This solicitation requests proposals for the design and construction of a reprogramming facility as the second phase of development at Eglin Air Force Base in Florida. Offerors will submit proposals in two phases for the design and construction of a two-story addition of approximately 34,669 square feet plus 1,800 square feet of renovations. The facility is to include an electronics lab, control room, lab support offices, work rooms, a Network Operations Center, offices, a receiving area, classified storage areas up to the Secret level, and a large training room. Proposals are due by October 9, 2020. Phase One proposals will be evaluated based on past performance and management approach, with up to five offerors selected to submit Phase Two proposals. Phase Two proposals will be evaluated on technical design and construction approach, key personnel qualifications, and small business participation plans, with award based on a best value determination of non-price factors and price.

View the file

Other files for this federal contract opportunity

Other files attached to ACURL Phase 2 Eglin AFB, FL, newest first.
File Type Posted
EM 385-1-1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PHASE ONE

THIS PROJECT IS ADVERTISED ON AN UNRESTRICTED BASIS

SOLICITATION NO: W9127820R0111

CADD CODE: MEF19009

SPECIFICATIONS

FOR

FTFA171106

TWO-PHASE DESIGN AND CONSTRUCTION

OF

ACURL PHASE 2

EGLIN AIR FORCE BASE, FLORIDA

(OKALOOSA COUNTY)

U.S. ARMY ENGINEER DISTRICT, MOBILE

109 St. Joseph St

Mobile, Alabama 36602

“BUILDING STRONG®”

Note: THERE ARE NO SPECIFICATIONS OR DRAWINGS IN THIS PHASE.

One solicitation will be issued covering both phases. Proposals will be evaluated in Phase One to determine which offerors will submit proposals for Phase Two, and an amendment will be issued to those selected offerors. Selection of offerors for involvement in Phase Two will be based on requirements stated in Section 00 11 00.

Detailed project design requirements will then be added by amendment to the solicitation at the start of the Phase Two stage of the Request For Proposals. A maximum of five (5) firms will be invited to participate in Phase Two.

This page was intentionally left blank for duplex printing.

FTFA171106 2-PHASE D/B ACURL PHASE 2 W9127820R0111

EGLIN AIR FORCE BASE, FLORIDA MEF19009

CHECKLIST FOR PREPARATION OF OFFERS (PHASE ONE)

Before sending your offer to us, review it for the following documents--without these, your offer could be rejected.

Any questions about this solicitation, including technical questions about plans and specifications, shall be submitted via the Bidder Inquiry Portal in ProjNet at https://www.projnet.org. Please refer to Section 01 00 01 paragraph “REQUESTS FOR INFORMATION”.

This checklist is designed for your convenience to assist you in completing your offer. Its completion does not guarantee that your offer will be acceptable. A complete and acceptable offer is solely the responsibility of the Contractor.

1. Your attention is directed to the following clause:

Section 00 45 00, FARS Clause 52.204-7, “System for Award Management (Oct 2018)”. LACK OF

REGISTRATION IN THE SAM DATABASE WILL RENDER OFFEROR INELIGIBLE FOR AWARD.

Information on how to register and the time it takes is detailed in the clause.

2. Standard Form 1442 Titled “SOLICITATION, OFFER AND AWARD”

a. Is it signed in Block 20B? Yes (Y)___Not Applicable(NA) ___

b. Have you verified with the Project Office that you have received all Amendments? Have you acknowledged all Amendments using block 19? Y__ NA__

c. Is the complete, correct address of the company printed in Block 14? Y__ NA__

(ALSO INCLUDE YOUR TIN, DUNS, AND CAGE NUMBERS IN THIS BLOCK)

d. Are the correct phone numbers, and fax numbers including country codes, included in Block 15? Y__

NA__

e. If the mailing address of the company is different from the address in Block 14, is the mailing address written in Block 16? Y__ NA__

f. If you are a Partnership or Joint Venture, have all partners or joint ventures signed in Block 20; or has authority properly been delegated pursuant to the provisions of the solicitation clause entitled JOINT VENTURE

BID REQUIREMENTS? Y__ NA__

g. . If you are a Joint Venture have you submitted your Joint Venture Agreement and taken the other actions necessary to comply with the “Joint Venture Bid Requirement” Clause? Y__ NA__ h.. Is the time you are allowing for acceptance of the offer, the same or longer than the time set out in block 13?. Y__ NA__

3. Representations, Certifications, and Other Statements of the Offeror

Are all of the clauses in this section completed and signed in the appropriate places and returned attached to the offer? Y__ NA__

