20R0050-0002-AMENDMENT.pdf
PDF 715 KB Posted
- Attached to
- Lower 4 PL84-99 Earthwork Federal contract opportunity
- Solicitation number
- W912P9-20-R-0050-0002
About this file
This is an amendment to a solicitation for the Lower 4 PL84-99 Earthwork project. The amendment provides answers to 16 questions from potential offerors. Key details include decreasing the required number of proposal copies from 4 to 1, and extending the response deadline from August 28, 2020 to August 31, 2020 at 10:00 AM. The project involves slide repairs and erosion control work along levees in Illinois. The U.S. Army Corps of Engineers is the contracting agency. No bid bond or advance payment bond is required. The wage determination was clarified. Restrictions on work hours and contractor access to residences were addressed. The sources and use of water, as well as borrow areas, were also discussed.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 20R0050-0002-ATTACHMENT-1.pdf | ||
| 20R0050-0002-ATTACHMENT-2.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SEE PAGE TWO.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Aug-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P920R0050
X 9B. DATED (SEE ITEM 11)
20-Jul-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Aug-2020
CODE
CONTRACTING DIVISION
US ARMY ENGR DIST ST LOUIS
1222 SPRUCE STREET, RM 4.207
ST LOUIS MO 63103-2833
W912P9 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P920R0050
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
AMENDMENT 0002
QUESTIONS AND ANSWERS FOR LOWER 4 EARTHWORK
1.) Paragraph states: “The outside cover of each separate volume (Vol 1 – Technical; Vol 2 – Price) must be clearly marked.” It appears this paragraph requirement is missing a (2) as designation. Please confirm this requirement is separate from (1) and (3) and amend with a “2” designator.
USACE RESPONSE: This is to confirm that it is a “2” designator.
2.) Request offerors be allowed to submit previously completed Past Performance Questionnaires?
USACE RESPONSE: No.
3.) Section L, 14, (4) states Tab 1 is the Proposal Cover Sheet. However, Section L,
16. PROPOSAL FORMAT - VOLUME 2 refers to tab 1 (PRICE). Please clarify which section is “Tab 1
USACE RESPONSE: Note Tab 1 includes the following:
Information to be provided in Volume 2 Tab 1:
• Proposal Cover Sheet (see instructions below)
• Standard Form 1442 “Solicitation, Offer and Award” and all amendments to the solicitation signed and dated
• Section 00010Bid Schedule
• Copy of SAM’s Representations and Certifications for offeror your Proposal Cover Sheet and
4.)The SF1442 indicates no bid guarantee is required. However, at LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000) there is Liquidated damages amount listed. Gov’t confirm whether bid guarantee and/or a bid bond is required with submission of the proposal?
USACE RESPONSE: Bid Guarantee is not required.
5.) Clause states: “if the offeror intends to use an ILC in lieu of a bid bond” …Please confirm that a bid bond and/or ILC are not required with proposal.
USACE RESPONSE: See response to #4
6.) RFP Instruction at Section L, Section 00 21 16 , Line Item 7 states “Electronic proposals, and their applicable modifications or cancellations, will not be accepted…” However, at Clause under Section 00 21 16 states proposal is to be submitted via “electronic media” Please clarify whether proposal is expected to be submitted hard copy or via electronic means. If via electronic, please amend this clause and the line item 7 stating electronic offers will not be accepted.
USACE RESPONSE: Amendment 0001 has instructions on how to submit proposal
7.) Can the Gov’t provide a copy of the attendees list for the site walk?
USACE RESPONSE: See Attachment-1
8.) Wage Determination IL20200018 - Heavy (Dredging and Marine) is included with the RFP. Should this not be Wage Determination IL20200016 - Heavy and Highway? There is no dredging or other marine work upon the Mississippi River or Big Muddy River indicated in the scope of work.
USACE RESPONSE: IL20200016 Heavy Highway is correct (See Attachment-2)
9.) Is a Notice of Intent (NPDES) required to be submitted the State of Illinois?
Who will sign as “Owner” for the NOIs? USACE? Levee Districts?
Has USACE imitated and completed the required Historic Preservation & Endangered Species Compliance reviews required under the NPDES General Permit?
USACE RESPONSE: Please reference SECTION 01 11 30. NOIs not required to be submitted. USACE has completed our project requirements for Historic Preservation and Endangered Species Compliance.
10.) What, if any are the restrictions on the Contractor’s work hours and schedule?
USACE RESPONSE: No restrictions on work hours or schedule.
11.) What agreements does the USACE or the Levee Districts have to accommodate and mitigate the impact on the residences? Does the Contractor need to provide temporary access to the residences and emergency services? Temporary access could require the construction of temporary roads and ramps outside of the provided construction limits. Which CLIN should include these costs?
USACE RESPONSE: As soon as any haul road shall have served the purpose for which it was constructed, the opening in the existing levee shall be restored to the prescribed grade and section and dressed, fertilized and seeded or sodded. The levee embankment restoration shall be accomplished as specified and as shown on the drawings.
Material used in the construction of the approach ramps of the haul roads shall be removed. The areas of the levee slopes formerly covered by the ramps shall be prepared and seeded as specified in 32 29 35.99 15, or sodded in a manner approved by the Contracting Officer at no additional cost to the Government.
11.) There is no CLIN item to repair/replace these road sections. Which CLIN should include these costs?
Please provide specifications for Asphaltic Concrete Repair
USACE RESPONSE: Asphaltic Concrete Repair is not included in the scope of work.
13.) Can water be used from flowing adjacent rivers, streams, channels (i.e. not stagnant, shallow or marshy)?
What are the “… State approved sources …”?
USACE RESPONSE: Pipeline intakes in flowing streams and rivers shall be enclosed to exclude silt, mud, grass and other solid materials and there shall be a minimum depth of 2 feet of water under the intake at all times. In addition, water obtained from other than State approved sources shall be free from oil, acid, alkali or any other substances deleterious to the soil-lime mixture.
14.) Are any of the repair areas on “Federal Levees”?
USACE RESPONSE: The project limits are on Federal Levees.
15) The technical requirements work plan require that working in the area of the pipeline be addressed. Based on the site visit and our review of the plan sheets there are no slide repairs on this solicitation near the pipeline that crosses the Grand Tower levee. Is this correct?
USACE RESPONSE: Page 14/62 4)a. of work plan does ask for this to be addressed, but you are correct. There are no areas within this contract that will require work near the pipeline that crosses Grand Tower.
16.) Is the contractor responsible for providing borrow for CLIN 0005, 2004, & 2008?
USACE RESPONSE: CLIN 0005: Borrow will be required, however it will be hauled from within the project. The work shall be schedule so that excess material from the slide repairs can be utilized with the Type III erosion.
CLIN 2004: No.
CLIN 2008: No.
End of Questions and Answers.
NOTE: Please send in your DoD Safe request for submitting Proposals, and also send your proposals to the point of contacts in amendment 0001
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 28-Aug-2020 10:00 AM to 31-Aug-2020 10:00 AM.
The number of offeror copies required has decreased by 3 from 4 to 1.
(End of Summary of Changes)