218539A - Proposal.pdf
PDF 6 MB Posted
- Attached to
- PMC-HMA MDOT-Marshall temporary widening M96
- Solicitation number
- RFP - 591 - 230000002706
- Issued by
- Calhoun County, Mayville Village, Michigan
About this file
This document is a proposal for a Michigan Department of Transportation (MDOT) contract for the PMC-HMA MDOT-Marshall temporary widening M96 project in Calhoun County and Mayville Village, Michigan. The contract includes requirements and restrictions to maintain traffic on M-96 (Michigan Ave) in Marshall Township, Calhoun County. The work must be completed by the final completion date of November 17, 2023, with specific interim completion dates. The Contractor is responsible for providing sufficient resources and adjusting work schedules to complete the work within the contract time. Failure to meet the interim or final completion dates will result in liquidated damages. The contract requires the Contractor to attend a preconstruction meeting, submit an Internal Traffic Control Plan, and coordinate with emergency services, transit agencies, law enforcement, and schools.
The pricing terms include hot mix asphalt unit prices for HMA Approach, HMA 3EML, and HMA 4EML. The contract does not include any set asides, and there is no information provided about incumbents or funding sources. The work will be paid for using the applicable pay items based on the measured quantities of work completed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 218539A - Plan Set.pdf | ||
| RFP.SWR.Marshall M96 HMA Mod.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 of 1 Contract ID: 13062-218539
PROGRESS CLAUSE: Submit a Progress Schedule. The Engineer for this project is as follows:
Greg Finnila, P.E.
MDOT – Marshall TSC 15300 West Michigan Avenue Marshall, MI 49068 269-789-0592 FinnilaG@michigan.gov
After award, start work on the date approved by the Engineer, which must be no earlier than August 07, 2023. In no case may any work be commenced prior to award by the Department.
All contract work, except for second application of pavement markings, must be complete by the interim completion date of October 20, 2023.
The entire project must be completed by the final completion date of November 17, 2023.
The Contractor is responsible to provide sufficient resources and adjust work schedules to complete work within the contract time.
Failure by the Contractor to meet interim completion, and/or final completion dates will result in the assessment of liquidated damages in accordance with subsection 108.10.C.1 and 108.10.C.2 of the Standard Specifications for Construction. Liquidated damages will be assessed separately and simultaneously for failure to meet interim completion and/or final completion dates.
Liquidated damages will continue to be assessed for each calendar day that the work associated with the interim completion, and/or final completion dates remains incomplete, even if these days extend into or beyond seasonal suspension, unless approved otherwise by the Engineer.
Unless specific pay items are provided in the contract any extra costs incurred by the Contractor due to cold-weather protection and winter grading will not be paid for separately but will be included in the payment of other pay items in the contract.
After award and prior to the start of work, the Contractor must attend a preconstruction meeting with the Engineer. The Engineer will determine the day, time and place for the preconstruction meeting. The meeting will be conducted after project award and may be rescheduled if there are delays in the award of the project. The named subcontractor(s) for, Designated and/or Specialty Items, as shown in the proposal, is(are) recommended to be at the preconstruction meeting if such items materially affect the work schedule.
The Contractor may be required to meet with Department representatives for a post-construction review meeting, as directed by the Engineer. The Engineer will schedule the meeting.
V3.3
MICHIGAN
DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISION
FOR
MAINTAINING TRAFFIC
SWR/MAR:MCP 1 of 6 APPR:MAR: 06/12/2023
a. Description. This special provision consists of requirements and restrictions to maintain traffic on M-96 Michigan Ave in Marshall Township, Calhoun County.
b. General. Maintain traffic throughout the project in accordance with the standard specifications, typicals, and supplemental specifications in the contract and as described on the plans for this project.
c. Construction Influence Area (CIA). The CIA includes the right-of-way of the following roadways, within the approximate limits described below:
1. On M-96 (Michigan Ave) from approximately 1/2 mile east of 13 Mile Rd to east of 15 Mile Rd.
2. In addition, the CIA includes the right-of-way of any intersecting roads adjacent to the work zone for a distance of approximately 1/4 mile in advance of the work zone or as far as the construction or detour signing extends. The roads include but are not limited to 15 Mile Rd.
d. Traffic Restrictions. Maintain traffic in accordance with the Maintaining Traffic Typicals contained herein, except as noted below. Changes or adjustments to the Maintaining Traffic Typicals may be necessary to fit field conditions, subject to approval of the Engineer or as determined by the Engineer.
1. Utilize the following Maintaining Traffic Typicals:
A. 101-GEN-SPACING-CHARTS
B. 102-GEN-NOTES
C. 103-GEN-SIGN
D. 107-GEN-SPEED
E. 110-TR-NFW-2L
F. 127-NFW-SHIFT-OLC
G. WZD-100-A
H. WZD-125-E
MTSC:MCP 2 of 6 06/12/2023
2. Do not work, deliver material, or close lanes (other than approved stage closures) during the holiday periods as defined in Table 1. Cover or remove “45 where workers present” signing during the holiday periods as defined in Table 1.
Table 1: 2023 Holiday Periods
Holiday Start Date and Time End Date and Time
Labor Day 3:00 p.m. Friday, September 1st 6:00 a.m. Tuesday September 5th
3. Perform work and lane closures within the allowable time frames as shown in Table 2, unless otherwise approved by the Engineer. Additional lane and/or roadway closures and shifts may be implemented during maintaining traffic stage and traffic switch operations with prior Engineer approval.
4. Traffic switch operations are exempt from lane rental assessments or liquidated damage assessments for 8 hours for each traffic switch. Perform traffic switch operations within the allowable “traffic restriction tables” as shown below.
A. A traffic switch is defined as a change in the existing (original or staged) traffic configuration which requires multiple (more than one) lane lines and/or edge lines to be relocated in a new location and the old lines to be removed either between construction stages, or maintenance of traffic stages.
Table 2: M-96 Eastbound/Westbound Traffic Restrictions
Closure Type Start Time
End Time
M Tu W Th F Sa Su
Single Lane Closures 07:00 19:00 ∞ ∞ ∞ ∞ ∞ ∞ 0
∞ = Closure is allowed, and the frequency is not limited during the project timeframe # = The number of times closures can take place during the project timeframe.
5. Maintain a minimum of one lane of traffic in each direction at all times on M-96 (Michigan Ave).
6. No more than one closure is allowed in each direction of travel at the same time.
A. The maximum closure length is 1/2 mile unless otherwise approved by the Engineer.
7. Close any dedicated lanes prior to the location under construction.
8. When a lane is closed, place channelizing devices at cross streets and major drives to form a radius that clearly defines the approaches to the through and turning traffic.
9. Maintain access to all driveways as directed by the Engineer unless prior agreements are made with the respective property owners.
e. Traffic General.
1. For any lane open to traffic, provide a minimum lane width of 11 feet with 2 feet of shy distance on both sides unless identified otherwise on plans.
MTSC:MCP 3 of 6 06/12/2023
2. Place lane closures and traffic regulation operations only in areas as show on the plans unless otherwise directed by the Engineer.
3. Prior to shifting traffic onto shoulders or opening any lanes/shoulders, remove, by sweeping all accumulated debris that has collected within the shoulder and/or within the closed lane/shoulder.
4. A speed reduction will be used. Set the work zone speed limit on M-96 (Michigan Ave) to 45 miles per hour (mph).
5. Develop and submit to the Engineer an Internal Traffic Control Plan (ITCP) per subsection 104.11.B of the Standard Specifications for Construction. The requirements listed herein are the requirements for a Type A ITCP. Submit the Type A ITCP at the preconstruction meeting. The Engineer will have 7 calendar days to review the ITCP for approval or provide comments for revisions required to obtain approval. Include in the ITCP, at a minimum, the proposed ingress/egress locations for construction equipment and vehicles, traffic control devices that will be utilized to warn the motoring public of ingress/egress locations, and measures that will be taken to ensure compliance with the ITCP. Ensure that the ITCP minimizes conflicts between construction vehicles and motorists and maintains overall safety and mobility within the work zone. No work may begin prior to approval of the ITCP. Additional time required to obtain an approved ITCP will not be cause for delay or impact claims. All costs associated with obtaining an approved ITCP, providing and executing all parts of the approved ITCP including required traffic control devices, or resolving an incomplete or unacceptable ITCP will be borne by the Contractor.
6. Upon approval of the ITCP, complete and submit the “Lane Closure Notification/Request Form or approved equal” to the Engineer for approval prior to the actual closure date. Submit the lane closure request 7 calendar days in advance of the lane closure for approval. This includes all shifts/shoulder/lane/ramp closures as stated per the proposal or any new lane closure requests submitted by the Contractor. The Engineer will have 4 calendar days to review the lane closure request for approval or provide comments for revisions required to obtain approval. Do not implement a lane closure prior to approval by the Engineer. In addition, notify the Engineer when the lane closure is removed or cancelled.
See Lane Closure Notification/Request Form contained in the proposal.
7. Protect the work area at the end of each day.
8. The Engineer will be responsible for notifying emergency services, transit agencies, law enforcement and schools prior to any lane closures, detours or major traffic shifts. In addition, the Contractor will be responsible for working with and complying with any coordination that is necessary with the Department and emergency services, transit agencies, law enforcement and schools. All costs associated with these coordination efforts will be considered included in the pay item “Minor Traf Devices”.
9. Obtain all necessary permits from local governments within areas of local jurisdiction, including noise/dust ordinance waivers when required, prior to placing construction signing on local roads.
A. The Department will reimburse permit costs in accordance with subsection 107.02.A of the Standard Specification for Construction. Adhere to all requirements made
MTSC:MCP 4 of 6 06/12/2023 by local maintaining agencies regarding placement of traffic control devices prior to closing lanes on roadways not under MDOT jurisdiction.
