210426_Jasper WWTP Specs.pdf
PDF 9 MB Posted
- Attached to
- Jasper (T) WWTP Improvements
- Solicitation number
- 2075178
- Issued by
- Putnam County, New York
About this file
This document contains the technical specifications and contract requirements for the Town of Jasper WWTP Improvements project in Steuben County, New York. The project scope includes installation of new process equipment, repair of treatment issues associated with the existing screen/grit unit, EQ tank and pumps, main WWTP, flow meter, post aeration tank, system pump stations, replacement of blowers, and addition of a new UV disinfection system. Bids are due by May 27, 2021, and the project is required to be substantially complete by May 1, 2022 and finally complete by June 30, 2022.
The contract includes requirements for Minority and Women-Owned Business Enterprise (MWBE) participation and Equal Employment Opportunities, American Iron and Steel, Davis-Bacon Act prevailing wages, restrictions on lobbying, and suspension and debarment. The MWBE participation goal is 23% for the project. Funding is provided through the New York State Clean Water State Revolving Fund and the contract includes all associated requirements for that funding source.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Jasper WWTP Plans.pdf | ||
| Bid Tab64.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DOCUMENTS
AND
TECHNICAL SPECIFICATIONS
for
Town of Jasper WWTP Improvements
Steuben County, New York
CDBG #5777PR176-09
EFC # C8-6406-04-00
October 2020 Revised March 2021
HUNT 1656-004
Prepared by:
Hunt Engineers, Architects, Land Surveyors & Landscape Architect, DPC Airport Corporate Park
100 Hunt Center Horseheads, NY 14845-1019
Phone (607) 358-1000, Fax (607) 358-1800
Town of Jasper WWTP Improvements HUNT 1656-004 Section 00 01 10
Section 00 01 10 Page 1
DOCUMENT 00 01 10
TABLE OF CONTENTS
SPECIFICATIONS
SECTION TITLE
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
Notice to Bidders Instruction to Bidders Bid Form (EJCDC C-410)
Bid Bond (EJCDC C-430) Non-Collusive Bidding Certification Qualifications Statement (EJCDC C-451) Waiver of Immunity Certifications of Non-Segregated Facilities NYS EFC Program Requirements and Bid Packet for Contracts Notice of Award (EJCDC C-510) Agreement Between Owner and Contractor (EJCDC C-520) Exhibit 4-2 Section 3 Rider Performance Bond (EJCDC C-610) Payment Bond (EJCDC C-615) PERM 44e Surety Bond Notice to Proceed (EJCDC C-550) General Conditions (EJCDC C-700) Supplementary Conditions (EJCDC C-800) Chapter 6 Construction Requirements (CDBG) Exhibit GC-A Exhibit D Non-Discrimination in Employment for State (NY) Assisted Construction Contracts Contractors Application for Payment (EJCDC C-620) Change Order (EJCDC C-941) Certificate of Substantial Completion (EJCDC C-625) Punch List Contractor’s Affidavit of Payment (AIA G706) Contractor’s Affidavit of Release of Liens (AIA G706A) Consent of Surety to Final Payment (AIA G707) Release of Property Wage Rates NYS Wage Rates Federal Wage Rates
DIVISION 01 – GENERAL REQUIREMENTS
01 10 00 Summary 01 20 00 Price and Payment Procedures 01 30 00 Administrative Requirements 01 33 00 Submittal Procedures 01 40 00 Quality Requirements 01 50 00 Temporary Facilities and Controls 01 50 01 Project Sign(s) 01 50 70 Maintenance & Protection Plan
Section 00 01 10 Page 2
01 60 00 Product Requirements 01 70 00 Execution and Closeout Requirements
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Selective Structural Demolition
DIVISION 03 – CONCRETE
03 10 00 Concrete Forming and Accessories 03 20 00 Concrete Reinforcing 03 30 00 Cast-in-Place Concrete
DIVISION 09 – FINISHES
09 96 00 High Performance Painting and Coatings
DIVISION 26 – ELECTRICAL
26 05 05 Selective Demolition for Electrical 26 05 19 Low-Voltage Electrical Power Conductors and Cables 26 05 26 Grounding and Bonding for Electrical Systems 26 05 29 Hangers and Supports for Electrical Systems 26 05 33.13 Conduit for Electrical Systems 26 05 33.16 Boxes for Electrical Systems 26 05 53 Identification for Electrical Systems 26 09 23 Lighting Control Devices 26 27 26 Wiring Devices 26 51 00 Interior Lighting
DIVISION 31 – EARTHWORK
