2027 Type III Re_mount RFB (1).pdf
PDF 1 MB Posted
- Attached to
- Ambulance Re-mount
- Solicitation number
- PE-61700-NONST-2027-000000081
- Issued by
- Calhoun County, Georgia
About this file
This is a Request for Bid (RFB) issued by Burke County Emergency Medical Services (EMS) Emergency Management Agency in Waynesboro, Georgia, for the procurement of one complete Type III ambulance remount service. The project involves remounting an existing modular ambulance body onto a new chassis, including comprehensive refurbishment of the modular body, installation and repair of all specified systems, and delivery F.O.B. Waynesboro, Georgia, with the original chassis to be returned upon completion. Bids must be received by 12:00 PM on January 4th, 2027, and submitted in a sealed envelope to the Burke County Board of Commissioners. The RFB requires bidders to attend a mandatory pre-construction conference at the Department's location before work begins, and successful vendors must accommodate a pre-delivery inspection trip at the vendor's location, with all meals and lodging provided by the vendor. The specification package includes detailed requirements across eleven major categories, from chassis specifications and modifications to electrical systems, interior patient compartments, and heating/cooling systems, with particular emphasis on compliance with NFPA ambulance step standards and either CAAS or NFPA ambulance standards for vehicles remounted on or after July 1, 2027.
Pricing is submitted as a single firm total bid price for the complete ambulance remount with F.O.B. delivery to Waynesboro, Georgia. The RFB contains no identified set-asides, incumbent information, or specific funding source details. A critical specification requirement stipulates that Lonplate II vinyl flooring, color number 424, must be installed in the patient compartment with no exceptions permitted to this requirement. Bidders must complete a comprehensive Yes/No compliance checklist identifying all aspects of the bid and must disclose all exceptions and deviations with detailed explanations referenced to specific specification pages and numbered requirements; failure to list exceptions disqualifies the bid. The RFB specifies that the county retains sole discretion as the judge of substitution equivalency and exception acceptability when determining award or denial. The contact for this procurement is Steven W. Mathews Sr., Chief, at 762-225-6571 or smathews@burkecounty-ga.gov.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fire Burke County EMS
Emergency Management Agency
277 Highway 24 South Waynesboro, Georgia 30830
Tel. (706) 554-6651
Fax (706) 554-4660
E-Mail: smathews@burkecounty-ga.gov Providing Professional Response and
Peace Of Mind to Burke County Steve Mathews – Chief
11/3/2026
BURKE COUNTY EMA
Request for Bid
2027 Type III Ambulance Re-Mount
One (1) Complete Ambulance Remount
BID DUE: 12:00 PM on January 4th, 2027
Total Bid: $__________________________________
Point of Contact
Steven W. Mathews Sr
227 GA-24 Waynesboro, GA 30830
762-225-6571 smathews@burkecounty-ga.gov
Includes Attachment A — Scope, Requirements, and Specifications
1. Invitation to Bid
Burke County EMA requests bids for one (1) complete Type III ambulance remount, including a new chassis, refurbishment of the existing modular body, installation and repair of the specified systems, and delivery F.O.B. Waynesboro, Georgia. The original chassis shall be returned with the remounted ambulance.
1.1 Deadline, Submission, and Contact
Bids must be received by 12:00 PM on January 4th, 2027. Submit bids by mail or delivery to:
Burke County Board of Commissioners; c/o County Manager; 602 North Liberty Street; Waynesboro, GA 30830.
Submit the bid in a sealed envelope with “Burke County Type III Remount Bid” clearly visible on the outside.
Point of Contact:
Steven W. Mathews Sr; 227 GA-24 Waynesboro, GA 30830; 762-225-6571;
smathews@burkecounty-ga.gov.
1.2 Bid Response
Complete and sign the Bid Proposal on the following page. Enter the complete price on both the Bid Proposal and the cover-page Total Bid field. State the proposed chassis, ambulance brand, F.O.B.
point, and firm delivery commitment from the date of award.
Identify whether the bid complies without exceptions or takes only the exceptions listed on the Exceptions and Clarifications form. List every variation by specification page and numbered requirement and explain each variation in detail. Failure to list exceptions will disqualify the bid.
1.3 Specifications and Substitutions
Attachment A is part of this RFB and establishes the required scope. Burke County EMA is the sole judge of proposed substitution equivalency and exceptions when determining award or denial of a bid. The no-exceptions flooring requirement in A.6.1 remains mandatory.
1.4 Agreement and Completion
The bidder’s signature and submission constitute acceptance of the terms, conditions, and requirements of the bid specifications. If awarded, the bid represents the agreement between the parties. The successful vendor shall attend the pre-construction conference, furnish the production work order, support the pre-delivery inspection, and provide the documentation required by Attachment A.
Package Contents Bid Proposal; Exceptions and Clarifications; Attachment A, A.1–A.8; and dimension-reference drawings A-D1 through A-D3.