10. Remove all temporary traffic control devices from MDOT right-of-way during any shut down periods unless needed for directly maintaining or channelizing traffic. No additional payment will be made for removal and/or redeployment of these devices except for in the case of an approved extension of time.
11. Cover or remove construction signing that refers to work zone speed when work at a location is planned to be inactive for a period greater than 2 days, unless otherwise specified on the plans or as directed by the Engineer.
12. Once work is initiated that includes any lane restrictions, that work must be continued daily until completed. A lack of work activity for more than 3 days will require the removal of lane closures at no expense to the Department.
f. Traffic Regulator Control.
1. Maintain two-way traffic at all times on M-96 (Michigan Ave) using traffic regulator control. A traffic regulator sequence is allowed to cover a maximum closure length of 1/2 mile.
Place the arrow panel, signs and channelizing taper for the traffic regulator operation at locations approved by the Engineer for adequate visibility by oncoming traffic.
2. Do not utilize more than 1 traffic regulator operation at one time on M-96 (Michigan Ave).
g. Stage Construction. Maintain traffic in accordance with the restrictions listed in section
d. Traffic Restrictions and the sequence of operations contained herein. Use of an alternate traffic control plan is subject to review and approval by the Engineer.
1. Stage 1.
A. Shift traffic to westbound shoulder and lane using traffic regulators for the removal of centerline and eastbound edge line corrugation.
B. Use Maintaining Traffic Typical 110-TR-NFW-2L
C. Shift traffic to eastbound shoulder and lane using traffic regulators for the removal of westbound edge line corrugation.
D. Use Maintaining Traffic Typical 110-TR-NFW-2L
2. Stage 2.
A. Shift traffic to eastbound shoulder and lane to complete work on westbound shoulder.
B. Use Maintaining Traffic Typical 127-NFW-SHIFT-OLC
3. Stage 3.
MTSC:MCP 5 of 6 06/12/2023
A. Shift traffic to westbound shoulder and lane to complete work on eastbound shoulder.
B. Use Maintaining Traffic Typical 127-NFW-SHIFT-OLC
h. Hot Mix Asphalt (HMA) Work.
1. Resurface all HMA milled areas the same day as the HMA cold milling operation.
2. No traffic is allowed on the HMA milled surface, unless directed by the Engineer.
i. Traffic Control Devices. Ensure all traffic control devices are in accordance with the MMUTCD and must meet the “acceptable” criteria as defined in the ATSSA publication entitled “Quality Guidelines for Temporary Traffic Control Devices and Features” at the time of initial deployment and after each major stage change.
1. During non-working periods, place applicable advance signs and channelizing devices at specific locations, as directed by the Engineer, at no additional cost to the Department.
2. Notify the Engineer 24 hours in advance of when traffic control devices are being delivered to the project site, to allow for initial inspection of devices to take place.
3. Remove from the project site all traffic control devices (including detour signing) no longer needed for a particular operation and equipment for construction within 14 calendar days of reopening the shoulder/lane/roadway.
4. Channelizing Devices.
A. Ensure all devices have sufficient ballast to prevent moving or tipping. If moving or tipping occurs, place additional ballast, as directed by the Engineer, at no additional cost to the Department. No more than two ballasts are allowed on each channelizing device.
B. Do not use caution tape on this project.
C. Space channelizing devices at 25 for tapers and 50 for tangents or tighter as directed by the Engineer
5. Temporary Signs.
A. Additional W20-1 (ROAD WORK AHEAD) signs are included in the quantities to be placed on all intersecting or adjacent roads where construction activities may be encountered.
B. Fabricate, install, and remove temporary sign overlays on existing signs with the pay item for Sign, Type B, Temp, Prismatic, Furn. Attach the overlay in accordance with subsection 812.03.D.2 of the Standard Specifications for Construction.
j. Measurement and Payment. Payment will be in accordance with the standard specifications unless otherwise specified. No additional payment will be made for the following activities:
MTSC:MCP 6 of 6 06/12/2023
1. Transporting traffic control items from site to site.
2. Providing sufficient vehicles and staff to make changes as-needed on site during work.
3. Providing sufficient vehicles and staff to remove closures from the roadway.
4. Providing additional traffic control devices required to expedite the construction for the convenience of the Contractor.
Sign , Type B, Temporary, Prismatic (For Information Only)
SIGN MESSAGE QTY
SIZE
AREA
(SFT)
WIDTH
(IN)
HEIGHT
(IN)
G20-2 "END ROAD WORK" 2 48 24 16.00
R2-1 "SPEED LIMIT 45" 4 24 30 20.00
R2-1 "SPEED LIMIT 55" 2 24 30 10.00
R5-18b "INJURE/KILL WORKER" 2 48 60 40.00
R5-18c "WORK ZONE BEGINS" 2 48 48 32.00
W20-1 "ROAD WORK AHEAD" 4 36 36 36.00
W20-4 “ONE LANE ROAD AHEAD” 2 36 36 18.00
W20-7a TRAFFIC REGULATOR 2 36 36 18.00
W1-4L SHIFT LEFT ARROW 2 36 36 18.00
W1-4R SHIFT RIGHT ARROW 2 36 36 18.00
W1-6L LEFT ARROW 2 48 24 16.00
W1-6R RIGHT ARROW 2 48 24 16.00
W3-4 “BE PREPARED TO STOP” 2 36 36 18.00
W3-5b "REDUCED SPEED ZONE AHEAD" 2 36 36 18.00
W8-26 "RUMBLE STRIPS AHEAD" 1 36 36 9.00
TOTAL , Sign, Type B, Temp, Prismatic: Sft 303
NOT TO SCALE
FILE:
Michigan Department of Transportation
MAY 2021
"B", "D" AND "L" TABLES
CHANNELIZING DEVICE SPACING,
SIGN BORDER KEY, AND ROLL-AHEAD SPACING
DATE:
SHEET:
101-GEN-SPACING-CHARTS.dgn
MAINTAINING TRAFFIC TYPICAL
SPACING-CHARTS
101-GEN-
NO:
DISTANCE BETWEEN TRAFFIC SIGNS, "D"
POSTED SPEED LIMIT, MPH (PRIOR TO WORK AREA)
D (FEET)
DISTANCES
"D"
B (FEET)
GUIDELINES FOR LENGTH OF LONGITUDINAL BUFFER SPACE, "B"
LENGTHS
"B"
30 35 40 45 50 55 60 65 70
25 30 35 40 45 50 55 60 65 70
250 300 350 400 450 500 550 600 650 700
SPEED, MPH (PRIOR TO WORK AREA)
132 181 230 279 329 411 476 542 625
OPERATING SPEED.
* POSTED SPEED, OFF-PEAK 85TH PERCENTILE SPEED PRIOR TO WORK STARTING, OR THE ANTICIPATED
POSTED SPEED LIMIT, MPH (PRIOR TO WORK AREA)
25 30 35 40 45 50 55 60 65 70
1 11
2 100 110 120 130 140
3 135 150 165 180 195 210
4 107 180 200 220 240 260 280
5 103 134 225 250 300 325 350
6 123 160 270 300 330 360 390 420
7 143 187 315 350 385 420 455 490
8 164 214 360 400 440 480 520 560
(FEET)
OFFSET
MINIMUM MERGING TAPER LENGTH, "L" (FEET)
9 184 240 405 450 495 540 585 630
10 205 267 450 500 550 600 650 700
11 225 294 495 550 605 660 715 770
12 180 245 320 540 600 660 720 780 840
13 266 347 585 650 715 780 845 910
14 286 374 630 700 770 840 910 980
15 307 400 675 750 825 900 975 1050
15 21 27 45 50 55 60 65 70 75
90544130
32 45 62 80
42 60 82
53 75 275
63 90
33 83
Michigan Department of Transportation
MAY 2021
"B", "D" AND "L" TABLES
CHANNELIZING DEVICE SPACING
SIGN BORDER KEY AND ROLL-AHEAD SPACING
SPACING-CHARTS
101-GEN-
NO:
SHOWN IN THE ABOVE TABLES ARE AS FOLLOWS:
MERGING TAPER IN DERIVING THE "L" VALUES
THE FORMULAS FOR THE MINIMUM LENGTH OF A
60 THE WORK AREA IS 40 MPH OR LESS
WHERE POSTED SPEED PRIOR TO "L" = W X S
THE WORK AREA IS 45 MPH OR GREATER
WHERE POSTED SPEED PRIOR TO "L" = W X S
W = WIDTH OF OFFSET
S = POSTED SPEED LIMIT IN MPH PRIOR TO WORK AREA
L = MINIMUM LENGTH OF MERGING TAPER
UPSTREAM TAPERS
DOWNSTREAM TAPERS
TAPER LENGTHTYPES OF TAPERS
100' - MAXIMUM2 TO 1 LANE ROAD TAPER
1/3 L - MINIMUMSHOULDER TAPER
1/2 L - MINIMUMSHIFTING TAPER
L - MINIMUMMERGING TAPER
MAXIMUM SPACING FOR CHANNELIZING DEVICES
SPEED LIMIT
WORK ZONE
TAPERTAPER TANGENT TANGENT
< 45 MPH
> 45 MPH 25 FEET100 FEET50 FEET
1 x SPEED LIMIT 2 x SPEED LIMIT
100' (PER LANE)(USE IS RECOMMENDED)
DRUM AND 42" DEVICE SPACING (FT) NIGHTTIME 42" DEVICE SPACING (FT)
25 FEET 50 FEET
50 FEET
EXITEXIT
IS TO BE PLACED ON THE PROJECT
SOLID OUTLINES INDICATE A SIGN THAT
EXISTS ON SITE, AND NEEDS TO BE COVERED.
