12034320Q0060
1. REQUEST NO.
5a. ISSUED BY
NAME
a. NAME
c. STREET ADDRESS
d. CITY
10. PLEASE FURNISH QUOTATIONS TO
THE ISSUING OFFICE IN BLOCK 5a ON
OR BEFORE CLOSE OF BUSINESS (Date)
2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG.1
RATING
6. DELIVERY BY (Date)
7. DELIVERY
9. DESTINATION
a. NAME OF CONSIGNEE
b. STREET ADDRESS
PAGE OF PAGES
5b. FOR INFORMATION CALL: (No collect calls)
TELEPHONE NUMBER
AREA CODE NUMBER
8. TO:
b. COMPANY
e. STATE f. ZIP CODE
c. CITY
d. STATE e. ZIP CODE
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
THIS RFQ
REQUEST FOR QUOTATION
(THIS IS NOT AN ORDER)
IS IS NOT A SMALL BUSINESS SET ASIDEX
03/04/2020
1 97
R1 AQM EAST SIDE ACQUISITION TEAM
ATTN DANA BANGART
3710 FALLON STREET SUITE C
USDA FOREST SERVICE
BOZEMAN MT 59718
10/01/2020
USDA FOREST SERVICE
DISTRICT RANGER GALLATIN NTL FOREST
PO BOX 5 HWY 89 S
GARDINER
MT 59030
406 624-3442DANA BANGART
03/20/2020 1630 MT
FOB DESTINATION
OTHER
(See Schedule)X
ITEM NO.
(a)
SUPPLIES/SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
Period of Performance: 07/01/2020 to 10/01/2020
0001 Davis Creek and Upper Eagle Creek AOP Culverts Product/Service Code: Z2QA Product/Service Description: REPAIR OR ALTERATION
OF RESTORATION OF REAL PROPERTY (PUBLIC OR
PRIVATE)
Delivery: 10/01/2020 There is no formal site visit for this project.
Interested vendors are highly encouraged to visit the site prior to submitting a quotation.
Please read Section L of the solicitation to understand what is required in the response package and where to send it.
Continued ...
12. DISCOUNT FOR PROMPT PAYMENT
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations
13. NAME AND ADDRESS OF QUOTER
b. STREET ADDRESS
c. COUNTY
d. CITY e. STATE f. ZIP CODE
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
16. SIGNER
a. NAME (Type or print)
c. TITLE (Type or print)
a. NAME OF QUOTER
AREA CODE
NUMBER
15. DATE OF QUOTATION
b. TELEPHONE are are not attached
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not usable
STANDARD FORM 18 (REV. 6-95)
Prescribed by GSA - FAR (48 CFR) 53.215-1(a)
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 97
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12034320Q0060
All respondents shall be registered and active in the System for Award Management at the time of
Contracting Officer receiving quote.
Magnitude of Construction Project (per FAR
36.204(c)) - Between $100,000 and $250,000.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
12034320Q0060 – RFQ
Davis Creek and Upper Eagle Creek Aquatic Organism Passage (AOP) Culverts Gardiner Ranger District, Custer Gallatin National Forest
B – SUPPLIES OR SERVICES AND PRICES
DAVIS CREEK AND UPPER EAGLE CREEK AQUATIC ORGANISM PASSAGE (AOP) CULVERTS
GARDINER RANGER DISTRICT, CUSTER GALLATIN NATIONAL FOREST
PARK COUNTY, MONTANA
B-1 SCHEDULE OF ITEMS
DAVIS CREEK AOP CULVERT
ITEM
NO.
