2104 Specifications.pdf

PDF 464 KB Posted

Attached to
Kenosha County Detention Center Sealant Replacement
Solicitation number
2104
Issued by
Kenosha County, Kellnersville Village, Wisconsin

About this file

This is a specifications document for a sealant replacement and exterior repair project at the Kenosha County Detention Center in Kenosha, Wisconsin, prepared by Industrial Roofing Services, Inc. (IRS) for the County of Kenosha. The project scope includes removal and replacement of sealants within CMU control joints, routing and sealing of cracks in CMU walls, removal and replacement of perimeter sealants at windows and doors, installation of sealants in precast concrete coping joints and metal panels, wet sealing of windows and clerestory windows, and preparation and painting of all steel doors, steel window frames, lintels, overhead door protection, and steel staircases. Two alternate additions are available: removal and replacement of all counterflashing sealant and removal and replacement of the storefront entrance. The specifications detail the location at 4777 88th Street, Kenosha, Wisconsin, and include requirements for materials, execution procedures, quality control standards, and contractor qualifications. The document establishes unit pricing methodology measured in dollars per linear foot, with progress payments subject to five percent retainage and weekly submission of completed work approvals.

The project specifications require contractors to submit comprehensive documentation including insurance certificates with the Owner as certificate holder, performance bonds, materials lists with manufacturer information, Safety Data Sheets for all products brought on-site, project schedules with start and completion dates for each task, and one-year workmanship warranties. The sealant materials specified include Dow Corning 756 SMS and 795 silicone sealants with colors selected by the Owner, along with closed-cell backer rods, bond breaker tape, and specified primers. The contractor must conduct field-adhesion testing per ASTM C1521 with the manufacturer's representative present and obtain approval of sample sections before proceeding with full installation. Manufacturer warranties of five years from Substantial Completion and installer warranties of two years are required. All work must comply with ASTM standards, and the contractor is responsible for site conditions maintenance, debris removal, grounds repair, and protection of roof surfaces during staging operations. A pre-bid meeting and pre-construction conference are required to review project requirements and establish quality standards.

View the file

Other files

File Type Posted
2104 Bid Documents.pdf PDF
Vendor Responsibility Form Construction.pdf PDF
2104 Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS

for

SEALANT REPLACEMENT & EXTERIOR REPAIR PROJECT

KENOSHA COUNTY DETENTION CENTER

IRS JOB# 17529

Located at

4777 88TH STREET

KENOSHA, WI

Prepared for

Mr. Mike Schrandt Facilities Manager

County of Kenosha

912 56th Street Kenosha, WI 53140

December 15, 2020

IRS I R S ndustrial oofing ervices, Inc.

13000 West Silver Spring Drive

Butler, Wisconsin 53007 Phone: (262) 432-0500

Fax: (262) 432-0504 www.irsroof.com

"Asset Management Consultants"

IRS

I

00 01 10

TABLE OF CONTENTS

DIVISION 1 - General Requirements Pages To

01 11 00 – Summary of Work

01 25 00 – Applications for Payment

01 30 00 – Alternates, Allowances, and Substitutions

01 31 19 – Project Meetings

01 33 00 – Submittal Procedures

01 40 00 – Quality Control

01 50 00 – Site Conditions and Controls

01 60 00 – Materials and Equipment

01 70 00 – Contract Close-out and Warranties

01 74 29 – Grounds Repair

DIVISION 7 - Thermal and Moisture Protection Pages To 07 92 00 – Joint Sealants

DIVISION 8 - Doors and Windows Pages To 08 41 13 – Aluminum-Framed Entrances and Storefronts

DIVISION 9 - Finishes Pages To 09 91 13 – Exterior Painting

II

APPENDICES

Drawings

AO - COVER SHEET

A 1.0 - KEY PLAN REPAIR SPECIFICATION

A1.1 - NORTH ELEVATION REPAIR SPECIFICATION

A1 .2 - EAST ELEVATION REPAIR SPECIFICATION

A1 .3 - SOUTH ELEVATION REPAIR SPECIFICATION

A1 .4 - WEST ELEVATION REPAIR SPECIFICATION

A1 .5 - UPPER ELEVATIONS REPAIR SPECIFICATION

A2.0 - EXTERIOR REPAIR DETAILS 1-4

A2.1 - EXTERIOR REPAIR DETAILS 5-8

A2.2 - EXTERIOR REPAIR DETAILS 9-11

- END OF TABLE OF CONTENTS -

Sealant Replacement & Exterior Repair Project County of Kenosha IRS Project 17529 01 11 00 - 1 Summary of Work Kenosha County Detention Center

01 11 00

SUMMARY OF WORK

- GENERAL

1.01 PROJECT OVERVIEW

A. The Work consists of sealant replacement and exterior repair at Kenosha County Detention Center in Kenosha, WI for the County of Kenosha.

B. The Work includes:

1. Removal and replacement of sealant within all CMU control joints.

2. Rout and seal all cracks within the CMU walls including previously sealed cracks.

3. Removal and replacement of all perimeter sealants at windows, vents, and steel service doors.

4. Within precast concrete coping joints, remove mortar, and install sealant.

5. Seal “I” beam and CMU interface.

6. Install sealant within metal panels.

7. Wet seal all windows.

8. Wet seal clearstory windows

9. Prepare and paint all-steel doors, steel window frames, exposed portions of lintels, overhead door protection, and steel staircase including the underside of the staircase.

C. The Work may also include the following Alternate Additional Items:

1. Alternate Addition #1

a. Remove and replace all counterflashing sealant

2. Alternate Addition #2

a. Remove and replace the storefront entrance.

- PRODUCTS

2.01 SYSTEM COMPONENTS

A. Closed-cell backer rod

B. Bond breaker tape

C. Silicone sealant

D. Silicone Sealant primer

E. Rust inhibitive primer and paint

F. Aluminum storefront entrance

2.02 COMPONENTS SUPPLIED BY OWNER

A. None.

- EXECUTION

3.01 WORK PERFORMED BY CONTRACTOR

A. General

IRS Project 17529 01 11 00 - 2 Summary of Work Kenosha County Detention Center

1. Notify Consultant of any detrimental conditions that may affect the installation of the work.

2. All removed and demolished items are the property of the contractors unless otherwise indicated. All debris shall be properly disposed of in accordance with all applicable local and state codes and ordinances.