4. Technical Documents that Pertain to Evaluation Factors, Award will be based on the specific factors set out in the Section 00 11 00, “PHASE ONE - PROPOSAL SUBMISSION AND EVALUATION CRITERIA.”

a. Have you responded to all the evaluation factors (if required by the solicitation)? Y__ NA__

b. Is a summary of the experience and special qualifications of your Administration staff included (if required by the solicitation)? Y__ NA__

c. Is a quality control plan included (if required by the solicitation)? Y__ NA__

d. Are time tables and schedules included (if required by the solicitation)? Y__ NA__

e. Is a current audit of your company’s financial status included or a certificate attached to a past audit stating the financial status has not changed since the time of the past audit (if required by the solicitation)? Y__

NA__

f. Is a list of the contracts you are currently working on attached (if required by the solicitation)? Y__

NA__

g. Have you included a list of the names and phone numbers of references for whom you have done past contracts (if required by the solicitation)? Y__ NA__

All your documents must be in English

TABLE OF CONTENTS PAGE 1

TABLE OF CONTENTS

CHECKLIST FOR PREPARATION OF OFFERS

BIDDING REQUIREMENTS

CONTRACT CLAUSES

STANDARD FORM 1442 - SOLICITATION, OFFER, AND AWARD

00 21 16 INSTRUCTIONS TO PROPOSERS

00 11 00 PHASE ONE – PROPOSAL SUBMISSION AND EVALUATION CRITERIA

00 12 00 PHASE TWO - PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION

CRITERIA, SELECTION PROCEDURES AND BASIS OF AWARD

00 45 00 REPRESENTATIONS AND CERTIFICATIONS

00 70 00 CONDITIONS OF THE CONTRACT

01 00 01 GENERAL CONTRACT REQUIREMENTS

CESAM FORM 1151, PROMPT PAYMENT CERTIFICATION

SPECIFICATIONS

TO BE ADDED IN PHASE TWO

End of Project Table of Contents

SOLICITATION, OFFER

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

W9127820R0111

2. TYPE OF

SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED

9 SEP 2020

PAGES OF PAGES

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

6. PROJECT NO.

MEF20045

7. ISSUED BY CODE CT 8. ADDRESS OFFER TO

U.S. ARMY ENGINEER DISTRICT, MOBILE

CONTRACTING DIVISION (CESAM-CT)

109 SAINT JOSEPH STREET

MOBILE, AL 36628-0001

SAME AS BLOCK 7

IF HAND CARRIED, DELIVER TO

CONTRACT SPECIALIST IDENTIFIED IN BLOCK 9.

9. FOR INFORMATION

CALL : Lisa Trimble Kyle Rodgers

A. NAME

Elizabeth.M.Trimble@usace.army.mil Kyle.M.Rodgers@usace.army.mil

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

(251) 690-3329

(251) 690-3356

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

FTFA171106 2-PHASE DESIGN AND CONSTRUCTION OF ACURL PHASE 2, EGLIN AIR FORCE BASE, FLORIDA

* See Section 01 00 00, Paragraph “COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK”. (TO BE PROVIDED IN PHASE TWO) **Block 13A. : Refer to Section 00 11 00 for the number of copies to submit with the original offer.

11. The Contractor shall begin performance within _8____ calendar days and complete it within __*__ calendar days after receiving award, notice to proceed.

This performance period is mandatory, negotiable. (See _ __ .)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and ___**___ copies to perform the work required are due at the place specified in Item 8 by _1400_ (hour) local time 9 OCTOBER 2020 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, is not required for the Phase Two proposal submission.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than __120__ calendar days for Government acceptance after the date Phase Two offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 1442-101

STANDARD FORM 1442(REV. 4-85)

Prescribed by GSA FAR(48 CFR) 53.236-1(e)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within _________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

20B. SIGNATURE 20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (contractor is required to sign this document and return _______ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award,

(b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED

TO SIGN (Type or print)

31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE 30C. DATE 31B. UNITED STATES OF AMERICA

BY

31C. AWARD

DATE

STANDARD FORM 1442 BACK (REV. 4-85)

SECTION 00 21 16 – INSTRUCTIONS TO PROPOSERS

CLAUSES INCORPORATED BY REFERENCE

52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 52.217-5 Evaluation of Options JUL 1990 52.222-5 Construction Wage Rate Requirements – Secondary Site of the Work MAY 2014 52.225-12 Notice of Buy American Requirement-Construction Materials Under

