This is a contract book for a Massachusetts public works project issued by the Boston Water and Sewer Commission for replacement and rehabilitation of sewer and drain pipes and replacement of water mains in Roxbury, Boston. The contract, numbered 21-309-001, requires the contractor to replace approximately 660 linear feet of water mains, replace 2,450 linear feet of sewer and storm drain, and rehabilitate approximately 2,320 linear feet of sewer and storm drain. The work includes related items such as excavation, backfill, paving, pipe laying, manhole construction, lining work, landscaping, and television inspection of conduits. Bid opening was scheduled for Wednesday, July 29, 2026 at 10:00 AM, with proposals due prior to that time. The specified time for completion is within 210 working days from the date of order to commence work. The contractor must complete a site visit to familiarize themselves with local conditions and all permit requirements, with the Commission responsible for obtaining permits from the City of Boston.

The bid deposit requirement is 5 percent of the total bid amount, and the performance bond and payment bond each require 100 percent of the total contract price. The contract includes price adjustment provisions for diesel fuel, gasoline, liquid asphalt, and portland cement based on Massachusetts Department of Transportation pricing. The contractor must comply with minority employee utilization requirements of Article VIII, Boston resident employment policies under Article IX, and minority-owned and women-owned business enterprise utilization of not less than 9.0 percent and 6.0 percent respectively under Article X. Liquidated damages are set at $750.00 per calendar day for delays beyond the stipulated completion date. Progress payments include 5 percent retainage with additional retention based on the Commission's estimate of claims and subcontractor direct payment demands. The contract requires compliance with all applicable Massachusetts labor laws, special duty police detail at contractor expense, CDL drug and alcohol testing compliance, and large vehicle safety device requirements per City of Boston ordinance.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROPOSAL, CONTRACT