31 05 13 Soils for Earthwork 31 05 16 Aggregates for Earthwork 31 22 00 Grading 31 23 16 Excavation 31 23 16.13 Trenching 31 23 19 Dewatering 31 23 23 Fill
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 92 19 Seeding
DIVISION 33 – UTILITIES
33 01 10.58 Disinfection of Water Utility Piping Systems 33 01 30.41 Cleaning of Sewers 33 05 13 Manholes and Structures 33 31 13 Site Sanitary Sewerage Gravity Piping 33 32 18 Pumps
Section 00 01 10 Page 3
DIVISION 40 – PROCESS EQUIPMENT SUBGROUP
40 05 13 Process Piping 40 05 23 Valves and Accessories 40 91 01 Flow Metering and Recording Equipment
DIVISION 46 – WATER AND WASTEWATER EQUIPMENT
46 05 10 FRP Weirs and Baffles 46 05 29 Positive Displacement Blowers 46 24 23 Submersible Grinder Pumps 46 51 21 Diffusers 46 53 10 Miscellaneous WWTP Equipment 46 64 10 Temporary Wastewater Treatment System 46 66 56 Ultraviolet Disinfection Equipment
END OF SECTION
HUNT 1656-004 Advertisement for Bid
ADVERTISEMENT FOR BIDS
NOTICE TO BIDDERS
The Town of Jasper, Steuben County, New York, invites sealed bids for the WWTP Improvements.
The work to be done under this project shall include the installation of new process equipment and repair treatment issues associated with the existing screen/grit unit, EQ tank and pumps, main WWTP, flow meter, post aeration tank, system pump stations, replacing blowers, and adding a new UV disinfection system.
Bids shall be enclosed in a sealed, post-paid envelope marked “Town of Jasper WWTP Improvements” and addressed to the Town of Jasper c/o HUNT EAS, 100 Hunt Center, Horseheads, NY 14845. Such bids shall be received at the Hunt Engineers, Architects, Land Surveyors & Landscape, DPC Office until 2:00 p.m., May 27, 2021 at which time the bids will be opened and read aloud through a Zoom Meeting.
All bids must be accompanied by a security deposit in the amount of FIVE PERCENT (5%) of the amount of the base bid in the form and subject to the conditions provided in the Contract Documents.
The Town of Jasper is an Equal Opportunity employer and strongly encourages the participation of M/WBE and Section 3 Businesses.
Minority and Women Owned Business Participation Goals The following goals for MWBE participation on this project have been established at:
Total Combined Minority & Women Owned Business Enterprise (WMBE) 23%
Any bidder may withdraw their bid at any time before the time set for the opening of the bids. No bidder may withdraw their bid within sixty (60) days after the date of opening, but may withdraw it any time prior to the scheduled closing time for reception of bids.
The Contract Documents may be obtained from Horseheads office of Dataflow, Inc., Airport Corporate Park, 100 Hunt Center, Horseheads, NY 14845, corning@godataflow.com, phone (607) 562-2196, fax
(607) 562-3214. Contract Documents are available in the following format:
• Electronic (pdf) files for a non-refundable payment of $25 (check only payable to the Town of Jasper).
• Printed copies upon payment of a deposit of Seventy-Five Dollars ($75.00) per set (check only payable to the Town of Jasper). Any Bidder requiring the plans be sent via mail, shall be responsible to provide a separate check of Twenty-Five Dollars ($25.00) to cover the non-refundable cost of postage and handling (payable to HUNT). Any bidder, submitting a sealed bid, upon returning the drawings and specifications to DATAFLOW within 30 days and in good condition, will be refunded the $75.00 deposit. Any Non-Bidder will not be refunded such deposit.
Copies of the Contract Documents may be examined at no expense at Hunt Engineers, Architects, Land Surveyors & Landscape Architect, DPC, 100 Hunt Center, Horseheads, New York 14845 between the hours of 9 AM and 4 PM, Monday through Friday. Documents are also available for view at www.godataflow.com; click on “Find Projects”, click on “HUNT Engineers, Architects, Land Surveyors & Landscape Architect, D.P.C.” to view Bid Documents electronically and the current Plan Holders list.
A Pre-Bid conference will be held at the Jasper Sewer District located at 3809 Grange Street, Jasper, NY 14855, on May 6, 2021 at 10:00 a.m.
Questions regarding this project can be directed to Mark Chiovarelli at chiovarellim@hunt-eas.com or 607-358-1023 until May 20, 2021.