DASHED OUTLINES INDICATE A SIGN THAT
SIGN OUTLINE KEY
Michigan Department of Transportation
MAY 2021
"B", "D" AND "L" TABLES
CHANNELIZING DEVICE SPACING
SIGN BORDER KEY AND ROLL AHEAD SPACING
SPACING-CHARTS
101-GEN-
NO:
TO WORK ZONE)
(POSTED SPEED PRIOR
PREVAILING SPEED
25 FT
GUIDELINES FOR ROLL-AHEAD DISTANCES FOR TMA VEHICLES - TEST LEVEL 2
VEHICLE
TMA
WEIGHT OF
40 MPH OR LESS
(STATIONARY)
5.5 TONS
TO WORK ZONE)
(POSTED SPEED PRIOR
PREVAILING SPEED
50-55 MPH
100 FT
150 FT
175 FT
VEHICLE
TMA
WEIGHT OF
* ROLL-AHEAD DISTANCES ARE CALCULATED USING A 4,410 POUND IMPACT VEHICLE WEIGHT.
25 FT
25 FT
50 FT
(STATIONARY)
12 TONS
(MOBILE)
5 TONS
45 MPH
60-75 MPH
45 MPH
50-55 MPH
60-75 MPH
TMA VEHICLE TO WORK AREA)
(DISTANCE FROM FRONT OF
ROLL-AHEAD DISTANCE*
TMA VEHICLE TO WORK AREA)
(DISTANCE FROM FRONT OF
ROLL-AHEAD DISTANCE*
* ROLL-AHEAD DISTANCES ARE CALCULATED USING A 10,000 POUND IMPACT VEHICLE WEIGHT.
GUIDELINES FOR ROLL-AHEAD DISTANCES FOR TMA VEHICLES - TEST LEVEL 3
MAY 2022
TRAFFIC TYPICALS
NOTE SHEET
102-GEN-NOTES.dgn
102-GEN-NOTES
NO:
GENERAL NOTES
BUFFER AREAS.
DO NOT STORE EQUIPMENT, MATERIALS OR PERFORM WORK IN ESTABLISHEDG4:
BY MDOT WILL BE ALLOWED.
APPLICABLE SPECIAL PROVISIONS. ONLY DESIGNS AND MATERIALS APPROVED
STANDARD SPECIFICATIONS FOR CONSTRUCTION, THE STANDARD PLANS AND
MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, THE CURRENT EDITION OF THE
HARDWARE (MASH) TL-3 AS WELL AS THE CURRENT EDITION OF THE MICHIGAN
REPORT 350 (NCHRP 350) TEST LEVEL 3, OR MANUAL FOR ASSESSING SAFETY
LIGHTING MUST MEET NATIONAL COOPERATIVE HIGHWAY RESEARCH PROGRAM
ALL TEMPORARY SIGNS, TYPE III BARRICADES, THEIR SUPPORT SYSTEMS ANDG3:
ARE ADEQUATELY DELINEATED BY OTHER TRAFFIC CONTROL DEVICES.
WILL BE MADE FOR TRAFFIC PATTERNS FOR WORK LESS THAN THREE DAYS THAT
BE REMOVED BEFORE ANY CHANGE IS MADE IN THE TRAFFIC PATTERN. EXCEPTION
CHANGES IN TRAFFIC PATTERNS OR PROPOSED TEMPORARY TRAFFIC MARKINGS SHALL
ALL EXISTING PAVEMENT MARKINGS WHICH ARE IN CONFLICT WITH EITHER PROPOSED G5:
S9:
OF THE STOP SIGN OR IF SIGNALS ARE BEING USED TO CONTROL TRAFFIC.
STOP AHEAD SIGNS ARE NOT REQUIRED IF THERE IS ADEQUATE VISIBILITY
STOP SIGNS NOT REQUIRED IF SIGNALS ARE ON 4-WAY FLASHING RED.
S8:
PLACE THEM "D" DISTANCE APART.
WHEN SPEED LIMIT SIGNS CANNOT BE PLACED SIDE BY SIDE AS SHOWN,
S7:
THE WORK ZONE.
PLACE ADDITIONAL R8-3 SIGNS AT A MAXIMUM 500' SPACING THROUGHOUT
S6:
STANDARDS.
FABRICATE SPECIAL SIGNS IN ACCORDANCE WITH CURRENT SIGNING DESIGN
S4:
THE W20-5 SIGNS.
WHEN TRAFFIC VOLUMES ARE SIGNIFICANT ENOUGH TO CREATE BACKUPS BEYOND
ADDITIONAL SIGNING AND/OR ELONGATED SIGNING SEQUENCES SHOULD BE USED
S2:
AND CONSOLIDATE THE SEQUENCE AS APPROPRIATE.
OR LONGER. TO APPLY THIS TYPICAL WITHOUT R5-18b SIGNS, REMOVE THE SIGNS
15 DAYS OR LONGER OR NON-FREEWAY PROJECTS WITH A DURATION OF 90 DAYS
R5-18b SIGNS ARE ONLY REQUIRED ON FREEWAY PROJECTS WITH A DURATION OF
S3:
OMIT THIS SIGN IN SUBSEQUENT SEQUENCES IN THE SAME WORK ZONE.
R5-18c IS ONLY REQUIRED IN THE INITIAL SIGNING SEQUENCE IN THE WORK ZONE.
SIGN NOTES
S5:
ACCORDINGLY.
SPEED LIMIT ARE POSTED, OMIT ALL W3-5b AND R2-1 SIGNS AND REDUCE SPACING
OF THE WORK AREA AS INDICATED. IF PERMANENT SIGNS DISPLAYING THE CORRECT
SPEED LIMIT SIGNS RETURNING TRAFFIC TO ITS NORMAL SPEED BEYOND THE LIMITS
WHEN REDUCED SPEED LIMITS ARE UTILIZED IN THE WORK AREA, PLACE ADDITIONAL
ROADWAY SUCH THAT NO SPEED LIMIT SIGNS ARE MORE THAN 2 MILES APART.
IS IN EFFECT. PLACE ADDITIONAL SPEED LIMIT SIGNS AT INTERVALS ALONG THE
ENTRANCE RAMP THAT COMES ONTO THE FREEWAY WHERE THE REDUCED SPEED
EACH MAJOR CROSSROAD THAT INTERSECTS THE WORK ZONE, OR AFTER EACH
PLACE ADDITIONAL SPEED LIMIT SIGNS REFLECTING THE WORK ZONE SPEED AFTER
S1:
SAFETY AND MOBILITY MANUAL, SECTIONS 6.01.09 AND 6.01.10.
CONDITIONS, COVERED, OR REMOVED. FOR GUIDANCE SEE THE WORK ZONE
ALL NON-APPLICABLE SIGNING WITHIN THE CIA MUST BE MODIFIED TO FIT
TCD8:
REVERSE CURVE SIGN, AND THE SECOND REVERSE CURVE SIGN CAN BE OMITTED.
REVERSE CURVE SIGN (W24-1) CAN BE USED INSTEAD OF THE FIRST
WHERE THE SHIFTED SECTION IS SHORTER THAN 600 FEET, A DOUBLE
TYPE III BARRICADES MUST BE LIGHTED FOR OVERNIGHT CLOSURES.TCD3:
"ROAD CLOSED" EXTENDING COMPLETELY ACROSS THE HAUL ROAD.
WHEN THE HAUL ROAD IS NOT IN USE, PLACE LIGHTED TYPE III BARRICADES WITHTCD4:
TEMPORARY TRAFFIC CONTROL DEVICE NOTES
TCD7:
OFF ROAD FROM EDGE OF PAVEMENT TO EDGE OF PAVEMENT.
ADDITIONAL TYPE III BARRICADES MAY BE REQUIRED TO COMPLETELY CLOSE
TCD9:
ARE NOT TO EXCEED 50 FEET AT NIGHT.
45 MPH OR GREATER. THE SPACING FOR 42 INCH CHANNELIZING DEVICE TANGENTS
EXCEED 100 FEET ON ROADWAYS WITH A POSTED WORK ZONE SPEED LIMIT OF
WITH A POSTED WORK ZONE SPEED LIMIT LESS THAN 45 MPH AND SHOULD NOT
SHOULD NOT EXCEED TWICE THE WORK ZONE SPEED LIMIT IN MPH FOR ROADWAYS
THE MAXIMUM DISTANCE IN FEET BETWEEN CHANNELIZING DEVICES IN A TANGENTTCD2:
TAPERS ARE NOT TO EXCEED 25 FEET AT NIGHT.
LIMIT OF 45 MPH OR GREATER. THE SPACING FOR 42 INCH CHANNELIZING DEVICE
SHOULD NOT EXCEED 50 FEET ON ROADWAYS WITH A POSTED WORK ZONE SPEED
ROADWAYS WITH A POSTED WORK ZONE SPEED LIMIT LESS THAN 45 MPH AND
SHOULD NOT EXCEED 1.0 TIMES THE WORK ZONE SPEED LIMIT IN MPH FOR
THE MAXIMUM DISTANCE IN FEET BETWEEN CHANNELIZING DEVICES IN A TAPERTCD1:
AT A CONSISTENT DISTANCE, BETWEEN 10' AND 20' APART.
THREE RUMBLE STRIPS. PLACE THE RUMBLE STRIPS IN THE ARRAY
RECOMMENDATIONS. AN ARRAY OF RUMBLE STRIPS CONTAINS
SHOWN, AND IN ACCORDANCE WITH THE RUMBLE STRIP MANUFACTURER'S
IF NOT SPECIFIED IN THE CONTRACT, PLACE RUMBLE STRIPS AS
RUMBLE STRIPS ARE TO BE PLACED AS SPECIFIED IN THE CONTRACT.