AND SPECIFICATIONS

CONTRACT NO. 21-309-001

FOR

REPLACEMENT AND REHABILITATION OF SEWER AND DRAIN PIPES

AND REPLACEMENT OF WATER MAINS

IN

ROXBURY

BOSTON WATER AND SEWER COMMISSION

ENGINEERING: DESIGN DEPARTMENT

980 HARRISON AVENUE, BOSTON, MASSACHUSETTS 02119

i

TABLE OF CONTENTS

ITEM

Purchasing Department Bid Information 1

Information for Bidders 2

IB.1 General Description and Location of Work 2

IB.2 Bidding Information 2

IB.3 Use and Calculation of Unit Prices 5

IB.4 Permits and Fees 5

IB.5 Substitution of Equal Items for Specified Items 6

IB.6 Determination of Equality 6

IB.7 Retail Sales Act Exemption 7

IB.8 Special Duty Police 7

IB.9 Time for Commencement and Completion of Work 8

IB.10 Minority Employee Utilization Requirement 8

IB.11 Minority Business Enterprise/Women Business 8

Enterprise Requirements

IB.12 CDL Drug and Alcohol Testing Requirements 9

IB.13 Price Adjustment – Diesel Fuel; Gasoline; Liquid 10

Asphalt and Portland Cement

IB.14 Large Vehicle Protective Devices, Convex 12

Mirrors, Convex Cross-Over Mirrors and Safety

Devices

IB.15 State Tax Compliance Certificate 13

Proposal and Contract 14

I. Proposal 14

1.1 Interested Persons 14

1.2 Execution and Delivery of Contract, Performance Bond 14

and Payment Bond

1.3 Bid Deposit 15

1.4 Documents Included in Contract 16

1.4.1 Labor 16

1.5 Time of the Essence, Liquidated Damages 16

1.6 Contract Price 17

1.7 Bidder's Certification Statement 17

1.8 Bidder's M/WBE Certification Statement 18

Identification of Bidder 19 ii

Certificate of Authority 21

II. Contract 22

Article I - The Contract Documents 22

Article II - The Work 23

Article III - The Contract Price 23

Article IV - Payment of the Contract Sum 23

4.1 Progress Payments 23

4.2 Final Payments 23

Article V– Obligation of Contractor to Perform 24

5.1 Responsibility of Contractor for Errors: 24

Indemnification by Contractor

5.1.1 Indemnification 25

5.2 Performance in Accordance with Specifications 27

5.3 Change Orders 27

5.4 Variation in Specified Amounts of Materials 28

5.5 Claims for Loss, Damage, Extra Cost or Injury 29

and Extensions of Time

5.6 Materially Different Subsurface and Latent 29

Physical Conditions

5.7 Full Compliance with Specifications 30

5.8 Function of Commission Engineers 30

5.9 Employment of Commission Personnel 31

Article VI-Authority of Executive Director 31

6.1 Contract Interpretation 31

6.2 Duties and Authority of Commission Engineers 32

and Inspectors

6.3 Access to Construction Site 32

6.4 Inspection of Off-Site Materials 33

6.5 Supervision by Contractor 33

Article VII- Requirements of Department of Labor 34

And Industries and MCAD

7.1 Compliance with Labor Laws 34

7.2 Employment Preference 34

iii

7.3 Maximum Hours 34

7.4 Minimum Wage Rates 35

7.5 Payment of Health and Welfare Wage Rates 35

Article VIII- Minority Participation 35

8.1 Definitions 35

8.2 Minority Employee Utilization (Labor) 36

Article IX – Residents Job Policy 40

9.1 Definitions 40

9.2 General Policy Statement 41

9.3 The BWSC Residents Job Policy 41

9.4 Organizational Procedures 41

Article X – Utilization of Minority-Owned Business 43

Enterprises and Women-Owned Business Enterprises

10.1 Definitions 43

10.2 Goals 44

10.3 Indemnification of M/WBEs 44

10.4 Material Breach 45

10.5 Waiver of Modification 46

Article XI- Department of Telecommunications and Energy 46

Department of Labor and Industries

11.1 Transportation Charges 46

Article XII – Subcontractors 46

12.1 Payment of Subcontractors 46

12.2 Payment for Labor and Materials by Contractor 49

Article XIII – Insurance 50

13.1 Liability Insurance 50

13.2 Workman’s Compensation and Employer’s Liability Insurance 51

13.3 Certificate of Compliance 51

13.4 Effect of Failure to Continue Insurance in Force 51

13.5 Authorized Insurers 51

13.6 Identification of Insurance Carrier 52

Article XIV- Satisfactory Performance; Remedy for 2 52

Defective Work iv

14.1 Defective and Unauthorized Work 52

14.2 Termination by the Commission for Cause 53

14.3 Payment Following Termination 54

Article XV – Final Inspection and Acceptance; 54

Method of Payment

15.1 Final Inspection 54

15.2 Unacceptable Performance 54

15.3 Satisfactory Performance 54

15.4 Final Estimate 55

Article XVI – Discharge of Bonds 55

Article XVII – Liability Under Contract 56

17.1 General Release and Discharge by Contractors 56

17.2 Acts of God 56

Article XVIII – Record Keeping, Internal Accounting Controls, 57

Financial Statement – M.G.L., CH.30, Section 39R

18.1 Record Keeping 57

18.2 Examination of Records 57

18.3 Change in Record Keeping 57

18.4 Filing Requirements 57

18.5 Financial Statement 58

18.6 Statement of Management 58

18.7 Public Accountant’s Statement 58

18.8 Filing Financial Statement 58

Article XIX – Right to Know Act 59

Article XX - Compliance with Laws 59

Article XXI- Provisions Required by Law Deemed Inserted 59

Article XXII – CDL License Requirement 60

Article XXIII – Authority of the Commission 60

Article XXIV – State Tax Compliance Certificate 61

Performance Bond 63 v

Payment Bond 65

Certificate 67

General Conditions

GC.1 Definitions GC-2

GC.2 Abbreviations GC-3

GC.3 Time for Commencement and Completion of Work GC-4

GC.4 Interpretation of Specifications GC-4

GC.5 Project Meetings GC-4

GC.6 Construction Schedule and Order of Work GC-4

GC.7 Submittals GC-5

GC.8 Pipe Locations GC-6

GC.9 Lines, Grades and Measurements GC-6

GC.10 Responsibility for Materials GC-7

GC.11 Non-Interference with Other Work GC-7

GC.12 Changes in Work and Extras GC-7

GC.13 Orderly and Competent Employees GC-8

GC.14 Employ Sufficient Labor and Equipment GC-8

GC.15 Work to Conform GC-8

GC.16 Traffic Control GC-9

GC.17 Precautions and Restoration of Property GC-11

GC.18 Emergency Street Openings GC-11

GC.19 Sanitary Regulations GC-11

GC.20 Compliance with Laws GC-12

GC.21 Cleaning Up GC-12

GC.22 Standard Drawings GC-12

GC.23 Excess Paving Deductions GC-12

GC.24 Periodic Payments GC-13

GC.25 By-pass System GC-13

GC.26 Maintenance Period of Roadway Surface GC-13

GC.27 Daily Scheduling of Work GC-14

GC.28 Contractor's Emergency Contact and Response GC-14

Requirements

GC.29 BWSC Project Sign Requirements GC-15

GC.30 Winter Work Shut Down GC-15

GC.31 Utility Company Notifications GC-16

GC.32 Use of BWSC Hydrants GC-17

GC.33 Pavingstones and Cobblestones GC-17

GC.34 Liquidated Damages GC-17

GC.35 Noise Control GC-18

GC.36 BPWD Requirements GC-18

GC.37 ADA Requirements GC-18

GC.38 Delays in Obtaining Permits GC-19

GC.39 Post Hydrants Supplied by Commission GC-19

GC.40 BPWD Construction Sign Requirements GC-19 vi

GC.41 Edgestone GC-20

GC.42 Sidewalks GC-20

GC.43 Temporary By-Pass/Flow Diversion of GC-21

Sewers/Storm Drains

GC.44 Bid Items for Sewer and Drain Pipe GC-22

GC.45 Don’t Dump Signs GC-22 GC.46 Method of Cutting Pavement GC-22

GC.47 Work Outside of Permitted Time GC-23

GC.48 Lead Free Products GC-23

Special Conditions SC-1

SC.1 Location and General Description of Work SC-1

SC.2 Time for Commencement and Completion of Work SC-2

SC.3 Construction Schedule Requirements SC-2

SC.4 Test Pit Excavation and Design Verification SC-2

SC.5 ADA Access Guidelines SC-3

SC.6 Pedestrian Access and Temporary Business Signage SC-3

SC.7 Trash, Recycling, and Street Sweeping SC-4

SC.8 Boston Transportation Department Requirements SC-4

SC.9 Boston Public Works Department Requirements SC-7

SC.10 Boston Fire Department SC-7

SC.11 Massachusetts Bay Transportation Authority

Requirements SC-7

SC.12 City of Boston Large Vehicle Safeguards Ordinance SC-8

SC.13 Boston Street Lighting Requirements SC-8

SC.14 Miscellaneous Utility Requirements SC-10

SC.15 National Grid Requirements SC-10

SC.16 Eversource Electric Requirements SC-11

SC.17 Comcast Requirements SC-11

SC.18 Verizon and Telecommunication Requirements SC-12

SC.19 Conflict and Obstruction Alternative Alignment SC-12

SC.20 Trench Support SC-13

SC.21 Existing Building Laterals SC-14

SC.22 Catch Basin Laterals and Structure Modifications SC-14

SC.23 Cleaning of Conduits Prior to Lining Work SC-15

SC.24 Method for Disposal of Cleaning Materials SC-15

SC.25 Discharge of Process Water from Lining Work SC-16

SC.26 Abandoned Railroad Tracks SC-16

SC.27 Don’t Dump Signs SC-16

SC.28 Sidewalks and Edgestone SC-16

SC.29 Landscaping SC-17

SC.30 Rodent Control SC-17

SC.31 Price Adjustment SC-18

SC.32 Buried and Unmapped Manholes SC-18

SC.33 Thwing Street Easement SC-19 vii

SC.34 Pre-Construction and Post-Construction Video and

Photographs of Work Site SC-20

SC.35 Available CCTV Video SC-20

SC.36 Standard Details SC-20

SC.37 Question Submissions SC-20

Specifications

DW Description of Water Works DW-1 to DW-3

SW Description of Sewerage Works SW-1

A1 Excavation and Backfill A1-1 to A1-8

A1.2 Rock and Boulder Excavation A1.2-1 to A1.2-8

A2 Gravel A2-1 to A2-2

A3 Screened Gravel A3-1 to A3-2

A7.2 Trench Support System A7.2-1 to A7.2-3

A10 Controlled Density Fill A10-1 to A10-5

B1 Bituminous Concrete Paving B1-1 to B1-8

B3 Brick Paving B3-1 to B3-3

B6 Reset Edgestone and Guttermouths B6-1 to B6-3

C1 Ductile Iron Pipe and Fittings C1-1 to C1-9

C2 Valves and Appurtenances C2-1 to C2-5

C3 Post Hydrants C3-1 to C3-3

C4 Service Lines C4-1 to C4-8

C8 Temporary By-Pass System C8-1 to C8-7

C9 Raise or Adjust Waster Castings (BWSC) C9-1 to C9-2

D1 Sewer and Drain Pipe D1-1 to D1-20

D2 Raise/Adjust Sewer or Drain Castings D2-1 to D2-11

D3 Raise/Adjust Sewer or Drain Castings D3-1 to D3-3

D4-02 Cement Concrete Sidewalks D4-02-1 to D4-02-5

D18 Pedestrian Ramps D18-1 to D18-6

F1 Sewer and Drain Pipe Lining F1-1 to F1-21

G1 Point Repairs G1-1 to G1-2

L-1 Landscaping L1-1

L2 Landscaping L2-1 to L2-8

P1 Special Duty Police P1-1 to P1-2

R1 Rodent Control R1-1 to R1-2

T1 City Signal, Light & Way Restoration T1-1 to T1-8

TV1 Television Inspection TV1-1 to TV1-15

Appendices to Contact No. 21-309-001

SEWER AND DRAINAGE WORKS IMPROVEMENTS

BOSTON WATER AND SEWER COMMISSION

PROCUREMENT DEPARTMENT

BID INFORMATION

(Not to be filled in by Contractor)

