21-KAA-068_C7_Solicitation.pdf
PDF 1 MB Posted
- Attached to
- Annual Ceramic Refractory Tubes, Tees, and Elbows Procurement for Naval Foundry and Propeller Center (NFPC)
- Solicitation number
- N6449821Q0244
About this file
This solicitation requests ceramic refractory tubes, tees, and elbows for use in naval ship casting processes. The vendor shall supply ceramic pieces from Industrial Ceramic Products according to the CLIN structure and delivery table, with no substitutions allowed. Early deliveries are acceptable but the vendor must notify the Navy in advance. Quantities, national stock numbers, and delivery destinations to the Naval Foundry and Propeller Center are specified. The period of performance is one base year with four one-year options to renew.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 21-KAA-068_E15_JA_Redacted.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
N6449821Q0244 30-Aug-2021
b. TELEPHONE NUMBER
215.897.7368
8. OFFER DUE DATE/LOCAL TIME
12:00 PM 13 Sep 2021
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
N644989. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
KARETTE A ARMSTRONG
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
NAVAL SURFACE WARFARE CENTER PHILA
CODE 0223, KARETTE ARMSTRONG
KARETTE.A.ARMSTRONG@NAVY.MIL
5001 SOUTH BROAD STREET, BUILDING 4
PHILADELPHIA PA 19112
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE N00151 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
NAVAL FOUNDRY & PROPELLER CENTER
EDWARD ERICKSON
1701 KITTY HAWK AVE
RECEIVING GATE 3
PHILADELPHIA PA 19112
TEL: 2158974104 FAX:
FAX:
TEL: 215-897-7368 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
NAICS:
327120
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF147
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
N6449821Q0244
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 160 Each 9" x 9" or 6.75" x 2.5" Choke Brick
FFP
The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
MFR PART NR: 058885
PSC CD: 9390
NET AMT
0002 150 Each 1A Choke Brick With Hole
FFP
The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
MFR PART NR: 058866
0003 29 Each 2" Cup
FFP
The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
MFR PART NR: 058130
0004 3 Each 2.5" Cup
FFP
The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
MFR PART NR: 058807
0005 18 Each 3" Cup
FFP
The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
MFR PART NR: 058814M
0006 12 Each 36” Pour Cup
FFP
The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
MFR PART NR: 058814R
0007 938 Each 1.5" Tube
FFP
The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein and also found in detail in Section C, Statement of Work (SOW).
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
MFR PART NR: 058129
0008 544 Each 2" Tube
FFP
The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
MFR PART NR: 058581NP
0009 795 Each 2.5" Tube
FFP
The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
MFR PART NR: 058315
0010 453 Each 3" Tube
FFP
The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
MFR PART NR: 058583NP
0011 625 Each 4" Tube
FFP
The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
MFR PART NR: 058584NP
0012 35 Each 5" Tube
FFP
The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
MFR PART NR: 058585NP
0013 643 Each 6" Tube
FFP
The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
MFR PART NR: 058875
0014 30 Each 2" Tee
FFP
The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
MFR PART NR: 058464R
0015 130 Each 2.5" Tee
FFP
The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
MFR PART NR: 058467R
0016 20 Each 3" Tee
FFP
The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
MFR PART NR: 058470A
0017 5 Each 3.5" Tee
FFP
The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
MFR PART NR: 058473
0018 165 Each 3" x 2.5" x 2.5" Tee
FFP
The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
MFR PART NR: 058593NP
0019 81 Each 4" Tee
FFP
The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
MFR PART NR: 058476
0020 4 Each 5" Tee
FFP
The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
MFR PART NR: 058563
0021 102 Each 6" Tee
FFP
The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
MFR PART NR: 058873
0022 58 Each 2" Elbow
FFP
The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
MFR PART NR: 058463R
0023 6 Each 3" Elbow
FFP
The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
MFR PART NR: 058469
0024 4 Each 4" Elbow
FFP
The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
MFR PART NR: 058475
0025 4 Each 5" Elbow
FFP
The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
MFR PART NR: 058478
0026 93 Each 6" Elbow
FFP
The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
MFR PART NR: 058872
0027 128 Each OPTION 9" x 9" or 6.75" x 2.5" Choke
FFP
Year 2 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0028 150 Each OPTION 1A Choke Brick With Hole
FFP
Year 2 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0029 23 Each OPTION 2" Cup
FFP