RAMP NOTES
DIVERGE IN A FREE MANNER
CHANELIZING DEVICES MUST BE POSITIONED TO ENABLE RAMP TRAFFIC TO
WHEN CONDITIONS ALLOW, E5-1 SIGNS MUST BE REMOVED OR COVERED ANDRMP1:
WORK SHOULD BE EXPEDITED TO AVOID THE STOP AND/OR YIELD CONDITIONS.
THE RAMP TO COMPLETE WORK TO ALLOW AN ADEQUATE MERGE DISTANCE.
IN PLACE OF W3-2 SIGNS. CONSIDERATION SHOULD BE GIVEN TO CLOSING
R1-2 SIGNS. WHEN R-1 SIGNS ARE USED, W3-1 SIGNS MUST BE USED
WHEN CONDITIONS WARRANT, R1-1 SIGNS MAY BE USED IN PLACE OF
STOP AND YIELD CONDITIONS SHOULD BE AVOIDED WHENEVER PRACTICAL.RMP2:
G2:
THE ENGINEER.
GEN-KEY ARE APPROXIMATE AND MAY NEED ADJUSTING AS DIRECTED BY
DISTANCE BETWEEN SIGNS, "D", THE VALUES FOR WHICH ARE SHOWN IN TYPICAL
BOARD IN THE CLOSED LANE AS CLOSE TO THE BEGINNING OF TAPER AS POSSIBLE.
SECTIONS, IF ARROW BOARD CANNOT BE PLACED BEHIND CURB, PLACE ARROW
MOTORISTS WHEN PHYSICAL LIMITATIONS RESTRICT PLACEMENT. IN CURBED
PRACTICAL, BUT NOT IN A MANNER THAT WILL OBSCURE OR CONFUSE APPROACHING
PLACE LIGHTED ARROW PANELS AS CLOSE TO THE BEGINNING OF TAPERS AS TCD6:
S10:
A SPEED REDUCTION IN THIS DIRECTION.
PLACE REDUCED SPEED ZONE AHEAD SIGN (W3-5b) HERE WHEN USING
TCD10:
SIDES OF THE ROAD 1000 FEET FROM EACH OTHER.
CORRECT PCMS MESSAGING. STAGGER PCMS THAT ARE ON OPPOSING
CHANGEABLE MESSAGE SIGN GUIDELINES FOR RECCOMENDED AND
SEE THE WORK ZONE SAFETY AND MOBILITY MANUAL, PORTABLE
AN ANGLE OF 45 DEGREES IN THE DIRECTION VEHICULAR TRAFFIC IS TO PASS.
HAVE ALTERNATING DIAGONAL ORANGE AND WHITE STRIPES SLOPING DOWNWARD AT
AND WHITE RETROREFLECTIVE SHEETING. THE RETROREFLECTIVE SHEETING MUST
A MINIMUM OF 12 INCHES IN WIDTH AND 36 INCHES IN HEIGHT AND HAVE ORANGE
WHEN USED WITH A TEMPORARY SIGNAL SYSTEM. THE OBJECT MARKERS MUST BE
IN THE STANDARD PLAN FOR TEMPORARY CONCRETE BARRIER (R-53, AND R-126)
USE OBJECT MARKER SIGNS IN LIEU OF THE TYPE B HIGH INTENSITY LIGHT SHOWNTCD5:
ROLL AHEAD DISTANCE
B = LENGTH OF LONGITUDINAL BUFFER
L = MINIMUM LENGTH OF TAPER
D = DISTANCE BETWEEN TRAFFIC CONTROL DEVICES
SEE GEN-SPACING-CHARTS FOR COMMON VALUES INCLUDING:G1:
TRAFFIC REGULATOR NOTES
TR1:
BY THE ROADWAY ADT, GEOMETRICS, AND AS DIRECTED BY THE ENGINEER.
THE MAXIMUM DISTANCE BETWEEN THE TRAFFIC REGULATORS IS DETERMINED
AND THE VIDEO "HOW TO SAFELY REGULATE TRAFFIC IN MICHIGAN".
THE CURRENT VERSIONS OF THE TRAFFIC REGULATOR'S INSTRUCTION MANUAL
SPECIFICATIONS, THE STANDARD PLANS AND APPLICABLE SPECIAL PROVISIONS,
TRAFFIC REGULATORS MUST FOLLOW ALL THE REQUIREMENTS IN THE STANDARD
TR2:
THE HOURS OF DARKNESS.
REGULATOR'S STATIONS WHEN TRAFFIC REGULATING IS ALLOWED DURING
PROVIDE APPROPRIATE BALLOON LIGHTING TO SUFFICIENTLY ILLUMINATE TRAFFIC
S11:
LENGTH OF SHIFT AND AS PER THE ENGINEER.
SHIFTS MORE THAN 12FT, PLACE THREE OR MORE W1-6(R)(L) SIGNS DEPENDING UPON
SHIFTS 5FT TO 12FT, PLACE TWO W1-6(R)(L)
SHIFTS 4FT OR LESS, PLACE ONE W1-6(R)(L)
THE NUMBER OF W1-6 SHIFT SIGNS TO PLACE FOR A SHIFT IS AS FOLLOWS:
S12:
IN THIS DIRECTION
PLACE R2-1 SIGNS AS DETAILED IN NOTE S5 WHEN THERE IS A SPEED REDUCTION
THE FOLLOWING NOTES APPLY IF CALLED FOR ON THE TRAFFIC TYPICAL
THE REQUIREMENTS OF THE MMUTCD
PROVIDE EITHER A STOP/SLOW AFAD OR A RED/YELLOW LENS AFAD, MEETINGTR3:
MAY 2022
NOTE SHEET
102-GEN-NOTES.dgn
102-GEN-NOTES
NO:
SIGNAL NOTES
TRUCK IS LOCATED OVER ACTIVE TRAVEL LANES.
THE CONTRACTOR MUST HAVE A DESIGNATED SPOTTER IF THE AERIAL BUCKETSIG4:
INTERSECTION WHEN TRAFFIC IS PLACED IN A 4 WAY STOP.
COMPROMIZED. USE TRAFFIC REGULATORS TO CONTROL TRAFFIC THROUGH THE
THE INTERSECTION IN A 4 WAY STOP IF THE 14 FOOT VERTICAL CLEARANCE IS
CLEARANCE. THE CONTRACTOR MUST UTILIZE AN ALTERNATE SET UP, OR PLACE
THE LOWEST POINT OF THE BUCKET MAY NOT TRAVEL BELOW 14 FOOT VERTICALSIG5:
TRUCK MAY BE MOVED TO FACILITATE WORK.
DELINEATE THE TRUCK WITH CHANNELIZING DEVICES. THE POSITION OF THESIG6:
42 INCH CHANNELIZING DEVICES FOR NIGHTTIME WORK.
DELINEATE THE WORK ZONE AREA WITH 28 INCH CONES FOR DAYTIME WORK, ORSIG3:
SIGNAL IS IN OPERATION.SIG2:
EXISTING SIGNAL MUST BE EITHER 4-WAY FLASHING RED, BAGGED, OR TURNED OFF.SIG1:
MAINTENANCE AND SURVEYING NOTES
ACTIVATED AMBER BEACON.
WORK AND SHADOW VEHICLES SHALL BE APPROPRIATELY EQUIPPED WITH AN MS4:
SIGHT DISTANCE IN ADVANCE OF VERTICAL OR HORIZONTAL CURVES.
SLOW DOWN AND TRAVEL AT A FARTHER DISTANCE TO PROVIDE ADEQUATE
AREA AND PROCEEED AT THE SAME SPEED. THE SHADOW VEHICLE SHOULD
VEHICLES SHOULD MAINTAIN THE RECOMENDED DISTANCE FROM THE WORK
WHENEVER STOPPING SIGHT DISTANCE EXISTS TO THE REAR, THE SHADOW MS1:
TABLES.
SHOULD BE PARKED ACCORDING TO THE ROLL AHEAD DISTANCE
SEPARATE THE WORK SPACE FROM TRAFFIC. IF USED, THE VEHICLES
WORK OR SHADOW VEHICLES WITH OR WITHOUT A TMA MAY BE USED TO MS3:
TO) IS THE LAYOUT OF CONCRETE PATCHES.
SPACING MUST BE USED. AN EXAMPLE OF AN OPERATION (BUT NOT LIMITED
CHANNELIZING DEVICES TO DELINEATE OPEN OR CLOSED LANES AT 50 FT
A MOBILE OPERATION IS OCCURRING DURING THE NIGHTTIME HOURS,
WHEN WORKERS ARE OUTSIDE THEIR VEHICLES IN AN EXISTING LANE WHILEMS5:
TYPE OF WORK TAKING PLACE AS PER THE ENGINEER.
W21-6 AND W20-1 SIGNS MAY BE SUBSTITUTED AS DETERMINED BY THE MS6:
"END ROAD WORK" SIGN.
