2027 Sewer Lining Project.pdf

PDF 1 MB Posted

Attached to
Sewer Lining Rehabilitation
Solicitation number
26-52
Issued by
Washtenaw County, Michigan

About this file

This Request for Proposal (RFP) 26-52 is issued by the City of Ann Arbor, Michigan's Public Services Area/Public Works Unit to select qualified contractors to provide comprehensive sewer rehabilitation services including video inspection, cleaning, cured-in-place pipe (CIPP) lining, manhole rehabilitation, and joint testing and grouting for sanitary and storm infrastructure. The scope encompasses sewers ranging from 8 to 42 inches in diameter, with services including flushing, debris removal, grease removal, root cutting, deposit cutting, internal CCTV video inspection, full-length and spot repair CIPP rehabilitation, manhole rehabilitation with cementitious lining, sewer joint testing, packer injection grouting, bypass pumping, and maintenance of traffic services. The City intends to award up to two construction contracts with a three-year term from Notice to Proceed, with an optional one-year extension. Proposals must be submitted by December 2, 2026, at 2:00 p.m. local time to the City of Ann Arbor Procurement Unit. Written questions are due by November 10, 2026, at 2:00 p.m. No pre-proposal meeting will be held. Selection will be made by a committee using a point-based evaluation system, with potential interviews for selected firms.

Pricing is structured on a unit price basis with hourly or weekly estimates for labor and equipment, plus material and subcontractor costs, with contractors entitled to no greater than 5 percent markup on subcontractor costs and 15 percent markup on material and equipment rental costs. The total available budget is approximately $4,000,000 annually, though the City commits no minimum volume of work. Contractors must submit bid security equal to 5 percent of the total bid price and comply with prevailing wage requirements under Michigan Department of Transportation guidelines, as well as living wage and non-discrimination requirements. The contract is subject to liquidated damages of $1,500 per calendar day for delays beyond completion dates. All proposals must include required compliance forms including General Declarations, Prevailing Wage Declaration, Living Wage Declaration, Conflict of Interest Disclosure, and Non-Discrimination Declaration. The selected bidder must provide an IRS Form W-9 and adhere to the City's standard Construction Agreement with no modifications entertained.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PUBLIC IMPROVEMENT REQUEST FOR PROPOSAL

RFP# 26-52

2027 SEWER LINING PROJECT

City of Ann Arbor

PUBLIC SERVICES AREA/PUBLIC WORKS UNIT

Due Date: December 2, 2026 by 2:00 p.m. (local time)

Issued By:

City of Ann Arbor Procurement Unit

301 E. Huron Street Ann Arbor, MI 48104

TABLE OF CONTENTS

SECTION I: GENERAL INFORMATION

SECTION II: SCOPE OF WORK

SECTION III: MINIMUM INFORMATION REQUIRED

SECTION IV: ATTACHMENTS

SECTION I - GENERAL INFORMATION

A. OBJECTIVE

The purpose of this Request for Proposal (RFP) is to select a firm to provide rehabilitation services for sanitary and storm infrastructure within the City of Ann Arbor. Services include video inspection of sewers, cleaning of sewers, full length and spot repair cured-in-place pipe rehabilitation, manhole rehabilitation, and sanitary sewer joint testing and grouting.

B. BID SECURITY

Each bid must be accompanied by a certified check or Bid Bond by a surety licensed and authorized to do business within the State of Michigan, in the amount of 5% of the total of the bid price.

Proposals that fail to provide a bid security upon proposal opening will be deemed non-responsive and will not be considered for award.

C. QUESTIONS AND CLARIFICATIONS / DESIGNATED CITY CONTACTS

All questions regarding this Request for Proposal (RFP) shall be submitted via e-mail.

Questions will be accepted and answered in accordance with the terms and conditions of this RFP.

All questions shall be submitted on or before November 10, 2026 at 2:00 p.m.

(local time), and should be addressed as follows:

Scope of Work/Proposal Content questions shall be e-mailed to Megan Seay, Public Works Engineer, mseay@a2gov.org

RFP Process and Compliance questions shall be e-mailed to Colin Spencer, Buyer

- CSpencer@a2gov.org

Should any prospective bidder be in doubt as to the true meaning of any portion of this RFP, or should the prospective bidder find any ambiguity, inconsistency, or omission therein, the prospective bidder shall make a written request for an official interpretation or correction by the due date for questions above.

All interpretations, corrections, or additions to this RFP will be made only as an official addendum that will be posted to a2gov.org and MITN.info and it shall be the prospective bidder’s responsibility to ensure they have received all addenda before submitting a proposal. Any addendum issued by the City shall become part of the RFP, and must be incorporated in the proposal where applicable.

D. PRE-PROPOSAL MEETING

No pre-proposal meeting will be held for this RFP. Please contact staff indicated above with general questions regarding the RFP.

E. PROPOSAL FORMAT

To be considered, each firm must submit a response to this RFP using the format provided in Section III. No other distribution of proposals is to be made by the prospective bidder. An official authorized to bind the bidder to its provisions must sign the proposal. Each proposal must remain valid for at least one hundred and twenty

(120) days from the due date of this RFP.

Proposals should be prepared simply and economically providing a straightforward, concise description of the bidder’s ability to meet the requirements of the RFP. No erasures are permitted. Mistakes may be crossed out and corrected and must be initialed in ink by the person signing the proposal.