DESCRIPTION
METHOD
OF
MEASUR
E-MENT
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
151-01a
MOBILIZATION
LSQ
Lump
Sum
1 $ XXXX $
152-01a
CONSTRUCTION SURVEY AND
STAKING
Sum
157-13a
SOIL EROSION CONTROL
Sum
201-01a
CLEARING AND GRUBBING
Sum
203-04a
REMOVAL & DISPOSAL OF
EXISTING CULVERT
Sum
208-01a
EXCAVATION
DQ CY 1028 $ $
204-03a
EMBANKMENT
DQ CY 682 $ $
209-01a
STRUCTURE BACKFILL
DQ CY 383 $ $
209-03a
BEDDING
DQ CY 20 $ $
209-05a
FOUNDATION FILL
AQ CY 10 $ $
251-01a
CLASS 4 RIPRAP ON UPSTREAM
DQ CY 15 $ $
251-05a
CLASS 5 RIPRAP INSIDE
CULVERT
DQ CY 40 $ $
DESCRIPTION
METHOD
OF
MEASUR
E-MENT
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
251-06a
CLASS 6 RIPRAP IN GRADE
CONTROL
DQ CY 45 $ $
251-07a
WEIR BOULDERS DQ EACH 30 $ $
251-09a
SALVAGED STREAMBED
MATERIAL
DQ CY 10 $ $
301-01a
SURFACE COURSE
AGGREGATE
DQ
CY
602-01a
128” X 83” x 68’ PIPE ARCH
(12 Gauge)
LSQ
Lump
Sum
602-20a
CONSTRUCTED STREAMBANK
(Includes furnishing and installing all materials)
DQ LF 40 $ $
622-01a
RENTAL EQUIPMENT AQ HR 4 $ $
623-01a
GENERAL LABOR
AQ HR 8 $ $
TOTAL FOR DAVIS CREEK AOP CULVERT
UPPER EAGLE CREEK AOP CULVERT
NO.
DESCRIPTION
METHOD
OF
MEASUR
E-MENT
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
151-01b
MOBILIZATION
Sum
152-01b
CONSTRUCTION SURVEY AND
STAKING
Sum
157-13b
SOIL EROSION CONTROL
Sum
201-01b
CLEARING AND GRUBBING
Sum
203-04b
REMOVAL & DISPOSAL OF
Lump
DESCRIPTION
METHOD
OF
MEASUR
E-MENT
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
EXISTING CULVERT
208-01b
EXCAVATION
DQ CY 1570 $ $
204-03b
DQ CY 1182 $ $
209-01b
STRUCTURE BACKFILL
DQ CY 418 $ $
209-03b
BEDDING
DQ CY 20 $ $
209-05b
FOUNDATION FILL
AQ CY 10 $ $
251-01b
CLASS 4 RIPRAP ON UPSTREAM
DQ CY 15 $ $
251-05b
CLASS 5 RIPRAP INSIDE
DQ CY 46 $ $
251-06b
CLASS 6 RIPRAP IN GRADE
CONTROL
251-07b
WEIR BOULDERS DQ EACH 33 $ $
251-09b
SALVAGED STREAMBED
MATERIAL
DQ CY 10 $ $
301-01b
SURFACE COURSE
AGGREGATE
602-01b
128” X 83” x 80’ PIPE ARCH
(12 Gauge)
LSQ
Lump
622-01b
RENTAL EQUIPMENT AQ HR 4 $ $
623-01b
GENERAL LABOR
AQ HR 8 $ $
TOTAL FOR UPPER EAGLE CREEK AOP CULVERT
MODIFY OUTLET AND STREAMBED AT EXISTING ROAD #3293 CULVERT
NO.
DESCRIPTION
METHOD
OF
MEASUR
E-MENT
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
251-
06C
CLASS 5 RIPRAP IN
GRADE/EROSION CONTROL
DQ CY 30 $ $
622-
01C
RENTAL EQUIPMENT AQ HR 8 $ $
TOTAL FOR MODIFY OUTLET AND STREAMBED AT EXISTING ROAD #3293
TOTAL PRICE FOR ALL ITEMS $_______________________
B-2 NOTES TO QUOTER:
DQ = Design Quantity. “Design quantity” is a Forest Service method of measurement from the FS-96 Forest
Service Specifications for the Construction of Roads and Bridges. Under the FP-03 project specifications utilized in this contract this term is replaced by the term “Contract Quantity” (FSSS Section 101.04 Definitions). These quantities are based upon the original design data available prior to advertising the project. Contract quantities will be adjusted only when there are errors in the original design of 15% or more (FSSS Section 109.02
Measurement Terms and Definitions). Work is measured in accordance with Section 109 and FSSS Section 109.
AQ = Actual Quantity. “Actual quantity” is determined from measurement of the completed work measured in accordance with Section 109 and FSSS Section 109.