AND THE "END WORK CONVOY" SIGN, OR BETWEEN THE "WORK ZONE BEGINS" AND
WITH AN ACTIVATED BEACON, BETWEEN THE "BEGIN WORK CONVOY" SIGN
WORKERS OUTSIDE OF VEHICLES SHOULD WORK WITHIN 150' OF WORK VEHICLES MS2:
THE FOLLOWING NOTES APPLY IF CALLED FOR ON THE TRAFFIC TYPICAL
JUNE 2021
SIGN SHEET
103-GEN-SIGN.dgn
103-GEN-SIGN
NO:
SIGN NUMBER KEY
ROAD WORK
END
G20-2
EXIT
OPEN
E5-2
EXIT
CLOSED
E5-2a
EXIT
ONLY
E5-3
M4-8
DETOUR
M4-8a
END
DETOUR
M4-8b
END
M4-9L
DETOUR
M4-9R
DETOUR
M4-10L
DETOUR
M4-10R
DETOUR
PILOT CAR
FOLLOW ME
12" x 18" 12" x 24"
48" x 18"48" x 18"
48" x 36" 48" x 36" 48" x 36" 48" x 24"
36" x 18"
24" x 12"
30" x 15"
24" x 18" 24" x 12"
30" x 24"
48" x 36"
60" x 48"
30" x 24"
48" x 36"
60" x 48"
12" x 18"
12" x 18" 12" x 18" 12" x 18"
M4-9gL M4-9gR M4-9h
M4-9dL M4-9dR M4-9e
60" x 48"
48" x 48"
EXIT
E5-1f 60" x 24"
M4-9j
DETOUR
M4-9f
END
M6-1L M6-1R
M6-2R
M6-2L
M6-6L M6-6R M6-7L M6-7RM6-3 M6-5
WEST
EASTNORTH
DETOUR
M3-1 M3-2
M3-3 M3-4
SOUTH
XX
M1-1 M1-1 M1-2 M1-2 M1-3 M1-3
M1-4 M1-4
ROAD WORK
NEXT XX MILES
G20-1
M4-9kL
M1-5
M4-1 M4-2 M4-3 M4-4 M4-5
M4-6 M4-7
M4-1a
18" x 9"
12" x 6"
12" x 18" 12" x 18"
XXX XXX
XXX
MONTMORENCY>
COUNTY
XX
XX
INTERSTATE
XXX
INTERSTATE
XX
BUSINESS
LOOP
XX
BUSINESSBUSINESS
SPURSPUR
ALTERNATE ALT PASSBY BUSINESS TRUCK TO
END TEMPORARY
BUSINESS
LOOP
BUSINESS
SPUR
30" x 24"
48" x 36"
60" x 48"
M4-9i
END
XX
M4-7a
TEMP
M1-5a
24" x 24"
18" x 18"
M1-6
M4-11a
FOLLOW
M5-1L M5-1R M5-2L M5-2R
36" x 24"
E13-1aP
48" x 48"
36" x 36"
24" x 24"
18" x 18"
60" x 48"
45" x 36"
30" x 24"
22.5" x 18"
48" x 48"
36" x 36"
24" x 24"
18" x 18"
48" x 48"
36" x 36"
24" x 24"
18" x 18"
48" x 48"
36" x 36"
24" x 24"
18" x 18"
60" x 48"
45" x 36"
30" x 24"
22.5" x 18"
60" x 48"
45" x 36"
30" x 24"
22.5" x 18"
60" x 48"
45" x 36"
30" x 24"
22.5" x 18"
36" x 36"
30" x 30"
24" x 24"
18" x 18"
XXX
COUNTY
BARAGA XXX
M1-6
45" x 36"
30" x 24"
22.5" x 18"
36" X 36"
24" x 24"
18" x 18"
36" x 18"
30" x 15"
24" x 12"
18" x 9"
12" x 6"
36" x 18"
30" x 15"
24" x 12"
18" x 9"
36" X 18"
30" X 15"
24" X 12"
18" x 9"
12" X 6"
60" x 54"
48" x 42"
30" x 30"
60" x 54"
48" x 42"
30" x 30"
36" X 18"
30" X 15"
24" X 12"
18" x 9"
12" X 6"
30" x 21"
21" x 15"
12" x 9"
30" x 21"
21" x 15"
12" x 9"
30" x 21"
21" x 15"
12" x 9"
30" x 21"
21" x 15"
12" x 9"
30" x 21"
21" x 15"
18" x 12"
12" x 9"
30" x 21"
21" x 15"
18" x 12"
12" x 9"
30" x 21"
21" x 15"
18" x 12"
12" x 9"
30" x 21"
21" x 15"
18" x 12"
12" x 9"
30" x 21"
21" x 15"
18" x 12"
12" x 9"
30" x 21"
21" x 15"
18" x 12"
12" x 9"
30" x 21"
21" x 15"
18" x 12"
12" x 9"
30" x 21"
21" x 15"
18" x 12"
12" x 9"
30" x 21"
21" x 15"
18" x 12"
12" x 9"
30" x 21"
21" x 15"
18" x 12"
12" x 9"
M4-9kR
DETOUR
36" x 18"
30" x 15"
24" x 12"
18" x 9"
12" x 6"
36" x 18"
30" x 15"
24" x 12"
18" x 9"
12" x 6"
36" x 18"
30" x 15"
24" x 12"
18" x 9"
12" x 6"
36" x 18"
30" x 15"
24" x 12"
18" x 9"
12" x 6"
36" x 18"
30" x 15"
24" x 12"
18" x 9"
12" x 6"
36" x 18"
30" x 15"
24" x 12"
18" x 9"
12" x 6"
36" x 18"
30" x 15"
24" x 12"
18" x 9"
12" x 6"
36" x 18"
30" x 15"
24" x 12"
18" x 9"
12" x 6"
36" x 18"
30" x 15"
24" x 12"
18" x 9"
12" x 6"
36" x 18"
30" x 15"
24" x 12"
18" x 9"
12" x 6"
MPH
E13-1P
G20-4
M5-3
30" x 21"
21" x 15"
12" x 9"
M6-4
30" x 21"
21" x 15"
18" x 12"
12" x 9"
VAR x 24" u I-6a
30" x 30" 24" x 24" 18" x 18"
SEE MDOT SHS 13-WORK ZONE FOR SIGN DETAILS
60" x 54"
48" x 42"
30" x 30"
60" x 54"
48" x 42"
30" x 30"
DETOUR
M4-9mL
DETOUR
M4-9mR
30 MPH
JUNE 2021
103-GEN-SIGN
NO:
OUTHSORTHN
NORTH SOUTH
STOP
R1-1 M8-1gL M8-1gR
KEEP
FLE T
KEEP
GRIHT
YIELD
R1-2
WHERE
WORKERS
PRESENT
R2-1a R3-1 R3-2
DO
NOT
PASS
R4-1
R8-3
LIMIT
SPEED
XX
R2-1
INJURE /
KILL A
WORKER
7500$
15 YEARS
R5-18b
BEGINS
ZONE
WORK
R5-18c
ON
STOP
HERE
RED
R10-6b
TO
ONCOMING
TRAFFIC
R1-2aP R3-4
LEFT LANE
MUST
TURN LEFT
R3-7L
PASS
WITH
CARE
R4-2 R4-7
R4-8
STAY
IN
LANE
R4-9
DO NOT
ENTER
R5-1
WAY
WRONG
R5-1a
R6-1L
WAYONE
R6-1R
WAYONE
ONE
WAY
R6-2L
ONE
WAY
R6-2R
CROSSWALK
PEDESTRIAN
R9-8
CLOSED
SIDEWALK
R9-9
SIDEWALK CLOSED
USE OTHER SIDE
R9-10
SIDEWALK CLOSED
CROSS HERE
R9-11aL
SIDEWALK CLOSED
CROSS HERE
R9-11aR
ROAD CLOSED
10 MILES AHEAD
LOCAL TRAFFIC ONLY
R11-3a
BRIDGE OUT
10 MILES AHEAD
LOCAL TRAFFIC ONLY
R11-3b
ROAD CLOSED
TO
THRU TRAFFIC
R11-4
CLOSED
CROSSOVER
ONE
RIGHT
FORM
LANE
48" x 60"
36" x 30"36" x 30"
48" x 60"
48" x 48"
36" x 18" 24" x 12"
48" x 24"
48" x 24"
24" x 12"
48" x 24"
24" x 12" 36" x 54"
48" x 30" 48" x 30"
60" x 30" 60" x 30" 60" x 30"
60" x 30"
48" x 60" 30" x 42"
R11-2c
R5-18gR5-18f
USE ALL
LANES
DURING
BACKUPS
RUT N
ON
S
R3-3
NO LYY NO LYY
R3-8c
NO LYY NO LYY
R3-8d
TURN RIGHT
MUST
LANERIGHT
R3-7R
CLOSED
ROAD
R11-2
CLOSED
RAMP
OM-3ROM-3L
R11-2a
48" x 30"
R11-2b
CLOSED
EXIT
36" x 66" 36" x 66" 60" x 48"
SIGN NUMBER KEY
M8-2d
48" x 36"
36" x 30"
24" x 18"
SIDEWALK CLOSED
AHEAD
CROSS HERE
R9-11L
SIDEWALK CLOSED
AHEAD
CROSS HERE
R9-11R
48" x 36"
24" x 12"
48" x 36"
24" x 12"
78" x 12"
R5-18d
BEGIN WORK CONVOY END WORK CONVOY
72" x 12"
R5-18e
R3-6L R3-6RR3-5a
ONLY
R3-5L
ONLY
R3-5R
ONLY
36" x 72"
24" x 48"
12" x 36"
36" x 72"
24" x 48"
12" x 36"
48" x 48" 36" x 36" 30" x 30" 24" x 24" 18" x 18"
60" 48" 36" 30" 24" 18"
48" x 60"
36" x 48"
30" x 36"
24" x 30"
18" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
36" x 48"
30" x 36"
36" x 48"
30" x 36"
36" x 48"
30" x 36"
42" x 48"
30" x 36" 42" x 48"
30" x 36" 36" x 36"
30" x 30"
36" x 36"
30" x 30"
48" x 60"
36" x 48"
24" x 30"
18" x 24"
12" x 18"
48" x 60"
36" x 48"
24" x 30"
18" x 24"
12" x 18"
48" x 60"
36" x 48"
24" x 30"
18" x 24"
12" x 18"
48" x 60"
36" x 48"
24" x 30"
18" x 24"
48" x 60"
36" x 48"
24" x 30"
18" x 24"
48" x 48"
36" x 36"
30" x 30"
42" x 30"
36" x 24"
30" x 18"
54" x 18"
36" x 12"
54" x 18"
36" x 12"
48" x 60"
36" x 48"
24" x 30"