F. SELECTION CRITERIA

Responses to this RFP will be evaluated using a point system as shown in Section III.

A selection committee comprised primarily of staff from the City will complete the evaluation.

If interviews are desired by the City, the selected firms will be given the opportunity to discuss their proposal, qualifications, past experience, and their fee proposal in more detail. The City further reserves the right to interview the key personnel assigned by the selected bidder to this project.

All proposals submitted may be subject to clarifications and further negotiation. All agreements resulting from negotiations that differ from what is represented within the RFP or in the proposal response shall be documented and included as part of the final contract.

G. SEALED PROPOSAL SUBMISSION

All proposals are due and must be delivered to the City on or before December 2, 2026 by 2:00 p.m. (local time). Proposals submitted late or via oral, telephonic, telegraphic, electronic mail or facsimile will not be considered or accepted.

Each respondent should submit in a sealed envelope one (1) original proposal one (1) additional proposal copy one (1) digital copy of the proposal preferably on a USB/flash drive as one file in PDF format

Proposals submitted should be clearly marked: “RFP No. 26-52 – 2027 SEWER LINING PROJECT” and list the bidder’s name and address.

Proposals must be addressed and delivered to:

City of Ann Arbor c/o Customer Service 301 East Huron Street Ann Arbor, MI 48107

All proposals received on or before the due date and time will be publicly opened and recorded on the due date. No immediate decisions will be rendered.

Hand delivered proposals may be dropped off in the Purchasing drop box located in the Ann Street (north) vestibule/entrance of City Hall which is open to the public Monday through Friday from 8am to 5pm (except holidays). The City will not be liable to any prospective bidder for any unforeseen circumstances, delivery, or postal delays. Postmarking on the due date will not substitute for receipt of the proposal.

Bidders are responsible for submission of their proposal. Additional time will not be granted to a single prospective bidder. However, additional time may be granted to all prospective bidders at the discretion of the City.

A proposal may be disqualified if the following required forms are not included with the proposal:

Attachment B – General Declarations Attachment D - Prevailing Wage Declaration of Compliance Attachment E - Living Wage Declaration of Compliance Attachment G - Vendor Conflict of Interest Disclosure Form Attachment H - Non-Discrimination Declaration of Compliance

Proposals that fail to provide these forms listed above upon proposal opening may be deemed non-responsive and may not be considered for award.

H. DISCLOSURES

Under the Freedom of Information Act (Public Act 442), the City is obligated to permit review of its files, if requested by others. All information in a proposal is subject to disclosure under this provision. This act also provides for a complete disclosure of contracts and attachments thereto.

I. TYPE OF CONTRACT

A sample of the Construction Agreement is included as Attachment A. Those who wish to submit a proposal to the City are required to review this sample agreement carefully. The City will not entertain changes to its Construction Agreement.

For all construction work, the respondent must further adhere to the City of Ann Arbor General Conditions. The General Conditions are included herein. Retainage will be held as necessary based on individual tasks and not on the total contract value. The Contractor shall provide the required bonds included in the Contract Documents for the duration of the Contract.

The City reserves the right to award the total proposal, to reject any or all proposals in whole or in part, and to waive any informality or technical defects if, in the City’s sole judgment, the best interests of the City will be so served.

This RFP and the selected bidder’s response thereto, shall constitute the basis of the scope of services in the contract by reference.

J. NONDISCRIMINATION

All bidders proposing to do business with the City shall satisfy the contract compliance administrative policy adopted by the City Administrator in accordance with the Section 9:158 of the Ann Arbor City Code. Breach of the obligation not to discriminate as outlined in Attachment I shall be a material breach of the contract. Contractors are required to post a copy of Ann Arbor’s Non-Discrimination Ordinance attached at all work locations where its employees provide services under a contract with the City.

K. WAGE REQUIREMENTS

The Attachments provided herein outline the requirements for payment of prevailing wages or of a “living wage” to employees providing service to the City under this contract. The successful bidder must comply with all applicable requirements and provide documentary proof of compliance when requested.

Pursuant to Resolution R-16-469 all public improvement contractors are subject to prevailing wage and will be required to provide to the City payroll records sufficient to demonstrate compliance with the prevailing wage requirements. Use of Michigan Department of Transportation Prevailing Wage Forms (sample attached hereto) or a City-approved equivalent will be required along with wage rate interviews.

For laborers whose wage level are subject to federal, state and/or local prevailing wage law the appropriate Davis-Bacon wage rate classification is identified based upon the work including within this contract. The wage determination(s) current on the date 10 days before proposals are due shall apply to this contract. The U.S.

Department of Labor (DOL) has provided explanations to assist with classification in the following resource link: www.sam.gov.

For the purposes of this RFP the Construction Type of Heavy will apply.

L. CONFLICT OF INTEREST DISCLOSURE

The City of Ann Arbor Purchasing Policy requires that the consultant complete a Conflict of Interest Disclosure form. A contract may not be awarded to the selected bidder unless and until the Procurement Unit and the City Administrator have reviewed the Disclosure form and determined that no conflict exists under applicable federal, state, or local law or administrative regulation. Not every relationship or situation disclosed on the Disclosure Form may be a disqualifying conflict. Depending on applicable law and regulations, some contracts may awarded on the recommendation of the City Administrator after full disclosure, where such action is allowed by law, if demonstrated competitive pricing exists and/or it is determined the award is in the best interest of the City. A copy of the Conflict of Interest Disclosure Form is attached.