LSQ = Lump Sum Quantity. “Lump Sum Quantity” denotes one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job.
Quoter shall quote on all items and round to the nearest cent. Do NOT use fraction of cents in Unit Price.
This is a Request for Quotation (RFQ); therefore, no public opening will be held. The results will not be made public prior to award. Quotes submitted in response to this RFQ will not be returned, but will be retained by the U.S. Forest Service for official record purposes. The RFQ does not commit the Government to pay any costs incurred in the preparation or the submission of this quote, or to make any award.
Payment for bond premiums in accordance with Clause 52.232-5, Payment under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151-01 Mobilization.
Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitations, either before or after the solicitation’s closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse a quoter for any costs incurred.
The Forest Service utilizes an electronic invoice system called Invoice Processing Platform (IPP). Awardee is required to set-up an account at www.ipp.gov in order to submit invoices.
Price Quotation furnished by:
Name: _______________________________ Phone: ____________________________
Address: ______________________________ Cell: ____________________________
______________________________ FAX: ____________________________
E-Mail: ________________________________ DUNS # ___________________________ http://www.ipp.gov/
Gardiner Ranger District, Custer Gallatin National Forest
C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C-1 PROJECT DESCRIPTION AND LOCATION
(a) Scope of Contract. Furnish all labor, materials, equipment, supervision, and transportation necessary to complete the Davis Creek AOP Culvert, Upper Eagle Creek AOP Culvert, and Modify Outlet and Streambed at Existing Road #3293 Culvert work as shown and specified.
(b) Project Location. The project is located on Forest Road #3243 approximately 3 miles northeast of Gardiner, MT on the Custer Gallatin National Forest. The AOP Culvert construction sites are shown on the Plans. The site for the Modify Outlet and Streambed at Existing Road #3293 Culvert is located at the culvert where Road #3293 crosses Eagle Creek, approximately ¼ mile upstream from Eagle Creek Campground.
(c) Site Access for Potential Bidders. A portion of the road access route is closed to motorized use until May 16.
Contact Gardiner Ranger District at (406) 848-7375 regarding road conditions and seasonal road closure dates.
(d) Forest Service Contact. Parties with questions may contact Dale White, telephone (406) 587-6752.
(e) Pre-quote Site Tour. There will not be a pre-quote tour of the site. Interested bidders can reach the project sites on foot prior to May 16th and by vehicle via the Road #3243 after May 16th.
C-2 GENERAL SPECIFICATIONS
(a) Contractors Responsibilities. The Contractor shall comply with all applicable laws, ordinances, safety codes, regulations, orders and decrees. The Contractor shall be responsible for all damages to persons or property that occur as a result of the actions of the Contractor, all subcontractors, and all employees of the Contractor or subcontractors.
(b) Modify Outlet and Streambed at Existing Road #3293 Culvert work. This work will modify the streambanks and bed in the vicinity of the culvert outlet to create a vertical drop-off at the culvert outlet.
Stockpile riprap where directed by the C.O. Perform excavation, riprap installation, and spoils disposal (on site) as directed by the C.O.
(c) Stream Alteration Permits. The Forest Service will obtain the state and federal stream alteration permits required for the work. The Contractor shall comply with all requirements of these permits.
(d) Traffic Control and Safety. Traffic control and site safety shall be the sole responsibility of Contractor.
Adequate signs, barricades, cones, and other methods or devices shall be utilized in accordance with the MUTCD to prevent public access. Road closure shall comply with Section 156 of the Special Project Specifications for
Davis Creek and Upper Eagle Creek Aquatic Organism (AOP) Culverts.
(e) Submittals. Submit manufacturer’s literature and/or material testing results for all materials used in the work.
It shall be the Contractor's responsibility to submit all items with such promptness as to cause no delay in the work. C.O.’s written approval must be obtained before starting work which involves the item. The Contractor shall allow 7 calendar days for processing of submittals by the C.O. (with the exception of the Dewatering and
Sediment Control Plan submittal). The Contractor shall allow 14 calendar days for review of the Dewatering and
Erosion Control Plan.