Year 2 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0030 5 Each OPTION 2.5" Cup
FFP
Year 2 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0031 14 Each OPTION 3" Cup
FFP
Year 2 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0032 8 Each OPTION 36" Pour Cup
FFP
Year 2 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0033 750 Each OPTION 1.5" Tube
FFP
Year 2 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0034 435 Each OPTION 2" Tube
FFP
Year 2 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
MFR PART NR: 158581NP
0035 636 Each OPTION 2.5" Tube
FFP
Year 2 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0036 362 Each OPTION 3" Tube
FFP
Year 2 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0037 435 Each OPTION 4" Tube
FFP
Year 2 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0038 28 Each OPTION 5" Tube
FFP
Year 2 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0039 514 Each OPTION 6" Tube
FFP
Year 2 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0040 24 Each OPTION 2" Tee
FFP
Year 2 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0041 104 Each OPTION 2.5" Tee
FFP
Year 2 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0042 16 Each OPTION 3" Tee
FFP
Year 2 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0043 4 Each OPTION 3.5" Tee
FFP
Year 2 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0044 132 Each OPTION 3" x 2.5" x 2.5" Tee
FFP
Year 2 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0045 46 Each OPTION 4" Tee
FFP
Year 2 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0046 2 Each OPTION 5" Tee
FFP
Year 2 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0047 58 Each OPTION 6" Tee
FFP
Year 2 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0048 48 Each OPTION 2" Elbow
FFP
Year 2 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0049 4 Each OPTION 3" Elbow
FFP
Year 2 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0050 2 Each OPTION 4" Elbow
FFP
Year 2 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0051 2 Each OPTION 5" Elbow
FFP
Year 2 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0052 74 Each OPTION 6" Elbow
FFP
Year 2 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0053 128 Each OPTION 9" x 9" or 6.75" x 2.5" Choke Brick
FFP
Year 3 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0054 150 Each OPTION 1A Choke Brick With Hole
FFP
Year 3 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0055 23 Each OPTION 2" Cup
FFP
Year 3 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0056 5 Each OPTION 2.5" Cup
FFP
Year 3 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0057 14 Each OPTION 3" Cup
FFP
Year 3 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0058 8 Each OPTION 36" Pour Cup
FFP
Year 3 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0059 750 Each OPTION 1.5" Tube
FFP
Year 3 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0060 435 Each OPTION 2" Tube
FFP
Year 3 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0061 636 Each OPTION 2.5" Tube
FFP
Year 3 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0062 362 Each OPTION 3" Tube
FFP
Year 3 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0063 435 Each OPTION 4" Tube
FFP
Year 3 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0064 28 Each OPTION 5" Tube
FFP
Year 3 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0065 514 Each OPTION 6" Tube
FFP
Year 3 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0066 24 Each OPTION 2" Tee
FFP
Year 3 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0067 104 Each OPTION 2.5" Tee
FFP
Year 3 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0068 16 Each OPTION 3" Tee
FFP
Year 3 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0069 4 Each OPTION 3.5" Tee
FFP
Year 3 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0070 132 Each OPTION 3" x 2.5" x 2.5" Tee
FFP
Year 3 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0071 46 Each OPTION 4" Tee
FFP
Year 3 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0072 2 Each OPTION 5" Tee
FFP
Year 3 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0073 58 Each OPTION 6" Tee
FFP
Year 3 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0074 48 Each OPTION 2" Elbow
FFP
Year 3 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0075 4 Each OPTION 3" Elbow
FFP
Year 3 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0076 2 Each OPTION 4" Elbow
FFP
Year 3 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0077 2 Each OPTION 5" Elbow
FFP
Year 3 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0078 74 Each OPTION 6" Elbow
FFP
Year 3 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0079 128 Each OPTION 9" x 9" or 6.75" x 2.5" Choke Brick
FFP
Year 4 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0080 150 Each OPTION 1A Choke Brick With Hole
FFP
Year 4 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0081 23 Each OPTION 2" Cup
FFP
Year 4 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0082 5 Each OPTION 2.5" Cup
