Statement of Work

Upgrade to USCG Station Portage Boiler Controls

This Statement of Work (SOW) serves as a Request for Proposal (REP). An agreement will be awarded to a winning contractor for the Niagara N4 installation in accordance with below directions. Respondents must be able to proceed with the project upon contract award. Payment will be make for services upon completion and operational test witnessed by station Engineer Petty Officer (EPO).

Question and comments related to the SOW should be directed to USCG Station Portage EPO Jesse.j.chamberlain@uscg.mil .

Contractor is responsible to applying for and obtaining applicable certifications, licenses, and permits necessary for the installation and operation of boiler controls. All electrical work shall be performed by a licensed electrical contractor.

A 1 year warranty shall be provided for all labor. A 3 year warranty shall be provided for all equipment and materials.

Contractor shall furnish the material and/or perform the labor necessary to: Replace the existing obsolete boiler controls. The complete system will be connected via LON talk and accessible through a local computer. The boiler and 3 existing AHU’s will all be included.

Work will be complete with a system test and check-out.