Trade Agreements

MAY 2014

52.236-28 Preparation of Proposals – Construction OCT 1997 252.204-7008 Compliance with Safeguarding Covered Defense Information Controls OCT 2016 252.215-7008 Only One Offer JUL 2019 252.215-7013 Supplies and Services Provided by Nontraditional Defense Contractors JAN 2018

CLAUSES INCORPORATED BY FULL TEXT

Contents

52.216-1 TYPE OF CONTRACT (APR 1984)

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

52.228-1 BID GUARANTEE (SEP 1996)

52.233-2 SERVICE OF PROTEST (SEP 2006)

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm Fixed Price, ‘C’ contract resulting from this solicitation.

(End of provision)

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

15.4% 6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60‐4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60‐4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the ‐‐

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Eglin AFB, Okaloosa County, FL.

(End of provision)

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g.,bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds-

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be _20_____ percent of the bid price or $___3M____, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of clause)

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

Procuring Contracting Officer 109 Saint Joseph St Mobile, AL 36602

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of provision)

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236‐2, Differing Site Conditions, and 52.236‐3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for:

To be determined

(c) Participants will meet at:

To be determined

(d) The purpose of the site visit is to become familiar with the existing site conditions. Requests for Information (RFIs) generated from the site visit must be entered into the ProjNet Contractor RFI system for responses. Attendance at the site visit is strongly recommended. Due to Base Security requirements and limited field staff available for construction contractor site visits, this scheduled site visit will be the only one offered. Individual requests for site visits will not be granted.

Contractors will be required to register with xxxxxx by close of business on xxxxxx and will be required to provide their given name (as it appears on their driver's license), date of birth, the project name, name of the company that they represent, and a state driver’s license number. Contractors must provide a list with the names of the persons to be attending the site visit on Company Letterhead and email it to xxxxxxx at the number/address shown below. Request for attendance received after the date shown above will not be accepted.

Name:

Email:

(End of provision)

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov/browse/index/far https://www.acquisition.gov/dfars

(End of provision)

SECTION 00 11 00 – PAGE 1

SECTION 00 11 00

PHASE ONE - PROPOSAL SUBMISSION AND EVALUATION CRITERIA

1.0 GENERAL REQUIREMENTS.

1.1 This is a Federal Acquisition Regulation (FAR) Parts 15 and 36, unrestricted, two-phase, design-build source selection. This solicitation requires the Design/Build Construction of the ACURL Reprogramming Facility at Eglin Air Force Base, Florida. A competing prime construction contractor, hereinafter referred to as the “Offeror”, shall submit a proposal that includes the required submission information for Phase One as indicated below that demonstrates the Offeror’s ability to perform the work described in this solicitation. By submission of a proposal, the Offeror accedes to all the terms of this RFP.

1.2 The period of performance is as indicated in this solicitation. The approximate construction Programmed Amount (PA) for this contract is $23,000,000. It is the intent of the Government to award a single Firm Fixed- Price contract.

1.3 In Phase One, price is not a submission requirement. Proposals will be evaluated in Phase One to determine which Offerors will submit proposals for Phase Two. In Phase One, an Offeror must submit information regarding past performance, and a narrative discussing an overall management approach. Based on the results of Phase One, the Government intends to select a maximum of five (5) of the most highly rated Offerors to participate in the Phase Two competition. However, the Government reserves the right to reject any and/or all offers.

1.4 In Phase Two, Offerors will compete to determine which Offeror will be awarded the Firm Fixed-Price contract. For Phase Two, Offerors must submit information for a technical design and construction approach, key personnel, and small business approach. Offerors will also be required to provide pricing for the project. The Government reserves the right to reject any and/or all offers in Phase Two.

2.0 WHO MAY SUBMIT.

2.1 In Phase One, any responsible, interested, construction contractors may submit a proposal. For Phase-Two, only the Offerors that are selected in Phase-One to participate in Phase-Two will be allowed to submit a proposal.

2.2 Any design firm that participated in preparation of this solicitation, whether as a Government contractor or as a subcontractor to a Government contractor, is not eligible to participate in this solicitation as a prime contractor or subcontractor due to a conflict of interest. The Government considers such firms to have an unfair competitive advantage, and therefore will not consider such firms.

3.0 PHASE ONE - PROPOSAL SUBMISSION REQUIREMENTS.

3.1 Submit the electronic proposal package to the U.S. Army Corps of Engineers via DoD SAFE (https://safe.apps.mil/) as indicated on the Standard Form 1442 (SF 1442) in this solicitation. The Government must receive your proposal no later than the time and date specified in Block 13 of SF 1442.