3. When staging on the roof, the roof must be protected at all times. Any damage to the roof is the responsibility of the Contractor to repair.

4. The Contractor shall arrange to have a sample section of all typical types of sealants and applications installed to perform an adhesion pull test with parties from the manufacturer, supplier, consultant, owner, and key personnel from the contractor present. At this time all parties will approve the sample preparation and installation prior to proceeding with the balance of the work.

5. Restoration of any damaged landscaping is incidental to the contract. DS-75 erosion control blanket or equivalent and specified seed to be used for restoration. Watering of new seed is required for 2 weeks to establish growth. Topsoil to be per specifications to encourage seed growth.

6. Contractor to have pull test performed by manufacturer’s representative at all the different substrates. Reports to be forwarded to Consultant for review.

7. All work is to include above the roofline.

B. Base Bid:

1. Removal and replacement of sealant within all CMU control joints.

a. Remove existing sealant.

b. Clean and prepare the joint.

c. Prime joint with Dow Corning Primer P

d. Install closed-cell backer rod.

e. Install Dow 756 sealant per section 07 92 00.

f. Owner to choose a color.

2. Rout and seal all cracks within the CMU walls including previously sealed cracks.

a. Rout crack or remove existing failed sealant within the crack.

b. Clean and prepare the joint.

c. Prime joint with Dow Corning Primer P

d. Install closed-cell backer rod.

e. Install Dow 756 sealant per section 07 92 00.

f. Owner to choose a color.

3. Removal and replacement of all perimeter sealants at windows, vents, and steel service doors.

a. Remove perimeter sealants

b. Clean and prepare the joint.

c. Prime joint with Dow Corning 1200 OS Primer

d. Install closed-cell backer rod.

e. Install Dow 795 sealant per section 07 92 00.

f. Owner to choose a color.

4. Within precast concrete coping joints, remove mortar, and install sealant.

a. Remove mortar at head joints within the precast sills.

b. Prime joint with DOW P Primer

c. Install closed-cell backer rod

d. Install DOW 756 silicone sealant section 07 92 00

e. Owner to choose a color.

5. Seal “I” beam and CMU interface.

a. Remove failed sealant

a. Prime joint with DOW P Primer

b. Install closed-cell backer rod

c. Install DOW 756 silicone sealant section 07 92 00

d. Owner to choose a color.

6. Install sealant within metal panels.

a. Remove gasket at metal panel joints

b. Prime joint with DOW 1200 OS Primer

c. Install closed-cell backer rod

IRS Project 17529 01 11 00 - 3 Summary of Work Kenosha County Detention Center

d. Install DOW 795 silicone sealant section 07 92 00

e. The custom color will be required to match metal panels.

7. Wet seal all windows.

a. Remove failed sealant from window frame and glazing

b. Clean and prepare joint.

c. Prime with DOW 1200 OS Primer

d. Install DOW 795 silicone sealant section 07 92 00

e. Owner to choose a color.

8. Wet seal clearstory windows.

a. Remove failed sealant from window frame and glazing

b. Clean and prepare joint.

c. Prime with DOW 1200 OS Primer

d. Install DOW 795 silicone sealant section 07 92 00

e. At all frame, butt joints install DOW 123 extruded silicone tape

f. Owner to choose a color.

9. Prepare and paint all-steel doors, steel window frames, exposed portions of lintels, overhead door protection, and steel staircase including the underside of the staircase.

a. At doors, remove existing letters and numbers

b. Clean, prep, prime, and apply rust-inhibitive per Section 09 91 13.

c. At doors, once the painting is completed install new letters and numbers matching size, font, and configuration.

C. Alternate Addition #1

1. Remove and replace all counterflashing sealant

a. Remove failed sealant from window frame and glazing

b. Clean and prepare joint.

c. Prime with DOW 1200 OS Primer

d. Install DOW 795 silicone sealant section 07 92 00

e. Owner to choose a color.

D. Alternate Addition #2

1. Remove and replace storefront entrance per section 08 41 13.

2. Remove two (2) sets of doors including the middle infill piece and door threshold. Existing continuous hinges to be re-used.

3.02 INCLUSIONS

A. The Contractor shall include, in his bid, all costs incurred in complying with the intent of the Construction Drawings.

END OF SECTION

IRS Project 17529 01 25 00 - 1 Applications for Payment Kenosha County Detention Center

01 25 00

APPLICATIONS FOR PAYMENT

- GENERAL

1.01 DESCRIPTION

A. This section describes the procedures and submittal requirements regarding Unit Pricing, Change Orders, and Application for Payment requests to the Owner.

1.02 PROGRESS PAYMENTS

A. Unit Pricing:

1. The Unit Pricing submitted by the Contractor shall be considered fixed and inclusive of its purchase, installation, overhead expenses, and profit.

2. Units of measurement shall be as described on the Bid Form:

a. Dollars per lineal foot.

3. The Contractor shall obtain written approval, on the Unit Pricing forms provided by or acceptable to the Consultant, by the signature of the Consultant or an authorized on-site representative of the Owner, for each day's quantity of completed work affected by unit pricing.

4. The Contractor shall accumulate the completed Unit Pricing forms and submit them to the Consultant, weekly, in conjunction with a completed Change Order form totaling the cost of the approved Unit Pricing.

5. If proper approval of Unit Pricing is not obtained, the Owner reserves the right to reject the Contractor’s measurement of Unit Pricing work-in-place and to have the Work measured by the Consultant, or an independent surveyor acceptable to both the Owner and Contractor, at the Contractor's expense.