The Town of Jasper reserves the right to waive any irregularities or informalities in or to accept or reject any or all bids.
NOTICE OF PUBLICATION: Addison Post; April 29, 2021 mailto:corning@godataflow.com mailto:chiovarellim@hunt-eas.com
HUNT 1656-004 Instruction to Bidders
INSTRUCTION TO BIDDERS
TABLE OF ARTICLES
Page Article 1 - Defined Terms 1 Article 2 - Copies of Bidding Documents 1 Article 3 - Qualifications of Bidders 2 Article 4 - Examination of Bidding Documents, Other Related Data, and Site 2 Article 5 - Pre-Bid Conference 4 Article 6 - Site and Other Areas 4 Article 7 - Interpretations and Addenda 4 Article 8 - Bid Security 5 Article 9 - Contract Times 5 Article 10 - Liquidated Damages 5 Article 11 - Substitute and “Or-Equal” Items 5 Article 12 - Subcontractors, Suppliers, and Others 5 Article 13 - Preparation of Bid 6 Article 14 - Basis of Bid; Comparison of Bids 7 Article 15 - Submittal of Bid 7 Article 16 - Modification and Withdrawal of Bid 7 Article 17 - Opening of Bids 8 Article 18 - Bids to Remain Subject to Acceptance 8 Article 19 - Evaluation of Bids and Award of Contract 8 Article 20 - Contract Security and Insurance 8 Article 21 - Signing of Agreement 8 Article 22 - Sales and Use Taxes 9 Article 23 - Contracts to be Assigned 9
ARTICLE 1 - DEFINED TERMS
1.01 Terms used in these Instructions to Bidders will have the meanings indicated in the General
Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Issuing Office--The office from which the Bidding Documents are to be issued and where the bidding procedures are to be administered.
ARTICLE 2 - COPIES OF BIDDING DOCUMENTS
2.01 Complete sets of the Bidding Documents in the number and for the deposit sum, if any, stated in the Advertisement for Bids may be obtained from the Issuing Office. The deposit will be refunded to each bidder of record who returns a complete set of Bidding Documents in good condition within 14 days after opening of Bids. Any Non-Bidder will not be returned such deposit.
2.02 Complete sets of Bidding Documents must be used in preparing Bids; neither Owner nor
Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
2.03 Owner and Engineer in making copies of Bidding Documents available on the above terms do so only for the purpose of obtaining Bids for the Work and do not confer a license or grant for any other use.
ARTICLE 3 - QUALIFICATIONS OF BIDDERS
3.01 To demonstrate Bidder’s qualifications to perform the Work, within five days of Owner’s request, Bidder shall submit written evidence such as financial data, previous experience, present commitments, and such other data as may be called for below.
A. Contractor required to complete and submit, with the bid package, the Statement of
Contractor’s Qualifications
B. The contractor shall have three years practical experience and successful history in the application of specified products. Upon request, he shall substantiate this requirement by furnishing a list of references and job completions.
ARTICLE 4 - EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED DATA, AND SITE
4.01 Subsurface and Physical Conditions
A. The Supplementary Conditions identify:
1. Those reports of explorations and tests of subsurface conditions at or contiguous to the Site that Engineer has used in preparing the Bidding Documents.
2. Those drawings of physical conditions in or relating to existing surface and subsurface structures at or contiguous to the Site (except Underground Facilities) that Engineer has used in preparing the Bidding Documents.
B. Copies of reports and drawings referenced in paragraph 4.01.A will be made available by
Owner to any Bidder on request. Those reports and drawings are not part of the Contract Documents, but the “technical data” contained therein upon which Bidder is entitled to rely as provided in paragraph 4.02 of the General Conditions has been identified and established in paragraph 4.02 of the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any “technical data” or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
4.02 Underground Facilities
A. Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or contiguous to the Site is based upon information and data furnished to Owner and Engineer by owners of such Underground Facilities, including Owner, or others.
4.03 Hazardous Environmental Condition
A. The Supplementary Conditions identify any existing reports and drawings relating to a Hazardous Environmental Condition identified at the Site, if any, that ENGINEER has used in preparing the Bidding Documents.
B. Copies of reports and drawings referenced in paragraph 4.03.A will be made available by
Owner to any Bidder on request. Those reports and drawings are not part of the Contract Documents, but the “technical data” contained therein upon which Bidder is entitled to rely as provided in paragraph 4.06 of the General Conditions has been identified and established in paragraph 4.06 of the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any “technical data” or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
4.04 Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions and Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated conditions appear in paragraphs 4.02, 4.03, and 4.04 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work appear in paragraph 4.06 of the General Conditions.