Any and all amendments to the solicitation shall be acknowledged by signing on each amendment (SF30) and by completing Block 19 of the SF 1442. To

SECTION 00 11 00 – PAGE 2

confirm proposal receipt, you may call the Point of Contact listed on the

SF1442.

3.2 Submit your proposal as follows:

Submit one (1) electronic copy of the entire proposal (“Volume I and II”) in Portable Document File (PDF) format. Label the pdf “Volumes I and II”.

Submit one (1) electronic copy of Volume II in Portable Document File (PDF) format. Label the pdf “Volume II”.

Hard copies of Volumes I and II are not required to be submitted, and will not be accepted or evaluated. However, when formatting the PDF files the page size should be 8-1/2” x 11” for all pages except schedules and organizational charts, as applicable, which should be 11” x 17” (counts as one sheet toward page limitation).

3.3 To effectively and equitably evaluate proposals, the Source Selection Evaluation Board (SSEB) must receive information, in the order described below, that clearly describes an Offeror's capabilities to successfully execute design and construction in support of this project. It is therefore an Offeror’s responsibility to submit proposal information that is fully responsive to the submission requirements of this section. Offerors are responsible for organizing material sequentially under tabs and numbered pages as set out below to facilitate evaluation. Materials that are not properly organized may easily be overlooked during evaluations, possibly affecting an Offeror’s rating. Offers should be concise, addressing only the information outlined in this section.

4.0 PHASE ONE – EVALUATION CRITERIA.

4.1 There are two volumes required for Phase One. Volume I includes certain administrative requirements that are not rated. Volume II has three rated non-priced evaluation factors.

PHASE ONE - EVALUATION FACTORS AND ORDER OF RELATIVE IMPORTANCE

Volume Factor - Description Relative Importance

Volume I Administrative Requirements Not Rated

Volume II

- Tab A

Factor 1 – Past Performance Information of the Prime Contractor

1st in relative importance; more important than Factor 2

Volume II

– Tab B

Factor 2 – Past Performance Information of the Lead Design Firm

2nd in relative importance; less important than Factor 1

Volume II

– Tab C

Factor 3 – Overall Management Approach

3rd in relative importance; less important than Factor 2

4.1.1 Volume I, Administrative Requirements. The information submitted under this tab is not rated but checked for compliance.

(a) Submit a Standard Form (SF) 1442, completed and signed by an authorized representative of the Offeror. Also include a completed and signed Proposal Data Sheet (See Attachment 1).

(b) Offerors submitting proposals as a Joint Venture (JV) shall obtain a DUNS number and be registered in the System for Award Management (SAM) as a JV. Include a fully executed Joint Venture Agreement.

SECTION 00 11 00 – PAGE 3

(c) Submit an Organizational Conflicts of Interest (OCI) Disclosure:

The Offeror shall provide a disclosure statement with its proposal that concisely describes all the relevant facts concerning any past or present OCIs relating to this solicitation. If applicable, in the same statement, the Offeror shall provide information to assure the government that the conflicts of interest have been mitigated and/or neutralized to the maximum extent possible. If a conflict of interest is discovered after award of this contract, the Contracting Officer will make a decision on whether or not to terminate the contract. If no conflicts of interest exist, the Offeror shall provide a statement stating no Conflicts of Interest exist.

(d) All other documentation as identified in the Contract Clauses specifications sections within this solicitation.

4.2 Volume II - Tab A, Factor 1 – Past Performance Information of the Prime Contractor. The Past Performance of the Prime Contractor (Offeror) consists of (a) Relevant Company Effort and (b) Quality of Past Performance. The Government will review recent, relevant company efforts and quality information provided by the owners of those efforts to assess the Offeror’s past experience and probability of successfully performing the work described in this solicitation. For this factor, a recent, relevant project is a construction project:

(a) Performed under a contract or task order, as those terms are defined in FAR 2.101, for the Federal Government, or similar contractual agreements for State or Local Governments, or the commercial or private sector. (Multiple projects under a single contract or task order are considered one project. However, do not combine multiple projects under separate contracts or task orders to create a single project.);

(b) That is “recent”; one that has been completed within ten (10) years of the solicitation issue date, or one where the construction is at least 50% complete (measured by performance period days) as of the solicitation issue date. (Offerors are responsible for providing start and completion dates for each completed project, or the start and scheduled completion dates for projects currently under construction.);

(c) That is “relevant”; one that is similar in scope (type, size, complexity and dollar value) to the project types described in this solicitation. For a project to be assessed any degree of “relevancy” it must reflect performance of design and construction requirements as described by this solicitation.

