2027-440_Exhibit_F_Site_Plans.pdf

PDF 3 MB Posted

Attached to
DNR RFB Provencher WMA Wetland Restoration
Solicitation number
2000018831
Issued by
Mcleod County, Minnesota

About this file

Provencher WMA Wetland Restoration - Site Plans and Project Details

This document is a comprehensive site plan exhibit prepared by the Minnesota Department of Natural Resources (DNR) for the Provencher Wildlife Management Area (WMA) Wetland Restoration project (RFB 2027-440) located near Greenleaf in Meeker County. The project encompasses wetland restoration and site stabilization work including tile investigation (1,250 linear feet), tile removal (1,300 linear feet), sediment removal across seven designated areas totaling approximately 5,736 cubic yards, construction of two plugs for habitat enhancement, erosion control measures, and site preparation and seeding across 4.5 acres of disturbed areas. The total project site covers 86 acres with 4.5 acres designated for disturbance. Key bid line items include mobilization (lump sum), tile removal and investigation (unit pricing), site preparation (lump sum), sediment removal excavation (cubic yard pricing with no adjustment for quantity variance), erosion control blanket installation (1,400 square yards), straw wattles (1,150 linear feet), cultivation (4.5 acres), and sowing and mulching (4.5 acres). The contractor must obtain a Storm Water Pollution Prevention Plan (SWPPP) permit and National Pollution Discharge Elimination System (NPDES) stormwater construction permit from the Minnesota Pollution Control Agency (MPCA) at least 30 days prior to beginning work.

Project specifications require contractors to employ fully integrated GPS machine control technology with finish ground surfaces provided by DNR in Land XML and DXF file formats. The contractor must identify a certified erosion control supervisor and coordinate weekly proposed activities with the DNR field representative. All equipment and materials must be inspected at the staging area to prevent invasive species introduction. Primary project contacts include Cory Netland (Area Manager), Jake Rambow (Area Biologist), and Adam Kleinschmidt (Wetland Specialist). Responses must be submitted electronically through the Swift Portal with unit pricing reflecting all costs including labor, materials, equipment, transportation, and applicable taxes. The contract includes machine control requirements, weekly erosion control inspections, maintenance obligations following rain events, and final site stabilization within 14 days of work completion in specific areas. Prevailing wage rates apply to the project, with updated rates issued by the Department of Labor and Industry noted in the contract addendum.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 TMAP MOBILITY Earthstar Geographics SIO © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 TMAP MOBILITY Earthstar Geographics SIO

STATE

CALLONE

GOPHER

CALL BEFORE YOU DIG

PROVENCHER WMA

Operations Services Division Approval Division Approval Title:

File #:

CC2:

Sheet:

Survey:

Drawn:

Checked:

Horz. datum:

Designed:

Drawn:

Checked:

Revisions ByDate

Section: Township: Range: Vert. datum:

Site #:

© Copyright . State of Minnesota, Department of Natural Resources

PROVENCHER WMA

WETLAND RESTORATIONS C-001

#X#####

XXX#######

R########

07/25AK

07/25MO

07/25AK

NAVD88NAD83

06/25MO

06/25MO

05/25AK

TITLE SHEET

NEAR GREENLEAF

3111826

MEEKER COUNTY

F & W

WETLAND RESTORATIONS

MINNESOTA DEPARTMENT OF NATURAL RESOURCES - F & W DIVISION

PLOT DATE: 10/1/2026 2:23 PM C:\C3D\MN-PROVENTURE WMA\5_Drawings\503_Civil\PROVENCHER WMA COVER AND QUANT.dwg

Site Location

Operations Services Division Approval Division Approval

SHEET INDEX:

C-001 TITLE SHEET

C-002 ESTIMATED QUANTITIES AND NOTES

C-003 EXISTING TOPOGRAPHY

C-101 SITE PLAN

C-102 PLAN VIEW TILE INVEST. & REMOVAL

C-103 PLAN VIEW SRA'S & PLUGS

C-104 SRA AND PLUG DETAILS

C-105 PLAN VIEW EROSION CONTROL

C-106 EROSION CONTROL DETAILS

C-107 SWPPP

PROJECT CONTACTS:

CORY NETLAND MN DNR AREA MANAGER

320-347-7632 cory.netland@state.mn.us

JAKE RAMBOW

320-347-7633

MN DNR AREA BIOLOGIST

jacob.rambow@state.mn.us

ADAM KLEINSCHMIDT MN DNR WETLAND SPECIALIST

320-347-7636 adam.kleinchmidt@state.mn.us

180TH STREET

180TH STREET

N

N

ST

AT

E H

W Y

GREENLEAF

CTY HWY 18

0T

H A

VE

180TH ST

0T

H A

VE

LAKE

WILLIE

COOMBS

LAKE

ATKIINSON

LAKE LAKE

HARDEN

PROJECT

LOCATION

PROPERTYPROPERTYPROPERTYPROPERTY

P R

O P

E R

T Y

P R

O P

E R

T Y

P R

O P

E R

T Y

P R

O P

E R

T Y

PROPERTYPROPERTYPROPERTYPROPERTY

P R

O P

E R

T Y

PROPERTY PROPE

R T

Y P

R O

P E

R

TY PROPERTY PROPERTY

P R

O P

E R

T Y

P R

O P

E R

T Y

P R

O P

E R

T Y

P R

O P

E R

T

Y PROPERTY PROPERTY PROPERTY PROPERTY

P R

O P

E R

T Y

P R

O P

E R

T Y

P R

O P

E R

T Y

P R

O P

E R

T Y

P R

O P

E R

T Y

P R

O P

E R

T Y

P R

O P

E R

T Y

P R

O P

E R

T Y

PROPERTY LINE

SRA'S

PLUGS

PROPERTY

MAP POINT " " IS LOCATED AT INTERSECTION OF STATE HWY 22 AND COUNTY HWY 18

IN GREENLEAF, MN. TO PROJECT SITE HEAD NORTH ON STATE HWY 22 ±1 MILE TO

INTERSECTION OF 180TH STREET AND STATE HWY 22. HEAD WEST ON 180TH STREET ±1

MILE TO WMA PARKING LOT LOCATED ON SOUTH SIDE OF ROAD.