4.05 On request, Owner will provide Bidder access to the Site to conduct such examinations, investigations, explorations, tests, and studies as Bidder deems necessary for submission of a Bid. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies. Bidder shall comply with all applicable Laws and Regulations relative to excavation and utility locates.
4.06 Reference is made to Article 7 of the Supplementary Conditions for the identification of the general nature of other work that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) that relates to the Work contemplated by these Bidding Documents. On request, Owner will provide to each Bidder for examination access to or copies of Contract Documents (other than portions thereof related to price) for such other work.
4.07 It is responsibility of each Bidder before submitting a Bid to:
A. Examine and carefully study the Bidding Documents, the other related data identified in the Bidding Documents, and any Addenda;
B. Visit the Site and become familiar with and satisfy Bidder as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;
C. Become familiar with and satisfy Bidder as to all Federal, State, and local Laws and
Regulations that may affect cost, progress, or performance of the Work;
D. Carefully study all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in paragraph 4.02 of the General Conditions, and (2) reports and drawings of Hazardous Environmental Conditions at the Site which have been identified in the Supplementary Conditions as provided in paragraph 4.06 of the General Conditions;
E. Obtain and carefully study (or accept consequences for not doing so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying any specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents, and safety precautions and programs incident thereto;
F. Agree at the time of submitting its Bid that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding Documents;
G. Become aware of the general nature of the work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents;
H. Correlate the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents;
I. Promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder; and
J. Determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work.
4.08 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work required by the Bidding Documents and applying any specific means, methods, techniques, sequences, and procedures of construction that may be shown or indicated or expressly required by the Bidding Documents, that Bidder has given Engineer written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder has discovered in Bidding Documents and the written resolutions thereof by Engineer are acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work.
ARTICLE 5 - PRE-BID CONFERENCE
5.01 A Pre-Bid Conference will be held on May 6, 2021 at 10:00 a.m. All interested bidders shall meet at the Jasper Sewer District, 3809 Grange Street, Jasper, NY 14855. Representatives of Owner and Engineer will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference. Engineer will transmit to all prospective Bidders of record such Addenda as Engineer considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective.
ARTICLE 6 - SITE AND OTHER AREAS
6.01 The Site is identified in the Bidding Documents. Easements for permanent structures or permanent changes in existing facilities are to be obtained and paid for by Owner unless otherwise provided in the Bidding Documents. All additional lands and access thereto required for temporary construction facilities, construction equipment, or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by Contractor.
ARTICLE 7 - INTERPRETATIONS AND ADDENDA
7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to
Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than five days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
7.02 Addenda may be issued to clarify, correct, or change the Bidding Documents as deemed advisable by Owner or Engineer.
ARTICLE 8 - BID SECURITY
8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of 5 % of
Bidder’s maximum Bid price and in the form of a certified check or a Bid bond (EJCDC No. C- 430, 2013 Edition) issued by a surety meeting the requirements of paragraphs 6.01 and 6.02 of the General Conditions.
8.02 The Bid security of the Successful Bidder will be retained until such Bidder has executed the
Contract Documents, furnished the required contract security and met the other conditions of the Notice of Award, whereupon the Bid security will be returned. If the Successful Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within 15 days after the Notice of Award, Owner may annul the Notice of Award and the Bid security of that Bidder will be forfeited. The Bid security of other Bidders whom Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of seven days after the Effective Date of the Agreement or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be returned.
8.03 Bid security of other Bidders whom OWNER believes do not have a reasonable chance of receiving the award will be returned within seven days after the Bid opening.
ARTICLE 9 - CONTRACT TIMES
9.01 The number of days within which, or the dates by which, the Work is to be substantially completed and ready for final payment are set forth in the Agreement. Completion of this work is of the essence as detailed below:
Substantial Completion Date: May 1, 2022 Final Completion Date: June 30, 2022
ARTICLE 10 -LIQUIDATED DAMAGES
10.01 Provisions for liquidated damages are set forth in the Agreement.
ARTICLE 11 - SUBSTITUTE AND “OR-EQUAL” ITEMS
11.01 The Contract, if awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents, or “or-equal” materials and equipment as defined in paragraph 6.05 of the General Conditions, or those substitute materials and equipment approved by the Engineer and identified by Addendum. The materials and equipment described in the Bidding Documents establish a standard of required type, function and quality to be met by any proposed substitute or “or-equal” item. Request for Engineer’s clarification of materials and equipment considered “or-equal” prior to the Effective Date of the Agreement must be received by the Engineer at least 5 days prior to the date for receipt of Bids. No item of material or equipment will be considered by Engineer as a substitute unless written request for approval has been submitted by Bidder and has been received by Engineer at least 15 days prior to the date for receipt of Bids. Each request shall conform to the requirements of paragraph 6.05 of the General Conditions. The burden of proof of the merit of the proposed item is upon the Bidder. Engineer’s decision of approval or disapproval of a proposed item will be final. If Engineer approves any proposed substitute item, such approval will be set forth in an Addendum issued to all prospective Bidders. Bidders shall not rely upon approvals made in any other manner.
