21202908G2225_SOW.docx

DOCX document 1 MB Posted

Attached to
Services Building Heat Exchangers Replacement Federal contract opportunity
Solicitation number
70Z0290P8G222500
Issued by
Department of Homeland Security US Coast Guard

View the file

Other files for this federal contract opportunity

Other files attached to Services Building Heat Exchangers Replacement, newest first.
File Type Posted
21202908G2225_FAR.pdf PDF
21202908G2225_Combined Synopsis.doc DOC document
21202908G2225_WDOL.txt TXT text file
21202908G2225_SF 18.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Services Building Heat Exchangers Replacement

DEPARTMENT OF HOMELAND SECURITY

UNITED STATES COAST GUARD

SFO GALVESTON

GALVESTON, TEXAS 77550

Scope of Work

FOR

Services Building Heat Exchangers Replacement

PSN:

Work Order: 20-087

AT

Galveston Services Building 3000 Fort Point Rd. Galveston, TX 77550

Sector Houston-Galveston
Initial
Date

Contracting Officer (KO)

CWO Victor M. Regalado Contracting Technical Representative V.M.R

LT John Waters, CFM Sector Hou-Gal AOR Facilities Engineer

J.TW.

Statement of Work (SOW)

A. GENERAL INFORMATION

1. Title of Project: U.S. Coast Guard (USCG) Services Building Heat Exchangers Replacement

a. Lowest Priced Technically Acceptable.

Scope of Work: The Contractor shall complete all work assigned but not limited to the requirements with-in this scope listed in sub-section B. Work scope is to include, but not limited to flushing piping. cleaning existing lines from any and all debris, removing old oil, pumping new oil, purging system with dry nitrogen, remove and install new dryer units, install heat exchangers (provided by Coast Guard), and charging Dedicated Outdoor Sir System (DOAS) unit with new refrigerant as per manufacturer’s specifications.

2. Type of Contract Contemplated: This will be a firm-fixed priced purchase order.

3. General Requirement: Prior to contract issuance the prospective contractor MUST HAVE completed and/or current enrollment into DUNS & Bradstreet, as well as System Award Management (SAM), enrollment information for both can be respectively found at: https://www.sba.gov/content/getting-d-u-n-s-number and https://www.sam.gov/portal/SAM/#1, failure to do so WILL result in disqualification and reissuance of the contract. For any further enrollment assistance and/or questions, please contact CWO Mark Tahtinen at 281-464-4678.

B. CONTRACTOR REQUIREMENTS and LOCATIONS

1. U.S Coast Guard Sector Field Office (Services Building), 3000 Fort Point Rd. Galveston, TX 77550. This location is the site where in the heat exchanger replacement will take place.

· Work scope is to include, but not limited to flushing existing piping, cleaning existing lines from any debris; removing old oil, pumping new oil; purging system with dry nitrogen, remove and install new dryer units, install heat exchangers (provided by Coast Guard), and charging DOAS unit with new refrigerant as per manufacturer’s specifications. The Contractor shall not subcontract any part of this project without prior written consent of the Contracting Officer.

· Inspect the DOAS unit and compare to the manufactures specification, give a detailed listing of any defects to LT John T. Waters or MAT2 Victor M. Regalado.

· The contractor must remove and dispose of all hazardous material from the site caused by the heat exchangers replacement.

· The contractor must be finished and DOAS unit heat exchangers operational, no later than two weeks from the start date.

· Work must be in compliance with all OSHA and EPA guidelines.

2. The Contractor and/or its personnel shall refrain from smoking while inside any federal buildings, within 50 feet of any entrance to the buildings, and within 50 feet of any flammables. A designated smoking area is available on-site.

3. The Contractor and/or its personnel may utilize the public restroom facilities located on the closest to where work is being performed.

4. The Contractor shall provide all management, supervision, labor, materials, supplies, and equipment (except as otherwise noted herein).

5. The Contractor shall plan, schedule, coordinate and assure effective service to meet U.S. Coast Guard requirements.

C. GOVERNMENT RESPONSIBILITIES

1. The government will provide Contractor personnel access to all spaces necessary for any component associated with this project during normal business hours. Office building hours are as follows: Monday through Friday 0700 through 1700 (7 am – 5 pm). Any scheduled working times outside normal business hours by Contractor personnel shall be coordinated with the Sector Houston-Galveston Facilities Division Supervisors: LT John T. Waters 281-464-4687 John.T.Waters@uscg.mil or MAT2 Victor M. Regalado 281-464-4690 Victor.M.Regalado@uscg.mil prior to the commencement of said work. At any time scheduled work needs to go beyond normal business hours, the Contractor shall immediately notify LT Waters or MAT2 Regalado.