M. COST LIABILITY

The City of Ann Arbor assumes no responsibility or liability for costs incurred by the bidder prior to the execution of an Agreement. The liability of the City is limited to the terms and conditions outlined in the Agreement. By submitting a proposal, bidder agrees to bear all costs incurred or related to the preparation, submission, and selection process for the proposal.

N. DEBARMENT

Submission of a proposal in response to this RFP is certification that the Respondent is not currently debarred, suspended, proposed for debarment, and declared ineligible or voluntarily excluded from participation in this transaction by any State or Federal departments or agency. Submission is also agreement that the City will be notified of any changes in this status.

O. PROPOSAL PROTEST

All proposal protests must be in writing and filed with the Purchasing Manager within five (5) business days of any notices of intent, including, but not exclusively, divisions on prequalification of bidders, shortlisting of bidders, or a notice of intent to award.

Only bidders who responded to the solicitation may file a bid protest. The bidder must clearly state the reasons for the protest. If any bidder contacts a City Service Area/Unit and indicates a desire to protest an award, the Service Area/Unit shall refer the bidder to the Purchasing Manager. The Purchasing Manager will provide the bidder with the appropriate instructions for filing the protest. The protest shall be reviewed by the City Administrator or designee, whose decision shall be final.

Any inquiries or requests regarding this procurement should be only submitted in writing to the Designated City Contacts provided herein. Attempts by the bidder to initiate contact with anyone other than the Designated City Contacts provided herein that the bidder believes can influence the procurement decision, e.g., Elected Officials, City Administrator, Selection Committee Members, Appointed Committee Members, etc., may lead to immediate elimination from further consideration.

P. SCHEDULE

The following is the schedule for this RFP process.

Activity/Event Anticipated Date Written Question Deadline Nov. 10, 2026, 2:00 p.m. (Local Time) Addenda Published (if needed) Week of November 16, 2026 Proposal Due Date Dec. 2, 2026, 2:00 p.m. (Local Time) Selection/Negotiations December 2026 Expected City Council Authorizations January/February 2027

The above schedule is for information purposes only and is subject to change at the City’s discretion.

Q. IRS FORM W-9

The selected bidder will be required to provide the City of Ann Arbor an IRS form W- 9.

R. RESERVATION OF RIGHTS

1. The City reserves the right in its sole and absolute discretion to accept or reject any or all proposals, or alternative proposals, in whole or in part, with or without cause.

2. The City reserves the right to waive, or not waive, informalities or irregularities in terms or conditions of any proposal if determined by the City to be in its best interest.

3. The City reserves the right to request additional information from any or all bidders.

4. The City reserves the right to reject any proposal that it determines to be unresponsive and deficient in any of the information requested within RFP.

5. The City reserves the right to determine whether the scope of the project will be entirely as described in the RFP, a portion of the scope, or a revised scope be implemented.

6. The City reserves the right to select one or more contractors or service providers to perform services.

7. The City reserves the right to retain all proposals submitted and to use any ideas in a proposal regardless of whether that proposal is selected. Submission of a proposal indicates acceptance by the firm of the conditions contained in this RFP, unless clearly and specifically noted in the proposal submitted.

8. The City reserves the right to disqualify proposals that fail to respond to any requirements outlined in the RFP, or failure to enclose copies of the required documents outlined within the RFP.

S. IDLEFREE ORDINANCE

The City of Ann Arbor adopted an idling reduction Ordinance that went into effect July 1, 2017. The full text of the ordinance (including exemptions) can be found at:

www.a2gov.org/idlefree.

Under the ordinance, No Operator of a Commercial Vehicle shall cause or permit the Commercial Vehicle to Idle:

(a) For any period of time while the Commercial Vehicle is unoccupied; or

(b) For more than 5 minutes in any 60-minute period while the Commercial Vehicle is occupied.

In addition, generators and other internal combustion engines are covered

(1) Excluding Motor Vehicle engines, no internal combustion engine shall be operated except when it is providing power or electrical energy to equipment or a tool that is actively in use.

T. ENVIRONMENTAL COMMITMENT

The City of Ann Arbor recognizes its responsibility to minimize negative impacts on human health and the environment while supporting a vibrant community and economy. The City further recognizes that the products and services the City buys have inherent environmental and economic impacts and that the City should make procurement decisions that embody, promote and encourage the City’s commitment to the environment.

The City strongly encourages potential vendors to bring forward tested, emerging, innovative, and environmentally preferable products and services that are best suited to the City’s environmental principles. This includes products and services such as those with lower greenhouse gas emissions, high recycled content, without toxic substances, those with high reusability or recyclability, those that reduce the consumption of virgin materials, and those with low energy intensity.

As part of its environmental commitment, the City reserves the right to award a contract to the most responsive and responsible bidder, which includes bids that bring forward products or services that help advance the City’s environmental commitment.

In addition, the City reserves the right to request that all vendors report their annual greenhouse gas emissions, energy consumption, miles traveled, or other relevant criteria in order to help the City more fully understand the environmental impact of its procurement decisions.