FFP
Year 4 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0083 14 Each OPTION 3" Cup
FFP
Year 4 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0084 8 Each OPTION 36" Pour Cup
FFP
Year 4 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0085 750 Each OPTION 1.5" Tube
FFP
Year 4 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0086 435 Each OPTION 2" Tube
FFP
Year 4 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0087 636 Each OPTION 2.5" Tube
FFP
Year 4 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0088 362 Each OPTION 3" Tube
FFP
Year 4 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0089 435 Each OPTION 4" Tube
FFP
Year 4 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0090 28 Each OPTION 5" Tube
FFP
Year 4 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
VENDOR PART NR: 058585NP
0091 514 Each OPTION 6" Tube
FFP
Year 4 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0092 104 Each OPTION 2" Tee
FFP
Year 4 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0093 104 Each OPTION 2.5" Tee
FFP
Year 4 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0094 16 Each OPTION 3" Tee
FFP
Year 4 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0095 4 Each OPTION 3.5" Tee
FFP
Year 4 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0096 132 Each OPTION 3" x 2.5" x 2.5" Tee
FFP
Year 4 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0097 46 Each OPTION 4" Tee
FFP
Year 4 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0098 2 Each OPTION 5" Tee
FFP
Year 4 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0099 58 Each OPTION 6" Tee
FFP
Year 4 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0100 48 Each OPTION 2" Elbow
FFP
Year 4 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0101 4 Each OPTION 3" Elbow
FFP
Year 4 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0102 2 Each OPTION 4" Elbow
FFP
Year 4 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0103 2 Each OPTION 5" Elbow
FFP
Year 4 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0104 74 Each OPTION 6" Elbow
FFP
Year 4 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0105 128 Each OPTION 9" x 9" or 6.75" x 2.5" Choke Brick
FFP
Year 5 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0106 150 Each OPTION 1A Choke Brick With Hole
FFP
Year 5 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0107 23 Each OPTION 2" Cup
FFP
Year 5 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0108 5 Each OPTION 2.5" Cup
FFP
Year 5 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0109 14 Each OPTION 3" Cup
FFP
Year 5 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0110 8 Each OPTION 36" Pour Cup
FFP
Year 5 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0111 750 Each OPTION 1.5" Tube
FFP
Year 5 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0112 435 Each OPTION 2" Tube
FFP
Year 5 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0113 636 Each OPTION 2.5" Tube
FFP
Year 5 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0114 362 Each OPTION 3" Tube
FFP
Year 5 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0115 435 Each OPTION 4" Tube
FFP
Year 5 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0116 28 Each OPTION 5" Tube
FFP
Year 5 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0117 514 Each OPTION 6" Tube
FFP
Year 5 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0118 24 Each OPTION 2" Tee
FFP
Year 5 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0119 104 Each OPTION 2.5" Tee
FFP
Year 5 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0120 16 Each OPTION 3" Tee
FFP
Year 5 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0121 4 Each OPTION 3.5" Tee
FFP
Year 5 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0122 132 Each OPTION 3" x 2.5" x 2.5" Tee
FFP
Year 5 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0123 46 Each OPTION 4" Tee
FFP
Year 5 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0124 2 Each OPTION 5" Tee
FFP
Year 5 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0125 58 Each OPTION 6" Tee
FFP
Year 5 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0126 48 Each OPTION 2" Elbow
FFP
Year 5 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0127 4 Each OPTION 3" Elbow
FFP
Year 5 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0128 2 Each OPTION 4" Elbow
FFP
Year 5 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0129 2 Each OPTION 5" Elbow
FFP
Year 5 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
0130 74 Each OPTION 6" Elbow
FFP
Year 5 Option - The contractor is required to supply and deliver the Ceramic Refractory Tubes, Tees & Elbows item(s) listed herein.
PLEASE NOTE: The unit price shall include packaging and shipping costs.
FOB: Destination
Section C - Descriptions and Specifications
SPECIFICATIONS
Industrial Ceramics Products, Inc. (ICP) is the manufacturer of the parts listed below. Only ICP brand products will be accepted for this requirement. No replacements or subsitutions are acceptable.