PROJECT VICINITY MAP

NOT TO SCALE

PROJECT LOCATION MAP

NOT TO SCALE

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS LINEGAS GAS

Title:

File #:

CC2:

Sheet:

Survey:

Drawn:

Checked:

Horz. datum:

Designed:

Drawn:

Checked:

Revisions ByDate

Section: Township: Range: Vert. datum:

Site #:

© Copyright . State of Minnesota, Department of Natural Resources

PROVENCHER WMA

WETLAND RESTORATIONS C-002

#X#####

XXX#######

R########

07/25AK

07/25MO

07/25AK

NAVD88NAD83

06/25MO

06/25MO

05/25AK

ESTIMATED QUANTITIES AND NOTES

NEAR GREENLEAF

3111826

MEEKER COUNTY

F & W

PLOT DATE: 10/1/2026 2:45 PM C:\C3D\MN-PROVENTURE WMA\5_Drawings\503_Civil\PROVENCHER WMA COVER AND QUANT.dwg

STATEMENT OF ESTIMATED QUANTITIES

ITEM

NOTES ITEM. NO. SPEC. NO. ITEM UNIT

TOTAL

ESTIMATED

QUANTITIES

A 1 01 71 13 MOBILIZATION LUMP SUM 1

B 2 02 41 18 TILE REMOVAL L.F. 1300

C 3 31 14 13 SITE PREPARATION LUMP SUM 1

D 4 31 23 16 EXCAVATION- SEDIMENT REMOVAL AREAS (SRA'S) C.Y.-P 5736

E 5 31 23 33 TILE INVESTIGATION L.F. 1250

6 31 25 00 EROSION CONTROL BLANKET CAT. 20 - NATURAL NETTING S.Y. 1400

7 31 25 00 9"Ø STRAW WATTLES- NATURAL NETTING L.F. 1150

8 31 25 00 CONSTRUCTION EXIT E.A. 1

F 9 31 25 00 STORM WATER PERMIT FOR CONSTRUCTION LUMP SUM 1

G 10 32 91 13 CULTIVATION ACRE 4.5

H 11 32 92 00 SOWING AND MULCHING ACRE 4.5

BID ITEM NOTES:

A) BID ITEM FOR MOBILIZATION SHALL INCLUDE THE SUPPLY OF ALL LABOR, MATERIAL, AND EQUIPMENT TO TRANSPORT ALL NEEDED LABOR, MATERIAL, AND EQUIPMENT TO AND FROM A PROJECT SITE TO SUCCESSFULLY COMPLETE THE PROJECT AS SHOWN ON THE PLANS OR DESCRIBED BY THE DNR

FIELD REPRESENTATIVE.

B) BID ITEM FOR TILE REMOVAL SHALL INCLUDE STRIPPING, EXCAVATION, REMOVAL, AND BACKFILLING OPERATIONS. CONTRACTOR WILL ONLY BE PAID

FOR THE ACTUAL LINEAR FEET OF TILE REMOVED IN THE FIELD.

C) BID ITEM FOR SITE PREPARATION SHALL INCLUDE STRIPPING BENEATH PLUGS AND SHALL INCLUDE LEVELING/DRAGGING TOPSOIL SUITABLE

ENOUGH TO BE CONSIDERED SEEDBED READY.

D) BID ITEM FOR EXCAVATION- SEDIMENT REMOVAL AREAS SHALL INCLUDE EXCAVATING THE VARIOUS SRA'S AS IDENTIFIED IN THE PLANS.

ALL SPOIL MATERIAL SHALL BE REMOVED FROM WETLAND AREAS AND MOVED TO PLUG LOCATIONS OR DESIGNATED SPOIL AREAS AS SHOWN IN THESE PLANS. PAYMENT IS BASED ON CUBIC YARD PLAN, THERE WILL BE NO ADJUSTMENT MADE FOR INCREASE OR DECREASE TO QUANTITY.

MACHINE CONTROL WILL BE REQUIRED FOR SEDIMENT REMOVAL AREAS, SEE NOTE BELOW. CONTRACTOR WILL INCLUDE ANY MINOR WOODY

REMOVAL WITHIN SRA OR PLUG BOUNDARY UNDER THIS LINE ITEM.

E) BID ITEM FOR TILE INVESTIGATION SHALL INCLUDE STRIPPING, EXCAVATION, AND BACKFILLING OPERATIONS. CONTRACTOR WILL ONLY BE PAID FOR

THE ACTUAL LINEAR FEET INVESTIGATED.

F) BID ITEM FOR STORM WATER PERMIT FOR CONSTRUCTION SHALL INCLUDE THE CONTRACTOR OBTAINING THE STORM WATER PERMIT FOR

CONSTRUCTION ACTIVITIES PRIOR TO THE START OF CONSTRUCTION.

G) BID ITEM FOR CULTIVATION SHALL INCLUDE EQUIPMENT, LABOR, AND ALL ASSOCIATED COST REQUIRED TO CULTIVATE DISTURBED AREAS INCLUDING: SEDIMENT REMOVAL AREAS, PLUGS, SPOIL AREAS, AND TILE INVESTIGATION/REMOVAL AREAS. CONTRACTOR SHALL USE FIELD CULTIVATOR WITH DRAG/ROLLER SECTION OR OTHER IMPLEMENT WITH MINIMUM 4" DEPTH. FINISHED SURFACE SHALL BE SMOOTH FIRM SEEDBED, FREE OF ROCK AND DEBRIS SUITABLE FOR NATIVE SEED PLANTING. CULTIVATION LINE ITEM WILL BE PAID FOR BASED ON ACRES.

H) BID ITEM FOR SOWING AND MULCHING SHALL INCLUDE THE EQUIPMENT AND LABOR REQUIRED TO SOW AND MULCH ALL DISTURBED AREAS. MnDOT TYPE 1 MULCH SHALL BE USED AND CONTRACTOR WILL BE REQUIRED TO DISC ANCHOR IN THE FIELD. THE CONTRACTOR WILL PROVIDE AND SOW THE COVER CROP (OATS) SEED. THE MN DNR WILL PROVIDE THE NATIVE SEED MIXTURE AND THE CONTRACTOR WILL SOW SUCH SEED.

MACHINE CONTROL NOTE:

THE CONTRACTOR WILL BE REQUIRED TO USE FULLY INTEGRATED GPS MACHINE CONTROL FOR THIS PROJECT, SEE SPECIFICATION 01 32 24 FOR DETAILS. THE MINNESOTA DNR WILL PROVIDE FINISH GROUND SURFACES FOR SEDIMENT REMOVAL AREAS (SRA'S) AND PLUGS. THIS WILL COME TO THE CONTRACTOR IN THE FORM OF A LAND XML FILE. ALL OTHER DESIGNATED ITEMS (TILE INVEST/EROSION CONTROL/SPOIL AREAS, ETC) WILL COME TO THE CONTRACTOR IN THE FORM OF A DXF FILE. THERE WILL BE NO STAKES SET IN THE FIELD DELINEATING ANY OF THE REFERENCED ITEMS ABOVE. THE CONTRACTOR WILL BE RESPONSIBLE FOR TYING INTO MN DNR SURVEY CONTROL, EQUIP HEAVY EQUIPMENT, AND PERFORM THE WORK AS OUTLINED IN THESE PLANS AND SPECIFICATIONS. ANY QUESTIONS REGARDING MACHINE CONTROL CAN BE ANSWERED BY CALLING MATT OLSON (MN DNR) @ 320-634-7326 OR E-MAIL @ matt.l.olson@state.mn.us.

