21-086_PWS.pdf
PDF 797 KB Posted
- Attached to
- Proto Trak Preventive Maintenance Federal contract opportunity
- Solicitation number
- N32253-21-Q-0057
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| APPENDIX III.pdf | ||
| APPENDIX II.pdf | ||
| APPENDIX I.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT
X31PES11302018
Performance Work Statement (PWS) Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility
Southwestern Industries, Inc.
Proto Trak DPMSX5P, FHM7
Preventive Maintenance Inspection and Remedial Services
1. Background:
1.1. Pearl Harbor Naval Shipyard & Intermediate Maintenance Facility (PHNSY & IMF) is a US Navy regional industrial center that maintains, overhauls, and repairs various vessels of the US Navy. Its industrial operations provide the US naval forces with a wide range of services and resources located on the island of Oahu, Hawaii, with direct and indirect support to SSN 688 and 774 class submarines, surface vessels and shore based activities in the Pacific
2. Objective and Scope:
2.1. The Contractor shall supply a Manufacturer Trained Certified Technician from Southwestern Industries, Incorporated. The contractor will perform the annual preventive maintenance services on 6EA. TRAK DPMSX5P and 2EA. FHM7. The Contractor shall perform on-site, preventive maintenance, repair, calibration, and remedial services (repairs required outside scope of annual preventive maintenance), to include an inspection report on 6EA. TRAK DPMSX5P and 2EA. FHM7.
Alpha # Manufacturer Model Serial no Location eFEM asset # MPY Proto Trak TRAK DPMSX5P 183DM720 B-67 3225370691 MPX Proto Trak TRAK DPMSX5P 183DM719 B-67 3225370690 MPA Proto Trak TRAK DPMSX5P 154DM288 B-67 3225370714 MPE Proto Trak TRAK DPMSX5P 154DM289 B-1770 3225370715 MOS Proto Trak TRAK DPMSX5P 154DM291 B-67 3225370716 MOQ Proto Trak TRAK DPMSX5P 154DM292 B-67 3225370717 MOC Proto Trak FHM7 154CY225 B-67 3225370718 MOB Proto Trak FHM7 154CY221 B-67 3225370719
3. Performance Requirements:
3.1. Preventive Maintenance. The contractor shall provide all management, parts, labor, materials, supplies, transportation and tools required for preventive maintenance of all equipment in paragraph 2.1 in accordance with the applicable manufacturer’s manual to ensure proper operation of equipment. Contractor shall provide a contact phone number and alternate phone number for technical support during the contract duration. The contractor shall notify the Technical Point of Contact (TPOC) if any machine covered under this contract cannot be restored to operational status within the contract period.
3.1.1. Preventive Maintenance Parts. Parts that are replaced as part of the preventive maintenance service are included at no additional cost to the Government. Materials supplied shall be new and not refurbished or reconditioned materials.
3.1.2. Preventive Maintenance Service. Preventive Maintenance Service shall be in accordance with applicable Manufacturer’s Requirements.
3.2. Preventive Maintenance Reports. The contractor shall submit a written maintenance report to the Technical Point of Contact (TPOC) within 1 week after the completion of each Preventive Maintenance and Inspection. The report shall contain at a minimum, the identification and location of equipment, the type of maintenance performed, materials or parts replaced, date of preventive maintenance, service technicians name and an assessment of the overall condition of the equipment serviced.
3.3. Software Upgrades. All software upgrades, if required, shall be provided. The Contractor shall ensure that upgrades include all applicable software licensing agreements. The Contractor shall create complete system backups, prior to and after any configuration changes to hardware or software to ensure no loss of data.
3.4. Remedial Repairs. Remedial repair identified during preventive maintenance shall be accomplished if completion of the repair is possible within the period of performance.
3.4.1 Remedial Repair Parts. Parts that are replaced as part of remedial repair is to be issued on a separate purchase order to be approved by the TPOC. Materials supplied shall be new and not refurbished or reconditioned materials.