(f) Noxious Weed Control. In order to reduce the potential spread of noxious weeds onto National Forest System lands, the contractor will be required to clean all construction equipment that may operate off existing roads prior
Gardiner Ranger District, Custer Gallatin National Forest to the equipment entering the National Forest boundary, in accordance with Section 151. The cleaning shall remove all dirt and plant parts that may carry noxious weed seeds inside the National Forest boundary.
All materials brought from off-Forest shall originate from weed-free sources in accordance with Subsection
105.02(b).
(g) Protection of Resources. The Contractor shall confine all operations (including storage of materials) to areas authorized or approved by the C.O., and shall not deposit rocks, excavated materials, or other debris outside of these limits. Mechanized equipment shall be operated in the creek only in areas that are completely dewatered in accordance with Section 157.
Comply with Section 107 and all Montana Department of Natural Resources & Conservation (DNRC) regulations, including Forest Fire Regulations established by the DNRC Division of Forestry.
The work location does not coincide with any known archeological or historic sites. If a previously unidentified archeological or historic site is encountered, the Contractor shall immediately discontinue work in the general area of the site and notify the C.O. immediately.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. In accordance with Section 107 report, document, and clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.
(h) Utilities. There are no known overhead or buried utilities near the work site. The Contractor shall be solely responsible for damage to water or utility lines resulting from his actions or those of his employees or subcontractors.
(i) Erosion and Sediment Control. Prior to the start of construction, obtain C.O. approval of a written
Dewatering and Erosion Control Plan prepared in accordance with Section 157. Do not begin work until the necessary controls for that particular phase of work have been implemented.
(j) Food Storage. All food, beverages, and scented or flavored toiletries must be stored unavailable to bears at night and when unattended during the day. Attractants include canned food, pop, beer, garbage, grease, livestock or pet food, toothpaste, and chapstick. They must be hung at least 10-feet off the ground and 4-feet from any vertical support, or stored inside a bear resistant container or vehicle. Cars, pick-up cabs, enclosed horse trailers, hard sided campers or camper shells are all considered bear resistant. Food should be stored out of sight in vehicles. Coolers, pop-up campers, backpacks, and tents are not considered bear resistant.
(k) Storage and Stockpiling of Equipment and Materials. Comply with Section 105. The Contractor will be allowed to store materials at the project site only at C.O. approved locations. The Contractor shall be solely responsible for the loss of or damage to materials stored on Forest Service lands or elsewhere.
(l) Disposal of Waste Materials. Unsuitable or excess excavated material shall be disposed of in accordance with
Section 209. Trees and brush shall be disposed of in accordance with Section 201. Other project waste materials shall be removed from the Government lands and disposed of legally.
(m) Cleanup. Maintain the project work areas in a clean and orderly condition throughout the progress of work under this contract. Upon completing the work, the Contractor shall remove from the work and premises any rubbish, tools, equipment, and materials that are not the property of the Forest Service. Upon completing the work, the Contractor shall leave the work areas in a clean, neat, and orderly condition satisfactory to the C.O.
Gardiner Ranger District, Custer Gallatin National Forest
(n) Government Provided Material Sources. There are no government provided materials.
(o) Use of Government Facilities. The Contractor, all subcontractors, and all employees of the Contractor or subcontractors, are forbidden from camping on National Forest Lands while completing the contracted work except with written authorization from the Gardiner District Ranger. All conditions and requirements contained in such an authorization shall be met.
C-3 STANDARD SPECIFICATIONS
Materials and construction of the structure shall be in accordance with the Standard Specifications for
Construction of Roads and Bridges on Federal Highway Projects, FP-03 (U.S. customary units). These specifications can be found at http://www.wfl.fha.dot.gov/design/specs/.