U. MAJOR SUBCONTRACTORS

The Bidder shall identify each major subcontractor it expects to engage for this Contract if the work to be subcontracted is 15% or more of the bid sum or over $50,000, whichever is less. The Bidder also shall identify the work to be subcontracted to each major subcontractor. The Bidder shall not change or replace a subcontractor without approval by the City.

V. LIQUIDATED DAMAGES

A liquidated damages clause, as given on page C-2, Article III of the Contract, provides that the Contractor shall pay the City as liquidated damages, and not as a penalty, a sum certain per day for each and every day that the Contractor may be in default of completion of the specified work, within the time(s) stated in the Contract, or written extensions.

Liquidated damages clauses, as given in the General Conditions, provide further that the City shall be entitled to impose and recover liquidated damages for breach of the obligations under Chapter 112 of the City Code.

The liquidated damages are for the non-quantifiable aspects of any of the previously identified events and do not cover actual damages that can be shown or quantified nor are they intended to preclude recovery of actual damages in addition to the recovery of liquidated damages.

SECTION II - SCOPE OF WORK

A. Objective

To effectively maintain City storm and sanitary infrastructure, the City of Ann Arbor, Michigan, is requesting proposals from qualified contractors to provide sewer cleaning, inspection, and rehabilitation services as required by the City’s Department of Public Works Unit. The scope of services will consist of an annual list of pipes to be CIPP lined, as well as individual tasks to be determined and assigned during the contract period. Examples of potential type of work may include, but is not limited to the following:

Cleaning of sewers ranging in size from 8 to 42 inches in diameter. This work includes flushing, debris removal, grease removal, root cutting, deposit cutting, and grinding protruding break-in service connections.

Internal video inspection of sewers via Closed Circuit Television (CCTV) of sewers ranging from 8 to 42 inches in diameter. The inspections shall include providing the City with digital videos, images, and reports that include condition and other descriptive data related to the sewer in accordance with NASSCO’s Pipeline Assessment Certification Program.

Full length manhole to manhole styrene free Cured-in-Place Pipe (CIPP) rehabilitation of sewers ranging in size from 8 to 42 inches in diameter.

Spot repair CIPP rehabilitation of sewers ranging in size from 8 to 30 inches in diameter.

Spray lining large diameter pipes and culverts.

Manhole rehabilitation including the application of a cementitious or calcium aluminate manhole lining system, sealing active leaks, and bench/channel reconstruction.

Sewer joint and lateral connection testing and packer injection grouting to locate and seal joints and connections that are not watertight.

Maintenance of traffic services, including developing plans for traffic control as needed, reviewing with City Staff for Right-of-Way permits and advance lane closure notifications and obeying all City restrictions and requirements for the given location.

Bypass pumping for the above listed work or as-needed for other situations.

The City intends to award up to two (2) construction contracts. The term of the contracts will be 3 years from the Notice to Proceed with an optional extension for up to one (1) additional year. It shall be understood that the submitted unit prices are to be honored over the term of the contract. If the contract is extended, a one-time cost escalator of no greater than 3% may be added to the submitted rates. A written request from the Contractor at the end original contract period from will be required to consider any rate adjustments.

There will be no minimum value of services committed by the City for each service contract awarded. The total available budget for the term of the contract is approximately $4,000,000 annually. The contract amounts are subject to the availability of funds and approval of annual budgets.

B. Contract Implementation

The Public Works Unit will develop an annual non-emergency CIPP sewer lining project. A scope of work will be prepared for each annual project, including a list of pipes, adjacent manholes, pipe diameter and length, as well as maps of the pipes to be lined. The expected schedule for the non-emergency CIPP sewer lining work is each project will be completed within a year from the assigned date. The selected on-call contractor(s) shall provide the City with a price proposal to complete the project work including:

Total costs for self-performed work with a breakdown of the total labor cost.

Material costs, if provided by the Contractor.

Subcontractor names and costs with allotted mark-up percentages.

Schedule or date by which the work can be completed.

Names and contact information of assigned Foreman or Superintendent.

For emergency work, or work with an indeterminate scope, the Contractor shall provide written confirmation of anticipated labor, material and equipment necessary to perform the work. Final costs shall be paid on a time and materials basis using the rates and information provided in the Fee Proposal Form.

The City will assign specific tasks to a Contractor based on availability, turnaround time for completion of tasks, experience and other factors relevant to the task. The City does not guarantee either a minimum volume of work or a specific volume of work under this Contract.

The Contractor will be contractually obligated to use the fees included in their proposal to generate costs for individual tasks solicited by the City under this Contract. Proposals shall be structured with hourly or weekly estimates of equipment usage and labor (whichever is appropriate for the duration of the task) and a list of materials and associated pricing.

The Contractor shall be entitled no greater than a 5% markup on subcontractor costs.

The Contractor shall be entitled no greater than a 15% markup on material and equipment rental costs. Back-up documentation for material and equipment rental costs shall be provided with all proposals and submitted invoices. The City may decide to complete any task on a Time and Materials basis using the fee schedule included as part of the Contractor’s proposal.

The desired response time for emergency tasks is 48 to 72 hours including equipment mobilization. The respondent should identify the typical anticipated emergency response time and if there are any stipulations or constraints in responding to emergency tasks.

C. Scope of Work

A typical project performed under the proposed contract will involve the following process:

1. City will contact Contractor and indicate work as emergency or non-emergency work and agree to engage in work.

2. Visit the project site with City staff and identify a preliminary scope of construction. Confirm work that is out of scope and not covered by the unit prices.