3.4.2 Remedial Repair Reports. The Contractor shall provide a repair report to the TPOC within 1 week after completion of the repair. The report shall include the date and time of the remedial repairs, the identification and location of the equipment, the repairs performed, material or parts replaced, and the name of the technician performing the repairs. If a repair cannot be completed during the on-site visit, the Contractor shall provide a report which includes equipment identification, description of the needed repair, estimated time and cost to accomplish the work.
3.5. Removal and disposal of replacement parts and materials. Contractor shall transfer replacement parts and materials, to PHNSY & IMF for proper disposal.
3.6. Hazardous Waste and Scrap Metal shall be turned over to PHNSY & IMF. For specific guidance, guidelines, and procedures governing the use and disposal of hazardous material or hazardous waste at PHNSY & IMF, direct all questions to the
TPOC.
3.7. Photography, photographic equipment, computing and recording devices are prohibited at PHNSY & IMF without prior approval. This includes personal and company cellular phones with camera features. Direct all questions to the TPOC.
3.10. Place of Performance. Pearl Harbor Naval Shipyard, Controlled Industrial Area
(CIA), Shop 31 Bldg.67 and Bldg.1770, Pearl Harbor, Hawaii.
3.11. Period of Performance. All work to be completed within twelve months after award of contract on an annual basis. The contractor shall meet with the Technical Point of Contact (TPOC) to establish a schedule and complete all work on 6EA. TRAK DPMSX5P and 2EA. FHM7. TPOC will be determined after contract award.
3.12. Hours of Performance. Normal Hours. All work shall be performed during normal business working hours of 0630 to 1500 hours, daily, Monday through Friday, excluding Federal Holidays (Normal work hours are subject to change upon customer’s discretion).
If the Federal Holiday falls on a Saturday, the holiday is observed on the following Monday. Facilities may close due to local or national emergencies, administrative closings, or other Government directed facility closings. PHNSY & IMF typically observes an annual curtailment closure between Christmas and New Year’s, consult with TPOC for details. Contractor access to Government facilities during closures is not permitted.
3.13 Workmanship. The Contractor shall ensure that all work performed is done by a factory trained and authorized service technician.
3.14 Contractor Manpower Reporting. The Contractor shall report ALL contract labor hours (including subcontractor labor hours) required for performance of services provided under this contract for PHNSY & IMF using the following web address:
https://www.sam.gov/SAM/. Reporting inputs will be for the labor executed during this period of performance during each government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year.
3.15 Service Delivery Summary Table A:
Performance Requirement
PWS
Paragraph
Notes Performance Threshold
1. Perform Preventive Maintenance Paragraphs 3.1
3.1.1 and 3.1.2
100% delivery and compliance.
2. Provide software upgrades if required.
Paragraph 3.2 100% delivery and compliance.
3. Provide written Preventive Maintenance Report within one week of service.
Paragraphs 3.3 100% delivery and compliance.
4. Perform Remedial Service and Repair
Paragraphs 3.4 100% delivery and compliance.
5. Remedial Repairs Parts Paragraphs 3.4.1
100% delivery and compliance.
6. Provide written Remedial Repair Report within one week of service.
Paragraph 3.4.2 100% delivery and compliance.
8. Removal and disposal of replacement parts and materials.
Paragraph 3.5 100% delivery and compliance.
9. Hazardous waste and scrap metal to be turned in to PHNSY & IMF.
Paragraph 3.6 100% delivery and compliance.
4. Quality Assurance.
4.1. The Contractor is responsible for implementing and maintaining a Quality Control Plan
(QCP) that identifies and results in the correction of potential and actual problems. The QCP shall be implemented on the first day of contract performance and a copy of QCP shall be provided to the Contracting Officer’s Representative (COR) prior to contract performance.
4.2. The QCP shall outline the Contractor’s plan to ensure the quality of deliverables as outlined in this PWS. The QCP shall address what will be reviewed and shall outline actions to be taken by the Contractor, should the review(s) identify areas requiring remedial action.