NOTES:

THE CONTRACTOR SHALL FIELD VERIFY UTILITY INFORMATION EXACT LOCATIONS PRIOR

TO COMMENCING CONSTRUCTION AS REQUIRED BY STATE LAW. NOTIFY GOPHER STATE

ONE-CALL 1-800-252-1166 OR 651-454-0002.

THE CONTRACTOR SHALL COMPLY WITH THE PROVISIONS IN PROJECT MANUAL, DIVISION

1, (01 30 00) INVASIVE SPECIES PREVENTION IN COMPLETING THE WORK

ALL NECESSARY EASEMENTS, PERMITS AND RIGHTS OF WAY FOR THE PROJECT SHALL

BE SECURED BY THE OWNER OR SPONSOR BEFORE CONSTRUCTION WORK IS

COMMENCED UNLESS OTHERWISE SPECIFIED.

VERIFY ALL DIMENSIONS AND LOCATIONS ON THE JOB. REPORT ALL DISCREPANCIES TO

FISH AND WILDLIFE DIVISION.

DO NOT SCALE DRAWINGS.

STATE

CALLONE

GOPHER

CALL BEFORE YOU DIG

© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 TMAP MOBILITY Earthstar Geographics SIO

MONBM 204 MNDNR ALUM CAP 2025

N 16,355,027.6370 E 1,245,052.3490

ELEV. 1147.758

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

MONBM 203 MNDNR REBAR

N 16,355,033.4680 E 1,245,412.3860

ELEV. 1144.236

11441146

11451144

1146 1147

11451143

P R

O P

E R

T Y

P R

O P

E R

T Y

P R

O P

E R

T Y

P R

O P

E R

T Y

P R

O P

E R

T Y

P R

O

PERTYPROPERTYPROPERTYPROPERTYPROPERTYPROPERTYPROPERTYPROPERTY

P R

O P

E R

T Y

P R

O P

E R

T Y

PROPERTY PROPERTY PROPERTY PRO

P E

R T

Y P

R O

P E

R T

Y P

ROPERTY PROPERTY PROPERTY PROPERTY PROPERTY

P R

O P

E R

T Y

P R

O P

E R

T Y

P R

O P

E R

T Y

P R

O P

E R

T Y

P R

O P

E R

T Y

P R

O P

E R

T Y

P R

O P

E R

T Y

P R

O P

E R

T Y

P R

O P

E R

T Y

P R

O P

E R

T Y

P R

O P

E R

T Y

P R

O P

E R

T Y

P R

O P

E R

T Y

P R

O P

E R

T Y

P R

O P

E R

T Y

P R

O P

E R

T Y

P R

O P

E R

T Y

P R

O P

E R

T Y

P R

O P

E R

T Y

P R

O P

E R

T Y

Title:

File #:

CC2:

Sheet:

Survey:

Drawn:

Checked:

Horz. datum:

Designed:

Drawn:

Checked:

Revisions ByDate

Section: Township: Range: Vert. datum:

Site #:

© Copyright . State of Minnesota, Department of Natural Resources

PROVENCHER WMA

WETLAND RESTORATIONS C-003

#X#####

XXX#######

R########

07/25AK

07/25MO

07/25AK

NAVD88NAD83

06/25MO

06/25MO

05/25AK

EXISTING TOPOGRAPHY

NEAR GREENLEAF

3111826

MEEKER COUNTY

F & W

PLOT DATE: 10/2/2026 8:37 AM C:\C3D\MN-PROVENTURE WMA\5_Drawings\503_Civil\PROVENTURE WMA TOPO.dwg

N

SCALE ( IN FEET )

250 500

LEGEND

PROPERTY LINE

GAS LINE

EDGE FIELD

EDGE MARSH

EDGE TREES

PROPERTY PROPERTY

GAS GAS GAS

180TH STREET

CONTROL STATEMENT:

HORIZONTAL CONTROL- COORDINATES ARE UTM ZONE 15 NORTH GRID

COORDINATES IN US FEET [(NAD83 (2011) (MOL)]. THEY WERE

ESTABLISHED USING THE MINNESOTA VRS SURVEYING SYSTEM ON

5-15-2025 WITH INFORMATION FROM A TRIMBLE R12I SURVEY GRADE GNSS

RECEIVER. HORIZONTAL CONTROL WAS CHECKED WITH MNDOT SURVEY

STATION STAMPED "4709 B 1978" (PID QP1938). HORIZONTAL COORDINATES

FOR THIS STATION WERE ESTABLISHED BY GPS OBSERVATIONS AND

ADJUSTED BY THE MINNESOTA DEPARTMENT OF TRANSPORTATION IN

FEBRUARY 2015.

VERTICAL CONTROL- WAS ESTABLISHED FROM THE GEOID 18US AND

CHECKED WITH MNDOT SURVEY STATION STAMPED "4709 B 1978" (PID

QP1938). VERTICAL CONTROL WAS ADJUSTED BY THE NATIONAL

GEODETIC SURVEY IN MARCH 2014.

© 2026 Microsoft Corporation © Maxar ©CNES (2026) Distribution Airbus DS © 2026 TMAP MOBILITY Earthstar Geographics SIO © Mapbox

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

SRA#1

SRA#2

SRA#4

SRA#6

SRA#7

SRA#3

SRA#5

N

SCALE ( IN FEET )

200 400

LEGEND

EDGE FIELD

EDGE TREES

DESIGNATED SPOIL AREA

FULL SERVICE LEVEL

STAGING AREA

GAS LINE

SEDIMENT REMOVAL AREAS (SRA'S)

PLUGS

GAS GAS GAS GAS GAS

PLUG#2

PLUG#1

Title:

File #:

CC2:

Sheet:

Survey:

Drawn:

Checked:

Horz. datum:

Designed:

Drawn:

Checked:

Revisions ByDate

Section: Township: Range: Vert. datum:

Site #:

© Copyright . State of Minnesota, Department of Natural Resources

PROVENCHER WMA

WETLAND RESTORATIONS C-101

#X#####

XXX#######

R########

07/25AK

07/25MO

07/25AK

NAVD88NAD83

06/25MO

06/25MO

05/25AK

SITE PLAN

NEAR GREENLEAF

3111826

MEEKER COUNTY

F & W

PLOT DATE: 10/2/2026 7:05 AM C:\C3D\MN-PROVENTURE WMA\5_Drawings\503_Civil\PROVENTURE WMA BASE.dwg

STAGING AREA

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

1148 1147

SRA#1

SRA#2

SRA#4

SRA#6

SRA#7

SRA#3

SRA#5

Title:

File #:

CC2:

Sheet:

Survey:

Drawn:

Checked:

Horz. datum:

Designed:

Drawn:

Checked:

Revisions ByDate

Section: Township: Range: Vert. datum:

Site #:

© Copyright . State of Minnesota, Department of Natural Resources

PROVENCHER WMA

WETLAND RESTORATIONS C-102

#X#####

XXX#######

R########

07/25AK

07/25MO

07/25AK

NAVD88NAD83

06/25MO

06/25MO

05/25AK

PLAN VIEW TILE INVEST. & REMOVAL

NEAR GREENLEAF

3111826

MEEKER COUNTY

F & W

PLOT DATE: 10/2/2026 7:08 AM C:\C3D\MN-PROVENTURE WMA\5_Drawings\503_Civil\PROVENTURE WMA BASE.dwg

N

SCALE ( IN FEET )

200 400

LEGEND

EDGE FIELD

EDGE TREES

GAS LINE

DESIGNATED SPOIL AREA

TILE INVESTIGATION (T.I.)