18" x 24"
12" x 16"
48" x 60"
36" x 48"
24" x 30"
18" x 24"
12" x 16"
30" x 18"
24" x 12"
STOP SLOW
FRONT
24" x 24"
18" x 18"
R1-1a
BACK
SEE MDOT SHS 13-WORK ZONE FOR SIGN DETAILS
48" x 48"
36" x 36"
24" x 24"
18" x 18"
12" x 12"
FOLLOW
TRUCKS
INTO
DO NOT
WORK ZONE
48" x 60"
R5-18h
JUNE 2021
103-GEN-SIGN
NO:
W1-4bL W1-4bRW1-4L W1-4R
W1-6L W1-6R
W3-2 W3-3 W3-4
TOSTOP
PREPARED
BE
W4-1L W4-1R W4-2L W4-2R W4-3L W4-3R
W24-1L
W24-1R
W3-5b
ZONE
AHEAD
REDUCED
SPEED
W3-1
W1-1L W1-1R W1-2L W1-2R
W4-6RW4-6L
W1-8L W1-8R
W1-3L W1-3R
W1-4cL W1-4cR
W3-5a
ZONE
AHEAD
SPEED
XX MPH
W6-1 W6-2 W6-3 W7-1
ALL
LANES
W24-1cP
W24-1aL
W24-1aR
W24-1bL
W24-1bR
SIGN NUMBER KEY
ROAD
NARROWS
W5-1
NARROWS
RAMP
W5-4
SPEED
XX
LIMIT
W3-5
NO
MERGE
AREA
W4-5P
NARROW
BRIDGE
W5-2
ONE LANE
BRIDGE
W5-3
W6-4
12" x 18"
BUMP
W8-1
W4-5RW4-5L
THRU
TRAFFIC
MERGE
LEFT
W4-7L
THRU
TRAFFIC
MERGE
RIGHT
W4-7R
PREPARE
TO STOP WHEN
FLASHING
W3-4b
%8
W7-1a
48" x 48"
36" x 36"
30" x 30"
24" x 24"
18" x 18"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
18" x 18"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
18" x 18"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
18" x 18"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
18" x 18"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
18" x 18"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
18" x 18"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
18" x 18"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
96" x 48"
60" x 30"
48" x 24"
36" x 18"
24" x 12"
96" x 48"
60" x 30"
48" x 24"
36" x 18"
24" x 12"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
18" x 18"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
18" x 18"
48" x 48"
36" x 36"
30" x 30"
18" x 18"
60" x 60"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
60" x 60"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
24" x 30"
18" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
60" x 60"
48" x 48"
36" x 36"
30" x 30"
60" x 60"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
18" x 18"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
18" x 18"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
SEE MDOT SHS 13-WORK ZONE FOR SIGN DETAILS
W1-2bL
48" x 48" 36" x 36"
48" x 48" 36" x 36"
W1-2bR
30" x 24"
24" x 18"
36" x 48"
30" x 36"
24" x 30"
18" x 24"
12" x 18"
36" x 48"
30" x 36"
24" x 30"
18" x 24"
12" x 18"
JUNE 2021
103-GEN-SIGN
NO:
W12-1
ON
RAMP
W13-4P
NO
CENTER
LINE
W8-12
W8-3
ENDS
PAVEMENT
W8-5
UNEVEN
LANES
W8-11
FALLEN
ROCKS
W8-14
W8-15P
PAVEMENT
GROOVED
W8-15 W8-17L W8-17R
ROAD
MAY
FLOOD
W8-18
SHOULDER
NO
W8-23
STEEL
PLATE
AHEAD
W8-24 W9-2L
LEFT
ENDSLANE
MERGE
W11-10
ENDS
SHOULDER
W8-25
SIGN NUMBER KEY
M . P . H .
W13-1P
ROAD
WORK
AHEAD
W20-1
W13-2
EXIT
XX
M P H
DIP
W8-2
SHOULDER
SOFT
W8-4
GRAVEL
LOOSE
W8-7
ROUGH
ROAD
W8-8
LOW
SHOULDER
W8-9
LEFT
LANE
ENDS
W9-1L
LANE
ENDS
RIGHT
W9-1R
MERGE
RIGHT
LANE ENDS
W9-2R
12 6
W12-2
NO
PASSING
ZONE
W14-3
ROAD
CLOSED
AHEAD
W20-3
X
W16-4aP
FEET
W16-2P W16-13P
WHEN
FLASHING
CLOSED
AHEAD
CENTER
& LEFT LANE
W9-3a
CLOSED
AHEAD
CENTER &
LEFT 2 LANES
W9-3b
CROSSING
TRUCK
W11-10a
R
WORK
AHEAD
W20-1d
SU VEYRA
WORK
AHEAD
W20-1b
MP G
WORK
AHEAD
W20-1c
SINAL
TRAFFIC
CIRCLE
W16-12P
24" x 18"
NEXT
MILES
W13-6a W13-7 W13-7a
W13-6
RAMP
MPH
RAMP
MPH
EXIT
MPH
EXIT
MPH
W8-26
RUMBLE
STRIPS
AHEAD
WATCH
FOR RAMP
TRAFFIC
W11-24
DETOUR
AHEAD
W20-2
STREET
CLOSED
AHEAD
W20-3a
WHEN
WET
W8-5P
CLOSED
AHEAD
CENTER
LANE
W9-3C
CLOSED
AHEAD
LEFT
LANE
W9-3L W9-3R
48" x 48"
36" x 36"
30" x 30"
24" x 24"
18" x 18"
48" x 48"
36" x 36"
30" x 30"
18" x 18"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
18" x 18"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
36" x 30"
30" x 24"
24" x 18"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
36" x 30"
30" x 24"
24" x 18"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
36" x 30" 30" x 24" 24" x 18"
W8-17P
SHOULDER
DROP-OFF
48" x 48"
36" x 36"
24" x 24"
48" x 48"
36" x 36"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
60" x 60"
48" x 48"
36" x 36"
30" x 30"
60" x 60"
48" x 48"
36" x 36"
30" x 30"
60" x 60"
48" x 48"
36" x 36"
30" x 30"
60" x 60"
48" x 48"
36" x 36"
30" x 30"
60" x 60"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
48" x 48"
36" x 36"
30" x 30"
18" x 18"
30" x 30"
24" x 24"
18" x 18"
48" x 60"
36" x 48"
24" x 30"
W13-3
RAMP
XX
M P H
48" x 60"
36" x 48"
24" x 30" 36" x 36"
24" x 24"
48" x 84"
36" x 60"
24" x 42"
48" x 84"
36" x 60"
24" x 42"
48" x 84"
36" x 60"
24" x 42"
48" x 84"
36" x 60"
24" x 42"
64" x 48"
48" x 36"
40" x 30"
36" x 24"
30" x 24"
24" x 18"
18" x 12"
36" x 30"
30" x 24"
24" x 18"
18" x 12"
30" x 24"
24" x 18"
60" x 60"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
W20-1a
R
WORK
AHEAD
ST EET
60" x 60"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
60" x 60"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
60" x 60"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
60" x 60"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 84"
36" x 60"
24" x 42"
SEE MDOT SHS 13-WORK ZONE FOR SIGN DETAILS
CLOSED
AHEAD
RIGHT
LANE
JUNE 2021
103-GEN-SIGN
NO:
SHOULDER
CLOSED
LEFT
W21-5aL
SHOULDER
RIGHT
CLOSED
W21-5aR
SHOULDER
CLOSED
AHEAD
LEFT
W21-5bL
SHOULDER
RIGHT
CLOSED
AHEAD
W21-5bR
SLOW MOVING
VEHICLE
W21-4
UTILITY
WORK
AHEAD
W21-7
MOWING
AHEAD
W21-8
TURN OFF
2-WAY RADIO
AND
CELL PHONE
W22-2
AHEAD
NEW
TRAFFIC
PATTERN
W23-2
CLOSED
AHEAD
LEFT LANE
W20-5L
RIGHT LANE
CLOSED
W20-5R
W20-7aW20-5aL2
LEFT
TWO LANES
CLOSED
AHEAD
RIGHT
TWO LANES
CLOSED
AHEAD
W20-5aR2
CLOSED
W20-5aL3
THREE LANES
LEFT RIGHT
W20-5aR3
THREE LANES
ROAD
MACHINERY
AHEAD
W21-3
SURVEY
CREW
W21-6
BLASTING
AHEAD
ZONE
W22-1
ZONE
END
BLASTING
W22-3 W23-1
SLOW TRAFFIC
AHEAD
CROSSOVER
CLOSED
USENEXT
CROSSOVER
36" x 18"