Day, Date and Time of Bid Opening... Wednesday July 29, 2026 at 10:00 AM

Amount of Bid Bond or Certified Check...5% of Total Bid Amount

Amount of Surety (Performance Bond)... 100% of Total Contract Price

Specified Time of Completion ... Within 210 working days from

Date of Order to Commence Work

Total Amount of Bid... $

Denise Devlin Text Box Thursday September 3, 2026

INFORMATION FOR BIDDERS

IB.1 General Description and Location of Work

IB.2 Bidding Information

IB.3 Use and Calculation of Unit Prices

IB.4 Permits and Fees

IB.5 Substitution of Equal Items for Specified Items

IB.6 Determination of Equality

IB.7 Retail Sales Act Exemption

IB.8 Special Duty Police

IB.9 Time of Commencement and Completion of Work

IB.10 Minority Employee Utilization Requirement

IB.11 MBE/WBE Requirements

IB.12 CDL Drug and Alcohol Testing Requirements

IB.13 Price Adjustment – Diesel Fuel; Gasoline; Liquid Asphalt and Portland Cement

IB.14 Large Vehicle Protective Devices, Convex Mirrors, Convex

Cross-Over Mirrors and Safety Devices Compliance

IB.15 State Tax Compliance Certificate

IB.1 GENERAL DESCRIPTION AND LOCATION OF WORK

The location and general description of work is listed in the Special

Conditions, Page SC.-2.

IB.2 BIDDING INFORMATION

The Boston Water and Sewer Commission, hereinafter designated as “the

Commission", 3rd floor, 980 Harrison Avenue, Boston, Massachusetts 02119 invites proposals for the doing of the work described in the contract and specifications annexed hereto (the "Contract").

The Information to Bidders, plans and specifications found online at the Commission’s website does not constitute on online bid and should not be submitted electronically or by facsimile. Proposals shall be submitted, in writing, to the Commission at the above address, on the accompanying forms. The proposal shall be properly filled out, with all pages intact, signed, enclosed in a sealed bid envelope, sealed and plainly marked with a descriptive title of the work to be done. The

Proposal shall be filed in the office of the Procurement Department of the Commission prior to the time designated in the advertisement for the opening of proposals.

A bid deposit in the form of a bid bond, or a certified check drawn on, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the order of the "Boston Water and Sewer

Commission" in the sum specified in the advertisement shall accompany the copy of the proposal filed with the Commission. The bid deposit shall be submitted in a separate sealed envelope stapled to the sealed envelope containing the proposal. The bid deposit shall become and be the property of the Commission as liquidated damages if, after a proposal is accepted, the bidder shall fail to execute the Contract annexed hereto in accordance with the terms of this proposal and the

Contract annexed hereto, and to furnish a performance bond and a labor and materials or payment bond as provided in the Contract within five days, excluding Saturdays, Sundays and legal holidays, after notice of such acceptance is mailed or delivered to him. Provided however that the amount of the bid deposit that becomes property of the Commission shall not exceed the difference between the bid price of such general bidder and the bid price of the next lowest responsible and eligible bidder.

The Contract shall be awarded within thirty (30) days, Saturdays, Sundays and legal holidays excluded, after the opening of the proposals provided; however, that 1) the Contractor's bid is approved by Boston

Water and Sewer Commissioners or 2) if the award of the Contract requires the approval of an officer, board or agency of the Federal government, the award shall be made within thirty (30) days, Saturdays, Sundays and legal holidays excluded, after such approval.

The Contract shall be awarded to the lowest responsible and eligible bidder complying with the conditions and requirements provided in this

Information for Bidders and the other bid documents. The successful bidder will be notified in writing that his bid has been accepted and that he has been awarded the contract. The successful bidder shall execute the contract and furnish the required bonds, and any other documents required in the Proposal and Contract, at the offices of the

Commission, if requested within five days, Saturdays and Sundays and legal holidays excluded, after presentation of the contract to him or notice to him that the contract is ready for execution. If the bidder selected fails to execute the contract, and furnish the required bonds, or any other documents required in the Proposal and Contract, the award will be made to the next lowest responsible and eligible bidder.

All bid deposits, except those of the three lowest responsible and eligible bidders, shall be returned within five (5) calendar days, Saturdays, Sundays and legal holidays excluded, after the opening of the proposals. The remaining bid deposits shall be returned upon the execution and delivery of the Contract.

Before submitting his proposal each bidder shall (a) thoroughly examine the contract documents, video tapes, and other reports prepared during design (b) visit the site to fully familiarize himself with local conditions that may in any manner affect cost, progress or performance of the work, and (c) fully familiarize himself with federal, state and local laws and ordinances, rules and regulations that may in any manner affect cost, progress or performance of the work. Failure of a bidder to fully acquaint himself with all contract requirements and statutory regulations, and to examine the site in detail shall not relieve the bidder from any obligation to perform the work at his bid price. The submission of a bid shall constitute a representation by the bidder that he has complied with every requirement of this section and that the contract documents are sufficient in scope and detail to complete performance of the work of this contract.

At a preconstruction meeting, the bidder will be required to furnish without expense to the Commission, a complete statement of the origin, composition and manufacture of any or all materials proposed to be used in the construction of the work, which may include samples, which samples may be subjected to the tests required by the Commission to determine their quality and fitness for the work.

Each bidder shall promptly notify the Chief Engineer of the Commission in writing of any ambiguity, inconsistency, or error they may discover upon examination of the contract documents, the site or other local conditions. All questions as to the interpretation of the plans and specifications shall be submitted in writing to the Chief Engineer and written answers to such questions will be sent by the Chief Engineer to every individual or firm on record as having taken a set of specifications. No questions will be answered unless received at least ten (10) calendar days prior to the expiration of the time set for filing bids. Oral clarifications or interpretations will be of no legal effect. The Commission will not be responsible for, and no bidder may rely upon or use as a basis of a claim against the

Commission, any information, explanation or interpretation of the contract documents rendered in any fashion except as provided above.