2. Bid Proposal
Name of Bidder: __________________________________________________________
Address: __________________________________________________________
City / State / ZIP: __________________________________________________________
Telephone: __________________________________________________________
Person to Contact: __________________________________________________________
We hereby submit our bid for one (1) complete Type III ambulance remount in accordance with this RFB and Attachment A.
Chassis: __________________________________________________________
Make: __________________________________________________________
Model / Type: __________________________________________________________
Ambulance Brand: __________________________________________________________
F.O.B. Point: __________________________________________________________
Firm Delivery Date or Elapsed Time from Award: __________________________
Complete Price for One (1) Ambulance Remount, F.O.B. Waynesboro, GA:
Mark one: ____ As specified, taking no exceptions.
____ Taking only the attached, specifically referenced exceptions.
By signing and submitting this bid, the bidder accepts all terms, conditions, and requirements of the bid specifications. If awarded, this bid represents the agreement between the parties.
Signature: __________________________________ Date: __________________
Printed Name: ______________________________ Title: __________________
3. Exceptions and Clarifications
List all variations and exceptions by specification page and numbered requirement. Identify an item not supplied or unavailable, and describe every deviation or proposed substitution in detail. Copy this page as needed. Burke County EMA is the sole judge of substitution equivalency and exceptions in determining award or denial.
Vendor Name: __________________________________________________________
Bidding: __________________________________________________________
Exception Page: __________ of __________ pages
Exception or Clarification 1 Specification Page: __________ Requirement No.: ________________________
Not Supplied: __________ Unavailable: __________ Substitution: __________
Explanation: __________________________________________________________
Exception or Clarification 2 Specification Page: __________ Requirement No.: ________________________
Not Supplied: __________ Unavailable: __________ Substitution: __________
Explanation: __________________________________________________________
Attachment A — Scope, Requirements, and Specifications
A.1 Chassis Provide a new cutaway van chassis with the following equipment and configuration.
Item Requirement
Rear Wheels / Drive Dual rear wheels; two-wheel drive
Gross Vehicle Weight Rating 14,050 lb
Wheelbase / Cab to Axle 158-inch wheelbase; 100-inch cab-to-axle dimension
Engine V-8 gasoline engine
Preparation Ambulance preparation package
Transmission Electronic automatic overdrive transmission
Cab Climate Control Air conditioner
Mirrors Manual trailer-tow mirrors
Steering Power steering
Windows and Locks Power windows and door locks
Cruise Control Cruise control
Front Bumper Chrome
OEM Audio Current-production AM/FM OEM stereo with digital clock
Gauges Fuel level, water temperature, and oil pressure
Stabilizer Front stabilizer bar
Tires LT225/75R16 BSW all-season tires
Brakes Four-wheel anti-lock brake system
Fuel Tank Aft-axle, 40-gallon capacity
Cab Floor Black mat floor covering
Cab Seating Dual captain’s chairs
A.1.1 OEM means original equipment manufacturer. Chassis and installation details shall follow the chassis manufacturer’s current requirements. Refer proposed deviations from the specified configuration to the Exceptions and Clarifications form.
A.2 Chassis Add-Ons, Modifications, and Remount
A.2.1 The upfitter shall install an upgraded aftermarket 12-volt, 360-amp alternator.
A.2.2 Install anti-sail mud flaps behind the rear wheels. Provide aluminum diamond-treadplate running boards with reinforced mounting. Running boards shall satisfy applicable National Fire Protection Association (NFPA) ambulance step requirements; identify the applicable standard and edition.
A.2.3 Provide Phoenix stainless-steel wheel inserts using over-lug-nut installation in accordance with current Ford body-builder and upfitter requirements applicable to the chassis.
A.2.4 Install a Provision backup camera with a 7-inch monitor mounted on the windshield to preserve console space.
A.2.5 Modify the fuel filler neck to fit the modular body. Supply new fuel filler hoses and plumbing.
Perform all modifications in accordance with chassis manufacturer requirements.
A.2.6 Extend the OEM tailpipe behind the dual rear wheels on the curb side.
Module Dismount, Inspection, and Remount A.2.7 Disconnect the modular body and all subsystems, including wiring harnesses and air-conditioning and heater hoses. Lift and remove the module from the original cab chassis.
A.2.8 Inspect the entire understructure and all exposed framing for cracks, corrosion, and excessive wear. Use dye penetrant manufactured for crack detection on questionable areas. Repair all defects to like-new condition and provide a written inspection and repair checklist.
A.2.9 After inspection, repairs, and the paint process, transfer the module to the remounting area and mount it squarely on the new chassis. Use chassis manufacturer OEM rubber spacers between the module frame and chassis frame. The completed installation shall conform to chassis manufacturer requirements.
A.2.10 Install a non-electrolytic rubber boot between cab and module to prevent air and water leaks.
Use heavy weatherproof material and stainless-steel bolts and components.