6. Unit Pricing is intended to be used for small-scale areas of extra work. If the scope of the work covered by the unit pricing escalates, the Owner reserves the right to use the Contractor’s time and materials (T&M) rate or negotiate a lump sum price in place of the Unit Pricing.

B. Time and materials (T&M) pricing:

1. The Time & Material Rate submitted by the Contractor shall be considered fixed and inclusive of overhead and profit.

2. Repair of latent defects or the execution of additional work for which unit prices were not submitted:

a. Dollars, per man-hour, for labor.

b. Percentage mark-up over purchase price for materials furnished.

C. Change Orders:

1. The Contractor shall be responsible for initiating the request for Change Order, on the forms provided by or acceptable to the Consultant, to include:

a. A summary of the approved Unit Pricing (include copies of approved Unit Pricing forms), weekly.

b. A description of the approved change in the Work, within one (1) week of initiation.

2. The Consultant will review the Change Order requests and forward them with his recommendation to the Owner; copies approved by the Consultant and Owner will be returned to the Contractor.

3. The Contractor shall submit the approved Change Order forms in conjunction with an Application for Payment form, including the total of the approved Change Orders.

4. Change Orders shall be considered valid only if:

a. Submitted in writing on the proper Change Order form.

IRS Project 17529 01 25 00 - 2 Applications for Payment Kenosha County Detention Center

b. Approved by signatures of both the Consultant and the Owner.

D. Application for Payment:

1. The Contractor shall submit:

a. Completed Application for Payment, on standard AIA formats.

b. Contractor’s original invoice.

c. Subcontractor’s material and/or labor Waivers of Lien, where applicable, to match the amount requested.

d. Written justification for payment of materials, not in-place utilizing supplier invoices, bills of lading, Waivers of Lien, etc.

2. The Contractor shall submit Application for Payment, periodically as determined in the

Agreement, to:

Industrial Roofing Services, Inc.

13000 West Silver Spring Drive Butler, WI 53007

EMAIL – office@irsroof.com

3. The Consultant shall review the Application for Payment and either:

a. Approve the requested amount as a representation that the Work has progressed to the point indicated and, that to the best of his knowledge, information, and belief, the quality of the Work is per the Contract Documents, or;

b. Revise the amount requested to an amount for which he can make such representation to the Owner.

c. Notify the contractor in writing of the application's rejection due to error and/or incompleteness

4. Payments will be reviewed, approved, and submitted to the Owner with the Consultant’s recommendations on a timely basis.

5. A retainage of five percent (5%) of the requested amount shall be withheld on each progress payment. The Contractor’s invoice shall match the amount requested, less the retainage.

- PRODUCTS

A. Not Used.

- EXECUTION

A. Not Used.

mailto:office@irsroof.com

IRS Project 17529 01 30 00 - 1 Alternates, Allowances, and Substitutions Kenosha County Detention Center

01 30 00

ALTERNATES, ALLOWANCES, AND SUBSTITUTIONS

- GENERAL

1.01 DESCRIPTION

A. This section identifies each voluntary and/or mandatory Alternate, by number, and describes the basic changes to be incorporated into the Work; only if that Alternate is made a part of the Work by acceptance by the Owner in the Agreement.

1. A Mandatory Alternate Bid shall be in addition to the Base Bid. It may contain some or all aspects of the Base Bid, except those changes specifically described herein.

2. An Alternate Bid shall be in place of the Base Bid. It shall contain all aspects of the Base

Bid, except those changes specifically described herein.

3. An Alternate Add or Alternate Deduct, as described herein, shall add work to, or deduct work from, the Base Bid.

B. This section also includes the Contractor’s options in selecting products or requesting the acceptance of substitute products.

C. This section also specifies Allowances – monetary amounts (or materials) to be included in the Contractor’s bid prices – which will be used to cover change orders, unit pricing, deteriorated material replacement, and/or other intangibles during the Work.

1.02 RELATED REQUIREMENTS

A. Bidding Documents: Method of quotation for each Alternate, and the basis of the Owner's acceptance of Alternates.

B. Referenced sections of these specifications, or drawing details, which stipulate the products and methods necessary to achieve the Work for each Alternate, as described below.

C. Coordination of related work and modification of surrounding work of the Base Bid, as required to properly integrate the work of each Alternate, to provide the Work as required by the Contract Documents.

1.03 DESCRIPTION OF ALTERNATES

A. Mandatory Alternate Bid #1: None.

B. Alternate Bid #1 None.

C. Alternate Addition #1: Remove and replace all counterflashing sealant.

D. Alternate Addition #2: Remove and replace storefront entrance

E. Alternate Deduct #1: None.

1.04 PRODUCT OPTIONS AND SUBSTITUTIONS

A. Contractor's product options:

1. If products are specified only by reference standard, any product which meets that standard, by any manufacturer, shall be used.

IRS Project 17529 01 30 00 - 2 Alternates, Allowances, and Substitutions Kenosha County Detention Center

2. If several products are specified by name or manufacturer, any of the listed products may be used.

3. If only one product is specified by name or manufacturer, that product shall be used, or the Contractor shall submit a request for substitution, as specified below, for a product that meets or exceeds the quality standards of the listed product.

4. If the product list is followed by “Approved equal”, the Contractor may use any of the listed products or shall submit his “or equal” for consideration, following the substitution procedure, as specified below.

B. Substitutions:

1. During the Bidding process, the Consultant may consider written requests from Bidders for substitute products in place of those specified. If the Consultant deems the substitute product to be worthy of approval, it will be incorporated as such into an Addendum to all Bidders. Requests for substitutions shall include data as listed below.

2. Any Bidder who wishes to propose substitute products must nevertheless submit his Bid Price per the specifications. Failure to do so may result in the substitution being rejected without consideration. He shall then submit his substitute product, and corresponding bid adjustment amount, in conjunction with the Bid Form, on the form provided.

3. After the Bid Opening but before Contract Award, the Consultant may consider the requests, submitted in conjunction with the Bid Form, from Bidders for substitute products in place of those specified. If the Owner deems the substitute product to be worthy of approval, it will be incorporated as such into the Agreement. Requests for substitutions shall include data as listed below.