42" x 36" 36" x 30"
42" x 36"
48" x 24"
12" x 18"W20-9
W20-10
CURING
CONCRETE
W20-14bP
W20-11
STOP
BUS
TEMP
54" x 48"
EXIT
OPEN
AHEAD
W20-17
FRESH
OIL
W21-2
FRESH
TAR
W21-2
SHOULDER
WORK
W21-5
WORKERS
W21-148" x 12"
36" x 12"
24" x 18"
CLOSED
SIDEWALK
AHEAD
W20-8
R
CLOSED
AHEAD
AMP
W20-3b
ONE LANE
ROAD
AHEAD
W20-4
WATCH
FOR
EMERGENCY
VEHICLES
W20-4c
CENTER LANE
CLOSED
AHEAD
W20-5C
W20-12P
W20-14aP
TAKE TURNS
48" x 12"
36" x 12"
LEFT LANE
W20-15
STAY
IN YOUR
LANE
TRUCKS
ENTERING
& EXITING
ROADWAY
PREPARE
FOR
BACKUPS
W20-15a
CLOSED
MILE
LEFT LANE
CLOSED
MILE
LEFT LANE
1 S2
W20-5L1 W20-5L2
MERGE
W20-14R
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
66" x 30"
48" x 24" VARIABLE x 12"
MERGE
W20-14L
48" x 48"
36" x 36"
48" x 48"
36" x 36"
48" x 48"
36" x 36"
48" x 48"
36" x 36"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
60" x 60"
48" x 48"
36" x 36"
30" x 30"
60" x 60"
48" x 48"
36" x 36"
30" x 30"
60" x 60"
48" x 48"
36" x 36"
30" x 30"
60" x 60"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
24" x 24"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
48" x 48"
36" x 36"
30" x 30"
SIGN NUMBER KEY
RIGHT LANE
CLOSED
MILE1
W20-5R1
RIGHT LANE
CLOSED
MILES2
W20-5R2
SEE MDOT SHS 13-WORK ZONE FOR SIGN DETAILS
W20-13P
VARIABLE x 12"
PINE GROVE PINE GROVE
48" x 48"
36" x 36"
W20-16
48" x 48"
36" x 36"
48" x 48"
36" x 36"
AREA
500 FT
EMERGENCY
PULL OFF
AREA
1/2 MILE
EMERGENCY
PULL OFF
48" x 54"
W20-15d
48" x 54"
W20-15c
Michigan Department of Transportation
MAY 2021
SPEED LIMIT LAYOUT
107-GEN-SPEED.dgn
107-GEN-SPEED
NO:
SHOULDER
SHOULDER
APPROPRIATE TYPICAL
SEQUENCE PER
REMAINING SIGNING
SHOULDER
SHOULDER
SHOULDER
SHOULDER
NO SPEED REDUCTION THROUGH WORK ZONE
REDUCED SPEED THROUGH WORK ZONE
REDUCED SPEED THROUGH WORK ZONE USING "WHERE WORKERS PRESENT"
XXX
XX-X
X
XXXX
XXXX
ROAD
WORK
AHEAD
W20-1
LIMIT
SPEED
XX
R2-1
BEGINS
ZONE
WORK
R5-18c
ROAD WORK
END
G20-2
LIMIT
SPEED
XX
R2-1
BEGINS
ZONE
WORK
R5-18c
ROAD WORK
END
G20-2
SPEED
EXISTING
LIMIT
SPEED
XX
R2-1
SPEED
EXISTING
SPEED
REDUCED
LIMIT
SPEED
XX
R2-1
BEGINS
ZONE
WORK
R5-18c
SPEED
REDUCED
WHERE
WORKERS
PRESENT
R2-1a
ROAD WORK
END
G20-2
LIMIT
SPEED
XX
R2-1
XXX
XX-X
X
XXXX
XXXX
APPROPRIATE TYPICAL
SEQUENCE PER
REMAINING SIGNING
ROAD
WORK
AHEAD
W20-1
XXX
XX-X
X
XXXX
XXXX
ROAD
WORK
AHEAD
W20-1
D D B WORK AREA VARIES
100'
2D
D D B WORK AREA VARIES
100'
DD
D D L B WORK AREA VARIES
100'
D DAPPROPRIATE TYPICAL
SEQUENCE PER
REMAINING SIGNING
1/3 L
L
1/3 L
L
1/3 L
R2-1 SIGN.
ADDITIONAL DISTANCE "D" AFTER THE
THE R2-1a SIGN SHALL BE PLACED
RESTRICT PLACEMENT AS INDICATED,
BY SIDE. WHEN PHYSICAL LIMITATIONS
PLACE R2-1 AND R2-1a SIGNS SIDE
SPEED
EXISTING
Michigan Department of Transportation
MAY 2021
SPEED LIMIT LAYOUT
107-GEN-SPEED.dgn
107-GEN-SPEED
NO:
SHOULDER
SHOULDER
BEGINS
ZONE
WORK
R5-18c
ROAD WORK
END
G20-2
LIMIT
SPEED
R2-1
SPEED
EXISTING
APPROPRIATE TYPICAL
SEQUENCE PER
REMAINING SIGNING
ROAD
WORK
AHEAD
W20-1
D B WORK AREA VARIES
100'
DDL
1/3 L
LIMIT
SPEED
R2-1
SPEED
REDUCED
REDUCED SPEED FROM 75 TO 60 THROUGH WORK ZONE
SHOULDER
SHOULDER
ROAD WORK
END
G20-2
LIMIT
SPEED
R2-1
SPEED
EXISTING
APPROPRIATE TYPICAL
SEQUENCE PER
REMAINING SIGNING
D B WORK AREA VARIES
100'
DDL
1/3 L
D D
XXX
XX-X
X
XXXX
XXXX
SPEED
LIMIT
BEGINS
ZONE
WORK
R5-18c
ROAD
WORK
AHEAD
W20-1
LIMIT
SPEED
R2-1
XXX
XX-X
X
XXXX
XXXX
SPEED
LIMIT
SPEED
REDUCED
WHERE
WORKERS
PRESENT
R2-1a
REDUCED SPEED FROM 75 TO 45 WWP THROUGH WORK ZONE
D
W3-5
W3-5
MAY 2021
UTILIZING TRAFFIC REGULATORS
ON A 2-LANE UNDIVIDED ROADWAY
LANE CLOSURE DATE:
110-TR-NFW-2L.dgn
110-TR-NFW-2L
NO:
S H
O U
L D
E R
S H
O U
L D
E R
LIMIT
SPEED
XX
R2-1
V A R
IE
S
W O R K
A R E A
50' TO 100' MAXIMUM
W3-4
TOSTOP
PREPARED
BE
W3-4
TOSTOP
PREPARED
BE
LIMIT
SPEED
XX
R2-1
LIMIT
SPEED
XX
R2-1
ROAD WORK
END
G20-2
ROAD WORK
END
G20-2
W20-7a
BEGINS
ZONE
WORK
R5-18c
INJURE /
KILL A
WORKER
7500$
15 YEARS
R5-18b
ONE LANE
ROAD
AHEAD
W20-4
ROAD
WORK
AHEAD
W20-1
LIMIT
SPEED
XX
R2-1
ROAD
WORK
W20-1
W20-7a
ONE LANE
ROAD
AHEAD
W20-4
BEGINS
ZONE
WORK
R5-18c
W3-5b
ZONE
AHEAD
REDUCED
SPEED
B
LIMIT
SPEED
XX
R2-1
LIMIT
SPEED
XX
R2-1
D
D
D
D
D D
D D
D
D
D
W3-5b
ZONE
AHEAD
REDUCED
SPEED
D
D
D
D
INJURE /
KILL A
WORKER
7500$
15 YEARS
R5-18b
KEY
PLACE SIGN AS INDICATED IN NOTE S2
PLACE SIGN AS INDICATED IN NOTE S5
REFLECTS EXISTING SPEED LIMIT
TRAFFIC FLOW
LIGHTED ARROW PANEL (CAUTION MODE)
CHANNELIZING DEVICES
TRAFFIC REGULATOR
L
L1
D
D
DEVICES:
TRAF REG:
SIGNING:
GENERAL:
TCD1, TCD2, TCD6
TR1, TR2
S1, S2, S3, S4, S5
G1, G2, G3, G4
STANDARD NOTES
(SEE GEN-NOTES)
JUNE 2021
SHIFT WITH BOTH BOUNDS
SHIFTED ON A 2-LANE UNDIVIDED ROADWAY
127-NFW-SHIFT-0LC.dgn
127-NFW-SHIFT-0LC
NO:
S H
O U
L D
E R
S H
O U
L D
E R
LIMIT
SPEED
XX
R2-1
LIMIT
SPEED
XX
R2-1
ROAD
WORK
AHEAD
W20-1
ROAD
WORK
AHEAD
W20-1
LIMIT
SPEED
XX
R2-1
BEGINS
ZONE
WORK
R5-18c
W1-4L
W3-5b
ZONE
AHEAD
REDUCED
SPEED
INJURE /
KILL A
WORKER
7500$
15 YEARS
R5-18b
INJURE /
KILL A
WORKER
7500$
15 YEARS
R5-18b
BEGINS
ZONE
WORK
R5-18c
ROAD WORK
END
G20-2
ROAD WORK
END
G20-2
W1-4R
LIMIT
SPEED
XX
R2-1
LIMIT
SPEED
XX
R2-1
D D
D D
D
D D
W O
R K
V
R
IE
S
D D
D D
D D
B
W1-4R
W1-4L
D W3-5b
ZONE
AHEAD
REDUCED
SPEED
D D
LIMIT
SPEED
XX
R2-1
S
IR
E C
T
B Y
T H
N
G
IN
E
D
P
L A
C
M P
P
A
M
K G
M O
X
P
A
K G
SEE NOTE TCD8
SEE NOTE TCD8
L
L
KEY
NOTE S2
PLACE SIGN AS INDICATED IN
NOTE S5
PLACE SIGN AS INDICATED IN
LIMIT
REFLECTS EXISTING SPEED
TRAFFIC FLOW
(CAUTION MODE)
LIGHTED ARROW PANEL
CHANNELIZING DEVICES
DEVICES:
SIGNING:
GENERAL:
TCD1, TCD2, TCD6. TCD8
S1, S2, S3, S5, S11
G1, G2, G3, G4, G5
STANDARD NOTES
(SEE 102-GEN-NOTES)
SEE NOTE S11
W1-6L
SEE NOTE S11
W1-6R
L
(ft )
SIGN AREA
9_<
9 _ 20<
N/A1 - 3 lb/ft
2 - 3 lb/ft 1 - 4" X 6"
2 - 4" X 6"
2 - 6" X 8"N/A
N/A
SIGNS 4 FEET AND GREATER IN WIDTH REQUIRE 2 POSTS.