C-4 SPECIAL PROJECT SPECIFICATIONS
The following Special Project Specifications are applicable to this contract and are attached:
Number Description
- Preface
101 Terms, Format, and Definitions
102 Bid, Award, and Execution of Contract
103 Scope of Work
104 Control of Work
105 Control of Material
106 Acceptance of Work
107 Legal Relations and Responsibility to the Public
108 Prosecution and Progress
109 Measurement and Payment
151 Mobilization
152 Construction Survey and Staking
155 Schedules for Construction Contracts
156 Public Traffic
157 Soil Erosion Control
201 Clearing and Grubbing
203 Removal of Structures and Obstructions
204 Excavation and Embankment
208 Structure Excavation and Backfill for Selected Major Structures
209 Structure Excavation and Backfill
251 Riprap
301 Untreated Aggregate Courses
602 Culverts and Drains
622 Rental Equipment
623 General Labor
703 Aggregate
705 Rock
Gardiner Ranger District, Custer Gallatin National Forest
AGAR 452.211-73 ATTACHMENTS TO STATEMENT OF WORK / SPECIFICATIONS (FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
D - PACKAGING AND MARKING
{For this solicitation there are NO Clauses.}
E - INSPECTION AND ACCEPTANCE
52.246-1 Contractor Inspection Requirements. (APR 1984)
52.246-12 Inspection of Construction. (AUG 1996)
F - DELIVERIES OR PERFORMANCE
52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984) Alternative I
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than October 1, 2020. The time stated for completion shall include final cleanup of the premises.
The completion date is based on the assumption that the successful offeror will receive the notice to proceed by
July 1, 2020. The completion date will be extended by the number of calendar days after the above date that the
Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.
(End of Clause)
52.242-14 Suspension of Work. (APR 1984)
G - CONTRACT ADMINISTRATION DATA
452.215-73 Postaward Conference. (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled after the date of contract award. The conference will be held at a date and time to be determined later.
(End of Clause)
H - SPECIAL CONTRACT REQUIREMENTS
H-1 SECURITY AND PROTECTION
(a) Security and Protection – Security is the Contractor’s responsibility. Limit access to the construction area to persons involved in the work. Provide secure storage for materials that are stored on site. Secure completed work as required to prevent loss.
Barricades, warning signs and light shall comply with standards and code requirements for erection of structurally adequate barricades. All road warning signs, barricades, and traffic control devices shall conform to MUTCD. Paint with appropriate colors, graphics, and warning signs to inform personnel and the public of the hazard being protected against. Where appropriate and needed, provide lighting, including flashing red or amber lights.
(b) Maintenance of Traffic – The Contractor is authorized to use roads under the jurisdiction of the Forest
Service, and open to public travel, for all activities necessary to complete this contract, subject to limitations and authorizations shown on the drawings or specified under this contract when such use will not damage the roads or national forest resources and when traffic can be accommodated safely.
Except as allowed in the contract, trailheads and roads shall remain open throughout the construction project. Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a plan for satisfactorily handling the traffic has been approved.
Before shutting down operations, take all necessary precautions to prevent damage to the project, such as temporary detours, approaches, crossings, or intersections; and provide for normal drainage and minimization of erosion. Leave all travel ways in a condition suitable for traffic.
(c) Protection of Improvements – The Contractor shall complete sequences of construction activity in order to prevent damage to equipment, material, and articles incorporated into the work covered by this contract.
H-2 CAMPING
(a) Before camping, the Contractor shall obtain a District Camping Permit, if required, from each District the
Contractor is working on through the Contracting Officer/Contracting Officer's Representative.
(b) A camp is interpreted to include a campsite or trailer parking area of any employee working on the project for the Contractor.
(c) Contractor is to bring a proposed campsite location to the prework for review and approval and prior to camping.
(d) In bear country there has been a special order on food storage and camping issued. Refer to section H-3 below for Food Storage requirements.
(e) The Government will make no special camping allowances for the Contractor within or near the project area.
Arrangements with the local private landowners will be at the discretion of the Contractor.