A.2.11 Return the original chassis with the completed remount.
A.3 Paint and Exterior Body Trim
A.3.1 After the dismounted module passes inspection and repairs, place it on a roll-around platform for paint preparation. Remove all hardware, lights, and handles. Also remove stone guards, skirt rails, kick panels, and diamond plate. Remove all module doors and paint them separately.
A.3.2 Inspect for minor body damage and electrolysis or corrosion damage. Professionally repair body damage to like-new condition and treat corrosion to prevent further deterioration.
A.3.3 Chemically treat, sand, and prepare module surfaces in accordance with the paint manufacturer’s specifications. Repaint the complete module body and doors to industry standards.
Perform painting in-house using a certified paint technician and the paint manufacturer’s instructions.
A.3.4 Paint the vehicle white over red to match the original vehicle. Strip rubber seals from all exterior storage compartments; sand, prepare, and refinish the compartments with Scorpion coating.
A.3.5 Provide four (4) new aluminum diamond-plate stone guards, one at each exterior corner.
Conform each guard to the module corner post and secure it with stainless-steel fasteners.
A.3.6 Install full-length skirt/rub rails on both sides of the module. Fabricate the rails from new aluminum channel with reflective red/white conspicuity tape and secure them with stainless-steel fasteners.
A.3.7 Provide a new aluminum diamond-plate rear kick panel spanning the full width of the rear compartment doors and the full height from the bottom of the doors to the bottom of the body. Use stainless-steel fasteners.
A.3.8 Inspect the rear step bumper frame and refurbish defects to like-new condition as necessary.
Replace all aluminum diamond-plate bumper tips and the grip-strut insert. Bolt the bumper to chassis frame rails using steel outriggers and stainless-steel bolts.
A.3.9 Install new stainless-steel fenderettes over the rear wheels.
A.4 Exterior Compartments and Doors A.4.1 Completely remove old weather stripping and door seals. Install new rubber or equivalent seals throughout.
A.4.2 Inspect each removed exterior door and repair or replace it as necessary. On reinstallation, check alignment and ease of closure. Lubricate latches and hardware; replace any latch or lock that does not operate properly.
A.4.3 Repair or replace damaged patient-entry door windows or sliding side windows.
A.5 Electrical System
A.5.1 Provide a new wood cab console with black Scorpion coating. House the new front switch panel and existing siren in the console. Install a timer-bypass switch on its lower driver side.
Determine the final console style, location, and layout at the pre-construction conference based on chassis layout and Department requirements.
A.5.2 Equip the switch panel with new labeled rocker switches, door and compartment indicator lights, and volt and amp gauges. Replace existing cab and Action Area switch panels. Include Battery On and door-open indicators and a low-voltage warning light and buzzer on the front panel.
A.5.3 Completely check the existing 12-volt system. Upgrade it to meet current needs and requirements. Replace malfunctioning circuit breakers, relays, solenoids, and other power-distribution-panel components. Deliver a fully operable power panel and system.
A.5.4 Provide a new under hood harness and new battery cables. Use new power wiring conforming to applicable current SAE International requirements and chassis manufacturer guidelines. Color-code and function-label wiring. Route it in high-temperature loom rated at least 300°F. Keep wiring accessible and secure it to the body or frame using insulated metal clamps.
A.5.5 Provide two (2) new 100-watt siren speakers, one mounted on each side of the chassis front bumper.
A.5.6 Install two (2) new Whelen 700 LED grille lights with clear lenses and chrome trim flanges or cast-aluminum housings.
A.5.7 Replace all existing door switches with new switches.
A.5.8 Completely check and service the module warning-light system. Replace halogen light assemblies with LED assemblies. Replace the lightbar with a seven-fixture LED light wall in a red-white-red-white-red-white-red arrangement. Provide a strobe-like, field-changeable flash pattern.
A.5.9 Replace all exterior lenses, including warning lights, scene lights, taillights, and clearance/identification marker lights. Specify the exact quantities and models in the bid response.
A.5.10 Install a new rear backup alert rated at least 97 dB that activates whenever the vehicle is placed in reverse.
A.5.11 Replace rear-control-panel rocker switches and all function labels with new components.
A.6 Interior Patient Compartment
A.6.1 Completely remove the existing floor covering. Inspect and repair or replace the subfloor as necessary. Install new heavy-duty, commercial-grade Lonplate II vinyl flooring, color number 424, extending approximately 4 inches up the sidewalls. NO EXCEPTIONS to the specified flooring are permitted.
A.6.2 Inspect all patient-compartment cabinets for problems and defects. Check that mounting hardware is properly tightened and shelves are secure. Replace missing trim and rusted or missing screws.
A.6.3 Inspect all patient-compartment seat-belt mounts for stability and wear. Replace defective seat belts with new equipment.