3. Review any drawings, specifications, reports, etc. provided by City staff on the proposed project.

4. Develop and agree on a final scope of construction. Submit letter proposal for out-of-scope work not covered by the unit prices to City staff for review and approval.

1. Provide schedule and quote for labor, material and equipment. Submit to City staff for review and approval.

2. Obtain written approval from the City for implementation of the task.

3. Apply for and obtain all necessary permits. Cost of City-issued permits to be covered by the City, all other permits are to be obtained at the Contactor’s expense.

1. Perform all work necessary.

2. City staff will review all work prior to final sign off. Contractor to address all identified deficiencies in the work.

3. Contractor to provide final documentation for all time and materials. City will release any retainage held on the individual task.

D. Requirements

1. Ability to work effectively with the City’s Public Works Unit staff with respect to any of the construction services required by the City.

2. Ability to work effectively with other City units and regulatory agencies.

3. The ability to function in a support role to the Public Works Unit. The contractor’s services will be utilized for activities that exceed the staffing level or expertise of the Public Works Unit.

4. The ability to respond to emergency service requests by City Public Works staff within 72 hours

5. The ability to respond to non-emergency service requests by City Public Works staff within 365 days unless written approval is obtained from the Owner.

6. The ability to complete work at any given site continuously without unwarranted delays until the work is completed. Includes immediate restoration of drivable surfaces.

7. The ability to work effectively with the City’s Engineering staff with respect to furnishing and managing temporary traffic control operations as required by the City.

8. It is the responsibility of the Contractor to provide an up-to-date list of names and contact numbers of on-call personnel. The City will contact the Contractor by phone as emergencies occur and will provide as much information as available about the emergency work assignment, including the location(s), type of work and sit condition(s).

E. Standard Specifications

All work performed under this Contract shall be performed in accordance with the Public Services Department Standard Specifications in effect at the date of availability of the contract documents stipulated in the Advertisement. All work under this Contract which is not included in these Standard Specifications, or which is performed using modifications to these Standard Specifications, shall be performed in accordance with the Detailed Specifications provided during the implementation of individual tasks under this Contract.

Copies of the Standard Specifications can be downloaded from the following web link.

https://www.a2gov.org/departments/engineering/Pages/Engineering-and-Contractor- Resources.aspx

DETAILED SPECIFICATION

FOR

PROJECT SCHEDULE

DESCRIPTION

Examination of Plans, Specifications, and Work Site: Bidders shall carefully examine the Bid Form, plans, specifications and the work site until the Bidder is satisfied as to all local conditions affecting the contract and the detailed requirements of construction. The submission of the bid shall be considered prima facie evidence that the Bidder has made such examination and is satisfied as to the conditions to be encountered in performing the work and all requirements of the contract.

The entire work under this Contract shall be completed in accordance with, and subject to, the scheduling requirements as outlined below, and all other requirements of the Contract Documents.

1. The Contractor shall begin the work of this project only upon receipt of the fully executed Contract and Notice to Proceed. The Contractor shall have one calendar year to complete the non-emergency sewer rehabilitation work from the date the work is assigned.

2. The entirety of work under this Contract, including but not limited to sanitary sewer inspection, cleaning, televising, and rehabilitation (cured-in-place pipe [CIPP] lining); manhole rehabilitation; the removal of any and all traffic control devices; and the installation/maintenance of the needed temporary soil erosion and sedimentation control devices, shall be completed by the expiration of the project contract.

The Contractor is expected to be furnished with two (2) copies of the Contract, for his/her execution. The Contractor shall properly execute both copies of the Contract and return them, with the required Bonds and Insurance Certificate, to the City within ten (10) days. The Contractor shall not begin the work before the applicable date(s) as describes herein without approval from the Project Engineer, and in no case before the receipt of the fully executed Contract.

Time is of the essence in the performance of the work of this contract. The Contractor is expected to mobilize sufficient personnel and equipment and work throughout all authorized hours to complete the project within the specified time/date of this Contract. Should the Contractor demonstrate that work must occur on Sundays in order to maintain the project schedule, they may do so between the hours of 9:00 a.m.

and 5:00 p.m. with prior approval from the City. The Contractor will submit authorization requests for any Sunday work a minimum of three working days in advance of the day of the proposed work. There will be no additional compensation due to the Contractor for work performed on Sundays.

Prior to the start of any construction, the Contractor shall submit a detailed progress schedule of work for the Engineer's review and approval. Work shall not start until a schedule is approved in writing by the Engineer. The Contractor shall update the approved work schedule upon request by the Engineer and present it to the Engineer within seven days of said request.

The City's decision to delete locations, add locations, change the limits of construction limits at any locations, or, the City's contribution to a delay of the construction at any one location shall not entitle the Contractor to receive additional compensation for work on any other location(s), nor shall it relieve the Contractor of any responsibilities for completion of work on any other location(s).

The Engineer may delay or stop the work due to threatening weather conditions. The Contractor shall not be compensated for unused materials or downtime due to rain, or the threat of rain. The Contractor is solely responsible for repairing all damages to the work and to the site, including road infrastructures, road subgrades, and any adjacent properties, which are caused as a result of working in the rain.