GAS GAS GAS GAS GAS

SPOIL AREA

TILE INVESTIGATION NOTE:

THE CONTRACTOR WILL PERFORM TILE INVESTIGATION AS DIRECTED BY THE DNR FIELD REPRESENTATIVE AND AS SHOWN THIS SHEET.

THERE ARE (10) TEN LOCATIONS WHERE TILE INVESTIGATION WILL BE PERFORMED WITH A TOTAL LENGTH OF 1250 L.F. ONCE THE TILE IS FOUND REMOVE DISTANCE AS SPECIFIED ON THESE PLANS AND NOTED IN TILE REMOVAL. THE CONTRACTOR WILL ONLY BE PAID FOR THE ACTUAL LINEAR FEET INVESTIGATED IN THE FIELD AS DETERMINED BY THE DNR FIELD REPRESENTATIVE. THE CONTRACTOR WILL STRIP ALL TOPSOIL AND STOCKPILE PRIOR TO TRENCH EXCAVATION. EXCAVATED MATERIAL WILL BE BUCKET COMPACTED WITH AN EXCAVATOR TO ACHIEVE COMPACTION NEAR THE VIRGIN SOIL. TOPSOIL SHALL BE REPLACED, BLENDED INTO EXISTING LANDSCAPE, AND LEVELED

SUITABLE ENOUGH TO BE CONSIDERED SEEDBED READY.

PAYMENT FOR TILE INVESTIGATION INCLUDING: STRIPPING, STOCKPILING, EXCAVATION, AND BACKFILLING OPERATIONS SHALL BE PAID FOR

BASED ON THE CONTRACTOR'S UNIT BID PRICE FOR "TILE INVESTIGATION."

TILE REMOVAL NOTE:

THE CONTRACTOR WILL PERFORM TILE REMOVAL AS DIRECTED BY THE DNR FIELD REPRESENTATIVE. THERE ARE (10) TEN LOCATIONS WHERE TILE REMOVALS WILL BE PERFORMED WITH A TOTAL LENGTH OF 1300 L.F. ONCE EXISTING TILE IS FOUND REMOVE DISTANCE AS SPECIFIED IN THESE PLANS. THE CONTRACTOR WILL ONLY BE PAID FOR THE ACTUAL LINEAR FEET OF TILE REMOVAL PERFORMED IN THE FIELD AS DETERMINED BY THE DNR FIELD REPRESENTATIVE. CONCRETE OR CLAY TILE CAN BE BURIED IN TRENCH PROVIDING MATERIAL IS EXCAVATED, CRUSHED, AND THOROUGHLY MIXED IN WITH SOIL (DO NOT CRUSH IN PLACE AS WATER WILL CONTINUE TO SEEP ALONG OLD TILE LINE). ALL PLASTIC TILE SHALL BE REMOVED AND PROPERLY DISPOSED OF OFF-SITE. CONTRACTOR WILL BE REQUIRED TO CAP THE EXISTING TILE AT THE BEGINNING AND ENDING STATIONS OF REMOVAL AS DETERMINED IN THE FIELD. THE CONTRACTOR WILL BE REQUIRED TO STRIP AND STOCKPILE TOPSOIL PRIOR TO EXCAVATION. IN-SITU MATERIAL SHALL BE BUCKET COMPACTED WITH AN EXCAVATOR TO ACHIEVE COMPACTION NEAR THE VIRGIN SOIL. TOPSOIL SHALL BE REPLACED, BLENDED INTO EXISTING LANDSCAPE, AND

LEVELED SUITABLE ENOUGH TO BE CONSIDERED SEEDBED READY.

PAYMENT FOR TILE REMOVAL INCLUDING: STRIPPING, STOCKPILING, EXCAVATION, REMOVAL, DISPOSAL, AND BACKFILLING OPERATIONS

SHALL BE PAID FOR BASED ON THE CONTRACTOR'S UNIT BID PRICE FOR "TILE REMOVAL."

EXISTING WETLAND

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

1148 1147

SRA#1

SRA#2

SRA#4

SRA#6

SRA#7

SRA#3

SRA#5

Title:

File #:

CC2:

Sheet:

Survey:

Drawn:

Checked:

Horz. datum:

Designed:

Drawn:

Checked:

Revisions ByDate

Section: Township: Range: Vert. datum:

Site #:

© Copyright . State of Minnesota, Department of Natural Resources

PROVENCHER WMA

WETLAND RESTORATIONS C-103

#X#####

XXX#######

R########

07/25AK

07/25MO

07/25AK

NAVD88NAD83

06/25MO

06/25MO

05/25AK

PLAN VIEW SRA'S AND PLUGS

NEAR GREENLEAF

3111826

MEEKER COUNTY

F & W

PLOT DATE: 10/2/2026 7:10 AM C:\C3D\MN-PROVENTURE WMA\5_Drawings\503_Civil\PROVENTURE WMA BASE.dwg

N

SCALE ( IN FEET )

200 400

SITE PREPARATION NOTE:

THE CONTRACTOR WILL STRIP 6" DEPTH OF TOPSOIL BENEATH PLUGS #1 & #2

FOOTPRINTS, STOCKPILE, AND UPON COMPLETION OF SRA SPOIL PLACEMENT;

PLACE TOPSOIL OVER COMPLETED PLUGS SIDE SLOPES SURFACE. ANY ADDITIONAL

MATERIAL SHALL BE USED TO FLATTEN PROPOSED GRADING SLOPES INTO

EXISTING LANDSCAPE. PAYMENT FOR SITE PREPARATION INCLUDING: STRIPPING,

STOCKPILING, BLENDING INTO EXISTING LANDSCAPE, AND LEVELING SUITABLE

ENOUGH TO BE CONSIDERED SEEDBED READY SHALL BE PAID FOR BASED ON THE

CONTRACTOR'S LUMP SUM BID FOR "SITE PREPARATION." NOTE: THERE WILL BE NO

STRIPPING UNDER PLUG#1 OVER GAS LINE EASEMENT AREA, CONTRACTOR CAN

FILL OVER EASEMENT AREA BUT NO STRIPPING.

SEDIMENT REMOVAL AREA (SRA) NOTE:

THE CONTRACTOR WILL EXCAVATE SEDIMENT REMOVAL AREAS AS SHOWN THIS SHEET. BOTTOM ELEVATIONS AND QUANTITIES ARE NOTED IN TABLE. CONTRACTOR WILL EXCAVATE TO GRADES LISTED IN THESE PLANS. SIDE SLOPES WILL BE MINIMUM 5:1 AND SHALL HAVE ROUNDED CORNERS AND TRANSITIONS FROM BOTTOM OF SCRAPE TO TOP SURFACE.