A.6.4 Inspect all interior Plexiglas and sliding tracks for proper operation. Replace broken or defective sliding windows with new Plexiglas. At the Department’s request, replace all sliding windows with new Plexiglas.
A.6.5 Replace defective exterior door switches. The all-door-switch replacement requirement in A.5.7 also applies.
A.6.6 Check every patient-compartment dome light for proper operation and replace all dome lights with new components. Replace halogen fixtures with LED fixtures. Specify the exact quantity in the bid response.
A.6.7 Provide a complete striping and lettering decal package. Determine the exact layout at the pre-construction conference.
A.7 Heating, Cooling, Ventilation, Oxygen, and Vacuum A.7.1 Supply a complete new heating and cooling system interfaced with the cab-chassis system, including all new hoses and fittings. Thoroughly test it for peak performance. Mount the air-conditioning condenser to protect it from road debris and speed bumps or humps. Include performance testing and certification in the Vehicle Owner’s Manual.
A.7.2 Test the power ventilator. Repair or replace it as necessary for proper operation.
A.7.3 Test the existing piped oxygen system, including a nitrogen leak test lasting at least four (4) hours. Repair or replace the system, outlets, and lines as necessary. Include oxygen-test documentation in the Vehicle Owner’s Manual.
A.7.4 Test the existing piped vacuum system. Repair or replace the system, outlets, and piping as necessary. Include vacuum/suction-system test documentation in the Vehicle Owner’s Manual.
A.8 Conferences, Inspection, and Standards
Pre-Construction Conference A.8.1 Before construction begins, the successful vendor’s representative or dealer shall attend a required pre-construction conference at the Department’s location. Both parties shall review the specifications and vehicle, so the refurbishment meets or exceeds all requirements. After the conference, the vendor representative shall provide the Department with the written production work order.
Pre-Delivery Inspection A.8.2 Department members shall make a pre-delivery inspection trip to the successful vendor’s location and inspect the ambulance for compliance with all specifications. The vendor shall provide all meals and lodging for that trip.
Engine Block Heater and Shore Power A.8.3 Wire the chassis OEM block heater to a nominal 120-volt AC shoreline adapter mounted on the modular body. Provide a hard-plastic weatherproof cover. Furnish this installation at no additional cost to the Department.
Current Standards and Manufacturer Requirements A.8.4 Perform the specified remount work in accordance with applicable current chassis manufacturer installation instructions and applicable Georgia ambulance design and safety requirements. References to SAE wiring requirements and NFPA step requirements apply to the systems addressed in this attachment.
A.8.5 For any ambulance remounted on or after July 1, 2027, comply with the current Commission on Accreditation of Ambulance Services (CAAS) Ground Vehicle Standards or the NFPA Standard for Automotive Ambulances, as required by Georgia Rule 511-9-2-.07(4)(a)3. Identify the applicable standard, edition, and compliance basis with the firm delivery commitment.
Dimension-Reference Drawings A.8.6 Drawings A-D1 through A-D3 are provided for module dimensions only. They reproduce the original front/rear, street-side, and curb-side elevations. Historical equipment labels and model references on those drawings do not replace the written requirements in this attachment.
Drawing index: A-D1 — Front/Rear Elevation; A-D2 — Street-Side Exterior Elevation; A-D3 — Curb- Side Exterior Elevation. The drawings identify the module as 163 inches long × 98 inches wide × 72 inches high, walk-through configuration.
A-D1 — Front/Rear Elevation
Attachment A | Module Dimensions Only — A-D1 — Front/Rear Elevation
A-D2 — Street-Side Exterior Elevation
Attachment A | Module Dimensions Only — A-D2 — Street-Side Exterior Elevation
A-D3 — Curb-Side Exterior Elevation
Attachment A | Module Dimensions Only — A-D3 — Curb-Side Exterior Elevation
BURKE COUNTY EMA | 2027 Type III Re-Mount Bidder Response
Bidder: ____________________ | Bidder Initials: __________ | Page 1
Bidder Yes/No Compliance Checklist 2027 Type III Ambulance Re-Mount Bidder / Company: ______________________________________ Prepared By / Title: __________________________________ Address: ______________________________________________________________________________________________ Telephone: __________________________ Email: __________________________________ Date: _____________________ Total Bid: $________________________ Firm Delivery Date or Elapsed Time from Award: ______________________________
Submission and Contact Reference Deadline: 12:00 PM on January 4th, 2027. The County must receive the bid by this deadline.
Mail or delivery: Burke County Board of Commissioners; c/o County Manager; 602 North Liberty Street; Waynesboro, GA 30830.
Sealed envelope: “Burke County Type III Remount Bid” must be clearly visible on the outside.
Point of contact: Steven W. Mathews Sr; 227 GA-24 Waynesboro, GA 30830; 762-225-6571; smathews@burkecounty-ga.gov.