4.2.1 (a) Relevant Company Effort: The Offeror shall provide no more than five (5) examples of recent, relevant construction projects performed as the prime construction contractor that demonstrate the company’s ability to perform work similar in scope and magnitude to that required by this solicitation. For each project, the Offeror shall furnish the information specified below. Attachment 2, at the end of this section, may be used to present the information. The construction effort shown does not have to be a task order under an IDIQ contract, but where it is, clearly indicate so. If more than five (5) projects are submitted for evaluation, only the first five

(5) projects presented will be evaluated.

(1) Company Name

(2) Name of Project

(3) Location of Project

SECTION 00 11 00 – PAGE 4

(4) Project Owner

(5) General Scope of Project

(6) Your Role and Construction Type Work Your Company Self-Performed on site other than Construction Management Services

(7) Construction Cost of the single project

(8) Extent and Type of Work Subcontracted Out

(9) Construction Period - Start and Completion/Scheduled Completion Dates (Provide Month/Year)

(10) Termination or Liquidated Damages Information; Comments regarding any known performance deemed unacceptable to the customer, or not in accordance with the contract terms and conditions.

(b) Quality of Past Performance.

(1) The Offeror shall submit evidence of the quality of their past performance for each project. For Federal Government projects, the Offeror shall provide a completed contractor performance evaluation, whether interim or final, found in the Contractor Performance Assessment Reporting System (www.cpars.gov/). If a proper evaluation does not exist in CPARS, because it has not been completed or the project is a non-Federal Government project, the Offeror shall provide a completed Past Performance Questionnaire (PPQ).

(See Attachment 3). If, at time of evaluation, a final contractor performance evaluation exists in CPARS, and yet the Offeror submits a PPQ, only the evaluation in CPARS will be considered.

(2) Past performance surveys/assessment/evaluation forms other than CPARS or PPQs are unacceptable and will not be considered or evaluated.

(3) Completed PPQs that were submitted in response to previous solicitations may be used in this source selection. However, Offerors shall not incorporate such PPQs by reference. The Offeror must resubmit PPQs for each submitted project within their proposal as evidence of quality of past performance. This does not, however, preclude the Government from utilizing previously submitted PPQ information in the Past Performance evaluation.

While the Government may elect to consider data from other sources, the burden of providing current, detailed and complete past performance information rests with the Offeror.

(4) If the CPARS or PPQs for each submitted project within the proposal indicate that the Offeror was required to take corrective action for any substandard performance or experienced other performance problems such as cost overruns, extended performance periods, numerous warranty calls, etc., the Offeror should explain the circumstances and the corrective actions taken within their proposal.

(5) If an Offeror’s client/customer will only provide completed PPQs directly to the U.S. Army Corps of Engineers, Mobile District, Offerors must ensure the client/customer submits the PPQ by the proposal due date to the Points of Contact indicated on the SF1442. The solicitation number shall be included on the PPQ form. PPQs received after the proposal due date will be considered untimely and will not be considered during the evaluation.

4.2.2 Joint Venture Submission Requirements.

4.2.2.1 Like other Offerors, a JV Offeror shall provide no more than five (5) examples of recent, relevant projects performed by the JV that reflect the JV’s ability to perform the work required in this solicitation.

SECTION 00 11 00 – PAGE 5

4.2.2.2 If the JV Offeror does not have five (5) projects performed as a JV, the Offeror may supplement those projects it performed as a JV with recent, relevant projects performed by the members of the JV in their individual capacities. In such instance, the total number of projects submitted by the JV shall be no more than five (5).

4.2.2.3 If the JV Offeror has not previously performed as a JV, each member of the JV may submit recent, relevant projects performed in their individual capacities. The total number of projects submitted by the JV shall be no more than five (5).

4.2.3 All Business Entities: To satisfy Paragraph 4.2.1 subparagraphs (a) and (b), only information pertaining to the corporate entity listed on the SF 1442 will be considered in the evaluation. Information related to a parent company, affiliates, divisions, subsidiaries, other related entities, subcontractors, or the individual experience of key personnel will not be considered.

4.2.4 Verification: The Government reserves the right to verify the information on projects submitted for evaluation, and to review CPARS, or other Government project appraisal systems, for information on other projects performed by the Offeror whether submitted as part of a proposal or not. The Government also reserves the right to contact project clients/customer, or other references. For any adverse performance information found for which the Offeror has not had an opportunity to address, the Offeror will be afforded an opportunity to explain.