P/N Description Manufacturer Base Year
Quantity
Option Quantity Per Year
Total Contract Quantity
058885 9" x 9" or 6.75" x 2.5" Choke Brick ICP 160 128 672 058866 1A Choke Brick With Hole ICP 150 150 750 058130 2" Cup ICP 29 23 121 058807 2.5" Cup ICP 3 5 23
058814M 3" Cup ICP 18 14 74 058814R 36” Pour Cup ICP 12 8 44 058129 1.5" Tube ICP 938 750 3,938
058581NP 2" Tube ICP 544 435 2,284 058315 2.5" Tube ICP 795 636 3,339
058583NP 3" Tube ICP 453 362 1,901 058584NP 4" Tube ICP 625 433 2,357 058585NP 5" Tube ICP 35 28 147
058875 6" Tube ICP 643 514 2,699 058464R 2" Tee ICP 30 24 126 058467R 2.5" Tee ICP 130 104 546 058470A 3" Tee ICP 20 16 84 058473 3.5" Tee ICP 5 4 21
058593NP 3" x 2.5" x 2.5" Tee ICP 165 132 693 058476 4" Tee ICP 81 46 265 058563 5" Tee ICP 4 2 12 058873 6" Tee ICP 102 58 334
058463R 2" Elbow ICP 58 48 250 058469 3" Elbow ICP 6 4 22 058475 4" Elbow ICP 4 2 12 058478 5" Elbow ICP 4 2 12 058872 6" Elbow ICP 93 74 389
CLAUSES INCORPORATED BY FULL TEXT
C-202-H001 ADDITIONAL DEFINITIONS–BASIC (NAVSEA) (OCT 2018)
(a) Department - means the Department of the Navy.
(b) Commander, Naval Sea Systems Command - means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.
(c) References to The Federal Acquisition Regulation (FAR) - All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.
(d) National Stock Numbers - Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:
(1) National Item Identification Number (NIIN). The number assigned to each approved Item Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit non-significant number.
(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.
(End of text)
C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (NAVSEA)
(OCT 2018)
(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.
(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:
(1) The support contractor not disclose any information;
(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;
(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,
(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.
(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.
(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.
C-211-H016 SPECIFICATIONS AND STANDARDS (NAVSEA) (OCT 2018)
(a) Definitions.
(i) A "zero-tier reference" is a specification, standard, or drawing that is cited in the contract (including its attachments).
(ii) A "first-tier reference" is either: (1) a specification, standard, or drawing cited in a zero-tier reference, or (2) a specification cited in a first-tier drawing.
(b) Requirements. All zero-tier and first-tier references, as defined above, are mandatory for use. All lower tier references shall be used for guidance only unless specifically identified below.
None
C-211-H017 UPDATING SPECIFICATIONS AND STANDARDS (NAVSEA) (DEC 2018)
The contractor may request that this contract be updated to include the current version of the applicable specification or standard if the update does not affect the form, fit or function of any deliverable item or increase the cost/price of the item to the Government. The contractor should submit update requests to the Procuring Contracting Officer with copies to the Administrative Contracting Officer and cognizant program office representative for approval. The contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval of its request to update by the Procuring Contracting Officer. Any approved alternate specifications or standards will be incorporated into the contract.
C-215-H002 CONTRACTOR PROPOSAL (NAVSEA) (OCT 2018)
(a) Performance of this contract by the Contractor shall be conducted and performed in accordance with the detailed obligations to which the Contractor committed itself in Proposal dated in response to Solicitation No.
(b) The technical volume(s) of the Contractor's proposal is(are) hereby incorporated by reference and made subject to the "Order of Precedence" (FAR 52.215-8) clause of this contract. Under the "Order of Precedence" clause, the technical volume(s) of the Contractor's proposal referenced herein is (are) hereby designated as item (f) of the clause, following "the specifications" in the order of precedence.
C-233-H001 DOCUMENTATION OF REQUESTS FOR EQUITABLE ADJUSTMENT--BASIC (NAVSEA) (OCT 2018)
(a) For the purposes of this special contract requirement, the term "change" includes not only a change that is made pursuant to a written order designated as a "change order" but also (1) an engineering change proposed by the Government or by the Contractor and (2) any act or omission to act on the part of the Government in respect of which a request is made for equitable adjustment.