4. After Contract Award, the Consultant will consider written requests for “or equal” product substitutions in place of those specified. Such requests must be submitted with the product list submittals. Approval of the submittal package shall constitute the approval of proposed substitute products. Requests for substitutions shall include the data listed below.

5. Submit two (2) copies of the request form for each substitution, supported with complete data, drawings, and/or appropriate samples as necessary to show compliance with the intent of the Contract Documents, including:

a. Product description, performance, and test data, and applicable reference standards.

b. Name, address, date of installation, and Owner contact of similar projects on which the product was used.

c. Changes that are required in other elements of the Work as a result of the incorporation of the substitute product.

d. Effect on the anticipated construction schedule, if any.

e. Cost of incorporation of the proposed substitution regardless of whether the

Contract Sum is affected or not.

C. Contractor’s representation: a request for substitution constitutes a representation that the Contractor:

1. Has investigated and determined that the proposed substitute product is equal or superior, in all respects, to the specified product.

2. Will provide the same warranty as specified if substitute products are utilized.

3. Will coordinate the incorporation of the proposed substitution in the Work

4. Will modify other portions of the Work, as may be required, to complete the project per the intent of the Contract Documents.

5. Waive all future claims for added costs to the Contract, over and above those approved by the Owner that may be caused by the use of the substitute product.

D. Substitutions will not be considered if:

1. They are indicated or implied on shop drawings or product data submittals, except as described above.

2. The substitute product is considered, in the opinion of the Consultant, to be outside of the general classifications of the specified product.

IRS Project 17529 01 30 00 - 3 Alternates, Allowances, and Substitutions Kenosha County Detention Center

3. Approval of the substitution would require substantial revisions to the Contract Documents.

E. The contractor shall not order or install substitute products without Written Notice of Acceptance of the request for substitution by the Consultant and the Owner. Submission of the Substitution Request Form does not in any way constitute approval. If the substitution is not approved, the rejection shall be considered final and the Contractor shall furnish a specified product.

1.05 ALLOWANCES

A. The Contractor shall include the allowance listed on the Kenosha County bid form in his bid amount.

B. Use of the allowance is restricted to the direction of the Consultant for the Owner's purposes and only authorized by Signed Change Orders or Unit Pricing Approvals that indicate amounts to be charged to the allowance.

C. At Project closeout, credit unused amounts remaining in the contingency allowance to Owner by Change Order.

- PRODUCTS

A. Not Used.

- EXECUTION

A. Not Used.

IRS Project 17529 01 31 19 - 1 Project Meetings Kenosha County Detention Center

01 31 19

PROJECT MEETINGS

- GENERAL

1.01 DESCRIPTION

A. This section provides information regarding the Consultant’s scheduled project meetings.

1.02 PRE-BID MEETING

A. A pre-bid meeting will be held, at the project site, at the time designated on the county bid documents.

B. Representatives of all prospective Bidders shall meet with the Consultant to review the existing conditions on the project site.

C. The Consultant will, as a minimum, address the following items at the pre-bid meeting:

1. Introduction of key project personnel;

2. The general project scope, including site walkover;

3. The bid(s) to be included;

4. The Bid due date;

5. The Owner’s intended project construction schedule;

6. Required project warranties;

7. Any special requirements;

8. Anticipated construction facilities:

a. Use of the site and restrictions, if any;

b. Temporary services and controls.

1.03 PRE-CONSTRUCTION CONFERENCE

A. Within ten (10) days after Consultants receipt and approval of required project submittals Contractor shall provide Consultant with written notice of his intent to start the work.

B. Within ten (10) days after receipt of Contractors written notice of his intent to start the work Consultant will schedule a formal pre-construction conference to be held at the project site, at a time designated by the Consultant.

C. Representatives of the Contractor and his subcontractors, including the project superintendent and foreman, shall attend the pre-construction conference with the Consultant and a representative of the Owner.

D. The Consultant will, as a minimum, address the following items at the pre-construction meeting:

1. Designation of key personnel and their duties;

2. The channels for project communication;

3. Review of the Project Scope of Work;

4. The anticipated project construction schedule, showing timeframe for the start and completion of each portion of the Work;

5. Review of the material list (Contractor shall provide an updated list if changes were made from initial submittal);

6. Review of sequencing for critical areas of the Work;

7. The requirements for approving and processing of Unit Pricing and Change Orders;

8. Job site conditions and requirements:

a. Use of site and restrictions;

IRS Project 17529 01 31 19 - 2 Project Meetings Kenosha County Detention Center

b. Temporary services and controls;

c. Existing facilities and maintenance of operation;

d. Daily completion procedures, such as night seals;

e. Emergency weather-seal protections;

9. Notification procedures;

10. Expectations of the Owner and IRS;

11. Quality control of new work.

- PRODUCTS

A. Not Used.

- EXECUTION

IRS Project 17529 01 33 00 - 1 Submittal Procedures Kenosha County Detention Center

01 33 00

SUBMITTAL PROCEDURES

- GENERAL

1.01 DESCRIPTION

A. This section provides requirements for project submittals and guidelines for submittals, by the Contractor or his Subcontractor, of shop drawings and other submittals as requested in the Project Documents.

1.02 SUBMISSION REQUIREMENTS

A. Submittals listed below shall be delivered to the Consultant as soon as possible after Contract Award, but no later than ten (10) days before Contractor’s intent to start work, and/or a minimum of five (5) days before approval is needed to order materials.

B. Provide Three (3) Bound Sets for IRS and Owner’s use; any additional copies will be returned for the Contractor’s, subcontractor’s, or material supplier's use.

C. Provide Three (3) Bound Sets of SDS, one for IRS and one for Owner’s reference; the third copy shall be kept at the project site.

D. Accompany submittals with a transmittal letter, containing:

1. Date.

2. Project title and IRS Job number.

3. Contractor’s name and address.

4. Notification of deviations from Contract Documents, if any.

E. Required Submittal items:

1. Insurance Certificate: Original copy, with the Owner as the certificate holder and the

Consultant (and any other entities specified) named as Additional Insureds.