4.3 Volume II - Tab B, Factor 2 – Past Performance Information of the Lead Design Firm. The Past Performance of the Lead Design Firm consists of (a) Relevant Company Effort and (b) Quality of Past Performance. The Government will review recent, relevant company efforts and quality information provided by the owners of those efforts to assess the Lead Design Firm’s past experience and probability of successfully performing the work described in this solicitation. For this factor, a recent, relevant project is a design project:

(a) Performed under a contract or task order, as those terms are defined in FAR 2.101, for Federal Government, or similar contractual agreements for State or Local Governments, or the commercial or private sector. (Multiple projects under a single contract or task order are considered one project. However, do not combine multiple projects under separate contracts or task orders to create a single project.);

(b) That is “recent”; one that has been completed within six (6) years of the issue date. (Lead Design Firm’s are responsible for providing start and completion dates for each completed project);

(c) That is “relevant”; one that is similar in scope (type, size, complexity and dollar value) to the project types described in this solicitation. For a project to be assessed any degree of “relevancy” it must reflect performance of design and construction requirements as described by this solicitation.

4.3.1 (a) Relevant Company Effort of Lead Design Firm: The Lead Design Firm shall provide no more than five (5) examples of recent, relevant design projects performed as the Lead Design Firm that demonstrate the company’s

SECTION 00 11 00 – PAGE 6

ability to perform work similar in scope and magnitude to that required by this solicitation. For each project, the Lead Design Firm shall furnish the information specified below. Attachment 4, at the end of this section, may be used to present the information. The design-build construction effort shown does not have to be a task order under an IDIQ contract, but where it is, clearly indicate so. If more than five (5) projects are submitted for evaluation, only the first five (5) projects presented will be evaluated.

(1) Lead Design Firm Name

(2) Name of Project (Type of Project)

(3) Location of Project

(4) Project Owner

(5) General Scope of Project

(6) Summary of Role in Design the Project

(7) Construction Cost of the single project

(8) Extent and Type of Work Subcontracted Out

(9) Design Period – Start and Completion Dates (Provide Month/Year)

(10) Construction Period - Start and Completion/Scheduled Completion Dates (Provide Month/Year)

(11) Performance Evaluation

(12) Owner POC and telephone number

(13) LEED Rating, if applicable

(b) Quality of Past Performance for the Lead Design Firm.

(1) The Lead Design Firm shall submit evidence of the quality of their past performance for each project. For Federal Government projects, the Lead Design Firm shall provide a completed contractor performance evaluation, whether interim or final, found in the Contractor Performance Assessment Reporting System (www.cpars.gov/). If a proper evaluation does not exist in CPARS, because it has not been completed or the project is a non-Federal Government project, the Lead Design Firm shall provide a completed Past Performance Questionnaire (PPQ) (See Attachment 5). If, at time of evaluation, a final contractor performance evaluation exists in CPARS, and yet the Lead Design Firm submits a PPQ, only the evaluation in CPARS will be considered.

(2) Past performance surveys/assessment/evaluation forms other than CPARS or PPQs are unacceptable and will not be considered or evaluated.

(3) Completed PPQs that were submitted in response to previous solicitations may be used in this source selection. However, Lead Design Firm shall not incorporate such PPQs by reference. The Lead Design Firm must resubmit PPQs for each submitted project within their proposal as evidence of quality of past performance. This does not, however, preclude the Government from utilizing previously submitted PPQ information in the Past Performance evaluation. While the Government may elect to consider data from other sources, the burden of providing current, detailed and complete past performance information rests with the Lead Design Firm.

(4) If the CPARS or PPQs for each submitted project within the proposal indicate that the Lead Design Firm was required to take corrective action for any substandard performance or experienced other performance problems such as cost overruns, extended performance periods, numerous warranty calls, etc., the Lead Design Firm should explain the circumstances and the corrective actions taken within their proposal.

SECTION 00 11 00 – PAGE 7

(5) If an Lead Design Firm’s client/customer will only provide completed PPQs directly to the U.S. Army Corps of Engineers, Mobile District, Lead Design Firm must ensure the client/customer submits the PPQ by the proposal due date to the Points of Contact indicated on the SF1442. The solicitation number shall be included on the PPQ form. PPQs received after the proposal due date will be considered untimely and will not be considered during the evaluation.

