete curb, complete in place$ 0 $ 16,740.0 LF 180 $ 220 $ 39,600.0
#1-4 FALSE Concrete sidewalk, complete in place$ 0 $ 21,800.0 SF 1090 $ 32 $ 34,880.0
#1-5 FALSE Detectable warning surface (DWS), complete in place$ 0 $ 2,400.0 SF 96 $ 170 $ 16,320.0
#2-1 FALSE Work zone traffic control$ 0 $ 0 LS 1 $ 800 $ 800
#2-2 FALSE Concrete curb, complete in place$ 0 $ 6,510.0 LF 70 $ 220 $ 15,400.0
#2-3 FALSE Concrete sidewalk, complete in place$ 0 $ 6,800.0 SF 340 $ 32 $ 10,880.0
#2-4 FALSE Detectable warning surface (DWS), complete in place$ 0 $ 1,000.0 SF 40 $ 185 $ 7,400.0
#3-1 FALSE Work zone traffic control$ 0 $ 0 LS 1 $ 800 $ 800
#3-2 FALSE Concrete sidewalk, complete in place$ 0 $ 4,600.0 SF 230 $ 40 $ 9,200.0
#3-3 FALSE Detectable warning surface (DWS), complete in place$ 0 $ 400 SF 16 $ 250 $ 4,000.0
#4-1 FALSE Work zone traffic control$ 0 $ 0 LS 1 $ 800 $ 800
#4-2 FALSE Concrete curb, complete in place$ 0 $ 3,720.0 LF 40 $ 230 $ 9,200.0
#4-3 FALSE Concrete sidewalk, complete in place$ 0 $ 5,200.0 SF 260 $ 42 $ 10,920.0
#4-4 FALSE Concrete cheekwall, complete in place$ 0 $ 800 LF 20 $ 150 $ 3,000.0
#4-5 FALSE Detectable warning surface (DWS), complete in place$ 0 $ 600 SF 24 $ 200 $ 4,800.0
Base Bid Pricing (5)
Alternate Bid No. 1 (4)
Alternate Bid No. 2 (3)
Alternate Bid No. 3 (5)
$ 0
$ 182,900.0
Construction Masters Services, LLC
UnitPrice TotalCost UnitPrice TotalCost UnitPrice TotalCost UnitPrice TotalCost UnitPrice
$ 15,000.0 $ 15,000.0 $ 14,088.0 $ 14,088.0 $ 10,000.0 $ 10,000.0 $ 7,100.0 $ 7,100.0 $ 15,000.0
$ 1,500.0 $ 1,500.0 $ 775 $ 775 $ 1,000.0 $ 1,000.0 $ 10,800.0 $ 10,800.0 $ 500
$ 145 $ 26,100.0 $ 93 $ 16,740.0 $ 160 $ 28,800.0 $ 215 $ 38,700.0 $ 107
$ 25 $ 27,250.0 $ 36.5 $ 39,785.0 $ 26 $ 28,340.0 $ 35 $ 38,150.0 $ 20.5
$ 45 $ 4,320.0 $ 55.53 $ 5,330.88 $ 70 $ 6,720.0 $ 35.5 $ 3,408.0 $ 28.5
$ 1,200.0 $ 1,200.0 $ 575 $ 575 $ 1,000.0 $ 1,000.0 $ 8,650.0 $ 8,650.0 $ 950
$ 145 $ 10,150.0 $ 93 $ 6,510.0 $ 165 $ 11,550.0 $ 230 $ 16,100.0 $ 125
$ 25 $ 8,500.0 $ 36.5 $ 12,410.0 $ 27 $ 9,180.0 $ 55.5 $ 18,870.0 $ 35
$ 45 $ 1,800.0 $ 55.53 $ 2,221.2 $ 45 $ 1,800.0 $ 35.5 $ 1,420.0 $ 28.5
$ 1,300.0 $ 1,300.0 $ 575 $ 575 $ 1,000.0 $ 1,000.0 $ 1,450.0 $ 1,450.0 $ 100
$ 25 $ 5,750.0 $ 36.5 $ 8,395.0 $ 34 $ 7,820.0 $ 59 $ 13,570.0 $ 35
$ 45 $ 720 $ 55.53 $ 888.48 $ 45 $ 720 $ 35.5 $ 568.0 $ 28.5
$ 1,200.0 $ 1,200.0 $ 575 $ 575 $ 1,000.0 $ 1,000.0 $ 1,150.0 $ 1,150.0 $ 1,400.0
$ 145 $ 5,800.0 $ 93 $ 3,720.0 $ 175 $ 7,000.0 $ 217 $ 8,680.0 $ 125
$ 25 $ 6,500.0 $ 36.5 $ 9,490.0 $ 28 $ 7,280.0 $ 47 $ 12,220.0 $ 35
$ 90 $ 1,800.0 $ 136.16 $ 2,723.2 $ 160 $ 3,200.0 $ 70 $ 1,400.0 $ 115
$ 45 $ 1,080.0 $ 55.53 $ 1,332.72 $ 45 $ 1,080.0 $ 35.5 $ 852.0 $ 28.5
$ 0 $ 0 $ 0 $ 0 $ 0
0 0 0 0
Mid-State Paving, LLC
$ 119,970.0 $ 126,134.48 $ 127,490.0 $ 183,088.0 $ 109,671.0
Doug Lamb Construction, Inc.Final Grade Excavation, LLC JVI Group INC Kinsley Construction Site York
TotalCost UnitPrice TotalCost UnitPrice TotalCost
$ 15,000.0 $ 5,000.0 $ 5,000.0 $ 8,000.0 $ 8,000.0
$ 500 $ 2,500.0 $ 2,500.0 $ 0 $ 0
$ 19,260.0 $ 150 $ 27,000.0 $ 100 $ 18,000.0
$ 22,345.0 $ 22.5 $ 24,525.0 $ 20 $ 21,800.0
$ 2,736.0 $ 50 $ 4,800.0 $ 25 $ 2,400.0
$ 950 $ 1,250.0 $ 1,250.0 $ 0 $ 0
$ 8,750.0 $ 175 $ 12,250.0 $ 100 $ 7,000.0
$ 11,900.0 $ 30 $ 10,200.0 $ 20 $ 6,800.0
$ 1,140.0 $ 50 $ 2,000.0 $ 25 $ 1,000.0
$ 100 $ 1,250.0 $ 1,250.0 $ 0 $ 0
$ 8,050.0 $ 30 $ 6,900.0 $ 20 $ 4,600.0
$ 456.0 $ 50 $ 800 $ 25 $ 400
$ 1,400.0 $ 1,250.0 $ 1,250.0 $ 0 $ 0
$ 5,000.0 $ 175 $ 7,000.0 $ 100 $ 4,000.0
$ 9,100.0 $ 30 $ 7,800.0 $ 20 $ 5,200.0
$ 2,300.0 $ 150 $ 3,000.0 $ 40 $ 800
$ 684.0 $ 50 $ 1,200.0 $ 25 $ 600
0 0 0
$ 0 $ 0 $ 0
Mid-State Paving, LLCPorter Construction LLC & ConcretePro’s Concrete
$ 109,671.0 $ 118,725.0 $ 80,600.0
| Legend |
| Sheet 1 |
File details come from the government source that posted it. Updated .