Vendor QA.pdf

PDF 58 KB Posted

Attached to
Vestibule Alterations Federal contract opportunity
Solicitation number
2032H326Q00049
Issued by
Not on record

About this file

This is a Vendor Questions and Answers document addressing a clarification regarding construction specifications for a federal contract opportunity.

The single Q&A addresses the installation of door frame and wall assemblies in an area with a raised floor system. A vendor inquired whether the wall assembly extending below the raised floor to reach the true floor is a Statement of Work (SOW) requirement, specifically to maintain the required Sound Transmission Class (STC) door rating. The government confirmed that yes, the wall must extend down below the access flooring to the true floor. This clarification establishes that proper acoustic performance of the door assembly necessitates extending the wall structure to the structural floor rather than terminating it at the raised floor level.

View the file

Other files for this federal contract opportunity

Other files attached to Vestibule Alterations, newest first.
File Type Posted
Wage determination.pdf PDF
MT 5436 Vestibule Alterations Drawings Specifivations.pdf PDF
2032H326Q00049.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Vendor Questions and Answers:

1. It was observed at the site visit (and indicated on the drawings) that a raised floor system is present. To maintain the required STC door rating, the door frame/wall assembly must extend down to the true floor rather than the raised floor level. Please confirm the wall assembly extending below the raised floor is a SOW requirement.

Answer: Yes the wall must go down below the access flooring to the true floor

File details come from the government source that posted it. Updated .