All proposals shall also be accompanied by evidence satisfactory to the

Executive Director that the bidder has the ability and experience in the class of work required to perform the Contract, and that he has sufficient capital and plant to enable him to perform the same successfully, and to complete it within the time named in the contract.

It is the policy of the Commission not to award the attached contract to any bidder who does not furnish such evidence. The Commission reserves the right to reject the bid of any bidder when its investigation raises any significant doubt as to the bidder's competency, responsibility, experience or capacity to successfully complete the project within contract requirements.

The Commission reserves the right to reject any or all proposals if it be in the public interest to do so. Every proposal which is not accompanied by the required bid deposit, or which otherwise does not conform to statutory bid requirements, or which is on a form not fully completed, or which is conditional, incomplete or obscure, or which contains any additions unless requested, shall be considered invalid, and the Commission shall reject any such bid. In addition, the

Commission may consider as informal and may reject any proposal which is not prepared and submitted in accordance with all requirements of the bid documents or which contains erasures, alterations, additions, errors or irregularities of any kind, or which contains proposed prices for any class or item of work which are, in the Commission's judgment, substantially less or more than the actual cost to complete the work;

provided, however, the Commission reserves the right to waive any and all informalities as to form. Matters of substance shall not be waived. The determination of the Commission in this regard is final.

IB.3 USE AND CALCULATION OF UNIT PRICES

Every bidder shall submit his proposal using the form which constitutes

Part I of the attached Proposal and Contract. The bidder shall supply a contract price, in both words and figures, and shall specify a unit price, in both words and figures, for each item for which a quantity is given, and shall also show the products of the respective unit prices and quantities written in figures in the column provided for that purpose, and the total amount of the proposal obtained by adding the amounts of the several items.

All words and figures shall be in ink. In case of a discrepancy between the prices written in words and those written in figures, the written words shall govern. In the event there is a discrepancy between the unit prices and the total sum of all the items, the unit prices shall govern. Failure to bid on each and every item may lead to the rejection of the proposal.

IB.4 PERMITS AND FEES TO BE RESPONSIBILITY OF COMMISSION

The Commission shall have the responsibility for obtaining all permits from the City of Boston and any Department thereof and for paying all fees, which may be required in connection with the work to be performed pursuant to this Contract. The contract price shall not include the cost of any such permits issued by the City of Boston or fees or bonds payable thereto. It shall be the responsibility of the Contractor to advise the Commission in a timely manner, a minimum of fifteen working days prior to start date, of the need for permits, the date as of which permits are needed, their duration, and all other necessary information. There will be no additional payment for delays caused by the inability of the Commission to obtain permits. The Contractor is required to keep a copy of all permits on each job site.

Permits issued by the City of Boston are issued on terms and conditions upon which the Contractor herein agrees to comply, and to indemnify and defend Commission for any claim based upon the Contractor’s failure to do so.

IB.5 SUBSTITUTION OF EQUAL ITEMS FOR SPECIFIED ITEMS

Except where otherwise specifically provided in the specifications, due to the proprietary nature of a particular item of material or for any other sound reason in the public interest, a Contractor shall be permitted to substitute an item of material for any item of material named or described in this Contract, or in the specifications, plans, addenda, or other documents incorporated in and made a part of the

Contract, provided that such substituted item of material shall be considered equal, by the Commission, to the item of material so-named or described. The word "material" as used herein shall mean and include any article, assembly or system, or any component part thereof.

The Commission shall consider any item of material equal to the item of material named or described in this Contract if (1)it is at least equal in quality, durability, appearance, strength and design, (2) it will perform at least equally the function imposed by the general design for the work to be performed pursuant hereto, and (3) it performs substantially, even with deviations, to the detailed requirements for such named items in the specifications attached to the contract.

IB.6 DETERMINATION OF EQUALITY

The Bidder selected as the general contractor is required to submit to the Executive Director for consideration as to its equality, a written notice containing the name and full particulars, pertaining to any item

(or items) of material other than the specific or specifics named or described therefore in the Contract or in documents incorporated in and made part thereof in advance of the time of its incorporation in the work to be performed pursuant to the Contract by submitting the aforesaid written notice to the Executive Director, immediately following the execution of the Contract by the Commission. An item shall be considered equal to the item so named or described if (1) it is at least equal in quality, durability, appearance, strength and design, (2) it will perform at least equally the function imposed by the general design for the public work being contracted for or the material being purchased and (3) it conforms substantially, even with deviations, to the detailed requirements for the item in the said specifications.

Forthwith upon receipt of such written notice, the Executive Director, or designee, shall conduct or cause to be conducted a reasonable investigation to determine whether the item (or items) in question shall be considered equal to the item(s) named or described therefore in the Contract or in the documents incorporated in and made a part of the Contract. Upon conclusion of the investigation, the Executive

Director, or designee, shall, in writing, promptly advise the contractor that the item(s) of material in question is, or is not, considered the equal of the item(s) of material or described as aforesaid, and that said item(s) of material may, or may not, be incorporated in the work to be performed pursuant to the Contract. If a substitute/alternate item is allowed and is less expensive than the item originally proposed, upon the request of the Chief Engineer, a credit shall be given to the Commission.

In no case may an item other than that specifically described in the

Contract be incorporated into work to be performed pursuant to the

Contract unless the Executive Director shall consider the item as the equal of the item so named or described, as provided by law.

IB.7 RETAIL SALES ACT EXEMPTION

The exemption certificate number assigned to the Commission by the

Commissioner of Corporations and Taxation under Section 6, Chapter 14 of the Act of 1966 commonly referred to as the Retail Sales Act is E-

042-621-990.

IB.8 SPECIAL DUTY POLICE

The Executive Director shall require the selected bidder to maintain at the expense of the selected bidder such police officers on special duty

(outside their regular tour of duty) as the Police Commissioner or his designee may deem necessary to avoid, so far as reasonably possible, danger to the safety of persons and substantial interference with the free circulation of traffic. This clause shall not prohibit reimbursement of the selected bidder for such expenses if a Contract between such person and the City or any other person provides for such reimbursement.

The selected bidder is required to carry in its bid the items for special duty police at the rates set by the City of Boston or

Commonwealth of Massachusetts for the estimated quantities. The

Commission does not guarantee the estimated quantities for each special duty police item. The selected bidder will be reimbursed only for those items and will not be entitled to overhead, administrative costs or profits associated with said reimbursement.