ALL SRA'S SHALL BE LEVELED SUITABLE ENOUGH TO BE CONSIDERED SEEDBED READY. FINISH GROUND SURFACE FILES WILL BE PROVIDED TO THE CONTRACTOR FOR EACH SEDIMENT REMOVAL AREA. THERE WILL BE NO STAKES SET IN THE FIELD DELINEATING SRA BOTTOMS OR SIDE SLOPES. SEE MACHINE CONTROL NOTE SHEET C-002.

ALL SPOIL MATERIAL FROM SRA EXCAVATION WILL BE REMOVED FROM WETLAND AREA AND DEPOSITED IN DESIGNATED AREAS SHOWN THIS SHEET. SPOIL MATERIAL FROM SRA #7 WILL BE PLACED IN DESIGNATED SPOIL AREA TO RAISE GROUND TO ELEV. 1145.00. CONTRACTOR WILL DEPOSIT SPOIL OVER FULL AREA, BLENDED INTO EXISTING LANDSCAPE, AND LEVELED SUITABLE ENOUGH TO BE CONSIDERED SEEDBED READY. SPOIL MATERIAL FROM SRA'S 1-6 WILL BE USED TO CREATE PLUGS AS SHOWN AND LISTED IN TABLE THIS SHEET. PLUGS WERE CALCULATED USING A 30% SHRINKAGE FACTOR AND BALANCED USING SRA'S SPOIL MATERIAL. THE CONTRACTOR WILL BE REQUIRED TO MOVE SRA SPOIL MATERIAL TO PLUGS LOCATION AS DETERMINED IN THE FIELD. THE CONTRACTOR WILL STRIP PLUGS AS NOTED IN SITE PREPARATION. THE CONTRACTOR WILL BE REQUIRED TO COMPACT PLUGS USING HEAVY EQUIPMENT TO THE EXTENT POSSIBLE AS APPROVED BY THE DNR FIELD REPRESENTATIVE. FINISH GROUND SURFACE FILES WILL BE PROVIDED TO THE CONTRACTOR FOR THE PLUGS SHOWN AND LISTED IN TABLE. THERE WILL BE NO STAKES SET IN THE FIELD DELINEATING PLUGS. SEE MACHINE CONTROL NOTE SHEET C-002. ALL SPOIL WORK INCLUDING: HAULING, PLACING, COMPACTING, GRADING, AND LEVELING SUITABLE ENOUGH TO BE CONSIDERED SEEDBED READY WILL BE CONSIDERED "INCIDENTAL" TO

SRA EXCAVATION.

THE SEDIMENT REMOVAL AREAS WILL BE BID AS CUBIC YARD PLAN. THERE WILL BE NO ADJUSTMENT MADE FOR INCREASE

OR DECREASE TO QUANTITY.

PAYMENT FOR SEDIMENT REMOVAL AREAS INCLUDING: EXCAVATION, REMOVAL, HAULING, DEPOSITING, GRADING, AND LEVELING SHALL BE PAID FOR BASED ON THE CONTRACTOR'S UNIT BID PRICE FOR "EXCAVATION- SEDIMENT REMOVAL

AREAS (SRA'S)."

LEGEND

EDGE FIELD

EDGE TREES

DESIGNATED SPOIL AREA

GAS EASEMENT

GAS LINE

SEDIMENT REMOVAL AREAS (SRA'S)

PLUGS

GAS GAS GAS GAS GAS

1144.5

PLUG#2

PLUG#1

60'-0"

60'-0"

EASEMENT EASEMENT

PLACE SPOIL TO ELEV. 1145.00

AS DETERMINED IN THE FIELD.

EXISTING GROUND

TYPICAL SECTION SEDIMENT REMOVAL AREAS (SRA'S)

NOT TO SCALE

5:1

BTM OF SRA

ELEV. VARIES

NO TOPSOIL STRIPPING

REQUIRED FOR SRA

EXCAVATION.

SIDE SLOPES WILL BE

5:1 SLOPE PER SRA.

MACHINE CONTROL REQUIRED

TYPICAL SECTION PLUGS

NOT TO SCALE

TOP WIDTH VARIES

TOP OF PLUGS

ELEV. VARIES

SLOPE VARIES SLOPE VARIES

MACHINE CONTROL REQUIRED

CONTRACTOR WILL STRIP 6" DEPTH TOPSOIL OVER PLUGS

FOOTPRINT, STOCKPILE, AND UPON COMPLETION OF SRA

SPOIL PLACEMENT AND PLUG GRADING PLACE TOPSOIL

OVER COMPLETED SURFACE AND BLEND INTO EXISTING

LANDSCAPE.

EXISTING GROUND

PLUG BALANCED USING SRA SPOIL

MATERIAL, MACHINE COMPACT.

EXISTING GROUND

ALL SPOIL MATERIAL TO BE

REMOVED FROM SRA AREA

AND HAULED TO PLUGS OR

SPOIL LOCATIONS.

PLUG SURFACE

CREATE CROWN OVER

PLUG TOP TO PROVIDE

POSITIVE DRAINAGE

AND NO PONDING.

CONTRACTOR WILL COVER PLUG WITH

SITE PREPARATION MATERIAL, BLEND

INTO EXISTING LANDSCAPE, AND LEVEL

SUITABLE ENOUGH TO BE CONSIDERED

SEEDBED READY.

5:1

SITE PREPARATION NOTE:

CONTRACTOR WILL NOT STRIP PLUG #1 OVER EASEMENT AREA. 30 L.F. EACH SIDE OF CL

GAS LINE. REMAINING FOOTPRINTS OUTSIDE OF EASEMENT AREA WILL BE STRIPPED 6"

DEPTH AS SHOWN THIS SHEET.