2. No work shall be scheduled during Federal Holidays or Weekends, unless prior approval has been coordinated with the Sector Houston-Galveston Facilities Division Supervisors: LT John T. Waters or MAT2 Victor M. Regalado

3. All Contractor access to designated restricted and/or controlled access spaces will be coordinated with the Command Security Officer prior to accessing these spaces. Once in these spaces, Contractor personnel will be monitored by Coast Guard personnel with appropriate access and clearance to be inside these designated restricted and/or controlled access spaces throughout the performance of work in these spaces. At no time shall the entry points of these spaces remain unlocked to facilitate ease of installation.

D. REPORTING REQUIREMENTS

1. The contractor is required to provide verbal progress reports daily for the period of project duration. The progress report shall cover all work completed during the day and shall present the work to be accomplished during the subsequent period. This report shall also identify any problems that arose and a statement explaining how the problem was resolved. This report shall also identify any problems that have arisen but have not been completely resolved and provide an explanation.

2. All verbal progress reports shall be provided to the Sector Houston-Galveston Facilities Division Supervisors: LT John T. Waters or MAT2 Victor M. Regalado, prior to Contractor departing the premises of the Sector Houston-Galveston Area of Responsibility and the SFO Galveston Services Building where the work is being performed.

Notice to Offerors: All information and data related to this project that the contractor gathers or obtains shall be both protected from unauthorized release and considered the property of the government. The contracting officer will be the sole authorized official to release verbally or in writing, any data, the draft deliverables, the final deliverables, or any other written or printed materials pertaining to this contract. Press releases, marketing material, or any other printed or electronic documentation related to this project, must not be publicized without the written approval of the contracting officer.

E. CONTRACTOR EXPERIENCE

1. The Contractor shall provide a Certificate of Insurance to indicate the liability, property, and accident coverage held by the Contractor, as well as any optional insurance recommended by the Contractor. The United States Coast Guard (USCG) shall be listed as “Additional Insured” on all Certificates of Insurances.

2. The Contractor and its personnel shall conform with the same high standards of behavior applicable to the maintenance of government equipment. All individuals performing any portion of maintenance and/or installation associated with this project shall be properly trained and qualified for the work to which that is assigned.

F. SECURITY REQUIREMENTS

1. The Contractor and its personnel performing work under this project shall be escorted at all times whenever work is to be performed in designated restricted and/or controlled access spaces. At no time shall the Contractor and its personnel be left unattended while working in designated restricted and/or controlled access spaces. Escorts shall be Coast Guard members currently assigned to the designated facility complex with appropriate clearance levels and access to be in the specific designated restricted and/or controlled access space at the time work is to be performed.

2. The Contractor shall provide employee information for all foreign nationals (defined as those employees not currently designated a U.S. Citizen as determined by applicable U.S. law, regulation, or policy) prior to the commencement of any on-site work related to this project and entry onto the premises of the U.S. Coast Guard owned facilities. Individuals determined to meet the criteria to be considered a foreign national will be allowed access to U.S. Coast Guard owned facilities; however, these individuals will be prohibited from accessing the designated restricted and/or controlled access spaces, even when under escort, unless otherwise approved by the Command Security Officer.

3. The Contractor shall provide a personnel alphabetical roster of all individuals assigned to perform work under this project, listing the dates work is to be performed by the individual – daily rosters may be provided for ease of facilitating the next day’s work. Daily rosters shall be provided to the Command Security Officer no later than 1500 the day before work is to be performed.

4. The Contractor and its personnel shall provide a valid non-expired state or federal issued photo identification card or credential upon accessing U.S. Coast Guard owned facilities and whenever entering the main entrance. Identification card or credential shall be handed to the sentry and front desk watch-stander for visual inspection and validation. Failure to provide a valid non-expired state or federal issued photo identification card or credential will prevent your access to U.S. Coast Guard owned facilities, even if under escort.

5. Any U.S. Coast Guard facilities credentials issued to the Contractor and its personnel shall clearly indicate an expiration date no later than the period of this project. Each credential issued will be tracked and surrendered upon request by the Coast Guard or upon completion of this project, whichever occurs first. All issued credentials shall be worn and visible at all times. Whenever actively working, the credential may be removed as a safety precaution, but shall be immediately returned to a visible location on person when no longer a safety concern.

G. PLACE AND PERIOD OF PERFORMANCE

1. Place of Performance – All work related to the components of this project shall be performed at the U.S Coast Guard Sector Field Office Galveston (Services Building), 3000 Fort Point Rd. Galveston, TX 77550

2. Period of Performance

(a) The installation of all associated components in this project shall be completed within thirty (14) calendar days after award date.