ARTICLE 12 - SUBCONTRACTORS, SUPPLIERS, AND OTHERS
12.01 If the Supplementary Conditions require the identity of certain Subcontractors, Suppliers, individuals, or entities to be submitted to Owner in advance of a specified date prior to the Effective Date of the Agreement, the apparent Successful Bidder, and any other Bidder so requested, shall within five days after Bid opening, submit to Owner a list of all such Subcontractors, Suppliers, individuals, or entities proposed for those portions of the Work for which such identification is required. Such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, individual, or entity if requested by Owner. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit a substitute, without an increase in the Bid.
12.02 If apparent Successful Bidder declines to make any such substitution, Owner may award the
Contract to the next lowest responsible Bidder that proposes to use acceptable Subcontractors, Suppliers, individuals, or entities. Declining to make requested substitutions will not constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which Owner and Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to revocation of such acceptance after the Effective Date of the Agreement as provided in paragraph 6.06 of the General Conditions.
12.03 Contractor shall not be required to employ any Subcontractor, Supplier, individual, or entity against whom Contractor has reasonable objection.
12.04 The Contractor shall not award work to Subcontractor(s) in excess of the limits stated in SC
6.06.
ARTICLE 13 - PREPARATION OF BID
13.01 The Bid form is included with the Bidding Documents. Additional copies may be obtained from
Engineer.
13.02 All blanks on the Bid form shall be completed by printing in ink or by typewriter and the Bid signed in ink. Erasures or alterations shall be initialed in ink by the person signing the Bid From.
A Bid price shall be indicated for each bid item and alternative listed therein, or the words “No Bid,” “No Change,” or “Not Applicable” entered.
13.03 A Bid by a corporation shall be executed in the corporate name by the president or a vice-president or other corporate officer accompanied by evidence of authority to sign. If required by State where work is to be performed, the corporate seal shall be affixed and attested by the secretary or an assistant secretary. The corporation business address and state of incorporation shall be provided on the Bid Form.
13.04 A Bid by a partnership shall be executed in the partnership name and signed by a partner
(whose title must appear under the signature), accompanied by evidence of authority to sign.
The business address of the partnership shall be provided on the Bid Form.
13.05 A Bid by a limited liability company shall be executed in the name of the firm by a member and accompanied by evidence of authority to sign. The state of formation of the firm and the business address of the firm must be provided on the Bid Form.
13.06 A Bid by an individual shall show the Bidder’s name and business address.
13.07 A Bid by a joint venture shall be executed by each joint venturer in the manner indicated on the Bid form. The business address of the joint venture must be provided on the Bid Form.
13.08 All names shall be typed or printed in ink below the signatures.
13.09 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers and dates of which shall be filled in on the Bid form.
13.10 The address and telephone number for communication regarding the Bid shall be shown.
13.11 The Bid shall contain evidence of Bidder’s authority and qualification to do business in the state where the Project is located or covenant to obtain such qualification prior to award of the Contract. Bidder’s state contractor license number for the state of the Project, if any, shall also be shown on the Bid Form.
ARTICLE 14 - BASIS OF BID; COMPARSION OF BIDS
14.01 Lump Sum
A. Bidders shall submit a Bid on a lump sum basis as set forth in the Bid Form.
ARTICLE 15 - SUBMITTAL OF BID
15.01 With each copy of the Bidding Documents, a Bidder is furnished one separate unbound copy of the Bid Form, and the Bid bond form. The unbound copy of the Bid Form is to be completed and submitted with all the attachments outlined in Article 7 of the Bid Form.