4.3.2 Joint Venture Submission Requirements for the Lead Design Firm.

4.3.2.1 A JV Lead Design Firm shall provide no more than five (5) examples of recent, relevant projects performed by the JV that reflect the JV’s ability to perform the work required in this solicitation.

4.3.2.2 If the JV Lead Design Firm does not have five (5) projects performed as a JV, the Lead Design Firm may supplement those projects it performed as a JV with recent, relevant projects performed by the members of the JV in their individual capacities. In such instance, the total number of projects submitted by the JV shall be no more than five (5).

4.3.2.3 If the JV Lead Design Firm has not previously performed as a JV, each member of the JV may submit recent, relevant projects performed in their individual capacities. The total number of projects submitted by the JV shall be no more than five (5).

4.3.3 All Business Entities for the Lead Design Firm: To satisfy Paragraph

4.3.1 subparagraphs (a) and (b), only information pertaining to the corporate entity’s lead design firm as demonstrated on the Proposal Data Sheet (Attachment 1) will be considered in the evaluation. Information related to a parent company, affiliates, divisions, subsidiaries, other related entities, subcontractors, or the individual experience of key personnel will not be considered.

4.3.4 Verification for the Lead Design Firm: The Government reserves the right to verify the information on projects submitted for evaluation, and to review CPARS, or other Government project appraisal systems, for information on other projects performed by the Lead Design Firm whether submitted as part of a proposal or not. The Government also reserves the right to contact project clients/customer, or other references. For any adverse performance information found for which the Lead Design Firm has not had an opportunity to address, the Lead Design Firm will be afforded an opportunity to explain.

4.4 Volume II - Tab C, Factor 3 – Overall Management Approach.

4.4.1 In Factor 3, the Offeror must submit an overall management approach narrative to explain their company’s ability to execute the contract. The response to Factor 3 shall be limited to twenty (20) pages. Address each of the following items in the narrative:

(a) Describe the home office organizational structure, allocation of responsibilities, and show the lines of authority to support the execution of this design-build contract. At a minimum, discuss key management positions and departments, project team composition for both design and construction, to include subcontractors, etc. Include an organizational chart and ensure the information fully supports the narrative.

SECTION 00 11 00 – PAGE 8

(b) Describe the Offeror’s business method for selecting subcontractors and for managing subcontract acquisition, execution and administration, including the technical approach to correcting deficient work performed by subcontractors.

(c) Describe the Offeror’s plan to ensure a safe environment for the job site. The discussion shall include the contractor’s plan for safe performance of the project requirements that would be required for a typical construction project in and around a military installation including joint building/site occupancy.

5.0 PHASE ONE - EVALUATION PROCESS.

5.1 A Source Selection Evaluation Board (SSEB) composed of U.S. Army Corps of Engineers personnel, Using Activity representative, and, as necessary, technical advisors will conduct the evaluation. The number and identities of Offerors are not revealed to anyone not involved in the evaluation and award process or to other Offerors. The SSEB will evaluate proposals, using the factors and evaluation criteria described in this section.

5.2 The evaluation process for Phase One consists of two parts: Proposal Compliance Review, and Non-Price Factor Evaluation.

5.2.1 Proposal Compliance Review. This is an initial check by Contracting Division to ensure that all required forms are complete, and in compliance with all administrative and submission criteria.

5.2.2 Non-Price Factor Evaluation. In accordance with the solicitation, each member of the SSEB will conduct an independent review of the proposals. The review will be an in-depth, systematic evaluation of the proposal against the submission criteria and evaluation factors. After these reviews, the SSEB, by consensus, will provide a rating for each evaluation factor supported by a justifying narrative. The Offeror’s ratings are confidential, and will remain in the Contracting Officer’s files. Upon completion of the evaluations, the results will be provided to the Contracting Officer in the form of a Proposal Analysis Report with a recommendation of the offerors who are most qualified to proceed to Phase Two.

5.3 Evaluation of Factor 1 – Past Performance Information of the Prime Contractor and Factor 2 – Past Performance Information of the Lead Design Firm. Factor 1 and Factor 2 will be rated individually, each with relevancy ratings and a confidence rating applied as described below.

(1) An Offeror’s “Relevant Company Effort” information will be evaluated to determine if the construction and design projects submitted are “recent”, and “relevant”. For this solicitation, the Government will give more consideration for: design-build construction project on military installations; for dollar value similar to those anticipated under this solicitation; and projects where the Offeror performed as the prime contractor, as opposed to a subcontractor. Additionally, more consideration will be given to projects that demonstrate experience with secure areas, specifically SCIFs; and projects in which the Offeror and Lead Design Firm previously performed together. Additionally, more consideration will be given to a project portfolio that reflects successful performance of a diversity of construction and repair type projects similar to those described by this solicitation.