I - CONTRACT CLAUSES
52.252-2 Clauses Incorporated by Reference. (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://farsite.hill.af.mil/
(End of clause)
52.204-7 System for Award Management. (OCT 2018)
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. (OCT 2018)
52.204-13 System for Award Management Maintenance. (OCT 2018)
52.204-18 Commercial and Government Entity Code Maintenance. (JUL 2016) http://farsite.hill.af.mil/
52.209-6 Protecting the Governments Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (OCT 2015)
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (NOV 2015)
52.211-18 Variation in Estimated Quantity. (APR 1984)
52.219-6 Notice of Total Small Business Set-Aside. (NOV 2011)
52.219-28 Post Award Small Business Program Rerepresentation. (JUL 2013)
52.222-3 Convict Labor. (JUN 2003)
52.222-4 Contract Work Hours and Safety Standards – Overtime Compensation. (MAR 2018)
52.222-5 Construction Wage Rate Requirements – Secondary Site of the Work. (MAY 2014)
52.222-6 Construction Wage Rate Requirements. (AUG 2018)
52.222-7 Withholding of Funds. (MAY 2014)
52.222-8 Payrolls and Basic Records. (AUG 2018)
52.222-9 Apprentices and Trainees. (JUL 2005)
52.222-10 Compliance with Copeland Act Requirements. (FEB 1988)
52.222-11 Subcontracts (Labor Standards). (MAY 2014)
52.222-12 Contract Termination - Debarment. (MAY 2014)
52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations. (MAY 2014)
52.222-14 Disputes Concerning Labor Standards. (FEB 1988)
52.222-15 Certification of Eligibility. (MAY 2014)
52.222-21 Prohibition of Segregated Facilities. (APR 2015)
52.222-26 Equal Opportunity. (SEP 2016)
52.222-27 Affirmative Action Compliance Requirement for Construction. (APR 2015)
52.222-50 Combating Trafficking in Persons. (JAN 2019)
52.222-55 Minimum Wages Under Executive Order 13658. (DEC 2015)
52.222-62 Paid Sick Leave Under Executive Order 13706. (JAN 2017)
52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts. (SEP
2013)
52.223-6 Drug-Free Workplace. (MAY 2001)
52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving. (AUG 2011)
52.225-13 Restrictions on Certain Foreign Purchases. (JUN 2008)
52.228-2 Additional Bond Security. (OCT 1997)
52.228-11 Pledges of Assets. (AUG 2018)
52.228-12 Prospective Subcontractor Requests for Bonds. (MAY 2014)
52.228-14 Irrevocable Letter of Credit. (NOV 2014)
52.232-5 Payments under Fixed-Price Construction Contracts. (MAY 2014)
52.232-23 Assignment of Claims. (MAY 2014)
52.232-27 Prompt Payment for Construction Contracts. (JAN 2017)
52.232-33 Payment by Electronic Funds Transfer - System for Award Management. (OCT 2018)
52.232-39 Unenforceability of Unauthorized Obligations. (JUN 2013)
52.232-40 Providing Accelerated Payments to Small Business Subcontractors. (DEC 2013)
52.233-1 Disputes. (MAY 2014)
52.233-3 Protest after Award. (AUG 1996)
52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004)
52.236-2 Differing Site Conditions. (APR 1984)
52.236-5 Material and Workmanship. (APR 1984)
52.236-6 Superintendence by the Contractor. (APR 1984)
52.236-7 Permits and Responsibilities. (NOV 1991)
52.236-8 Other Contracts. (APR 1984)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR
1984)
52.236-10 Operations and Storage Areas. (APR 1984)
52.236-11 Use and Possession Prior to Completion. (APR 1984)
52.236-12 Cleaning Up. (APR 1984)
52.236-13 Accident Prevention. (NOV 1991)
52.236-14 Availability and Use of Utility Services. (APR 1984)
52.236-15 Schedules. (APR 1984)
52.236-16 Quantity Surveys. (APR 1984)
52.236-17 Layout of Work. (APR 1984)
52.236-21 Specifications and Drawings for Construction. (FEB 1997)
52.236-26 Preconstruction Conference. (FEB 1995)
52.242-14 Suspension of Work. (APR 1984)
52.243-5 Changes and Changed Conditions. (APR 1984)
52.244-6 Subcontracts for Commercial Items. (JAN 2019)
52.245-1 Government Property. (JAN 2017)
52.245-9 Use and Charges. (APR 2012)
52.246-12 Inspection of Construction. (AUG 1996)
52.246-21 Warranty of Construction. (MAR 1994)
52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form). Alternative I (APR
1984)
52.249-10 Default (Fixed-Price Construction). (APR 1984)
52.253-1 Computer Generated Forms. (JAN 1991)
452.232-70 Reimbursement for Bond Premiums – Fixed Price Construction Contracts. (NOV 1996)
452.236-71 Prohibition Against the Use of Lead-Based Paint. (NOV 1996)
452.236-73 Archaeological or Historic Sites. (FEB 1988)
452.236-74 Control of Erosion, Sedimentation, and Pollution. (NOV 1996)
452.236-77 Emergency Response (NOV 1996)
52.222-36 Equal Opportunity for Workers With Disabilities. (JUL 2014)
(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41
CFR 60.741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.