15.02 A Bid shall be submitted no later than the date and time prescribed and at the place indicated in the Advertisement for Bids and shall be enclosed in an opaque sealed envelope plainly marked with the Project title (and, if applicable, the designated portion of the Project for which the Bid is submitted), the name and address of Bidder, and shall be accompanied by the Bid security and other required documents. If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid shall be enclosed in a separate envelope plainly marked on the outside with the notation “Jasper (T) WWTP Improvements”. When using the mail or other delivery system, the Bidder is totally responsible for the mail or other delivery system delivering the Bid at the place and prior to the time indicated in the Advertisement for Bid. A mailed Bid shall be addressed to Owner at address in Article 1.01 of Bid Form.
ARTICLE 16 - MODIFICATION AND WITHDRAWAL OF BID
16.01 A Bid may be modified or withdrawn by an appropriate document duly executed in the manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids.
16.02 If within 24 hours after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid or negotiated, that Bidder will be disqualified from further bidding on the Work. This provision to withdraw a Bid without forfeiting the Bid security does not apply to Bidder’s errors in judgment in preparing the Bid.
ARTICLE 17 - OPENING OF BIDS
17.01 Bids will be opened at the time and place indicated in the Advertisement for Bids and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.
ARTICLE 18 - BIDS TO REMAIN SUBJECT TO ACCEPTANCE
18.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form.
ARTICLE 19 - EVALUATION OF BIDS AND AWARD OF CONTRACT
19.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, non-responsive, unbalanced, or conditional Bids. Owner further reserves the right to reject the Bid of any Bidder whom it finds, after reasonable inquiry and evaluation, to be non-responsible.
Owner also reserves the right to waive all informalities not involving price, time, or changes in the Work and to negotiate contract terms with the Successful Bidder.
19.02 More than one Bid for the same Work from an individual or entity under the same or different names will not be considered. Reasonable grounds for believing that any Bidder has an interest in more than one Bid for the Work may be cause for disqualification of that Bidder and the rejection of all Bids in which that Bidder has an interest.
19.03 In evaluating Bids, Owner will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Form or prior to the Notice of Award.
19.04 In evaluating Bidders, Owner will consider the qualifications of Bidders and may consider the qualifications and experience of Subcontractors, Suppliers, and other individuals or entities proposed for those portions of the Work for which the identity of Subcontractors, Suppliers, and other individuals or entities must be submitted as provided in the Supplementary Conditions.
19.05 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors, Suppliers, individuals, or entities to perform the Work in accordance with the contract Documents.
19.06 If the Contract is to be awarded, Owner will award the Contract to the responsible Bidder whose
Base Bid and any alternates are selected by the Owner, conforming with all the material terms and conditions of the Instructions to Bidders, is lowest, price and other factors considered.
ARTICLE 20 - CONTRACT SECURITY AND INSURANCE
20.01 Article 5 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds and insurance. When the Successful Bidder delivers the executed Agreement to Owner, it must be accompanied by such bonds.
ARTICLE 21 - SIGNING OF AGREEMENT
21.01 When Owner gives a Notice of Award to the Successful Bidder, it shall be accompanied by the required number of unsigned counterparts of the Agreement with the other Contract Documents which are identified in the Agreement as attached thereto. Within 15 days thereafter, Successful Bidder shall sign and deliver the required number of counterparts of the Agreement and attached documents to Owner. Within ten days thereafter, Owner shall deliver one fully signed counterpart to Successful Bidder with a complete set of the Drawings with appropriate identification.
ARTICLE 22 - SALES AND USE TAXES
22.01 OWNER is exempt from New York State sales and use taxes on materials and equipment to be incorporated in the Work. The Exemption Number shall be obtained from the Town Clerk; as necessary. Said taxes shall not be included in the Bid. Refer to paragraph 7.09 of the Supplementary Conditions for additional information.
HUNT 1656-004 Bid Form
EJCDC® C-410, Bid Form for Construction Contracts.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page i
BID FORM
Town of Jasper, Steuben County, New York WWTP Improvements
TABLE OF CONTENTS
Page
ARTICLE 1 – Bid Recipient
ARTICLE 2 – Bidder’s Acknowledgements
ARTICLE 3 – Bidder’s Representations
ARTICLE 4 – Bidder’s Certification
ARTICLE 5 – Basis of Bid
ARTICLE 6 – Time of Completion
ARTICLE 7 – Attachments to this Bid
ARTICLE 8 – Defined Terms
ARTICLE 9 – Bid Submittal
WICKS LAW
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 1
ARTICLE 1 – BID RECIPIENT
1.01 This Bid is submitted to:
Town of Jasper 3807 Preacher Road Jasper, NY 14855
1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.
ARTICLE 2 – BIDDER’S ACKNOWLEDGEMENTS
2.01 Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 60 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner.