2. Performance Bond:

3. Materials: List of major products proposed for use, with the name of the manufacturer, trade name, or model number of product or materials (final list may be provided at the pre-construction meeting if changing between specified products). Submit product data sheets, printed information, installation instructions, catalog cuts, or material color charts.

4. Safety Data Sheets: Provide copies of SDS for each product that will be brought on-site.

5. Project Schedule: Provide a breakdown of the project schedule timetable by each major portion of the work. As a minimum, include start and completion dates for each required task.

6. Schedule of Values: Provide a breakdown of the project cost by each major portion of the Work such as mobilization, sealant, paint, storefront. DO NOT list only material and labor.

7. Warranty: Submit a sample copy of the Contractor’s one (1) year workmanship warranty.

8. Project Contacts: Provide all necessary contact numbers (cellular, pager, etc.) for key personnel involved in the project. Include an after-hours contact name and home telephone number in case of an emergency. Also provide subcontractors’ names, addresses, contact names, and phone/fax numbers, if applicable.

1.03 CONTRACTOR RESPONSIBILITIES

A. The Contractor shall review the shop drawings, product data, and samples before submission.

The Contractor shall initial, sign, or stamp the submittals to certify his review and acceptance.

IRS Project 17529 01 33 00 - 2 Submittal Procedures Kenosha County Detention Center

B. Verification of existing field measurements and conditions is the SOLE responsibility of the Contractor.

C. The Contractor's responsibility for errors and omissions in submittals is not relieved by the Consultant’s review or acceptance of submittals.

D. Indicate, in the submittals, any deviations from the requirements of the Project Documents caused by acceptance of substitutions, negotiations with the Owner after the Bid, etc. Any changes to the Project Documents must be confirmed by written Change Order.

E. The Contractor shall not begin work before receipt of the approved submittals from the Consultant.

1.04 DISTRIBUTION OF SUBMITTALS

A. The Consultant will retain three (3) copies of approved or approved-as-noted submittals, two for IRS office use, and one for the Owner, and will return the remaining copies to the Contractor.

B. The Contractor shall be responsible for distributing submittals that carry the Consultant’s approval, as required for construction or fabrication, to the project superintendent, subcontractors, and material suppliers or distributors.

- PRODUCTS

A. Not Used.

- EXECUTION

IRS Project 17529 01 40 00 - 1 Quality Control Kenosha County Detention Center

01 40 00

QUALITY CONTROL

- GENERAL

1.01 DESCRIPTION

A. This section provides requirements for the standards of quality for materials and workmanship for this project.

1.02 GENERAL

A. The Contractor shall maintain quality control over his employees, suppliers, manufacturer’s products, services, and site conditions to produce work of specified quality.

1.03 WORKMANSHIP

A. Comply with recognized industry standards, except where specifications indicate more rigid standards or more precise workmanship.

B. Perform the Work with personnel qualified to produce workmanship of specified quality.

1.04 APPLICATION QUALITY CONTROL

A. The Contractor shall be experienced in all aspects of the type of work being performed.

B. The Contractor shall, at all times, have a complete set of Project Documents, including specifications, drawings, SDS sheets and approved submittals for his use and reference, on the project site. The site superintendent shall produce these Project Documents upon request of either the Owner or the Consultant. Failure to do so will result in a violation of Item 1.06 of this Section.

1.05 TESTING SERVICES

A. During the work, the Consultant may secure samples of materials being used and/or samples of the work in place at the project site. The samples will be submitted to an Independent Testing Laboratory for comparison with the specifications.

B. Should it be determined by the Consultant that the materials and/or application rates being utilized do not meet the specification requirements; the Contractor shall pay for the services of the Independent Testing Laboratory to perform reviews, tests, and other services, including costs incurred by the Consultant.

1. If test results prove that the material and/or work in place is not in compliance with the specifications, the Contractor shall be charged for all testing and other services, including costs incurred by the Consultant.

a. If the Work has been completed when test results are received, the Owner may charge the Contractor a penalty of up to twenty percent (20%) of the Contract price or require the Contractor to remove and replace the Work.

b. If only a portion of the Work has been completed when test results are received, the Owner may charge the Contractor a penalty in proportion to the amount completed or require the Contractor to remove and replace the Work. All remaining work shall be completed per the specifications.

IRS Project 17529 01 40 00 - 2 Quality Control Kenosha County Detention Center

C. Testing services shall be performed following the requirements of governing authorities, industry, and specified standards.

D. Reports shall be submitted to the Owner, in duplicate, giving observations and results of the tests, indicating compliance or non-compliance with specified standards and the Project Documents.

E. Manufacturer pull tests of sealant at all substrates are required.

1.06 MANUFACTURER'S FIELD SERVICES

A. Product Manufacturer shall make available, upon request, qualified personnel to observe field conditions, conditions of surfaces and installation, and quality of workmanship.

B. The product manufacturer shall make qualified personnel available to make necessary recommendations during the project and to perform a final review of the work if requested.

C. The manufacturer’s representative shall submit a copy of his written report to the Consultant, listing observations and recommendations.

1.07 CONSTRUCTION OBSERVATION

A. Construction observation shall be conducted by the Consultant periodically, as determined by agreement with the Owner. If the Contractor is cited for non-compliance with the specifications during a site visit, all parties shall be notified with a copy of the observation report.

B. If the Contractor is cited for the same non-compliance item twice, or any three items total, the Owner may employ the Consultant to provide more frequent observation or full-time observation, to ensure compliance with the Project Documents. The cost of these additional visits may be deducted, in whole or in part, from the Contractor's final contract amount.

- PRODUCTS

A. Not Used.

PART 3 - EXECUTION

IRS Project 17529 01 50 00 - 1 Site Conditions and Controls Kenosha County Detention Center

01 50 00

SITE CONDITIONS AND CONTROLS

- GENERAL

1.01 DESCRIPTION

A. This section provides requirements for the Contractor’s operations at the project site, including the use of existing facilities and utilities, delivery, and storage of materials and equipment and controls affecting work operations.