Title:

File #:

CC2:

Sheet:

Survey:

Drawn:

Checked:

Horz. datum:

Designed:

Drawn:

Checked:

Revisions ByDate

Section: Township: Range: Vert. datum:

Site #:

© Copyright . State of Minnesota, Department of Natural Resources

PROVENCHER WMA

WETLAND RESTORATIONS C-104

#X#####

XXX#######

R########

07/25AK

07/25MO

07/25AK

NAVD88NAD83

06/25MO

06/25MO

05/25AK

SRA AND PLUG DETAILS

NEAR GREENLEAF

3111826

MEEKER COUNTY

F & W

PLOT DATE: 10/2/2026 7:11 AM C:\C3D\MN-PROVENTURE WMA\5_Drawings\503_Civil\PROVENTURE WMA BASE.dwg

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

EASEMENT

1148 1147

SRA#1

SRA#2

SRA#4

SRA#6

SRA#7

SRA#3

SRA#5

Title:

File #:

CC2:

Sheet:

Survey:

Drawn:

Checked:

Horz. datum:

Designed:

Drawn:

Checked:

Revisions ByDate

Section: Township: Range: Vert. datum:

Site #:

© Copyright . State of Minnesota, Department of Natural Resources

PROVENCHER WMA

WETLAND RESTORATIONS C-105

#X#####

XXX#######

R########

07/25AK

07/25MO

07/25AK

NAVD88NAD83

06/25MO

06/25MO

05/25AK

PLAN VIEW EROSION CONTROL

NEAR GREENLEAF

3111826

MEEKER COUNTY

F & W

PLOT DATE: 10/2/2026 8:27 AM C:\C3D\MN-PROVENTURE WMA\5_Drawings\503_Civil\PROVENTURE WMA BASE.dwg

N

SCALE ( IN FEET )

200 400

LEGEND

EDGE FIELD

EDGE TREES

DESIGNATED SPOIL AREA

GAS EASEMENT

GAS LINE

CONSTRUCTION EXIT

STRAW WATTLES

EROSION CONTROL BLANKET

SEDIMENT REMOVAL AREAS (SRA'S)

PLUGS

GAS GAS GAS GAS GAS

EASEMENT EASEMENT

PROJECT SITE:

TOTAL PROJECT SITE 86 ACRES

TOTAL PROJECT AREAS DISTURBED 4.5 ACRES

TOTAL EXISTING IMPERVIOUS AREAS 0 ACRES

TOTAL PROPOSED IMPERVIOUS AREA 0 ACRES

CONSTRUCTION EXIT:

2"Ø WASHED ROCK 60 TON PER EXIT

SOWING AND MULCHING: (SOUTH AREA) 4.5 ACRES*

SRA'S, SPOIL AREAS, PLUGS AND ANY OTHER AREAS DISTURBED.

*CONTRACTOR WILL BE SOWING SITE WITH COVER CROP (OATS).

THE MNDNR WILL BE PROVIDING THE NATIVE SEED MIXTURE.

CONRACTOR WILL SOW SITE WITH COVER CROPS AND NATIVE

SEED. MnDOT TYPE 1 MUCH WILL BE APPLIED AT 2.0 TONS/PER

ACRE. CONTRACTOR WILL DISC. ANCHOR.

SOWING & MULCHING NOTE:

THE CONTRACTOR WILL SOW ALL DISTURBED AREAS WITH A COVER CROP (OATS) AND NATIVE SEED PROVIDED BY THE MN DNR. THIS INCLUDES: SRA'S, PLUG, SPOIL AREAS, TILE INVEST./REMOVAL, FILL AREAS AND ANY OTHER AREAS DISTURBED DURING CONSTRUCTION. THE COVER CROP SHALL BE APPLIED AT 50 LBS/PER ACRE MINIMUM. THE MNDNR WILL PROVIDE THE CONTRACTOR WITH NATIVE SEED MIXTURE. THE CONTRACTOR WILL BE PURCHASING THE COVER CROPS ONLY AND SOWING BOTH CROP CROPS AND NATIVE SEED MIXTURE. THE CONTRACTOR WILL NEED TO COORDINATE SOWING EFFORTS AND TIMELINES TO

COMPLY WITH THE STORM WATER PERMIT AND SWPPP.

CONSTRUCTION EXIT

PLUG#1

PLUG#2

STRAW WATTLE

45°

1"x2"x24" LONG WOODEN STAKES.

STAKES SHALL BE DRIVEN

THROUGH THE BACK HALF OF

THE STRAW WATTLE AT AN

ANGLE OF 45° WITH THE TOP OF

THE STAKE POINTING UPSTREAM.

FINISH GROUND

FLOW

BACKFILL AND COMPACT SOIL

FROM TRENCH ON UPGRADIENT

SIDE OF STRAW WATTLE.

8-10" EMBEDMENT DEPTH

PLACE WATTLE IN SHALLOW

TRENCH 1-2" DEPTH.

NOTES:

· SPACING OF STAKES SHALL BE IN ACCORDANCE TO MANUFACTURE RECOMMENDATIONS.

· STRAW WATTLES SHALL BE 9" DIAMETER WITH NATURAL NETTING.

· PILOT HOLES MAY BE DRIVEN THROUGH THE WATTLES AND INTO THE SOIL WHEN SOIL

CONDITIONS REQUIRE.

STRAW WATTLE DETAIL

NOT TO SCALE

CONSTRUCTION EXIT SPECIFICATIONS:

· STONE SIZE: 2" DIAMETER WASHED ROCK. (60 TON PER EXIT)

· THICKNESS: NOT LESS THAN 12" DEPTH.

· NON-WOVEN FILTER FABRIC PLACED OVER THE ENTIRE AREA PRIOR TO

PLACING ROCK.

· MAINTENANCE: THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION

WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO

PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING

WITH ADDITIONAL STONE AS CONDITIONS DEMAND AND REPAIR AND/OR

CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL

SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC

RIGHT-OF-WAYS MUST BE REMOVED IMMEDIATELY.

· WASHING: WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR

TO ENTRANCE ONTO PUBLIC RIGHT-OF-WAY. WHEN WASHING IS

REQUIRED, IT SHALL BE DONE ON AN AREA STABLIZED WITH STONE

AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING DEVICE.

· PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE

PROVIDED AFTER EACH RAIN EVENT.

PU

BL

IC

R

O

AD

50 L.F. MIN.

ENTRANCE WIDTH

AS REQUIRED,

MINIMUM 20 L.F.

MINIMUM 12" DEPTH 2"Ø WASHED ROCK

WITH NON-WOVEN FILTER FABRIC BENEATH. RADIUS AS

REQUIRED.

CONSTRUCTION EXIT DETAIL

NOT TO SCALE

MnDOT CATEGORY 20 EROSION

CONTROL BLANKET WITH NATURAL

NETTING.

6"x6" TRENCH BACKFILLED OVER

EROSION CONTROL BLANKET.

FLOW

STRAW WATTLE AND EROSION BLANKET DETAIL

NOT TO SCALE

NOTES;

· DITCH CHECKS, PLACE STRAW WATTLE PERPENDICULAR TO FLOW AND IN A

CRESCENT SHAPE WITH THE ENDS FACING UPSTREAM.

· POINT "A" MUST BE A MINIMUM OF 6" HIGHER THAN POINT "B" TO ENSURE

THAT WATER FLOWS OVER THE DIKE AND NOT AROUND THE ENDS.

· LAY EROSION BLANKET PARALLEL TO THE DIRECTION OF WATER FLOW.

· OVERLAP ADJACENT STRIP EDGES A MINIMUM OF 4" INCHES.

· OVERLAP BLANKET 7" (MIN.) AT EACH END. SHINGLE BLANKET IN THE

DIRECTION OF FLOW.