ARTICLE 3 – BIDDER’S REPRESENTATIONS
3.01 In submitting this Bid, Bidder represents that:
A. Bidder has examined and carefully studied the Bidding Documents, and any data and reference items identified in the Bidding Documents, and hereby acknowledges receipt of the following Addenda:
Addendum No. Addendum, Date
B. Bidder has visited the Site, conducted a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfied itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
C. Bidder is familiar with and has satisfied itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work.
D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, and (2) reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings.
E. Bidder has considered the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and any Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and (3) Bidder’s safety precautions and programs.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 2
F. Bidder agrees, based on the information and observations referred to in the preceding paragraph, that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents.
G. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents.
H. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and confirms that the written resolution thereof by Engineer is acceptable to Bidder.
I. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work.
J. The submission of this Bid constitutes an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article, and that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.
ARTICLE 4 – BIDDER’S CERTIFICATION
4.01 Bidder certifies that:
A. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation;
B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;
C. Bidder has not solicited or induced any individual or entity to refrain from bidding; and
D. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph 4.01.D:
1. “corrupt practice” means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process;
2. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Owner, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition;
3. “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish bid prices at artificial, non-competitive levels; and
4. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the e execution of the Contract.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 3
ARTICLE 5 – BASIS OF BID
5.01 Bidder will complete the Work in accordance with the Contract Documents for the following price(s):
Lump Sum Bid Price: $
Total Base Bid, in Words:
ARTICLE 6 – TIME OF COMPLETION
6.01 Bidder agrees that the Work will be substantially complete and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement.
6.02 Bidder accepts the provisions of the Agreement as to liquidated damages.
ARTICLE 7 – ATTACHMENTS TO THIS BID
7.01 The following documents are submitted with and made a condition of this Bid:
A. Required Bid Security;
B. List of Proposed Subcontractors (Wick’s Law form);
C. List of Proposed Suppliers;
D. Non-Collusive Bidding Certifications;
E. Qualification Statement with supporting data;
F. Waiver of Immunity;
G. Certifications of Non-Segregated Facilities; and
H. NYS SRF Bid Packet required documents (per page 30 of packet).
ARTICLE 8 – DEFINED TERMS
8.01 The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 4
ARTICLE 9 – BID SUBMITTAL
BIDDER: [Indicate correct name of bidding entity]
By:
[Signature]
[Printed name] (If Bidder is a corporation, a limited liability company, a partnership, or a joint venture, attach evidence of authority to sign.)
Attest:
[Signature]
[Printed name]
Title:
Submittal Date:
Address for giving notices:
Telephone Number:
Fax Number:
Contact Name and e-mail address:
Bidder’s License No.:
(where applicable)
NOTE TO USER: Use in those states or other jurisdictions where applicable or required.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 5
WICKS REFORM
SUBCONTRACTOR IDENTIFICATION
This form must be submitted with bid by the Prime Contractor in a SEPARATELY SEALED ENVELOPE.
For projects below the monetary threshold, bidders must submit a separately sealed list naming each subcontractor for the general trades (where applicable), plumbing, HVAC and electrical work and the amount to be paid to each. The list may not be changed unless the public owner finds a legitimate construction need, including a change in specifications or costs or use of a Project Labor Agreement (PLA), and must be open to public inspection.
List subcontracts as they apply to this project below:
BASE BID:
TRADE CONTRACTOR NAME AMOUNT PAID
General Trades
HVAC
Plumbing
Electrical
HUNT 1656-004 Bid Bond
EJCDC® C-430, Bid Bond (Penal Sum Form). Published 2013.
Prepared by the Engineers Joint Contract Documents Committee.
BID BOND
Any singular reference to Bidder, Surety, Owner or other party shall be considered plural where applicable.
BIDDER (Name and Address):
SURETY (Name, and Address of Principal Place of Business):
OWNER (Name and Address):
BID
Bid Due Date:
Description (Project Name— Include Location):
BOND
Bond Number:
Date:
Penal sum $ (Words) (Figures) Surety and Bidder, intending to be legally bound hereby, subject to the terms set forth below, do each cause this Bid Bond to be duly executed by an authorized officer, agent, or representative.
BIDDER SURETY
(Seal) (Seal) Bidder’s Name and Corporate Seal Surety’s Name and Corporate Seal
By: By:
Signature Signature (Attach Power of Attorney)
Print Name Print Name
Title Title
Attest: Attest:
Signature Signature
Title Title
Note: Addresses are to be used for giving any required notice.
Provide execution by any additional parties, such as joint venturers, if necessary.