How to Complete This Checklist Complete every Yes/No row. Mark Yes only if your bid complies with every part of the row. Mark No for any exception, deviation, omission, or unavailable item. Explain each No in the details column and list it on the exceptions schedule with its specification page and numbered requirement.
For future work, testing, conferences, and documentation, Yes confirms your commitment to perform the requirement if awarded. For a conditional requirement, state whether the condition applies; if it does not, mark Yes and explain why.
Enter requested quantities, models, standards, and other details in the response column or an identified attachment. Reference the attachment and page. Use additional response sheets as needed, identified by bidder name and requirement number.
Complete the bid particulars, exceptions schedule, and signed certification at the end. Complete and sign the RFB Bid Proposal as well. Burke County EMA remains the sole judge of substitution equivalency and exceptions. Use drawings A-D1 through A-D3 for module dimensions only.
Bidder: ____________________ | Bidder Initials: __________ | Page 2
1. Submission and Bid Proposal Reference Requirement — Will Your Bid Comply? Yes No Bidder Details / Bid Page / Exception Reference
1.1 Bid will be submitted for County receipt by 12:00 PM on January 4th, 2027.
1.1 Bid will be submitted by mail or delivery to Burke County Board of Commissioners, c/o County Manager, 602 North Liberty Street, Waynesboro, GA 30830.
1.1 Bid will be submitted in a sealed envelope.
1.1 “Burke County Type III Remount Bid” clearly visible on the outside of the envelope.
1.2; 2 Bid Proposal includes complete bidder contact information and mailing address.
1.2; 2 Chassis, make, model/type, ambulance brand, and F.O.B. point stated.
1.2; 2 Firm delivery date or elapsed time from award stated.
Cover; 2 Complete price for one (1) ambulance remount F.O.B. Waynesboro, Georgia entered on the Bid Proposal and cover Total Bid field;
amounts agree.
2 Signature, date, printed name, and title completed; bidder accepts all terms, conditions, and requirements. If awarded, the bid represents the agreement between the parties.
1.2; 2 Bid indicates either no exceptions or only the exceptions specifically listed and attached.
1.2; 3 Every variation or exception is identified by specification page and numbered requirement, with a detailed explanation; items not supplied, unavailable, or substituted are identified. Failure to list exceptions disqualifies the bid.
1.3; 3 Bid recognizes Burke County EMA as sole judge of substitution equivalency and exceptions in determining award or denial.
1; Att. A Bid covers one (1) complete Type III remount, including new chassis, refurbishment of the existing modular body, specified system installation/repair, and delivery F.O.B. Waynesboro, Georgia.
Bidder: ____________________ | Bidder Initials: __________ | Page 3
2. New Chassis — Attachment A.1 Reference Requirement — Will Your Bid Comply? Yes No Bidder Details / Bid Page / Exception Reference
A.1 New cutaway van chassis supplied.
A.1 / 01 Rear Wheels / Drive: Dual rear wheels; two-wheel drive.
A.1 / 02 Gross Vehicle Weight Rating: 14,050 lb.
A.1 / 03 Wheelbase / Cab to Axle: 158-inch wheelbase; 100-inch cab-to-axle dimension.
A.1 / 04 Engine: V-8 gasoline engine.
A.1 / 05 Preparation: Ambulance preparation package.
A.1 / 06 Transmission: Electronic automatic overdrive transmission.
A.1 / 07 Cab Climate Control: Air conditioner.
A.1 / 08 Mirrors: Manual trailer-tow mirrors.
A.1 / 09 Steering: Power steering.
A.1 / 10 Windows and Locks: Power windows and door locks.
A.1 / 11 Cruise Control: Cruise control.
A.1 / 12 Front Bumper: Chrome.
A.1 / 13 OEM Audio: Current-production AM/FM OEM stereo with digital clock.
A.1 / 14 Gauges: Fuel level, water temperature, and oil pressure.
A.1 / 15 Stabilizer: Front stabilizer bar.
A.1 / 16 Tires: LT225/75R16 BSW all-season tires.
A.1 / 17 Brakes: Four-wheel anti-lock brake system.
A.1 / 18 Fuel Tank: Aft-axle, 40-gallon capacity.
A.1 / 19 Cab Floor: Black mat floor covering.
A.1 / 20 Cab Seating: Dual captain’s chairs.
OEM means original equipment manufacturer. Dual rear wheels supersede the original package’s single-rear-wheel wording.
Bidder: ____________________ | Bidder Initials: __________ | Page 4
3. Chassis Add-Ons and Modifications Reference Requirement — Will Your Bid Comply? Yes No Bidder Details / Bid Page / Exception Reference
A.1.1 Chassis and installation details follow the chassis manufacturer’s current requirements; proposed configuration deviations are listed on the Exceptions and Clarifications form.
A.2.1 The upfitter shall install an upgraded aftermarket 12-volt, 360-amp alternator.