(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of $15,000 unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of
Federal Contract Compliance Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.
(End of Clause)
52.225-9 Buy American - Construction Materials. (MAY 2014)
(a) Definitions. As used in this clause-
Commercially available off-the-shelf (COTS) item- (1) Means any item of supply (including construction material) that is-
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
Construction material means an article, material, or supply brought to the construction site by the
Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means-
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Domestic construction material means-
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if-
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
Foreign construction material means a construction material other than a domestic construction material.
United States means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference. (1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR
12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
NONE
(3) The Contracting Officer may add other foreign construction material to the list in paragraph
(b)(2) of this clause if the Government determines that-
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy
American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United
States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material.
However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute or Balance of
Payments Program.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction material description Unit of Quantity Price measure (dollars)* Item 1:
Foreign construction material ________ ________ ________
Domestic construction material ________ ________ ________
Item 2:
Foreign construction material ________ ________ ________
Domestic construction material ________ ________ ________
* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).
List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.
Include other applicable supporting information.
52.228.13 Alternative Payment Protections. (JUL 2000)
(a) The Contractor shall submit one of the following payment protections:
SF-25A, Payment Bond
Irrevocable Letter of Credit (Portion of SF-25A shall be completed when utilizing ILC)
Certified or Cashier’s Check, Bank Drafts, Money Orders or Currency.
(b) The amount of the payment protection shall be 100 percent of the contract price.
(c) The submission of the payment protection is required within 10 days of contract award.
(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.
(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the
Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.
(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.
(End of Clause)
52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984)
(a) The Contractor acknowledges that it has taken steps reasonably necessary to ascertain the nature and location of the work, and that it has investigated and satisfied itself as to the general and local conditions which can affect the work or its cost, including but not limited to (1) conditions bearing upon transportation, disposal, handling, and storage of materials; (2) the availability of labor, water, electric power, and roads; (3) uncertainties of weather, river stages, tides, or similar physical conditions at the site; (4) the conformation and conditions of the ground; and (5) the character of equipment and facilities needed preliminary to and during work performance. The Contractor also acknowledges that it has satisfied itself as to the character, quality, and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site, including all exploratory work done by the Government, as well as from the drawings and specifications made a part of this contract. Any failure of the Contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from responsibility for estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expense to the
Government.
(b) The Government assumes no responsibility for any conclusions or interpretations made by the Contractor based on the information made available by the Government. Nor does the Government assume responsibility for any understanding reached or representation made concerning conditions which can affect the work by any of its officers or agents before the execution of this contract, unless that understanding or representation is expressly stated in this contract.
J - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
J-1: Wage Rate Requirements (Construction), Wage Determination: General Decision Number, MT20200079, dated 1/3/20.
J-2: Experience Questionnaire
J-3: Forest Service Special Project Specifications
J-4: Davis Creek Project Drawings
J-5: Upper Eagle Creek Project Drawings
K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS OR
RESPONDENTS
52.252-1 Solicitation Provisions Incorporated by Reference. (Feb 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es): https://www.acquisition.gov/
(End of provision)
52.204-16 Commercial and Government Entity Code Reporting. (JUL 2016)
52.204-19 Incorporation by Reference of Representations and Certifications. (DEC 2014)
52.204-8 Annual Representations and Certifications. (OCT 2018)
(a)
(1) The North American Industry classification System (NAICS) code for this acquisition is 237310 –
Highway, Street, and Bridge Construction.
(2) The small business size standard is $39.5 Million.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b)
(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph
(d) of this provision applies.
(2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:
[_] (i) Paragraph (d) applies.
[_] (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c)
(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:
https://www.acquisition.gov/
(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—
(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;
(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or
(C) The solicitation is for utility services for which rates are set by law or regulation.