1.02 SECURITY AND ACCESS

A. Security: follow the Owner’s procedures and requirements, as established during the pre-construction conference.

B. Maintenance of access and operations:

1. During the performance of the Work, the Owner shall continue to perform his normal operations in the building. The Contractor shall maintain access to Owner-occupied areas at all times.

2. Schedule demolition and site work with the Owner in such a manner as to allow his normal operations to continue without interruption.

C. Maintenance of existing services:

1. The Contractor shall, during the performance of the Work, not adversely affect the temperature and humidity of the building interior; dust and debris shall be controlled to prevent interference with normal operations.

2. Notify the Owner a minimum of three (3) days before each required interruption of mechanical or electrical services in the building. Such interruptions shall occur only when, and for the length of time, approved by the Owner.

1.03 MATERIAL STORAGE AND HANDLING

A. Store materials on-site where specified in 01 60 00 - “Materials and Equipment.” Do not use any portion of the building interior for storage, unless specifically approved by the Owner.

B. Stored materials shall be available for review by the Owner or Consultant at all times.

C. Handle all materials properly and in original cartons or containers to prevent damage. Provide for all necessary rigging of materials and equipment supplied to the project site.

1.04 SANITARY FACILITIES

A. The Contractor shall provide adequate, temporary chemical toilets for use by his employees. The toilets shall be in place at the project site when the Work is commenced.

B. Upon completion of the Work, remove these facilities and all traces thereof.

1.05 TEMPORARY WATER

A. The Contractor shall make arrangements with the Owner for water as required during the performance of the Work.

B. The Owner shall be responsible for the cost of the water supply.

IRS Project 17529 01 50 00 - 2 Site Conditions and Controls Kenosha County Detention Center

C. The Contractor shall be responsible for providing hoses necessary for conveyance.

1.06 TEMPORARY ELECTRICAL POWER

A. The Contractor shall make arrangements for electrical service, as necessary for the completion of the Work, as established during the pre-construction conference.

B. If the Owner agrees to provide access to electrical service, he shall pay all energy charges for power and/or lighting used by the Contractor.

1.07 ENVIRONMENTAL CONDITIONS

A. Do not work in rain or snow, or the presence of visible precipitation.

B. Do not install materials marked “Keep from Freezing” when daily temperatures are predicted to fall below 40°F.

C. Do not perform masonry work unless the temperature is above 35°F and rising. Make provisions to protect masonry work from freezing for a period of forty-eight (48) hours after completion.

Remove any masonry work that has been exposed to freezing within forty-eight (48) hours of completion.

1.08 DEBRIS REMOVAL

A. Remove debris promptly from work areas each day. Do not allow piled debris to accumulate.

B. All removed material, unless specifically noted for retention by the Owner, becomes the property of the Contractor.

C. Do not allow debris to enter storm sewers, catch basins, etc.

D. Provide at the site, before commencing removal of debris, a dumpster or dump truck to be located adjacent to the building as directed by the Owner.

E. Protect the building surfaces at set-up and debris removal areas. Take all precautions necessary to prevent the scattering of debris during operations.

F. Remove dumpster or dump truck from the premises when full and dispose of at approved dumping or refuse area.

G. Upon job completion, dumpster or dump truck and set-up area protection shall be removed from premises. All spilled or scattered debris shall be cleaned up immediately.

1.09 PARKING FACILITIES

A. The Owner shall provide vehicle parking assignments and/or restrictions for the Contractor to the extent established during the pre-construction conference.

IRS Project 17529 01 50 00 - 3 Site Conditions and Controls Kenosha County Detention Center

1.10 CLEANING

A. The Contractor shall remove all spillage, overspray, or collections of dust or debris, and repair any damage inflicted on Owner-occupied spaces during the Work.

B. As soon as work for an area is complete, clean up all surfaces, remove equipment, materials, and debris, and restore to a condition suitable for use by the Owner as quickly as possible.

- PRODUCTS

A. Not Used.

- EXECUTION

IRS Project 17529 01 60 00 - 1 Materials and Equipment Kenosha County Detention Center

01 60 00

MATERIALS AND EQUIPMENT

- GENERAL

1.01 DESCRIPTION

A. This section includes general requirements for delivery, storage, and handling of products to be used in the Work.

1.02 GENERAL

A. Materials to be incorporated into the Work:

1. Shall conform to applicable specifications and standards.

2. Shall comply with the size, make, type, and quality specified or shall be substitute products as specifically approved, in writing, by the Consultant.

3. Fabricated products:

a. Fabricate and assemble according to recognized industry standards.

b. Shall conform to the dimensions and configuration as shown or specified or per approved shop drawing submittals.

B. Materials shall not be used for purposes other than those for which they are designed unless otherwise specified.

1.03 REUSE OF EXISTING MATERIALS

A. Except as specifically indicated in the Construction Drawings or in 01 11 00 - “Summary of Work,” materials and equipment removed from the existing construction shall not be utilized in the completed Work.

B. Where materials and equipment are specifically indicated to be reused in the Work:

1. Use special care in removal, handling, storage, and reinstallation, to assure adequate and proper function in the completed Work.

2. The Contractor shall be responsible for transportation, storage, and handling of products that require off-site storage, restoration, or renovation.

1.04 MANUFACTURER'S INSTRUCTIONS

A. Where Project Documents require that the installation of work shall comply with the manufacturer's printed instructions, obtain and distribute copies of those instructions to all parties involved in the installation, including two copies to the Consultant.

1. Maintain one set of complete instructions at the project site until completion of the work.

2. Include copies of the printed instructions with the appropriate Product Data submittal.

B. Handle, install, connect, clean, condition, and adjust products in strict accordance with such instructions, and in conformity with specified requirements.

1. Should existing conditions or specified requirements conflict, in any way, with the manufacturer's instructions, request clarification from the Consultant. Failure to notify the Consultant shall be grounds for rejection of the completed work.