SECTION 00 11 00 – PAGE 9

This project is for the design and construction of the second phase of the ACURL Reprogramming Facility, a 2-story addition approximately 34,669 square-feet and 1,800 square feet in renovations at Eglin AFB, FL. This second phase of the ACURL includes an electronics lab and control room, lab tech support offices, separate smaller electronic work rooms, a Network Operations Center, office and engineering support areas, receiving area and classified material storage areas at Secret/Collateral and SAP levels, and a large training room with AV/VTC capabilities. The project scope includes reinforced concrete foundation and floor slab, steel structure, masonry walls, metal roof, HVAC, fire detection and protection, and mass notification system, and other supporting work necessary to make a complete and usable facility.

(2) The Government will then assess how well an Offeror and their Lead Design Firm performed on their projects. The Government will, as necessary, confirm quality of past performance data provided by the Offeror and, at its discretion, obtain additional past performance information, if available, from other sources. When the relevant performance record indicates performance problems, the Government will consider the number and severity of the problems and the appropriateness and effectiveness of any corrective action taken (not just planned or promised). The Government may review more recent contracts or performance evaluations to ensure corrective actions have been implemented and evaluate their effectiveness.

(3) Upon completion of its evaluation of each project, the SSEB, by consensus, will assign each project one of the following ratings:

Past Performance Relevancy Ratings Very Relevant - Present/Past effort involved essentially the same scope and magnitude, effort and complexities this solicitation requires.

Relevant - Present/Past effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Somewhat Relevant - Present/Past effort involved some scope and magnitude of effort and complexities this solicitation requires.

Not Relevant - Present/Past effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

No overall relevancy rating is assigned to an Offeror’s or Lead Design Firm’s portfolio of projects. Rather, after checking compliance and assigning each project a relevancy rating, the SSEB will then determine an overall Performance Confidence Assessment rating. The overall Performance Confidence Assessment rating takes into consideration the degree of relevancy of each project, and the quality ratings of those projects.

(4) If the Offeror or Lead Design Firm is submitting as a Joint Venture (JV), the SSEB will utilize the information submitted to conduct the relevancy and performance confidence assessment ratings of the JV, as previously indicated. Based on the information submitted by the JV Offeror, the SSEB will evaluate and assess:

(i) The JV’s “Past Performance Information”, and/or

(ii) Either JV partners’ “Past Performance Information”

(5) The overall Performance Confidence Assessment Rating reflects the degree of probability that the Offeror and Lead Design Firm will be able to meet the solicitation’s requirements. Upon completion of the evaluation, one of the following ratings will be assigned:

SECTION 00 11 00 – PAGE 10

Performance Confidence Assessment Ratings and Description Substantial Confidence

Based on the Offeror’s recent/relevant performance record, the Government has a high expectation that the Offeror will successfully perform the required effort.

Satisfactory Confidence

Based on the Offeror’s recent/relevant performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort.

Neutral Confidence

No recent/relevant performance record is available or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonable assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.

Limited Confidence

Based on the Offeror’s recent/relevant performance record, the Government has a low expectation that the Offeror will successfully perform the required effort.

No Confidence Based on the Offeror’s recent/relevant performance record, the Government has no expectation that the Offeror will successfully perform the required effort.

(6) Offerors and Lead Design Firms with little or no relevant past performance will not be evaluated favorably or unfavorably for Factor 1 or 2.

However, such a proposal will be rated neutral confidence, and thus may not represent the most advantageous proposal to the Government when compared to the proposals of other Offerors and Lead Design Firms with recent/relevant past performance.

5.4 Evaluation of Factor 3 – Overall Management Approach. The SSEB will evaluate the management approach narrative to assess the Offeror’s overall organizational structure, management of subcontractors, and safety measures to ensure it reflects an understanding of the requirements of the solicitation. The overall management approach will be assessed for understanding, logic, and reasonableness. The SSEB will determine the strengths, weaknesses and deficiencies, if any, in the approach presented, and then assign an overall combined technical/risk ratings as listed below.

Combined Technical/Risk Rating and Definitions OUTSTANDING Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.

GOOD Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.

ACCEPTABLE Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.

MARGINAL Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.

UNACCEPTABLE Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies,…