Statement of work providing details to accurately propose Fair an reasonable pricing for quote on parts and labor
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF308-13_Wage_Determination.pdf | ||
| SF18-95_LAS416.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
CHILLER UNIT PURCHES AND DELIVERY FOR BUILDING 1705
USCG Air Station Sacramento
1.0 GENERAL REQUIREMENTS
1.1 PROJECT DESCRIPTION
Installation of new commercial vinyl flooring for second story hallway, approximately 600SF. Installation of new flooring for two, three story stairwells and landings.
1.1.1 Technical Point of Contact (POC):
DC2 JORGE LOPEZ (808-341-6655)
1.2 LOCATION
1.2.1 Work to be conducted at USCG Air Station Sacramento.
6037 Price Ave
McClellan, CA 95652
Building #1106
1.3 AIR STATION AND LOCAL REGULATIONS
1.3.1 The work site is on Government property. All rules and regulations issued by the Commanding Officer covering safety, vehicle operation, and sanitation must be observed by the Contractor and his employees at all times.
1.3.2 All personnel employed on site shall keep within the limits of the work, and shall not enter any restricted area unless required or escort by a unit member. The Contractor’s equipment shall be conspicuously marked for identification.
1.3.3 The Contractor shall control its employee’s traffic on site. Parking for workers shall be at a suitable location as directed by the Technical POC.
1.3.4 The Contractor shall coordinate work with the technical POC to minimize any disruption to normal unit operations.
1.4 DAMAGE TO GOVERNMENT PROPERTY
1.4.1 Any damage caused to Government or private property shall be corrected at the Contractor’s expense.
1.5 SAFETY AND SECURITY
1.5.1 The Contractor shall provide all necessary safety equipment to protect the work site area. All work shall be performed in accordance with O.S.H.A. Safety standards to prevent injury to housing occupants, by-passers or workforce.
1.5.2 Contractor shall comply with Federal and State of California safety and health regulations. When standards differ, the more stringent shall apply. All accidents and property damage shall be reported to the Technical POC.
1.5.3 The Contractor shall be responsible for the security of their material, tools and equipment. The Government shall not be responsible for their loss.
1.5.4 The Contractor shall comply with all rules and regulations issued by the National Fire Protection Association covering the use and storage of flammable mixtures or material which might constitute a fire hazard.
2.0 EQUIPMENT
2.1 Contractor shall provide whatever equipment necessary to complete the inspection and service of unit boilers.
3.0 SCOPE OF WORK
3.1 Installation of new commercial vinyl flooring to include materials and labor for a second story hallway approximately 600SF. Installation of new flooring for two, three story stairwells and landings to include labor and materials.
3.2 Services shall be accomplished between the hours of 0800-1400, Monday-Friday, not to include federal holidays except as designated by the contracting officer or official representative.
3.3 The Contractor shall coordinate with the technical POC to schedule a date and time for project commencement.
3.3.1 Project is to be completed within 05 days of the contract being awarded.
3.4 The government shall use a 100% surveillance method. Inspection of work shall be performed at the time the Contractor is at the site performing its services and prior to contractor leaving the site.
3.5 The Contractor shall remove all debris, rubbish and hazardous waste from the job site.
3.6 The Contractor shall keep the Contracting Officer and /or technical POC fully informed on the daily progress of the work, from the start through completion of this inspection.
3.7 Unsatisfactory performance shall result in work being re-accomplished at no cost to the government.
3.8 It is the contractor’s responsibility to verify all measurements/dimensions listed above prior to submitting a quote/proposal.
3.9 Point of contact is DC2 JORGE LOPEZ (808-341-6655)