2. Do not proceed with work without clear instructions.

IRS Project 17529 01 60 00 - 2 Materials and Equipment Kenosha County Detention Center

1.05 TRANSPORTATION AND HANDLING

A. Arrange for delivery of materials per construction schedules; coordinate to avoid conflict with the sequencing of the Work and conditions at the project site.

1. When being transported to the project site by the Contractor, cover and protect materials in transit against the entrance of dirt and/or weather damage.

2. Deliver materials in undamaged condition, in manufacturer's original containers or packaging, with identifying labels intact and legible.

3. Immediately upon delivery, inspect shipments to assure compliance with requirements of the Project Documents and approved submittals, and to assure that materials are properly protected and undamaged.

B. Handle all materials properly and in original cartons or containers to prevent damage.

C. Provide equipment and personnel to handle materials using methods necessary to prevent soiling or damage to products or packaging.

1.06 STORAGE OF MATERIALS

A. Stored materials shall be available for review by the Owner or Consultant at all times.

B. Store rolled goods on ends only. Discard rolls that have been flattened, creased, or otherwise damaged.

C. Do not use any portion of the building interior for storage, unless specifically approved by the Owner.

D. Stack insulation and roll goods on pallets; neatly stack the wood on dunnage. Do not stack pallets.

E. Completely cover the top and sides of materials with tarpaulin. Secure tarpaulin to prevent blow-off.

F. Materials that, in the judgment of the Consultant, have been damaged, contaminated, or improperly stored shall be immediately removed from the project site and replaced with new materials.

- PRODUCTS

A. Not Used.

- EXECUTION

IRS Project 17529 01 70 00 - 1 Contract Close-out and Warranties Kenosha County Detention Center

01 70 00

CONTRACT CLOSE-OUT AND WARRANTIES

- GENERAL

1.01 DESCRIPTION

A. This section includes requirements for specific administrative procedures, close-out submittals, warranties and other forms to be used at the completion of the Work.

1.02 CLOSE-OUT PROCEDURES

A. When the Contractor considers the Work complete, he shall submit Written Notice to the Consultant that:

1. He has reviewed the Project Documents and inspected the project for compliance with them;

2. He certifies that the Work has been completed per the Project Documents; and

3. He certifies that the project is complete, to his satisfaction, and is ready for the Final

Review.

B. The Consultant will perform the Final Review after receipt of the Contractor's Written Notice of project completion.

1. If the Consultant considers the Work to be complete and per the requirements of the

Project Documents he shall notify the Contractor to produce the Contract Close-out submittals, as described below.

2. If the Consultant considers the Work to be incomplete or not per the requirements of Project Documents:

a. He shall notify the Contractor, in writing, of the deficiencies.

b. The Contractor shall take immediate steps to remedy the identified deficiencies, and shall make the Work ready for re-review.

c. The Contractor shall submit a second Written Notice to the Consultant confirming that the identified deficiencies have been remedied.

d. The Consultant shall review the Work and, if complete, shall notify the Contractor to produce the Contract Close-out Submittals.

3. Should the Consultant be required to perform a third review of the Work due to the failure of the Contractor to correct previously-identified deficiencies, the Owner may retain, from amounts of money due to the Contractor, such amount as necessary to compensate the Consultant for additional visits.

1.03 FINAL CLEANING

A. Perform project clean-up before the Final Review:

1. Clean surfaces and drainage system free from foreign matter and debris.

2. Remove all grease, mastics, adhesives, bitumen, or other foreign materials from sight-exposed exterior surfaces of the building.

3. Repair, patch and touch up marred surfaces to match adjacent finishes.

4. Remove all waste and surplus material, rubbish, and construction facilities from the project site.

5. Repair the grounds and landscaping per 01 74 29 - “Grounds Repair.”

6. Before leaving the project site, conduct a thorough review of the work surfaces and all sight-exposed exterior surfaces in work areas, to verify that the entire Work is clean.

IRS Project 17529 01 70 00 - 2 Contract Close-out and Warranties Kenosha County Detention Center

1.04 CLOSE-OUT SUBMITTALS AND WARRANTIES

A. Guarantees, Warranties, and Bonds:

1. The Contractor shall, upon project completion provide the following original warranty documents to the Consultant for the delivery to the Owner:

a. After the Consultant’s acceptance, the Contractor shall deliver to the Consultant each manufacturer warranty required by individual Sections of the Project Specifications, to be effective once complete payment has been received by both the Contractor and material suppliers.

b. Contractors one (1) year workmanship warranty for labor and materials.

B. Certification:

1. Lien Waivers: The Contractor shall submit final Waivers of Lien including those from subcontractors, material suppliers, or any other parties that may have lien rights against the property of the Owner, including a list of those parties. All waivers of lien shall be verified and duly executed before submittal.

C. Final Application for Payment:

1. The Contractor shall submit a final Application for Payment form showing the remaining amount due.

1.05 CONTRACT CLOSE-OUT PACKAGE

A. The Contractor shall submit the Contract Close-out package to the IRS Corporate Office per these requirements. The Consultant shall review the Contract Close-out Package for accuracy and completeness.

1. Contract Close-out Packages that are accurate, complete, and in proper form shall be approved by Consultant and submitted to Owner on a timely basis.

2. Contract Close-out Packages that are not accurate, complete and in proper form, Consultant shall notify Contractor of its rejection and cause the Package to be set aside for forty-five (45) days, after which time Consultant shall again review corrected Contract Close-out Package if received and if correct, shall approve the final payment and submit them to the Owner on a timely basis.

IRS CORPORATE OFFICE

Industrial Roofing Services, Inc.

13000 West Silver Spring Drive Butler, Wisconsin 53007 c/o Kim Wesell office@irsroof.com

- PRODUCTS

- EXECUTION

A. Not Used.

mailto:office@irsroof.com

IRS Project 17529 01 74 29 - 1 Grounds Repair Kenosha County Detention Center

01 74 29

GROUNDS REPAIR

- GENERAL

1.01 DESCRIPTION

A. This section covers the removal, and replacement with like materials, of lawns, plantings, and pavement damaged by the Contractor during the performance of the Work.