36" X 36"
> X
X
X X
1 - 2" 12 or 14 GA
2 - 2" 12 or 14 GA
X
X> 144" WIDE
ROUNDING OF CORNERS IS NOT REQUIRED FOR TYPE I OR II SIGNS.
VERTICAL JOINTS ARE NOT PERMITTED.
HORIZONTIAL JOINTS THROUGH SIGN LEGEND OR SYMBOLS ARE NOT PERMITTED.
A MAXIMUM OF 2 POSTS WITHIN A 7' PATH IS PERMITTED.
<> N/A 3 - 6" X 8"
SIGNS GREATER THAN 8 FEET IN WIDTH REQUIRE 2 OR 3 WOOD
POSTS DEPENDING ON AREA OF SIGN.
36" X 36" _ 96" TO WIDE
POST TYPE
2 WOODSQUARE TUBULAR STEELU-CHANNEL STEEL
20 _ 30
N/A
N/A
POST SIZE REQUIREMENTS TABLE
SIGN MATERIAL SELECTION TABLE
SIGN SIZE TYPE I TYPE II TYPE III
SIGN MATERIAL TYPE
TYPE I ALUMINUM EXTRUSION
30 _ 60
60 _ 84 N/A
96" WIDE TO 144" WIDE
SUPPORTS FOR TEMP SIGNS
GROUND DRIVEN SIGN
WZD-100-AAUG
CON/ECH
1 11 11/2/2017
DEPARTMENT DIRECTOR MICHIGAN DEPARTMENT OF TRANSPORTATION
OF
SHEET
PLAN DATEF.H.W.A. APPROVALCHECKED BY:
DRAWN BY:
Michigan Department of Transportation
APPROVED BY:
APPROVED BY:
Kirk T. Steudle
BY
PREPARED
DESIGN DIVISION
DIRECTOR, BUREAU OF FIELD SERVICES
BUREAU OF DEVELOPMENT STANDARD PLAN FOR
DIRECTOR, BUREAU OF DEVELOPMENT
DISTANCE BETWEEN OUTSIDE POSTS.
SPREAD POSTS SO AS TO HAVE A 8' MIN. TO 9' MAX.
FOR ALL 11' AND 12' LONG SIGNS ON 3 WOOD SUPPORTS,
SIGN
L
2 POST SIGN SUPPORT SPACING
1/6L 1/6L2/3L
SIGN
L
1/6L 1/6L
3 POST SIGN SUPPORT SPACING
1/3L 1/3L
2 11
11/2/2017 WZD-100-A
MICHIGAN DEPARTMENT OF TRANSPORTATION
PLAN DATEF.H.W.A. APPROVAL
SHEET
OF
NOTE: THE ORIGINAL SIGNED COPY IS KEPT ON FILE AT THE MICHIGAN DEPARTMENT OF TRANSPORTATION.
BUREAU OF DEVELOPMENT STANDARD PLAN
ROAD
ROAD
WORK
AHEAD
DETOUR
AHEAD
AHEAD
CLOSED
RIGHT LANE
M.P.H.
BOTTOM HEIGHT AND OFFSET
6'-12' 6'-12'
6'
RURAL
URBAN
5' MIN.
2'
7' MIN.
2'
7'MIN.
4'MIN.
URBAN
4" MAX.4" MAX.
WZD-100-A
3 11
PAVED SHOULDER
SPEED PLATE
RURAL WITH ADVISORY
WALKWAY WALKWAY
WALKWAYS ARE PRESENT)
(CURBED AREAS OR WHERE
WALKWAYS ARE PRESENT)
(CURBED AREAS OR WHERE
11/2/2017
SHEET
OF
X X
P O
N G
R I
E S
3 3/4" MAX.
I
O
L
N
N
X
3" MIN.
X X
TRAFFIC FLOW
WEIGHT = 3 lbs/ft
1" MIN.
1†" MAX.
L
SECT. MOD. X.-X. = 0.31 CUBIC INCHES MIN.
WZD-100-A 4 11
U - CHANNEL STEEL POST
MOUNT SIGN ON OPEN FACE OF
(NO SPLICE)
3 lb. U - CHANNEL STEEL POST
SHEET
OF
A A
N
N
U P
P
P
S T
P
UPPER SPLICE LOWER SPLICE
A A
N
P
TRAFFIC FLOW
U P
P
S T
D R I
V
U B
D R I
V
U B
5 11
UPPER U - CHANNEL STEEL POST
MOUNT SIGN ON OPEN FACE OF
2 REQUIRED
5/16" BOLTS
2 REQUIRED
5/16" BOLTS
2 REQUIRED
5/16" BOLTS
2 REQUIRED
5/16" BOLTS
(WITH SPLICE)
3 lb. U - CHANNEL STEEL POST
SHEET
OF
7/16"
NOTES:
UPPER POSTDRIVEN POST
TRAFFIC FLOW
5/16" BOLT
SPACER DETAIL
3/4" O.D.
3/8" I.D.
SPACER THICKNESS
SECTION A-A
1. THE SPACER THICKNESS SHALL BE 1/16" LESS THAN THE GAP BETWEEN THE POST
WHEN POSITIONED IN THE UNBOLTED CONFIGURATION.
2. THE EXTERIOR BOLT (CLOSEST TO LAP), SPACER, WASHER, AND NUT SHALL BE
INSTALLED IN A PREPUNCHED HOLE 1" to 2" FROM THE END OF THE LAP.
3. THE INTERIOR BOLT (FARTHEST FROM LAP), SPACER, WASHER, AND NUT SHALL BE
INSTALLED IN THE NEXT PREPUNCHED HOLE.
4. THE DRIVEN POST SHALL ALWAYS BE MOUNTED IN FRONT OF THE UPPER POST
WITH RESPECT TO THE ADJACENT ONCOMING TRAFFIC, REGARDLESS OF THE
DIRECTION THE SIGN IS FACING.
5. THE SPLICE LAP SHALL BE FASTENED BY FOUR-5/16" DIA. GALVANIZED A449 BOLTS
(SAE J429 GRADE 5) OR GALVANIZED A325 BOLTS.
6 11
(WITH SPLICE)
3 lb. U - CHANNEL STEEL POST
O.D. 3/4" MIN., I.D. 3/8" MAX.
REQUIRED FOR ALL BOLTS
7/16" SPACER
SHEET
OF
3# POST
VARIES VARIES VARIES
A
A
SECTION A-A
FRONT
1. MATERIAL: 12 GAUGE CARBON STEEL.
3. FINISH-AFTER STAMPING AND PUNCHING,
GALVANIZE ACCORDING TO CURRENT
3 1/2"
1 3/4" 1 3/4"
7/16" DRILL
EQUAL TO POST THROAT
OPENING DIMENSION
2. TOLERANCE ON ALL DIMENSIONS 0.0625"
SPECIFICATIONS FOR ZINC (HOT
GALVANIZE) COATINGS ON PRODUCTS
FABRICATED FROM PLATES OR STRIPS
NOTES: (FOR STEEL SIGN REINF' PLATE)
0.19" R
PLYWOOD (TYPE II) OR ALUMINUM SHEET (III) SIGN
STEEL SIGN REINFORCING PLATE
SIGN TO 3 lb. POST CONNECTION
3 lb. U - CHANNEL STEEL POST SIGN CONNECTION
REQUIRED FOR TYPE III SIGNS ONLY
5/16" DIAMETER GALVANIZED BOLT
AND NUT
FLAT WASHER
WZD-100-A 7 11
(TYP. ALUMINUM SHEET [TYPE III] SIGN ONLY)
REINFORCING PLATE
SELF-ALIGNING STEEL
SHEET
OF
(4" X 6" (NOMINAL) POST) 1 1/2" DIA. 2 HOLES
(6" X 8" (NOMINAL) POST) 3 1/2" DIA. 2 HOLES
N
8" DIA. AUGERED HOLE FOR 4" X 6" POST
10" DIA. AUGERED HOLE FOR 6" X 8" POST
5•" OR 7•" (ACTUAL)
SAW CUT DETAIL
5 1/2 " OR 7 1/2" ACTUAL
TRAFFIC FLOW
WOOD POST DETAILS
(MULTIPLE POST INSTALLATIONS)
TRAFFIC FLOW
SIGN PANEL
CONSTRUCTION.
THE STANDARD SPECIFICATIONS FOR
SECTION 912 OF THE CURRENT EDITION OF
WOOD POST SHALL BE IN CONFORMANCE TO
WZD-100-A 8 11
LAYERS, TAMPING EACH LAYER.
EXISTING MATERIAL IN FIVE EQUAL
AUGERED HOLE. IF AUGERED, BACKFILL WITH
THE POST MAY BE DRIVEN OR PLACED IN AN
S I
N G
S E
M B
L I
E S
W
U
T
E X
C E
P T
I
N
(FOR 6" X 8" NOMINAL POST) 1 1/2"
(FOR 4" X 6" NOMINAL POST) 1"
CENTERED ON POSTS.
HOLES ARE TO BE
DRILLED BREAKAWAY
DIRECT EMBEDMENT DETAILS
WOOD POST BREAKAWAY HOLES/
SHEET
OF
POST ASSEMBLIES
EXCLUDE SAW CUT ON SINGLE
SAME AS BOLT ABOVE
TYPE II AND TYPE III SIGNS
END VIEW REAR VIEW
C OF POST
1 1/2"
(TYP.)
P A
N E
L
W I
D T
H
TOP VIEW
LENGTH ALL EXTRUSIONS.
L
1/2"
O
T Y
P
12"
T Y
P
4" X 6" (NOMINAL) OR 6" X 8" (NOMINAL) WOOD POST
ON APPROX. 24" CENTERS FULL
TYPE I SIGN
WOOD POST…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .