20Q1120 Atch 1 SOW Underwater Treadmill dtd 27 Aug 2020.pdf
PDF 174 KB Posted
- Attached to
- Whiteman AFB Underwater Canine Treadmill
- Solicitation number
- FA462520Q1120
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
509TH MEDICAL GROUP (AFGSC)
WHITEMAN AIR FORCE BASE, MISSOURI
NO HEALTH…NO STEALTH!!
Statement of Work
Underwater Treadmill for Canines Contract for 509th Medical Group
27 August 2020
1. GENERAL INFORMATION. The contractor shall provide all personnel, equipment, tools, transportation, materials and other items as needed to complete installation. The contractor shall install Underwater treadmill in Whiteman AFB Veterinary Clinic, 900 Perimeter Rd., Bldg 1732, Whiteman AFB, MO 65305.
2. SCOPE OF WORK.
2.1. Salient Characteristics. The Underwater Treadmill for Canines must have the following:
Treadmill belt runs in both, forward and reverse directions with a speed from 0.2 mph to 9mph in 0.1 mph increments
The running surface can accommodate large breed of canines
Programmable touch screen
All hardware and software requirements are included in the equipment
Variable speed motor
4-year warranty
Resistance jets with automatic incline and transfer pumps
400 gallons storage tank with recirculation system
Low dual entry/exit doors walk through /with no ramp required entry
Water treatment starter kit included
The underwater treadmill can also be heated and chlorinator
Belt surface area for exercising: 65 in long x 20 in wide
At least 77 in length x 32 in depth x 32 height
Emergency drain on treadmill in the event of power failure or water contamination
DEPARTMENT OF THE AIR FORCE
509TH MEDICAL GROUP (AFGSC)
WHITEMAN AIR FORCE BASE, MISSOURI
NO HEALTH…NO STEALTH!!
2.3. Requirements. The contractor hereby agrees to install Underwater Treadmill. Contractor shall use only approved Air Force products. All wiring shall meet Air Force security standards and routed through a conduit. Then equipment must be compatible with existing equipment. A Floor plan will be provide upon contract award. If access to the network, plumbing, and waterlines are required the contractor will contact 509 MDG/SGGM Facility Management, POC:
Donald Munson at 660-687-2105, email: donald.s.munson.civ@mail.com. Any damages to the facility made during the installation will be fixed by contractor at no additional expense.
Contractors must do the following:
Provide their own equipment to install
Must dispose of their own refuse
Equipment must be validated for serviceability upon completion with the Medical Group
Company must provide their own transportation
Ensure Installation is within codes and regulations applicable to federal, national, and local standards
Company must provide documentation to the service and equipment to include, not limited to, warranty, certifications, and etc
Coordinate with 509th Medical facilities for installation
Equipment must be compatible with existing and scheduled facility modification
Onsite Training
3. MEETING SALIENT CHARACTERISTICS. The Contractor must provide equipment and installation which meets the characteristics laid out in this document. If the Contractor submits equipment which does not explicitly meet all of the specifications in this Statement of Work, they must provide qan explanation as to how the intend to meet the requirements of this project.
File details come from the government source that posted it. Updated .