B. The cost of all repairs covered under this section shall be the sole responsibility of the Contractor. If the Contractor fails to make repairs to the Owner’s satisfaction, the Owner reserves the right to retain, from amounts of money due to the Contractor, such amount as necessary to repair the grounds to their previous condition.

1.02 REQUIREMENTS

A. Verify, with the Owner, at the pre-construction meeting, as to whether re-seeding will be acceptable for the repair of lawn areas; if not, areas shall be resodded.

B. All plants and planting materials shall meet “Horticultural Standards” for the number one grade nursery stock as adopted by the American Association of Nurserymen.

C. All plants and planting materials shall meet or exceed applicable regulatory requirements and inspections for plant disease and insect control.

1.03 WORK SEQUENCING

A. Do not proceed with permanent replacements until after the Contractor has cleaned and vacated the project site.

B. Replacement plantings and/or sod:

1. Place plantings and/or sod within forty-eight (48) hours of cutting; protect and maintain during transit and storage on the site to prevent dry-out.

2. All plantings and/or sod remaining unplaced on the site longer than forty-eight (48) hours, as well as any yellowing or otherwise discolored plantings and/or sod, shall be discarded.

1.04 WARRANTY

A. The Contractor shall maintain and warrant all work performed under this section for ninety (90) days from the date of its completion. The Contractor shall be responsible for the correction of unsatisfactory landscaping materials or workmanship and shall repair such defects promptly upon notice, at no additional cost to the Owner.

- PRODUCTS

2.01 ACCEPTABLE LAWN REPAIR PRODUCTS

A. Provide topsoil which is:

1. Natural, friable, and characteristic of soil on the project site;

2. Not extremely acidic nor alkaline, nor containing toxic substances;

3. Free from the subsoil, clay lumps, stones, roots, debris, or other foreign objects;

4. Contains 1/3, by volume, soil amendment – organic material, fortified with organic nitrogen.

IRS Project 17529 01 74 29 - 2 Grounds Repair Kenosha County Detention Center

B. Provide fertilizer which is:

1. Commercially-balanced 11-8-4 composition.

2. Free-flowing to allow for mechanical spreading.

C. Provide grass seed, if acceptable, which is:

1. Free from noxious weeds, and recleaned;

2. Grade A recent crop seed;

3. Treated with appropriate fungicide at the time of mixing;

4. In proportion, by weight:

a. Kentucky Bluegrass – 35%

b. Red Fescue – 20%

c. Hard Fescue – 20%

d. Improved Fine Perennial Ryegrass – 25%

5. Covered with DS-75 erosion blanket or equivalent.

D. Provide sod, if grass seed is not acceptable, which is:

1. Well established, containing dense root systems;

2. Exhibiting vigorous, healthy root growth;

3. Free of noxious weeds, objectionable grasses, grubs, diseases, or injurious insects.

E. Erosion Control Blanket:

1. Manufacturer: North American Green or approved equivalent

2. Model #: DS75 or approved equivalent

3. Equivalents shall meet or exceed Type 1.C specification requirements established by the

Erosion Control Technology Council

2.02 ACCEPTABLE PLANTING REPAIR PRODUCTS

A. Provide trees and/or plants which are:

1. Of the same species and size of growth to match those being replaced;

2. Well established, containing dense root systems;

3. Exhibiting vigorous, healthy root growth;

4. Free of grubs, diseases, or injurious insects.

B. Provide planting bed cover consisting of:

1. Ground mulch chips;

2. Shredded bark.

2.03 VEHICLE & PEDESTRIAN PAVEMENTS

A. Asphalt pavement:

1. Base course aggregate:

a. Crushed limestone (traffic-bond) or crushed concrete, containing no pieces over three-quarter (3/4) inch in greatest dimension, for base courses less than four (4) inches thick.

b. Crushed limestone, containing no pieces over one and one-half (1-1/2) inches in greatest dimension, for base courses over four (4) inches thick.

2. Paving asphalt:

a. Shall comply with applicable sections of the State Highway Specifications for binder and surface-grade paving asphalt mixes.

b. Shall be hot, plant-mixed asphalt paving material; temperature shall be 290-

320°F when leaving the plant and 280°F, minimum, at time of placement.

B. Concrete pavement: Compressive strength shall achieve a minimum of 4000 psi in twenty-eight

(28) days. Mix concrete materials following ASTM C94, to comply with the following:

1. Slump: three (3) inches, plus one (1) inch or minus one-half (1/2) inch.

2. Air entrainment: Maximum five percent (5%) at the time of placement.

3. Maximum aggregate size: ¾ inch.

IRS Project 17529 01 74 29 - 3 Grounds Repair Kenosha County Detention Center

4. Minimum cement content: 440 lbs./cu. Yd.

5. Maximum fly ash content: 100 lbs./cu. Yd.

6. Maximum water-to-cementitious material ratio (W/C): 0.55.

- EXECUTION

3.01 EXAMINATION

A. Examine the project site and verify satisfactory conditions for the performance of the work.

B. Notify the Owner and Consultant of pre-existing defects or conditions which may interfere with the requirements of this section. The absence of notice will constitute the Contractor’s acceptance of the site.

C. Verify the existence and location of underground utilities, water and gas lines, fire sprinkler systems, pavement heating devices, and lawn sprinkling systems.

3.02 PREPARATION

A. Protect existing adjacent trees, plantings, lawns, and pavement before commencing repairs.

B. Lawn replacement areas:

1. Fill ruts and depressions with topsoil. Work the soil to a depth of not less than three (3) inches with a rototiller.

2. Remove stones, debris, and foreign objects larger than one (1) inch in diameter from the lawn repair area before seeding or sodding.

3. Grade the repair area, thoroughly remove ridges and depressions, and make the area a smooth, continuous, firm plane that ensures proper drainage.

C. Planting replacement areas:

1. Remove…