IB.9 TIME FOR COMMENCEMENT AND COMPLETION OF WORK

See Special Conditions, Page SC-2.

IB. 10 MINORITY EMPLOYEE UTILIZATION REQUIREMENT

No bid for the award of this project will be considered acceptable unless the Contractor agrees to comply fully with the provisions of

Article VIII, Minority Participation, of the Contract.

Included with the Contract Documents, Appendices, are copies of the

Contractor’s Certification Statement, Minority Employee Participation and the Minority Employee Weekly Utilization Report.

By signing this proposal the Contractor understands, acknowledges and agrees to the terms and conditions of this Section, Section 1.7 and

Article VIII of the Contract.

The Minority Employee Weekly Utilization Reports shall be submitted in accordance with section 8.2(d)(ii) and 8.2(d)(iii) of the Contract.

Failure to comply with the Minority Employee Utilization Requirements may result in imposition of sanctions set forth in section 8.2(f) and

(g) of the Contract.

No bid for the award of this project will be considered acceptable

Article IX, Residents Job Policy, of the Contract.

Included with the Contract Documents, Appendices, are copies of the

Contractor’s Certification Statement, Residents Job Policy and the

Boston Resident Employee Weekly Utilization Report. By signing this proposal the Contractor understands, acknowledges and agrees to the terms and conditions of this section and Article IX of the Contract.

The Boston Resident Employee Utilization Report shall be submitted in accordance with Section 9.4.C ii of the Contract. Failure to comply with the Boston Resident Employee Utilization Requirements may result in imposition of sanctions as set forth in the Contract.

IB.11 MINORITY BUSINESS ENTERPRISE/WOMEN BUSINESS ENTERPRISE

REQUIREMENTS

No bid for the award of this contract will be considered acceptable

Article X of the Contract, Utilization of Minority-Owned Business

Enterprises and Women-Owned Business Enterprises.

Included with the Contract Documents, Appendices, are copies of forms relating to the Utilization of Minority Business Enterprises and Women

Business Enterprises (MBEs and WBEs). Form BWSC-M/WBE-001 is a Notice to Contractors regarding the Commission M/WBE requirements which the

Contractor must sign as part of the Contract Documents, and Form BWSC-

M/WBE-002 is a report on the use of M/WBEs which the Contractor must file on a monthly basis with the Commission. By signing this proposal, the Contractor understands, acknowledges and agrees to the terms and conditions of this section, section 1.8 and Article X of the Contract.

The Contractor shall submit each month a breakdown of MBE and WBEs used in the current project, as set forth in the forms identified as “BWSC-

M/WBE-001 and BWSC-M/WBE-002”. These reporting forms can be found in the APPENDICES Section of this contract. Pay estimates will not be processed for payment unless contractors comply with this reporting requirement.

By signing this proposal, the Contractor understands, acknowledges and agrees to utilize certified minority-owned business enterprises as defined in Article X for not less than 9.0% of the cost of the bid, and certified women-owned business enterprises as defined in Article X for not less than 6.0% of the cost of the bid. If the Contractor wishes to have the provisions of Article X waived or modified, the Contractor shall apply to the Commission's Director of Organizational Diversity ten (10) calendar days prior to bid opening for a determination of waiver or of modification in accordance with Article X. The Director of

Organizational Diversity will render a decision on the application for waiver or modification five (5) calendar days prior to bid opening.

IB.12 CDL DRUG AND ALCOHOL TESTING COMPLIANCE

No bid for the award of this contract will be deemed acceptable unless the undersigned has provided assurance to the Commission that he is in compliance with applicable federal regulations for drug and alcohol testing when services involving the following are provided:

the driving of commercial vehicles with a gross vehicle weight of more than 26,000 pounds (inclusive of a towed unit with a gross vehicle weight of over the 10,000 pounds) the transportation of hazardous material in a quantity requiring "placarding"; or vehicles rated to carry more than 15 passengers, including the driver. In addition, the undersigned must assure the Commission that all proposed subcontractors providing like services are in compliance. Assurance of compliance must be satisfactory to the Commission.

IB. 13 PRICE ADJUSTMENT – DIESEL FUEL; GASOLINE AND LIQUID

ASPHALT AND PORTLAND CEMENT

Pursuant to Chapter 150 of the Acts of 2013 and M.G.L. Chapter 30, section 38A this contract contains a price adjustment clause that will provide for either additional compensation to the Contractor or repayment to the Commission, depending on an increase or a decrease in the average price of Diesel Fuel; Gasoline; Liquid Asphalt and Portland

Cement Contained in Cast-in Place Cement.

The Base Price will be the price as indicated in the Massachusetts

Department of Transportation Highway Department web site

(https://www.mass.gov/massdot-contract-price-adjustments), incorporated herein by reference, for the month in which the contract was advertised, which includes state tax.

The Period Price will be the average of prices charged to the State, including state tax for the bulk purchases made during each month as indicated on the Massachusetts Department of Transportation Highway

Department web site (https://www.mass.gov/massdot-contract-price-adjustments), incorporated herein by reference.

A price adjustment will be made on a monthly basis but only when the monthly cost change or variance between the Base Price and Period Price exceeds plus or minus five percent (5%). The complete adjustment will be paid in all cases with no deduction of the 5% from either upward or downward price adjustments.

The Contractor will be compensated through monthly payments after the work has been performed using the monthly period price for the month during which the work was performed. The set price Payment Items F8-2, F8-3, F8-4, F8-5, will be used as necessary to generate the appropriate adjustment(s). The Unit Quantity(s) will be adjusted to provide the appropriate total amount.

The Commission will be compensated from retainage.

No price adjustments will be allowed beyond the Completion date of this

Contract unless there is an approved extension of time.

Diesel Fuel and Gasoline

Diesel Fuel – Base Price: _$4.497 __ (including State Tax)

Gasoline – Base Price: _$3.752 _ (including State Tax)

The price adjustment will be based on the Period Price of Gasoline and

Diesel Fuel for each monthly period as it appears on the Massachusetts

Department of Transportation (MassDot) website

(https://www.mass.gov/massdot-contract-price-adjustments)

The price adjustment only applies to actual fuel usage during each month for site dedicated equipment requiring gasoline or diesel fuel including but not limited to construction equipment, trucks and bypass pumps. It shall not include transportation, idling or other charges.

The price adjustment will be determined by multiplying the number of gallons used during the applicable monthly period times the difference between the Base Price and the Period Price of Diesel Fuel or Gasoline.

The Contractor shall supply to the Commission, on a monthly basis, the certified fuel usage for each vehicle or piece of equipment.