A

B

Title:

File #:

CC2:

Sheet:

Survey:

Drawn:

Checked:

Horz. datum:

Designed:

Drawn:

Checked:

Revisions ByDate

Section: Township: Range: Vert. datum:

Site #:

© Copyright . State of Minnesota, Department of Natural Resources

PROVENCHER WMA

WETLAND RESTORATIONS C-106

#X#####

XXX#######

R########

07/25AK

07/25MO

07/25AK

NAVD88NAD83

06/25MO

06/25MO

05/25AK

EROSION CONTROL DETAILS

NEAR GREENLEAF

3111826

MEEKER COUNTY

F & W

PLOT DATE: 10/2/2026 8:22 AM C:\C3D\MN-PROVENTURE WMA\5_Drawings\503_Civil\SWPPP TEMPLATE.dwg

Title:

File #:

CC2:

Sheet:

Survey:

Drawn:

Checked:

Horz. datum:

Designed:

Drawn:

Checked:

Revisions ByDate

Section: Township: Range: Vert. datum:

Site #:

© Copyright . State of Minnesota, Department of Natural Resources

PROVENCHER WMA

WETLAND RESTORATIONS C-107

#X#####

XXX#######

R########

07/25AK

07/25MO

07/25AK

NAVD88NAD83

06/25MO

06/25MO

05/25AK

SWPPP

NEAR GREENLEAF

3111826

MEEKER COUNTY

F & W

PLOT DATE: 10/2/2026 8:23 AM C:\C3D\MN-PROVENTURE WMA\5_Drawings\503_Civil\SWPPP TEMPLATE.dwg

EROSION CONTROL NOTES:

1) THE IMPLEMENTATION OF THESE EROSION CONTROL PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT AND UPGRADING OF THESE EROSION CONTROL FACILITIES IS THE RESPONSIBILITY OF THE CONTRACTOR'S EROSION CONTROL SUPERVISOR UNTIL 70% OF PERMANENT VEGETATION IS ESTABLISHED.

2) THE EROSION CONTROLS SHOWN OR DESCRIBED IN THIS PLAN SHALL BE CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES AND IN SUCH A MANNER AS TO ENSURE THAT SEDIMENT LADEN WATER DOES NOT ENTER THE DOWNSTREAM RECEIVING WATERS OR VIOLATE APPLICABLE WATER STANDARDS.

3) CONTRACTOR SHALL NOT DISTURB ANY AREAS BEYOND THE DESIGNATED LIMITS OF CONSTRUCTION SHOWN IN THE PLANS UNLESS THAT WORK IS PRE-APPROVED. CONTRACTOR WILL MINIMIZE DISTURBANCE TO

EXISTING VEGETATION.

4) THE EROSION CONTROL FACILITIES SHOWN IN THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS DURING THE CONSTRUCTION PERIOD. THESE EROSION CONTROL FACILITIES SHALL BE UPGRADED AND AMENDED AS NEEDED FOR CHANGING SITE CONDITIONS AND UNEXPECTED STORM EVENTS.

5) THE EROSION CONTROL FACILITIES SHALL BE INSPECTED AND THE CONDITIONS RECORDED WEEKLY AND WITHIN 24-HOURS FOLLOWING A STORM EVENT GREATER THAN 12" IN 24-HOURS, AND MAINTAINED AS NECESSARY TO ENSURE THEIR CONTINUED FUNCTION. ALL NON-FUNCTIONAL BMP'S SHALL BE REPAIRED, REPLACED, OR SUPPLEMENTED WITH FUNCTIONAL BMP'S BY THE END OF THE NEXT BUSINESS DAY AFTER

DISCOVERY.

6) THE EROSION CONTROL FACILITIES ON INACTIVE AREAS OF THE SITE SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE PER MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT PRODUCING 12" OF RAINFALL

IN 24-HOURS.

7) ALL INSPECTION AND MAINTENANCE CONDUCTED DURING CONSTRUCTION MUST BE RECORDED IN WRITING BY THE EROSION CONTROL SUPERVISOR AND THESE RECORDS MUST BE RETAINED ONSITE WITH THE SWPPP.

8) ANY SITE AREA STRIPPED OF VEGETATION, INCLUDING ROADWAY RIGHT-OF-WAY, WHERE NO FURTHER WORK IS ANTICIPATED SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED EROSION CONTROL METHODS (EX.

HYDRO MULCH, SEED, EROSION CONTROL BLANKET, ETC) BUT IN NO CASE LATER THAN 14-DAYS AFTER

CONSTRUCTION IN THAT AREA HAS CEASED.

9) ALL TEMPORARY ACCESS ROADS PROVIDED FOR THE PUBLIC SHALL BE MAINTAINED FOR THE DURATION OF THE PROJECT; ALL EXISTING PAVED AREAS ARE TO BE KEPT CLEAN FOR THE DURATION OF THE PROJECT.

10) ALL PERIMETER CONTROL DEVICES SHALL BE REPAIRED OR REPLACED WHEN SEDIMENT REACHES 12 OF THE

TOTAL HEIGHT OF THE BMP.

11) WHERE SEEDING FOR TEMPORARY EROSION CONTROL IS REQUIRED, FAST GERMINATING COVER CROP SHALL BE APPLIED AT AN APPROPRIATE RATE. SEED WILL BE VERIFIED WITH DNR REPRESENTATIVE PRIOR TO

INSTALLATION.

12) WHERE STRAW MULCH FOR TEMPORARY EROSION CONTROL IS REQUIRED, IT SHALL BE CERTIFIED WEED FREE

AND APPLIED AT A MINIMUM OF 2.0 TONS/PER ACRE.

13) SURFACE WATERS, DRAINAGE DITCHES, AND CONVEYANCE SYSTEMS SHALL BE INSPECTED FOR EVIDENCE OF SEDIMENT DEPOSITION AND EROSION; THE REMOVAL OF SEDIMENT AND STABILIZATION OF ERODED AREAS SHALL TAKE PLACE UPON DISCOVERY AND BE COMPLETED WITHIN 24-HOURS OF DISCOVERY UNLESS

PRECLUDED BY LEGAL, REGULATORY, OR PHYSICAL ACCESS CONSTRAINTS.

14) THE NORMAL WETTED PERIMETER OF ANY TEMPORARY OR PERMANENT DRAINAGE DITCH OR SWALE THAT DRAINS WATER FROM ANY PORTION OF THE CONSTRUCTION SITE WITHIN 200-L.F. OF THE PROPERTY BOUNDARY OR CONNECTION TO A SURFACE WATER SHALL BE STABILIZED WITHIN 24-HOURS AFTER CONNECTION.

15) PIPE OUTLETS MUST HAVE TEMPORARY OR PERMANENT ENERGY DISSIPATION INSTALLED WITHIN 24-HOURS OF

CONNECTION TO A SURFACE WATER.

16) STABILIZED CONSTRUCTION ENTRANCE LOCATIONS AND ADJACENT STREETS SHALL BE INSPECTED FOR EVIDENCE OF OFF-SITE SEDIMENT TRACKING ONTO PAVED (ASPHALT, CONCRETE, OR GRAVEL) SURFACES;

TRACKED SEDIMENTS SHALL BE REMOVED FROM ALL OFF-SITE SURFACES WITHIN 24-HOURS OF DISCOVERY.