A.2.2 Install anti-sail mud flaps behind the rear wheels. Provide aluminum diamond-treadplate running boards with reinforced mounting. Running boards shall satisfy applicable National Fire Protection Association (NFPA) ambulance step requirements; identify the applicable standard and edition.
A.2.3 Provide Phoenix stainless-steel wheel inserts using over-lug-nut installation in accordance with current Ford body-builder and upfitter requirements applicable to the chassis.
A.2.4 Install a Provision backup camera with a 7-inch monitor mounted on the windshield to preserve console space.
A.2.5 Modify the fuel filler neck to fit the modular body. Supply new fuel filler hoses and plumbing. Perform all modifications in accordance with chassis manufacturer requirements.
A.2.6 Extend the OEM tailpipe behind the dual rear wheels on the curb side.
Bidder: ____________________ | Bidder Initials: __________ | Page 5
4. Module Dismount, Inspection, and Remount Reference Requirement — Will Your Bid Comply? Yes No Bidder Details / Bid Page / Exception Reference
A.2.7 Disconnect the modular body and all subsystems, including wiring harnesses and air-conditioning and heater hoses. Lift and remove the module from the original cab chassis.
A.2.8 Inspect the entire understructure and all exposed framing for cracks, corrosion, and excessive wear. Use dye penetrant manufactured for crack detection on questionable areas. Repair all defects to like-new condition and provide a written inspection and repair checklist.
A.2.9 After inspection, repairs, and the paint process, transfer the module to the remounting area and mount it squarely on the new chassis. Use chassis manufacturer OEM rubber spacers between the module frame and chassis frame. The completed installation shall conform to chassis manufacturer requirements.
A.2.10 Install a non-electrolytic rubber boot between cab and module to prevent air and water leaks. Use heavy weatherproof material and stainless-steel bolts and components.
A.2.11 Return the original chassis with the completed remount.
Bidder: ____________________ | Bidder Initials: __________ | Page 6
5. Paint and Exterior Body Trim Reference Requirement — Will Your Bid Comply? Yes No Bidder Details / Bid Page / Exception Reference
A.3.1 After the dismounted module passes inspection and repairs, place it on a roll-around platform for paint preparation. Remove all hardware, lights, and handles. Also remove stone guards, skirt rails, kick panels, and diamond plate. Remove all module doors and paint them separately.
A.3.2 Inspect for minor body damage and electrolysis or corrosion damage.
Professionally repair body damage to like-new condition and treat corrosion to prevent further deterioration.
A.3.3 Chemically treat, sand, and prepare module surfaces in accordance with the paint manufacturer’s specifications. Repaint the complete module body and doors to industry standards. Perform painting in-house using a certified paint technician and the paint manufacturer’s instructions.
A.3.4 Paint the vehicle white over red to match the original vehicle. Strip rubber seals from all exterior storage compartments; sand, prepare, and refinish the compartments with Scorpion coating.
A.3.5 Provide four (4) new aluminum diamond-plate stone guards, one at each exterior corner. Conform each guard to the module corner post and secure it with stainless-steel fasteners.
A.3.6 Install full-length skirt/rub rails on both sides of the module. Fabricate the rails from new aluminum channel with reflective red/white conspicuity tape and secure them with stainless-steel fasteners.
A.3.7 Provide a new aluminum diamond-plate rear kick panel spanning the full width of the rear compartment doors and the full height from the bottom of the doors to the bottom of the body. Use stainless-steel fasteners.
A.3.8 Inspect the rear step bumper frame and refurbish defects to like-new condition as necessary. Replace all aluminum diamond-plate bumper tips and the grip-strut insert. Bolt the bumper to chassis frame rails using steel outriggers and stainless-steel bolts.
A.3.9 Install new stainless-steel fenderettes over the rear wheels.
Bidder: ____________________ | Bidder Initials: __________ | Page 7
6. Exterior Compartments and Electrical Controls Reference Requirement — Will Your Bid Comply? Yes No Bidder Details / Bid Page / Exception Reference
A.4.1 Completely remove old weather stripping and door seals. Install new rubber or equivalent seals throughout.
A.4.2 Inspect each removed exterior door and repair or replace it as necessary. On reinstallation, check alignment and ease of closure.
Lubricate latches and hardware; replace any latch or lock that does not operate properly.
A.4.3 Repair or replace damaged patient-entry door windows or sliding side windows.
A.5.1 Provide a new wood cab console with black Scorpion coating. House the new front switch panel and existing siren in the console. Install a timer-bypass switch on its lower driver side. Determine the final console style, location, and layout at the pre-construction conference based on chassis layout and Department requirements.
A.5.2 Equip the switch panel with new labeled rocker switches, door and compartment indicator lights, and volt and amp gauges. Replace existing cab and Action Area switch panels. Include Battery On and door-open indicators and a low-voltage warning light and buzzer on the front panel.
A.5.3 Completely check the existing 12-volt system. Upgrade it to meet current needs and requirements. Replace malfunctioning circuit breakers, relays, solenoids, and other power-distribution-panel components. Deliver a fully operable power panel and system.