The Contractor shall not work in the dark except as approved by the Engineer and only when lighting for night work is provided as detailed elsewhere in this contract. The Engineer may stop the work or may require the Contractor to defer certain work to another day, if, in the Engineer's opinion, the work cannot be completed within the remaining daylight hours, or if inadequate daylight is present to either properly perform or inspect the work. The Contractor will not be compensated for unused materials or downtime, when delays or work stoppages are directed by the Engineer for darkness and/or inadequate remaining daylight reasons. The Contractor is solely responsible for repairing all damages to the work and to the site, including road infrastructures, road subgrades, and any adjacent properties, which are caused as a result of working in the dark.

No work shall be performed, or lane closures permitted during the holiday periods, as defined by the Engineer.

Failure to complete all work as specified herein within the times specified herein, including time extensions granted thereto as determined by the Engineer, shall entitle the City to deduct from the payments due the Contractor, $1,500.00 in Liquidated Damages, and not as a penalty, for delays in the completion of the work for each and every calendar day beyond any “Complete Work” date for each location, and beyond the overall project completion date as required by this Detailed Specification.

Liquidated Damages will be assessed until the required work is completed in the current construction season. If, with the Engineer’s approval, work is extended beyond seasonal limitations, the assessment of Liquidated Damages will be discontinued until the work is resumed in the following construction season.

If the work required by this construction contract is not completed by the specified date(s) including any extensions of time granted thereto, at the sole discretion of the City of Ann Arbor, this Contract may be terminated with no additional compensation due to the Contractor, and the Contractor may be forbidden to bid on future City of Ann Arbor projects for a period of at least three (3) years. If the Engineer elects to terminate the Contract, contract items paid for on a Lump Sum basis shall be paid up to a maximum percentage equal to the percentage of the contract work that has been completed.

COORDINATION AND COOPERATION WITH OTHERS

AND

WORK BY OTHERS

The Contractor is reminded as to the requirements of article 104.07 of the 2020 edition of the MDOT Standard Specifications, “Cooperation by the Contractor.”

The Contractor shall directly coordinate his/her work with individual City Departments/Divisions/Units.

No additional compensation will be paid to the Contractor, and no adjustments to contract unit prices will be made, due to delays and/or the failure of others in the performance of their work, nor for delays due to the encountering of existing utilities that are, or are not, shown on the Plans.

The following Utility Owners, and others not listed specifically, may have overhead and/or underground facilities located within the Right-of-Way/Public Easements:

The City of Ann Arbor University of Michigan (UM) Michigan Department of Transportation (MDOT)

AT&T

Comcast DTE Energy - Detroit Edison Company (Edison) DTE Energy - Michigan Consolidated Gas Company (Michcon) Fiber Link Inc.

Light Core (Century Tel) MCI Communications Windstream Communications

On all projects:

“3 Working Days before you Dig - Call MISS DIG - Toll Free” Phone No. 1-800-482-7171.

The Owners of public or private utilities which will not interfere with the completed project and which do not present a hazard to the public or an extraordinary hazard to the Contractor's operations will not be required to move their facilities on or from the street right-of-way.

During the life of this contract, other public authorities and utility companies may be performing work within or adjacent to the project limits, including, but not limited to; construction of adjacent projects, underground utility work, permanent signing and traffic signals work, traffic control improvements, street maintenance and snow removal, etc. The Contractor shall cooperate and coordinate construction activities with these agencies in accordance with Article 104.08 of the 2020 edition of the MDOT Standard Specifications for Construction.

Stoppages created solely by the operations of the utility companies which delay utility revisions on any portion of this project may be considered as a basis of claim for an extension of time for project completion.

Costs for this work will not be paid for separately, but shall be included in the bid price of the Contract Item “General Conditions.”

MAINTENANCE OF TRAFFIC

DESCRIPTION

Traffic shall be maintained in accordance with the City of Ann Arbor Public Services Department Standard Specifications and as specified in Sections 104.11, 812, and 922 of the Michigan Department of Transportation (MDOT) 2020 Standard Specifications for Construction, the 2011 Michigan Manual of Uniform Traffic Control Devices (MMUTCD), and as described herein.

The Contractor shall furnish, erect, maintain and, upon completion of the work, remove all traffic control devices and barricade lights as required on the project for the safety and protection of local traffic. This includes, but is not limited to, temporary advance, regulatory, and warning signs; barricades and channelizing devices at intersections and on streets where traffic is to be maintained; barricades at the ends of the project and at right-of-way lines of intersecting streets, and traffic control devices for moving construction operations.

MATERIALS

The materials and equipment shall meet the requirements specified in the corresponding sections of the MDOT 2020 Standard Specifications for Construction and the 2011 MMUTCD.

Maintenance of Local Traffic

Unless otherwise indicated on the plans, all side roads shall not be closed to through traffic except during construction operations of short duration and only upon written approval of the Engineer.

Local access shall be maintained at all times for emergency vehicles, refuse pick-up, mail delivery, school buses, and ingress/egress to public and private properties.

Contractor must accommodate the safe access to the residential buildings and businesses located within construction area.

Driveways shall not be blocked for extended periods of time unless arrangements can be made with the affected property owner(s). When it becomes necessary to temporarily block driveways, the Contractor shall notify the affected property owners in advance to coordinate the work and allow sufficient time for vehicles to vacate from properties. It may be necessary to allow for vehicles to temporarily park in the roadway at locations that do not interfere with the Contractor’s work. During these periods the owners of the respective vehicles must be available to, with proper notice, move their vehicles if it becomes necessary to accommodate the work.