Liquid Asphalt

Liquid Asphalt – Base Price: __$670.00__

The price adjustment will apply only to the following items:

Item B1-1 Temporary Paving Boston Streets S.Y.

Item B1-2 Permanent Trench Repair in Boston Streets S.Y.

Item B1-3 Permanent Trench Repair DCR Streets S.Y.

Item B1-3A Temporary Pavement DCR Streets S.Y.

Item B1-4 Permanent Pavement State Highway S.Y.

Item B1-5 Bituminous Concrete Overlay Paving S.Y.

The price adjustment will be based on the New Asphalt Period Price as it appears on the Massachusetts Department of Transportation Highway

Department site (https://www.mass.gov/massdot-contract-price-adjustments), incorporated herein by reference.

The price adjustment only applies to the actual virgin liquid asphalt content in the mixture placed in accordance with the Commission’s specifications. It shall not include transportation or other charges.

The price adjustment will be determined by multiplying the number of tons of hot mix asphalt mixture placed during each monthly period times the liquid asphalt content percentage times the difference between the

Base Price and the Period Price for Liquid Asphalt.

Portland Cement Contained in Cast-in-Place Concrete

Portland Cement Contained in Case-Place-Concrete – Base Price: $425.13

This provision applies to all projects using greater than 100 Cubic

Yards of Portland Cement concrete containing Portland Cement. The

Price adjustment will apply only to the following items:

Item D4-02A Cement Concrete Sidewalks S.F.

Item D5-10 Plain Concrete C.Y.

Item D5-11 Reinforced Concrete C.Y.

The price adjustment will be based on the variance in price for the

Portland Cement Component only from the Base Price to the Period Price.

The price adjustment applies only to the actual Portland Cement content in the mix placed on the job in accordance with the specifications. No adjustments will be made for any cement replacement materials such as fly ash or ground granulated blast furnace slag. It shall not include transportation or other charges.

The price adjustment for Portland Cement concrete mixes will be paid for per cubic yard under this item. It will be determined by multiplying the number of cubic yards of Portland Cement concrete placed during each monthly period times the Portland Cement content percentage times the difference between the Base Price and Period price of Portland Cement.

Note: For items that are not paid on a per cubic yard basis the Price

Adjustment will be calculated per cubic yard from the actual volume used based on information submitted to or gathered by the Commission.

IB. 14 LARGE VEHICLE PROTECTIVE DEVICES, CONVEX MIRRORS, CONVEX

CROSS-OVER MIRRORS AND SAFETY DEVICES

No bid for the award of this contract will be deemed acceptable unless the undersigned bidder has provided assurance to the Commission that he/she is in compliance with the requirements of City of Boston Code, Ordinance Chapter IV, Sections 4-8 which requires vendors to safeguard unprotected road users. See Appendices, which contain a copy of the

City of Boston Ordinance and the City of Boston Inspectional Services

Department Commissioner’s Bulletin setting forth relevant guidelines.

In addition, the undersigned bidder must assure the Commission that all proposed subcontractors are in compliance with this provision.

Assurance of compliance must be satisfactory to the Commission.

IB. 15 STATE TAX COMPLIANCE CERTIFICATE – ARTICLE XXIV

No bid for award of this contract will be deemed acceptable unless the bidder signs the State Tax Compliance Certificate found in Article XXIV on Page 53 of the contract and submits it with its bid.

The terms and conditions of this Notice to Bidders are hereby made a part of and incorporated in the Proposal and Contract attached hereto.

Date:_____________ __________________________________

Henry F. Vitale

Executive Director

PROPOSAL AND CONTRACT

I

This Proposal and Contract consists of three parts:

Part I (the "Proposal"), a proposal submitted to the Boston Water and

Sewer Commission by the Bidder whose name is set forth below to perform the work identified below, pursuant to the terms and conditions of this

Proposal and Contract; Part II, the general contract terms and Part

III, the specifications, plans, and addenda relating to the work proposed to be performed hereto.

I. Proposal

The undersigned bidder proposes to replace approximately 660 linear feet of water mains, replace 2,450 linear feet of sewer and storm drain, and rehabilitate approximately 2,320 linear feet of sewer and storm drain, and all other incidental work as shown on the plans or specified within.

1.1 Interested Persons

The undersigned, declares that it is the only person interested in this

Proposal, or in any Contract which be made under it, or in any expected profits to arise therefrom that this proposal is made in good faith without fraud, collusion, or connection of any kind with any other bidder for the same work, that it is bidding in its own behalf without connection or obligation to any undisclosed person, and that no other person has any interest in the profits of the general Contract; that it has carefully examined the Contract and Specifications and informed himself fully in regard to all conditions pertaining to the work and the place where it is to be done; that it has made its own examinations and estimates and from them makes this Proposal; and that it understands and agrees to all the reporting requirements in the

Contract.

1.2 Execution and Delivery of Contract, Performance Bond, and

Payment Bond

The undersigned proposes and agrees that if, within thirty days, Saturdays, Sundays, and legal holidays excluded, after the opening of the proposal, or, if the award requires federal approval, within thirty days, Saturdays, Sundays and legal holidays excluded, after such approval, notice that this Proposal will be accepted for the Commission shall be mailed to it at the business address given below, or shall be delivered to it, it shall within five (5) succeeding days excluding

Saturdays, Sundays and legal holidays, after the date of such mailing or delivery, whichever is later, deliver to the office of the Executive

Director of the Commission (the "Executive Director"), the Contract, accompanied by (i) a Performance Bond, in the form appearing herein as

Exhibit "A" to Part II of the Proposal and Contract, for the full amount of the Contract Price (ii) a Payment Bond, in the form appearing herein as Exhibit "B" to Part II of the Proposal and Contract for the full amount of the Contract Price (such Performance Bond and Payment

Bond being herein collectively referred to as the "Bonds"), (iii) the certificate as to proper corporate authorization in the form appearing herein as Exhibit "C" to Part II of the Proposal and Contract, and (iv) such other documentation, including but not limited to the documents required to comply with the requirements of Articles VIII, IX and X of the Contract, as may be requested by the Commission at the time of notification of acceptance by the Commission, all properly executed in their respective forms.

Performance Bonds and Payment Bonds shall be (a) in a form satisfactory to the Commission and (b) with a surety company qualified to do business in the Commonwealth and satisfactory to the Commission.

Place of Business in Massachusetts of Surety Company is

Street Address City Zip Code

Contact Person:____________________ Telephone No.:___________

1.3 Bid Deposit

The undersigned Bidder agrees that the certified check for_______________________________dollars ( ), or Bid

Bond, payable to the Commission, and deposited herewith, is the property of the Commission, and the maximum amount thereof is the amount of the damages which the Commission will sustain by failure of the undersigned Bidder to carry out the Proposal, but if this Proposal is not accepted, or if notice is mailed or delivered and the undersigned executes and delivers said Contract and Bonds as aforesaid, the check, or its amount, is to be paid to him on receipt therefore.