(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal
Transactions. This provision applies to solicitations expected to exceed $150,000.
(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal
Confidentiality Agreements or Statements—Representation. This provision applies to all solicitations.
(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.
(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—
(A) Are not set aside for small business concerns;
(B) Exceed the simplified acquisition threshold; and
(C) Are for contracts that will be performed in the United States or its outlying areas.
(vi) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations—Representation.
(vii) 52.209-5; Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.
(viii) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony
Conviction under any Federal Law. This provision applies to all solicitations.
(ix) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.
(x) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.
(xi) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.
(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.
(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.
(xii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.
(xiii) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.
(xiv) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal
Opportunity.
(xv) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.
(xvi) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
(xvii) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA- designated items.
(xviii) 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals—
Representation. This provision applies to solicitations that include the clause at 52.204-7.
(xix) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.
(xx) 52.225-4, Buy American--Free Trade Agreements--Israeli Trade Act Certificate. (Basic, Alternates I, II, and III.) This provision applies to solicitations containing the clause at 52.225- 3.
(A) If the acquisition value is less than $25,000, the basic provision applies.
(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.
(C) If the acquisition value is $50,000 or more but is less than $80,317, the provision with its Alternate II applies.
(D) If the acquisition value is $80,317 or more but is less than $100,000, the provision with its Alternate III applies.
(xxi) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.
(xxii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--
Certification. This provision applies to all solicitations.
(xxiii) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or
Transactions Relating to Iran—Representation and Certification. This provision applies to all solicitations.
(xxiv) 52.226-2, Historically Black College or University and Minority Institution
Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.
(2) The following representations or certifications are applicable as indicated by the Contracting Officer:
[Contracting Officer check as appropriate.]
_x__ (i) 52.204-17, Ownership or Control of Offeror.
_x__ (ii) 52.204-20, Predecessor of Offeror.
___ (iii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.
___ (iv) 52.222-48, Exemption from Application of the Service Contract Labor Standards to
Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Certification.
___ (v) 52.222-52 Exemption from Application of the Service Contract Labor Standards to
Contracts for Certain Services--Certification.
___ (vi) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for
EPA-Designated Products (Alternate I only).
___ (vii) 52.227-6, Royalty Information.
___ (A) Basic.
___ (B) Alternate I.
___ (viii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.
(d) The Offeror has completed the annual representations and certifications electronically in SAM accessed through https://www.sam.gov. After reviewing the SAM information, the Offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the
NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [offeror to insert changes, identifying change https://www.sam.gov/ by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.
FAR Clause Title Date Change
Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on SAM.
(End of Provision)
452.219-70 Size Standard and NAICS Code Information. (SEP 2001)
The North American Industrial Classification System Code(s) and business size standard(s) describing the products and/or services to be acquired under this solicitation are listed below:
Contract Line Item: ALL
--NAICS Code: 237310
--Size Standard: $39.5 Million
L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS
52.204-7 System for Award Management. (OCT 2018)
52.204-22 Alternative Line Item Proposal. (JAN 2017)
52.236-27 Site Visit (Construction). (FEB 1995)
QUOTE SUBMITTAL
Contractors wishing to submit a quote must include the following:
o SF-18, Request for Quotation o Completed Schedule of Items o Completed Section K o Completed Experience Questionnaire (J-2) o Acknowledgment of Amendments, if applicable
Quotations can be electronically mailed to: dana.bangart@usda.gov
OR
Mailed to: 3710 Fallon Street, Suite C, Bozeman, MT 59718
NOTE TO QUOTER: Per FAR 4.1102 vendors are required to be registered and ACTIVE in the System for
Award Management (www.sam.gov) prior to submitting a quotation. Vendor shall be considered non-responsive if there is not an active registration at the time of Contracting Officer receiving quotation.
52.216-1 Type of Contract. (APR 1984)
The Government contemplates award of a Firm Fixed Priced contract resulting from this solicitation.
mailto:dana.bangart@usda.gov http://www.sam.gov/
52.222-5 Construction Wage Rate Requirements – Secondary Site of the Work. (MAY 2014)
(a)
(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate
Requiremen…