At times, when it becomes necessary to temporarily obstruct local traffic during the performance of the work, the Contractor shall provide traffic regulator control in conformance with Chapter 6E of the MMUTCD, Sections 6E.01 thru 6E.08. A minimum of two traffic regulators are required. The cost of traffic regulator control shall be included in the contract pay item “Minor Traffic Control, Modified, Maximum $100,000”.

A lane-closure permit shall be obtained by the Contractor from the Engineering Department, at least 48 hours in advance of any proposed lane or street closing.

No lane closures shall be permitted during the Independence Day and Labor Day holiday periods, as defined by the Engineer.

The hours of work on all Local streets are 7:00 a.m. to 8:00 p.m., Monday through Saturday, or as specified on the lane-closure permit. No equipment will be allowed in the street before or after these hours. Local streets may only be closed to through traffic (local access only) with written authorization of the Engineer.

Work must be completed each day such that all streets are re-opened to through traffic by 8:00 p.m. unless otherwise specified, directed, or authorized in writing by the Engineer. All major changes in traffic control shall be made either between 9:30 a.m. and 3:30 p.m. or between 7:00 p.m. and 6:30 a.m. in order to minimize interference with rush-hour traffic. All traffic controls must be in-place and ready for traffic each day by 6:30 a.m. and 3:30 p.m.

The Contractor shall temporarily cover conflicting traffic and/or parking signs when directed by the Engineer.

The Contractor shall use quantities of dust palliative, maintenance aggregate, and cold patching/HMA mixtures for use as temporary base, surfacing, and dust control at utility crossings, side roads and driveways (wherever required to maintain traffic), and where directed by the Engineer to maintain local access. The cost for the use of dust palliative, maintenance aggregate, cold patch and/or hot mix asphalt 36A mixture, as required and directed by the Engineer for maintenance of traffic and local access, shall be included in contract pay item "General Conditions," and it will not be paid for separately.

The work of maintaining and relocating existing warning, regulatory and/or guide signs; and of removing, salvaging and reinstalling existing signs and supports is included in the bid price for the contract pay items “Minor Traffic Control” and “Major Traffic Control”.

Mailboxes and newspaper boxes that are in the way of the construction shall be removed and reset immediately in a temporary location approved by the Engineer. Mail and paper delivery shall not be interrupted during the construction. Upon completion of the construction, all mailboxes and newspaper boxes, including their supports, shall be repositioned in their permanent locations as approved by the Engineer. This work shall be included the contract unit price for the contract pay item “General Conditions,” and it will not be paid for separately.

The Contractor shall perform the work of this Contract while maintaining traffic in accordance with the Contract Documents as specified herein. No traffic shall be allowed on newly placed asphalt surfaces until rolling has been satisfactorily completed and the surface has cooled sufficiently to prevent damage from traffic. This is to be accomplished by flag persons and by relocating traffic control devices to prevent traffic from entering the work area until such time that it can be safely maintained without damaging the new construction. The Contractor shall provide traffic regulators in sufficient number to maintain traffic as described herein, and to keep traffic off sections being surfaced, and provide for safe travel at all times as directed by the Engineer.

The Contractor shall furnish, erect, maintain, and upon completion of the work, remove any and all traffic control devices utilized on the project.

Each pressure distributor, paver and roller shall be equipped with at least one approved flasher light which shall be mounted on the equipment so as to give a warning signal ahead and behind.

CONSTRUCTION SEQUENCING

The Contractor must submit a detailed progress schedule at the Pre-construction meeting which is to be approved by the Engineer. Unless an alternative sequence is requested by the Contractor and approved in writing by the Engineer, the work shall be performed in the order as shown on the schedule. This outline does not detail the full range of materials and processes needed to complete the work under this Contract.

At each location the Contractor shall:

1. Install the required temporary traffic control devices in accordance with the construction plans, as detailed in the specifications, and as directed by the Engineer.

2. Install the soil erosion control measures in accordance with the plans and as directed by the Engineer.

3. Obtain approval for, set up, and activate by-pass pumping.

4. Clean & videotape sewer to be lined.

5. Construct the proposed sewer lining. The new sewer shall be tested in accordance with the plans and specifications.

6. After all the new sewer has passed the required testing, the contractor shall open all service leads.

Service leads shall not be out of service for more than 12 hours.

7. Deactivate and breakdown by-pass pumping equipment.

8. Perform manhole rehabilitation.

9. Perform final cleanup and restoration in accordance with the Contract documents.

10. Remove temporary soil erosion and sedimentation control measures.

11. Remove all temporary traffic control devices.

HOURS OF WORK

General Restrictions - Hours of work shall be as stated in the Ann Arbor City Code Title IX, Chapter 119, Page 9.363, Monday through Saturday, between the hours of 7:00 a.m. and 8:00 p.m.

Exceptions - During installation of the cured-in-place pipe (CIPP) lining, the Contractor may choose, in some cases, to perform nighttime work to facilitate construction during the inversion and curing processes.

Additional requirements regarding this work are contained in Detailed Specification “CIPP Sewer Lining” and elsewhere in the Contract Documents. The Contractor shall include this work in their progress schedule, notify, and submit a request to the Engineer for permission to perform the nighttime CIPP work a minimum of 5 working days prior to beginning the work.