Such bid deposit shall be in an amount not less than five percent of the value of the bid. A Bid Bond shall be (a) in a form satisfactory to the Commission, (b) with a surety company qualified to do business in the Commonwealth and satisfactory to the Commission and (c) conditioned upon the faithful performance by the principal of the agreements contained in the bid.

Place of Business in Massachusetts of Surety Company is

Street Address City Zip Code

Contact Person:____________________ Telephone No.:___________

1.4 Documents Included in Contract

The undersigned Bidder agrees to be bound by the detailed specifications constituting Part III of this Proposal and Contract, all exhibits, appendices, schedules, attachments and plans which accompany the same, each of which shall be deemed supplementary to the other and in case of any item not being specifically mentioned in detail and yet shown on the plan or conversely, the necessary work or materials shall be supplied and installed to the satisfaction of the Executive

Director.

1.4.1 Labor

The undersigned Bidder hereby certifies that he is able to furnish labor that can work in harmony with all elements of labor employed or to be employed in the work; that all employees to be employed at the worksite will have successfully completed a course in construction safety and health approved by the United States Occupational Safety and

Health Administration that is at least 10 hours in duration at the time the employee begins work and who shall furnish documentation of successful completion of said course with the first certified payroll report for each employee.

1.5 Time of the Essence, Liquidated Damages

The undersigned Bidder hereby offers to provide all necessary machinery, tools and apparatus and to do all the work, and furnish all the materials called for by said specifications in the manner and time herein prescribed and according to the requirements of the Executive

Director, including all the incidental work, and to complete the work within the time specified.

Delay in completion of the work required under this Contact will cause interference with the Commission's construction schedules, will result in increased costs including, but not limited to, planning, engineering, police and inspection costs and will cause other tangible and intangible losses. If the Contractor fails to complete the work within the stipulated time, the Contractor and his sureties shall be liable for and shall pay the Commission the sum of $750.00 as fixed, agreed and liquidated damage for each calendar day of delay after the date stipulated in this Contract. Such damages have been fixed and agreed on because of the impracticability and extreme difficulty of fixing and ascertaining the actual damages the Commission would sustain in the event of delayed completion. The Commission is authorized to deduct out of the monies, which may be due to the Contractor under this

Contract the liquidated damages referred to in this section.

The Commission's right to recover liquidated damages is for consequential damages and is not a substitute for any right of recovery for additional costs incurred to complete the work should the contractor fail to do so.

1.6 Contract Price

The undersigned Bidder proposes to perform the work specified in this

Proposal and Contract for a contract price of ________________________ dollars. (___________________), which amount consists of the specified items beginning on Page 14A-1:

1.7 Bidder's Certification Statement

The undersigned bidder does hereby certify, pursuant to the Invitation for Proposals to perform this contract by and between the undersigned and the Boston Water and Sewer Commission, (the "Contract") as follows:

1. The undersigned has read Article VIII of the contract regarding the requirements with respect to the use of Minority Employees in the performance of the Contract; and

2. The undersigned understands that failure to comply with the provisions of the Contract set forth in said Article VIII may subject the undersigned to the sanctions set forth in Article

VIII, Section 8.2 (f) and (g) of the Contract.

The undersigned further certifies that within seven (7) days prior to the pre-construction meeting described in Section 8.2(c)(iii) of this

Contract, the Contractor shall send to the Contract Compliance Officer

ITEM QUANTITY

CENTS CENTS

ITEM WITH UNIT BID PRICE

WRITTEN IN WORDS

UNIT PRICE

DOLLARS

TOTAL

DOLLARS

A1-1

CY

MISC. TRENCH EXCAVATION

CUBIC YARDPER

A1-2

CY

BELOW GRADE EXCAVATION

CUBIC YARDPER

A1-3

CY

ROCK EXCAVATION

CUBIC YARDPER

A1-4

LF

RAILS AND WOOD TIES

LINEAR FOOTPER

A10-1

CY

CONTROLLED DENSITY FILL (F+E)

CUBIC YARDPER

A2-1

CY

GRAVEL

CUBIC YARDPER

A3-1

CY

SCREENED GRAVEL

CUBIC YARDPER

A7-2

LS

TRENCH SUPPORT

LUMP SUMPER

B1-1

SY

TEMPORARY PAVING

SQUARE YARDPER

B2-01

SY

BRICK SIDEWALK ON SAND BASE

SQUARE YARDPER

SUBTOTALPage 14A -- 1

Contract No : 21-309-001

REPLACEMENT AND REHABILITATION OF SEWER

AND DRAIN PIPES AND REPLACEMENT OF WATER

MAINS IN ROXBURY

ITEM WITH UNIT BID PRICE

WRITTEN IN WORDS

UNIT PRICE

DOLLARS

TOTAL

DOLLARS

B3-1

SY

RESET BRICK PAVERS

SQUARE YARDPER

B6-1

LF

RESET EDGESTONE

LINEAR FOOTPER

C1-04

LF

LAY 4" DICL WATER PIPE

LINEAR FOOTPER

C1-06

LF

LAY 6" DICL WATER PIPE

LINEAR FOOTPER

C1-08

LF

LAY 8" DICL WATER PIPE

LINEAR FOOTPER

C1-12

LF

LAY 12" DICL WATER PIPE

LINEAR FOOTPER

C1-99

LB

ADDITIONAL FITTINGS

POUNDPER

C2-04

EA

SET 4" GATE VALVE

EACHPER

C2-06

EA

SET 6" GATE VALVE

EACHPER

C2-08

EA

SET 8" GATE VALVE

EACHPER

SUBTOTALPage 14A -- 2

Contract No : 21-309-001

REPLACEMENT AND REHABILITATION OF SEWER

ITEM WITH UNIT BID PRICE

WRITTEN IN WORDS

UNIT PRICE

DOLLARS

TOTAL

DOLLARS

C2-12

EA

SET 12" GATE VALVE

EACHPER

C3-1 $2,000 00 $12,000 00

EA

SET OR RESET HYDRANT

EACHPER

TWO THOUSAND DOLLARS

AND ZERO CENTS

C4-1

EA

SET 3/4 INCH CORP. STOP

EACHPER

C4-2

EA

SET 1 INCH CORP. STOP

EACHPER

C4-3

EA

SET 1 1/2 INCH CORP. STOP

EACHPER

C4-4

EA

SET 1 1/2 X 2 INCH CORP. STOP

EACHPER

C4-5

LF

LAY 3/4 INCH COPPER TUBING

LINEAR FOOTPER

C4-5P $280 00 $14,000 00

LF

3/4" CU SERV. IN PRIV. PROP.