1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to pay to Owner upon default of Bidder the penal sum set forth on the face of this Bond.
Payment of the penal sum is the extent of Bidder’s and Surety’s liability. Recovery of such penal sum under the terms of this Bond shall be Owner’s sole and exclusive remedy upon default of Bidder.
HUNT 1656-004 Bid Bond
EJCDC® C-430, Bid Bond (Penal Sum Form). Published 2013.
Prepared by the Engineers Joint Contract Documents Committee.
2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents.
3. This obligation shall be null and void if:
3.1 Owner accepts Bidder’s Bid and Bidder delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents, or
3.2 All Bids are rejected by Owner, or
3.3 Owner fails to issue a Notice of Award to Bidder within the time specified in the Bidding Documents (or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by Paragraph 5 hereof).
4. Payment under this Bond will be due and payable upon default of Bidder and within 30 calendar days after receipt by Bidder and Surety of written notice of default from Owner, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due.
5. Surety waives notice of any and all defenses based on or arising out of any time extension to issue Notice of Award agreed to in writing by Owner and Bidder, provided that the total time for issuing Notice of Award including extensions shall not in the aggregate exceed 120 days from the Bid due date without Surety’s written consent.
6. No suit or action shall be commenced under this Bond prior to 30 calendar days after the notice of default required in Paragraph 4 above is received by Bidder and Surety and in no case later than one year after the Bid due date.
7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the state in which the Project is located.
8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier, or by United States Registered or Certified Mail, return receipt requested, postage pre-paid, and shall be deemed to be effective upon receipt by the party concerned.
9. Surety shall cause to be attached to this Bond a current and effective Power of Attorney evidencing the authority of the officer, agent, or representative who executed this Bond on behalf of Surety to execute, seal, and deliver such Bond and bind the Surety thereby.
10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length. If any provision of this Bond conflicts with any applicable statute, then the provision of said statute shall govern and the remainder of this Bond that is not in conflict therewith shall continue in full force and effect.
11. The term “Bid” as used herein includes a Bid, offer, or proposal as applicable.
HUNT 1656-004 Non-Collusive Bidding Certification
NON-COLLUSIVE BIDDING CERTIFICATION
By submission of this bid, each bidder and each person signing on behalf of any bidder, certifies, and in the case of a joint bid, each party thereto certifies as to its own organization, under penalty of perjury, that to the best of knowledge and belief:
1. The prices in this bid have been arrived at independently without collusion, consultation, communication, or agreement for the purpose of restricting competition as to any matter relating to such prices with any other bidder or with any competitor;
2. Unless otherwise required by law, the prices which have been quoted in this bid have not been knowingly disclosed by the bidder and will not knowingly be disclosed by the bidder prior to opening, directly or indirectly, to any other bidder or to any competitor; and
3. No attempt has been made or will be made by the bidder to induce any other person, partnership, or corporation to submit or not to submit a bid for the purpose of restricting competition; and
4. That the bidder has and has implemented a written policy addressing sexual harassment prevention in the workplace and provides annual sexual harassment prevention training to all of its employees. Such policy shall, at a minimum, meet the requirements of Section 201-g of the Labor Law.
(Signed)
(Title)
(Date)
Subscribed and sworn to before me
This day of , 20
Title
My commission expires
NOTE: If Bidder is a Corporation, the corporate name and title of officer signing must be stated.
HUNT 1656-004 Non-Collusive Bidding Certification
Please Complete Information Requested Below:
The P.O. Address of the Bidder is: Federal Identification No.
Street
City, State & Zip
Phone Number (include area code)
Fax Number
If a Corporation:
Name Address
President
Secretary
Treasurer
If a Firm:
Name Address
HUNT 1656-004 Qualifications Statement
EJCDC® C-451, Qualifications Statement.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
QUALIFICATIONS STATEMENT
THE INFORMATION SUPPLIED IN THIS DOCUMENT IS CONFIDENTIAL TO THE EXTENT
PERMITTED BY LAWS AND REGULATIONS
1. SUBMITTED BY:
Official Name of Firm:
Address:
2. SUBMITTED TO:
3. SUBMITTED FOR:
Owner:
Project Name:
TYPE OF WORK:
4. CONTRACTOR'S CONTACT INFORMATION
Contact Person:
Title:
Phone:
Email:
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies,
5. AFFILIATED COMPANIES:
Name:
6. TYPE OF ORGANIZATION:
SOLE PROPRIETORSHIP
Name of…
This is the start of the file's text. The full file is on GovTribe.