Maintenance of the sewer flow control may also require working outside the allowable hours of work (“off-hour” work). The Contractor shall provide anticipated off-hour work as part of their Sewer Flow Control Plan submittal(s) as contained in the Detailed Specification for “Sewer Flow Control.”

Additional work restrictions are contained in the Detailed Specifications for “Project Schedule,” “Maintenance of Traffic,” “Working Space,” “Construction Sequencing,” and elsewhere in the Contract Documents. These work restrictions shall take precedence over the General Restrictions and Exceptions listed above.

The Contractor shall only perform work at night or on Sundays as required by the Contract Documents, unless there is a special need and the work is approved by the Engineer. All requests to work during off-hours shall be included in the Contractor’s progress schedule and submitted to the Engineer for approval a minimum of 5 working days prior to beginning the work.

Noise Control - All noise generated by construction activities shall not exceed 71 decibels (dBA) beyond the property line of the property on which the work is being conducted between 7:00 a.m. and 8:00 p.m., Monday through Saturday. The Contractor shall provide screening, noise absorption, and level II sound attenuation as required on equipment to meet the noise limitations set herein. Any “off-hour” work will require a temporary exemption from the City of Ann Arbor City Administrator. A temporary exemption may be granted in accordance with each respective entities’ code of ordinance.

Method of Payment - The costs of night work, whether required by the Contract Documents or requested by the Contractor, shall not be paid for separately, but shall be considered included in the cost of the affected contract pay items.

WORKING IN THE RAIN

Portions of the work to be performed under this contract are weather sensitive. Contractor shall be responsible for coordinating and scheduling their work in anticipation of the weather.

Sewer flow control must cease during wet weather conditions. Wet weather conditions are as defined in Detailed Specification “Sewer Flow Control.”

In the event of a wet weather event, Contractor shall remove plugs installed for sanitary flow diversion.

Plugs shall be reinstalled upon cessation of the wet weather event and as approved by the Engineer.

The Contractor shall not be compensated for the time and/or effort spent removing the temporary flow diversion plugs and the lateral bypass pumping system or for unused materials or downtime caused as a result of a wet weather event. The Contractor is solely responsible for repairing all damage to the work and to the site, including road infrastructure, road subgrades, underground utilities, any adjacent properties, and the like, which are damaged as a result of working in the rain or working in areas that are wet from recent precipitation.

The only exception to the above is as indicated in Detailed Specification “Extension of Time, Additional Compensation.”

The costs of complying with this requirement shall not be paid for separately but shall be considered included in the cost of the affected contract pay items.

EXTENSION OF TIME, ADDITIONAL COMPENSATION

The Contractor shall notify the Engineer of their intent to submit a claim for additional compensation or an extension of time in accordance with the requirements of Section 104.10 of the 2020 edition of the Michigan Department of Transportation (MDOT) Standard Specifications for Construction. Failure to do so may be a basis for not approving the request for additional compensation or extension of time. The notification will allow the Engineer an opportunity to influence, keep records, and monitor the work.

Extensions of time will not be authorized due to delays caused by, or stemming from, the weather for the period between November 14th and April 16th unless any of the following conditions are present:

1. Air temperature (as measured from a thermometer provided, maintained, and installed by the Contractor in a location on the worksite, as mutually agreed upon between the Contractor and the Engineer) is below 15ºF for a period of time longer than 48 consecutive hours.

2. Accumulations of snow in excess of 12 inches occur in any 24 hour period.

3. Freezing rain in excess of 1/4-inch occur in any 24 hour period.

4. Wet weather event, as defined in Detailed Specification “Sewer Flow Control” requiring the temporary removal of flow diversion plugs and lateral bypass pumping system.

Should the above mentioned weather conditions occur, and the Contractor requests an extension of contract time, the time extension shall only be for the realized delay to the controlling work operation.

The above weather delays shall not be considered as a basis for additional compensation on this project.

The only exception shall be that if the temporary removal of the flow diversion plugs and lateral bypass pumping system occurred after the sewers had been cleaned, televised, prepped for lining, and approved by the Engineer for lining before the sewers were lined. In such an event, the Contractor may request compensation for the re-cleaning and re-televising of the affected pipes only. The re-cleaning must first be approved by the Engineer prior to the work beginning. No compensation shall be provided for the removal and re-installation of the plugs.

In addition, if delays resulting from air temperature, snow accumulation, and/or freezing rain occur and the Contractor has their bypass pumping system in place and operational, the Contractor shall still be responsible to continuously protect and maintain in operation the complete sewer flow control system.

Expenses related to maintaining the bypass pumping system shall not be considered to be additional costs or extra expenses during an authorized extension of time due to these weather-related time extensions.

The Contractor shall anticipate underground utility complications arising from the proposed utility work, unknown and/or fragile utilities, and utilities requiring investigation and or relocation. These utilities may be shown on the Drawings, correctly or incorrectly, or not at all, and may delay a controlling operation.

Additional compensation is defined as additional work, extra work, upward unit price adjustments, payments for down time, and the like

PROJECT SUPERVISION

DESCRIPTION

The Contractor shall designate a full-time Project Supervisor to act as the Contractor's agent/representative, and to be responsible for scheduling and coordination of all subcontractors,…