A.5.4 Provide a new underhood harness and new battery cables. Use new power wiring conforming to applicable current SAE International requirements and chassis manufacturer guidelines. Color-code and function-label wiring. Route it in high-temperature loom rated at least 300°F. Keep wiring accessible and secure it to the body or frame using insulated metal clamps.
Bidder: ____________________ | Bidder Initials: __________ | Page 8
7. Electrical Lighting and Warning Systems Reference Requirement — Will Your Bid Comply? Yes No Bidder Details / Bid Page / Exception Reference
A.5.5 Provide two (2) new 100-watt siren speakers, one mounted on each side of the chassis front bumper.
A.5.6 Install two (2) new Whelen 700 LED grille lights with clear lenses and chrome trim flanges or cast-aluminum housings.
A.5.7 Replace all existing door switches with new switches.
A.5.8 Completely check and service the module warning-light system.
Replace halogen light assemblies with LED assemblies. Replace the lightbar with a seven-fixture LED light wall in a red-white-red-white-red-white-red arrangement. Provide a strobe-like, field-changeable flash pattern.
A.5.9 Replace all exterior lenses, including warning lights, scene lights, taillights, and clearance/identification marker lights. Specify the exact quantities and models in the bid response.
A.5.10 Install a new rear backup alert rated at least 97 dB that activates whenever the vehicle is placed in reverse.
A.5.11 Replace rear-control-panel rocker switches and all function labels with new components.
Bidder: ____________________ | Bidder Initials: __________ | Page 9
8. Interior Patient Compartment Reference Requirement — Will Your Bid Comply? Yes No Bidder Details / Bid Page / Exception Reference
A.6.1 Completely remove the existing floor covering. Inspect and repair or replace the subfloor as necessary. Install new heavy-duty, commercial-grade Lonplate II vinyl flooring, color number 424, extending approximately 4 inches up the sidewalls. NO EXCEPTIONS to the specified flooring are permitted.
A.6.2 Inspect all patient-compartment cabinets for problems and defects.
Check that mounting hardware is properly tightened and shelves are secure. Replace missing trim and rusted or missing screws.
A.6.3 Inspect all patient-compartment seat-belt mounts for stability and wear. Replace defective seat belts with new equipment.
A.6.4 Inspect all interior Plexiglas and sliding tracks for proper operation.
Replace broken or defective sliding windows with new Plexiglas. At the Department’s request, replace all sliding windows with new Plexiglas.
A.6.5 Replace defective exterior door switches. The all-door-switch replacement requirement in A.5.7 also applies.
A.6.6 Check every patient-compartment dome light for proper operation and replace all dome lights with new components. Replace halogen fixtures with LED fixtures. Specify the exact quantity in the bid response.
A.6.7 Provide a complete Star of Life decal package. Determine the exact layout at the pre-construction conference.
Bidder: ____________________ | Bidder Initials: __________ | Page 10
9. Heating, Cooling, Oxygen, and Vacuum Reference Requirement — Will Your Bid Comply? Yes No Bidder Details / Bid Page / Exception Reference
A.7.1 Supply a complete new heating and cooling system interfaced with the cab-chassis system, including all new hoses and fittings. Thoroughly test it for peak performance. Mount the air-conditioning condenser to protect it from road debris and speed bumps or humps. Include performance testing and certification in the Vehicle Owner’s Manual.
A.7.2 Test the power ventilator. Repair or replace it as necessary for proper operation.
A.7.3 Test the existing piped oxygen system, including a nitrogen leak test lasting at least four (4) hours. Repair or replace the system, outlets, and lines as necessary. Include oxygen-test documentation in the Vehicle Owner’s Manual.
A.7.4 Test the existing piped vacuum system. Repair or replace the system, outlets, and piping as necessary. Include vacuum/suction-system test documentation in the Vehicle Owner’s Manual.
Bidder: ____________________ | Bidder Initials: __________ | Page 11
10. Conferences, Inspection, and Standards Reference Requirement — Will Your Bid Comply? Yes No Bidder Details / Bid Page / Exception Reference
A.8.1 Before construction begins, the successful vendor’s representative or dealer shall attend a required pre-construction conference at the Department’s location. Both parties shall review the specifications and vehicle so the refurbishment meets or exceeds all requirements. After the conference, the vendor representative shall provide the Department with the written production work order.
A.8.2 Department members shall make a pre-delivery inspection trip to the successful vendor’s location and inspect the ambulance for compliance with all specifications. The vendor shall provide all meals and lodging for that trip.
A.8.3 Wire the chassis OEM block heater to a nominal 120-volt AC shoreline adapter mounted on the modular body. Provide a hard-plastic weatherproof cover. Furnish this installation at no additional cost to the Department.