4.3. The Contractor shall keep records of any inspections and corrective actions taken, as outlined in the QCP and shall make such records available to the COR upon request.
5. Government Furnished Property and Services.
5.1. GENERAL: The Government will provide the following:
5.1.1. All reasonably required amounts of electricity for Contractor supplied tooling or test equipment.
5.1.2. Removal and disposal of Hazardous Waste, used lubricants, coolants, and cleaning solutions generated from servicing.
5.1.3. No other property, utilities or services will be provided by the Government.
6. Contractor Qualifications:
6.1. The Contractor shall provide a factory trained and authorized service technician and the necessary management and administrative support associated with personnel, equipment and services are provided.
6.2. Contractor personnel shall have a valid driver's license and a vehicle pass for base access. The Government will submit the base access request to JBPHH Security. In accordance with the Security Requirement - Appendix III, the Government will provide escorts as required while in the CIA and CNIA.
6.3. Prior to the start of performance, the Contractor shall submit a formal letter to the TPOC requesting facility access to include the following information: full name of all personnel working on this contract; Social Security number; date of birth, place of birth and citizenship. The Contractor shall state that the information has been verified and shall have supporting records on file, if required for examination.
6.4. The Contractor must be able to attain and maintain a green unescorted CIA badge.
6.5. Contractor employees shall clearly identify themselves as a Contractor (i.e. company shirt, badge, company identification) in a visible location on the front of exterior clothing, above the waist, (except when safety or health reasons prevent such placement). Identification badges shall be worn at all times when performing work.
6.6. The Contractor performing services shall be required to comply with all PHNSY&IMF rules, regulations and training that are applicable to conduct, safety, security, and procedures governing site entry and exit. Contractor personnel will be escorted when working in sensitive areas, as required. The TPOC will make arrangements to provide escort service if required.
7. Security Requirements:
7.1. Prior to the start of work, the contractor shall provide the COR (on company letterhead) a request for access to PHNSY & IMF and include the following information – full name of all personnel working on this contract; Social Security number; date of birth, place of birth, and citizenship. The contractor shall state that information has been verified and shall have supporting records on file if required for examination.
The contractor shall pass a background check to gain access PHNSY & IMF. The contractor’s employees must be a U.S. Citizen and registered with the Defense Biometric Identification System (DBIDS). The contractor shall coordinate with the COR to obtain a gate pass at Building 3455 Pass Office. Only those individuals with favorable investigations shall be utilized on this contract. Contractor will coordinate with building 3455 Pass Office in the completion of current form SECNAV 5512/1.
Contractor personnel must meet the requirements for a “green” unescorted badge for access to areas requiring services related to this contract. Contractor will coordinate with PHNSY Security Office at building 207 in the completion of Visit Request for Pearl Harbor Naval Shipyard current form PH-SYD 5512/28.
Security Requirements: This contract does not require a security clearance level and clearance granted by the Defense Security Service (DSS). Contractor shall comply with Security requirements specified in Appendix III
8. Point of Contact:
8.1. PHNSY C410.4 Contracting Officer
9. Attachments:
APPENDIX I – SAFETY AND HEALTH WORK PRACTICES FOR CONTRACTORS
WORKING WITH PEARL HARBOR NAVAL SHIPYARD AND INTERMEDIATE
MAINTENANCE FACILITY (PHNSY & IMF)
APPENDIX II – CONTRACTOR ENVIRONMENTAL SPECIFICATION GUIDELINES
APPENDIX III – SECURITY REQUIREMENTS APPLICABLE FOR PEARL HARBOR
NAVAL SHIPYARD & IMF’S CONTROLLED INDUSTRIAL AREA, OTHER
SENSITIVE AREAS, CONTROLLED NUCLEAR INFORMATION AREAS, AND/OR
NUCLEAR WORK AREAS
File details come from the government source that posted it. Updated .