LINEAR FOOTPER

TWO HUNDRED EIGHTY DOLLARS

AND ZERO CENTS

C4-6

LF

LAY 1 INCH COPPER TUBING

LINEAR FOOTPER

C4-6P $250 00 $12,500 00

LF

1" CU SERV. IN PRIV. PROP.

LINEAR FOOTPER

TWO HUNDRED FIFTY DOLLARS

AND ZERO CENTS

SUBTOTALPage 14A -- 3

Contract No : 21-309-001

REPLACEMENT AND REHABILITATION OF SEWER

ITEM WITH UNIT BID PRICE

WRITTEN IN WORDS

UNIT PRICE

DOLLARS

TOTAL

DOLLARS

C4-7

LF

LAY 1 1/2 INCH COPPER TUBING

LINEAR FOOTPER

C4-7P $150 00 $4,500 00

LF

1 1/2" CU SERV. IN PRIV. PROP.

LINEAR FOOTPER

ONE HUNDRED FIFTY DOLLARS

AND ZERO CENTS

C4-8

LF

LAY 2 INCH COPPER TUBING

LINEAR FOOTPER

C4-8P $150 00 $4,500 00

LF

2" CU SERV. IN PRIV. PROP.

LINEAR FOOTPER

ONE HUNDRED FIFTY DOLLARS

AND ZERO CENTS

C8-1

LS

TEMPORARY BY-PASS SYSTEM

LUMP SUMPER

C9-1 $200 00 $2,000 00

EA

RAISE WATER CSTG. TO GRADE

EACHPER

TWO HUNDRED DOLLARS

AND ZERO CENTS

D1-04

VF

CHIMNEY CONNECTION

VERTICAL FOOTPER

D1-06

LF

MINOR DRAIN

LINEAR FOOTPER

D1-10P

LF

LAY 10" PVC SEWER / DRAIN

LINEAR FOOTPER

D1-12P

LF

LAY 12" PVC SEWER / DRAIN

LINEAR FOOTPER

SUBTOTALPage 14A -- 4

Contract No : 21-309-001

REPLACEMENT AND REHABILITATION OF SEWER

ITEM WITH UNIT BID PRICE

WRITTEN IN WORDS

UNIT PRICE

DOLLARS

TOTAL

DOLLARS

D1-18P

LF

LAY 18" PVC SEWER/DRAIN

LINEAR FOOTPER

D1-24DS

LF

LAY 24" DI SEWER

LINEAR FOOTPER

D1-30R

LF

LAY 30" RCP SEWER / DRAIN

LINEAR FOOTPER

D18-1

SF

PEDESTRIAN RAMP

SQUARE FOOTPER

D2-01

EA

MANHOLE BASE

EACHPER

D2-02

VF

MANHOLE WALLS

VERTICAL FOOTPER

D2-03

EA

MANHOLE FRAME WITH COVER

EACHPER

D2-04

EA

CATCH BASIN

EACHPER

D2-05

EA

NEW HOOD IN EX. CB

EACHPER

D2-07

VF

BRICKWORK IN EX. STRUCT.

VERTICAL FOOTPER

SUBTOTALPage 14A -- 5

Contract No : 21-309-001

REPLACEMENT AND REHABILITATION OF SEWER

ITEM WITH UNIT BID PRICE

WRITTEN IN WORDS

UNIT PRICE

DOLLARS

TOTAL

DOLLARS

D2-08

EA

DROP INLET

EACHPER

D3-1 $365 00 $5,475 00

EA

RAISE SEWER / DRAIN CASTING

EACHPER

THREE HUNDRED SIXTY FIVE

DOLLARS AND ZERO CENTS

D3-1A

EA

ADJ. SEWER / DRAIN CASTING

EACHPER

D4-01

CY

CEMENT CONCRETE

CUBIC YARDPER

D4-02A $15 00 $6,000 00

SF

CEMENT CONC. SIDEWALK [6IN]

SQUARE FOOTPER

FIFTEEN DOLLARS

AND ZERO CENTS

F1-02

EA

REC SERV CONN. (W/O EXCAV.)

EACHPER

F1-03

EA

PROTRUDING LATERAL REMOVE

EACHPER

F1-04

EA

REC. SERV CONN (W/EXCAV.)

EACHPER

F1-08ST

LF

STR. LINING 8" SEWER/DRAIN

LINEAR FOOTPER

F1-10ST

LF

STR. LINING 10" SEWER/DRAIN

LINEAR FOOTPER

SUBTOTALPage 14A -- 6

Contract No : 21-309-001

REPLACEMENT AND REHABILITATION OF SEWER

ITEM WITH UNIT BID PRICE

WRITTEN IN WORDS

UNIT PRICE

DOLLARS

TOTAL

DOLLARS

F1-12ST

LF

STR. LINING 12" SEWER/DRAIN

LINEAR FOOTPER

F1-15ST

LF

STR. LINING 15" SEWER/DRAIN

LINEAR FOOTPER

F1-18ST

LF

STR. LINING 18" SEWER/DRAIN

LINEAR FOOTPER

F8-2 $10 00 $10,000 00

EA

DIESEL FUEL PRICE ADJUSTMENT

EACHPER

TEN DOLLARS

AND ZERO CENTS

F8-3 $10 00 $10,000 00

EA

GASOLINE FUEL PRICE ADJ.

EACHPER

TEN DOLLARS

AND ZERO CENTS

F8-4 $10 00 $10,000 00

EA

LIQUID ASPHALT PRICE ADJ.

EACHPER

TEN DOLLARS

AND ZERO CENTS

F8-5 $10 00 $10,000 00

EA

PORTLAND CEMENT PRICE ADJ.

EACHPER

TEN DOLLARS

AND ZERO CENTS

G1-01

EA

POINT REPAIR

EACHPER

L1-1

LS

LANDSCAPING

LUMP SUMPER

L1-2 $50 00 $5,000 00

SY

LANDSCAPING

SQUARE YARDPER

FIFTY DOLLARS

AND ZERO CENTS

SUBTOTALPage 14A -- 7

Contract No : 21-309-001

REPLACEMENT AND REHABILITATION OF SEWER

ITEM WITH UNIT BID PRICE

WRITTEN IN WORDS

UNIT PRICE

DOLLARS

TOTAL

DOLLARS

P1-1 $66 00 $134,640 00

HR

SPEC. DUTY BOSTON POLICE

HOURPER

SIXTY-SIX DOLLARS

AND ZERO…