A.8.4 Perform the specified remount work in accordance with applicable current chassis manufacturer installation instructions and applicable Georgia ambulance design and safety requirements. References to SAE wiring requirements and NFPA step requirements apply to the systems addressed in this attachment.
A.8.5 For any ambulance remounted on or after July 1, 2027, comply with the current Commission on Accreditation of Ambulance Services (CAAS) Ground Vehicle Standards or the NFPA Standard for Automotive Ambulances, as required by Georgia Rule 511-9-2-.07(4) (a)3. Identify the applicable standard, edition, and compliance basis with the firm delivery commitment.
Bidder: ____________________ | Bidder Initials: __________ | Page 12
11. Module Dimensions and Requested Technical Details Use the original drawings in Attachment A to review module fit. Historical equipment labels do not create additional equipment requirements.
Reference Requirement — Will Your Bid Comply? Yes No Bidder Details / Bid Page / Exception Reference
A.8.6 Drawings A-D1 (front/rear), A-D2 (street-side), and A-D3 (curb-side) are used for module dimensions only; written specifications govern equipment.
A.8.6;
drawings
Proposed remount accommodates the reference module: 163 inches long × 98 inches wide × 72 inches high, walk-through configuration.
A-D1 Front/rear module dimensional fit reviewed against drawing A-D1, including its stated reference dimensions and tolerances.
A-D2 Street-side module dimensions, compartment inside dimensions, and jamb openings reviewed against A-D2; proposed fit addresses the 158-inch wheelbase and 100-inch cab-to-axle layout.
A-D3 Curb-side module dimensions, compartment inside dimensions, and jamb openings reviewed against A-D3.
Requested Bid Details — Enter Here or Identify an Attachment A.5.9 Exterior lenses / light models and exact quantities: __________________________________________________________ A.6.6 Patient-compartment dome lights — exact quantity: __________________________________________________________ A.2.2 Applicable NFPA step standard and edition: _________________________________________________________________ A.8.5 Applicable ambulance standard, edition, and compliance basis with firm delivery commitment: __________________________ If remounted on or after July 1, 2027, the current CAAS or NFPA ambulance standard requirement applies. For attachments, state the document title, page, and requirement reference.
Bidder: ____________________ | Bidder Initials: __________ | Page 13
12. Bid Particulars, Exceptions, and Certification Bidder / Company: ________________________________________ Complete Bid Price: $______________________________ Chassis / Make / Model-Type: ______________________________________________________________________________ Ambulance Brand: ________________________________________ F.O.B. Point: _____________________________________ Firm Delivery Date or Elapsed Time from Award: __________________________________________________________________ Mark one: ____ No exceptions. ____ Only the exceptions listed below and on identified attached sheets.
Exceptions and Deviations — Copy or Attach Sheets as Needed Reference Exception / Deviation Proposed Alternative / Explanation Bid Attachment / Page
For each exception, enter the specification page and numbered requirement. Identify any item not supplied or unavailable. Describe the deviation or substitution in detail. Additional exception sheets: ______ pages. Enter “None” if there are no exceptions.
Completion and Accuracy Certification All Yes/No responses completed and requested details supplied? Yes ____ No ____ Every No response and exception identified and explained by specification page and requirement? Yes ____ No ____ Lonplate II, color 424, flooring offered without exception? Yes ____ No ____ I am authorized to submit this response for the bidder identified above. I certify that the responses, details, and attached explanations are complete and accurate to the best of my knowledge. Each Yes confirms compliance of the offered bid and a commitment to perform applicable future requirements if awarded. All exceptions and deviations are disclosed. I understand that the County determines substitution equivalency and exception acceptability.
Authorized Signature: ______________________________________________ Date: ___________________________________ Printed Name: __________________________________________ Title: ____________________________________________ Telephone: _____________________________________________ Email: ___________________________________________
| Providing Professional Response and |
| Peace Of Mind to Burke County |
| Steve Mathews – Chief |
| Burke_County_2027_Remount_Bidder_Compliance_Checklist.pdf |
| Bidder Yes/No Compliance Checklist |
| Submission and Contact Reference |
| How to Complete This Checklist |
| 1. Submission and Bid Proposal |
| 2. New Chassis — Attachment A.1 |
| 3. Chassis Add-Ons and Modifications |
| 4. Module Dismount, Inspection, and Remount |
| 5. Paint and Exterior Body Trim |
| 6. Exterior Compartments and Electrical Controls |
| 7. Electrical Lighting and Warning Systems |
| 8. Interior Patient Compartment |
| 9. Heating, Cooling, Oxygen, and Vacuum |
| 10. Conferences, Inspection, and Standards |
| 11. Module Dimensions and Requested Technical Details |
| Requested Bid Details — Enter Here or Identify an Attachment |
| 12. Bid Particulars, Exceptions, and Certification |
| Exceptions and Deviations — Copy or Attach Sheets as Needed |
| Completion and Accuracy Certification |
File details come from the government source that posted it. Updated .