(b) Whenever the Contractor requests or proposes an equitable adjustment of $100,000 or more per vessel in respect to a change made pursuant to a written order designated as a "change order" or in respect to a proposed engineering change and whenever the Contractor requests an equitable adjustment in any amount in respect to any other act or omission to act on the part of the Government, the proposal supporting such request shall contain the following information for each individual item or element of the request:
(1) A description (i) of the work required by the contract before the change, which has been deleted by the change, and (ii) of the work deleted by the change which already has been completed. The description is to include a list of components, equipment, and other identifiable property involved. Also, the status of manufacture, procurement, or installation of such property is to be indicated. Separate description is to be furnished for design and production work.
Items of raw material, purchased parts, components and other identifiable hardware, which are made excess by the change and which are not to be retained by the Contractor, are to be listed for later disposition;
(2) Description of work necessary to undo work already completed which has been deleted by the change;
(3) Description of work not required by the terms hereof before the change, which is substituted or added by the change. A list of components and equipment (not bulk materials or items) involved should be included. Separate descriptions are to be furnished for design work and production work;
(4) Description of interference and inefficiencies in performing the change;
(5) Description of each element of disruption and exactly how work has been, or will be disrupted:
(i) The calendar period of time during which disruption occurred, or will occur;
(ii) Area(s) aboard the vessel where disruption occurred, or will occur;
(iii) Trade(s) disrupted, with a breakdown of manhours for each trade;
(iv) Scheduling of trades before, during, and after period of disruption;
(v) Description of measures taken to lessen the disruptive effect of the change;
(6) Delay in delivery attributable solely to the change;
(7) Other work attributable to the change;
(8) Supplementing the foregoing, a narrative statement of the direct "causal" relationship between any alleged Government act or omission and the claimed consequences therefor, cross-referenced to the detailed information provided as required above; and
(9) A statement setting forth a comparative enumeration of the amounts "budgeted" for the cost elements, including the material costs, labor hours and pertinent indirect costs, estimated by the Contractor in preparing its initial and ultimate proposal(s) for this contract, and the amounts claimed to have been incurred and/or projected to be incurred corresponding to each such "budgeted cost" elements.
(c) Each proposal in excess of $100,000 submitted in support of a claim for equitable adjustment under any requirement of this contract shall, in addition to the information required by paragraph (b) hereof, contain such information as the Contracting Officer may require with respect to each individual claim item.
(d) It is recognized that individual claims for equitable adjustment may not include all of the factors listed in paragraph
(b) above. Accordingly, the Contractor is required to set forth in its proposal information only with respect to those factors which are comprehended in the individual claim for equitable adjustment. In any event, the information furnished hereunder shall be in sufficient detail to permit the Contracting Officer to cross-reference the claimed increased costs, or delay in delivery, or both, as appropriate, submitted pursuant to paragraph (c) of this requirement, with the information submitted pursuant to paragraph (b) hereof.
C-247-H001 PERMITS AND RESPONSIBILITIES (NAVSEA) (DEC 2018)
The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits for complying with any applicable Federal, State, and Municipal laws, codes, and regulations for shipping and transportation including, but not limited to, any movement over public highways of overweight/over dimensional materials.
Section D - Packaging and Marking
D-211-H004 IDENTIFICATION MARKING OF PARTS--BASIC (NAVSEA) (OCT 2018)
For all parts not subject to the marking requirements in DFARS 252.211-7003 – Item Unique Identification and Valuation, marking shall be accomplished in accordance with the following:
(1) Parts shall be marked in accordance with generally accepted commercial practice.
(2) In cases where parts are so small as not to permit identification marking as provided above, such parts shall be appropriately coded so as to permit ready identification.
D-247-H002 PACKAGING OF SUPPLIES—BASIC (NAVSEA) (DEC 2020)
Items: The supplies furnished hereunder shall be packaged in accordance with ASTM-D-3951-18, Standard Practice for Commercial Packing.
D-247-W001 PROHIBITED PACKING MATERIALS (NAVSEA) (OCT 2018)
The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hygroscopic or non-neutral material) is prohibited. In addition, the use of yellow wrapping or packaging material is prohibited except where used for the containment of radioactive material. Loose fill polystyrene is prohibited for shipboard use.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .