ATTACHMENT 1: QUESTIONS FORM
| # |
| RFQ Section |
| Question |
| Response |
| Change to RFQ? |
| Description of Change |
Transportation and Storage The RFP references a “bonded storage facility” in several places. Can the Government provide the details of the requirements for a bonded facility as this can significantly affect pricing?
| The OCC’s definition of bonded storage facility is a facility that insures OCC property against theft, fire, damage, etc. For additional reference regarding OCC property, please see Attachment 4 – Current Inventory. |
| No. |
| 2 |
| 2.2 Storage Facility Security Requirements |
| The RFQ states: “Access to the separate storage area shall be restricted to authorized personnel”. Can the Government supply details on what is acceptable for a restricted area in the context of this proposal? Also, must the entire warehouse be restricted, or only the 10,000 Sq. Ft. required for this effort? |
| The OCC does not require the entire warehouse or 10,000 sq ft to be restricted, just a portion of the 10,000 sq ft. for sensitive IT equipment. This area should be a locked section within the warehouse. The 10,000 sq ft should be restricted to warehouse employees and OCC employees only. |
| No. |
Transportation and Storage
| The RFP states a requirement for the contractor to “Pick up material from a location designated by the COR”. Will the Government provide details on these location(s) designated by the COR, as multiple unknown pickup locations can significantly impact pricing? |
| There are two locations: |
1) OCC HQ, 400 7th Street, SW, Washington, DC 20219
2) OCC’s Ashburn Data Center, 43830 Devin Shafron Drive, Ashburn, VA 20147 No
Transportation and Storage Will the Government confirm, based on past history, that there are 15 – 20 pickups per year?
| Yes, there is an estimate of 15 to 20 pickups and deliveries per year. |
| No |
| 5 |
| 1.1 Purpose |
| Will the Government consider revising the proposal due date with a 1-week delay? |
| 6 |
| 1.2 Period of Performance |
| Will the Government consider revising the start date to June 1, 2022? |
| No. The transition is required to be completed on or before May 31, 2022. |
| No |
Para. 2
| Requirement for CPARS or agency/contract-specific evaluation forms. Our company has not been provided with CPARS or evaluation forms for work similar in scope to the OCC requirements. How should we approach this lack of documentation? |
| OCC is removing the Past Performance requirement. |
| Yes |
| Removed ADDENDUM TO FAR 52.212-2 EVALUATIONS – COMMERCIAL ITEMS (NOV 2021), Volume I, 2. Past Performance submission requirement. |
Rqmts Matrix
| Are we to provide a written proposal in addition to the Requirements Matrix or is the Matrix considered the proposal? |
| Please complete Volume I and II. Volume I consist of the matrix. Volume II consist of Attachment 2 – Price Proposal Spreadsheet. |
| No |
| 9 |
| FAR 52.212-1 Instructions to Offerors Page 25 |
| Please confirm that we do not need to follow Paragraph B, Submission of Offers and provide the period of acceptance for offers. |
| Vendors do not need to follow Paragraph (b), Submission of offers, and paragraph (c), Period of acceptance of offers, of Clause 52.212-1 because it is replaced, in its entirety with ADDENDUM TO FAR 52.212-2 EVALUATIONS – COMMERCIAL ITEMS (NOV 2021). |
| No |
| 10 |
| Section 4 FAR Provisions, Instructions to Offerors, Volume I: Technical |
| Do I understand it correctly, that the entire technical proposal is to be thoroughly completed on the Requirements Matrix and it does not require any other proposal document for Technical writeup besides Past Performance for this Volume I? Thank you. |
| Yes, that is correct. However, the OCC is removing past performance. Please see the response to question #7. |
| No |
| Will you consider reducing the past performance requirements from (2) to (1) contract? |
| Please see our response to question 7. |
| No |