17) THE CONTRACTOR SHALL INSTALL DOWN GRADIENT PERIMETER EROSION CONTROL BMP'S PRIOR TO COMMENCING CLEARING & GRADING ACTIVITIES AND SHALL MAINTAIN THE BMP'S FOR THE DURATION OF CONSTRUCTION ACTIVITIES; UPON ESTABLISHMENT (70% COVERAGE MINIMUM) OF PROPOSED PERMANENT GROUND COVER THE CONTRACTOR SHALL REMOVE ALL SYNTHETICS AND SEDIMENT CONTROL LOGS FOR

OFF-SITE DISPOSAL.

18) ALL SLOPES SHALL BE STABILIZED WITHIN 14 DAYS ONCE WORK IS NOT ACTIVE IN THE VICINITY. EROSION CONTROL BLANKETS SHALL BE PLACED ON ALL DISTURBED CHANNEL SLOPES AND ROAD DITCH SLOPES.

19) SOIL STOCKPILES SHALL HAVE SILT FENCE OR OTHER EFFECTIVE PERIMETER SEDIMENT CONTROLS AND CANNOT BE PLACED IN SURFACE WATERS, INCLUDING STORMWATER CONVEYANCES SUCH AS CURB AND GUTTER SYSTEMS, SWALES, CONDUITS, OR DITCHES UNLESS THERE IS A BYPASS SYSTEM IN PLACE FOR THE

STORMWATER.

20) ALL DISTURBED NON-PAVED AREAS SHALL BE PROTECTED WITH TOPSOIL, SEED,

AND MULCH WITHIN THE FOLLOWING TIME FRAMES: IF GREATER THAN A 3:1 SLOPE

2-DAYS, 3:1 TO 10:1 SLOPE 7-DAYS, WITHIN 200 LINEAL FEET OF A SURFACE WATER

24 HOURS FOLLOWING COMPLETION OR SUSPENSION OF GRADING ACTIVITY IN

THAT PARTICULAR AREA.

STORM WATER POLLUTION PREVENTION PLAN NOTES:

1) THE CONTRACTOR IS REQUIRED TO APPLY FOR AND RECEIVE A NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM (NPDES) STORMWATER CONSTRUCTION PERMIT FROM THE MPCA A MIN. OF

30 DAYS PRIOR TO BEGINNING WORK.

2) THE CONTRACTOR SHALL IDENTIFY AN EROSION CONTROL SUPERVISOR WHO SHALL BE

CERTIFIED, KNOWLEDGEABLE, AND EXPERIENCED IN THE APPLICATION OF EROSION PREVENTION, SEDIMENT CONTROL, BEST MANAGEMENT PRACTICES (BMP'S), AND INSPECTIONS.

3) THE EROSION CONTROL SUPERVISOR SHALL WORK WITH THE MN DNR FIELD REPRESENTATIVE TO

OVERSEE THE IMPLEMENTATION AND AMENDMENT OF THE SWPPP, AND THE INSTALLATION, AND

MAINTENANCE OF THE EROSION PREVENTION AND SEDIMENT CONTROL BMP'S.

4) THE CONTRACTOR SHALL DEVELOP A CHAIN OF RESPONSIBILITY WITH ALL OPERATORS ON THE SITE TO ENSURE THAT THE SWPPP WILL BE IMPLEMENTED EFFECTIVELY UNTIL CONSTRUCTION IS COMPLETE, THE ENTIRE SITE HAS UNDERGONE FINAL STABILIZATION, A NOTICE OF TERMINATION

(NOT) HAS BEEN SENT TO THE MPCA, AND THE PROJECT HAS BEEN ACCEPTED BY THE OWNER.

5) THE CONTRACTOR SHALL PREPARE AND SUBMIT A WRITTEN WEEKLY SCHEDULE OF PROPOSED

EROSION CONTROL ACTIVITIES FOR THE MN DNR FIELD REPRESENTATIVE REVIEW AND APPROVAL

PRIOR TO THAT WORK BEING INITIATED. FAILURE TO DO SO WILL RESULT IN UNAUTHORIZED

WORK.

6) THE CONTRACTOR SHALL PROVIDE FOR TEMPORARY AND PERMANENT EROSION PREVENTION

AND SEDIMENT CONTROL BMP'S AS SHOWN IN THE PLANS AND THEY SHALL BE KEPT IN

FUNCTIONAL CONDITION AT ALL TIMES THROUGHOUT CONSTRUCTION; THESE MEASURES MAY BE

AMENDED AS APPROPRIATE FOR CONSTRUCTION STAGING AS DIRECTED BY THE EROSION

CONTROL SUPERVISOR. THE CONTRACTOR SHALL REMAIN IN COMPLIANCE WITH ALL NPDES AND

OTHER PERMIT REQUIREMENTS AT ALL TIMES.

7) THE CONTRACTOR SHALL PROVIDE EFFECTIVE CONTAINMENT FOR CONCRETE AND OTHER

WASTES (LIQUID AND SOLID) GENERATED BY WASHOUT OPERATIONS (CONCRETE, STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS, AND OTHER CONSTRUCTION MATERIALS) RELATED

TO THE CONSTRUCTION ACTIVITY. THE LIQUID AND SOLID WASHOUT WASTES SHALL NOT

CONTACT THE GROUND IN ACCORDANCE WITH PARTS 2.3 AND 12.9 OF THE MPCA NPDES PERMIT.

8) THE CONTRACTOR SHALL ENSURE THAT DISCHARGE POINTS ARE ADEQUATELY PROTECTED

FROM EROSION AND SCOUR; THE DISCHARGE SHALL BE DISPERSED OVER NATURAL ROCK

RIPRAP, SAND BAGS, PLASTIC SHEETING, OR OTHER ENERGY DISSIPATION MEASURES APPROVED

BY THE EROSION CONTROL SUPERVISOR. ADEQUATE SEDIMENTATION CONTROL MEASURES ARE

REQUIRED FOR DISCHARGE THAT CONTAINS SUSPENDED SOLIDS.

9) ANY FUEL OR CHEMICAL TANK STORED ON THE PROJECT AREA SHALL BE PROTECTED BY A SOIL

BERM OR HAVE A NEGATIVE GRADIENT TO ANY WATER RESOURCE; AS PER U.S.C.O.E.

REQUIREMENTS A CONTINGENCY PLAN SHALL BE CREATED BY THE CONTRACTOR TO ADDRESS A

SPILL OR LEAK OF ANY CHEMICAL, INCLUDING PETROCHEMICALS, DEEMED HARMFUL TO THE

ENVIRONMENT. THE CONTRACTOR SHALL HAVE ONSITE THE MATERIALS NECESSARY TO CAPTURE

AND CONTAIN SAID CHEMICAL SPILLS.

10) IN THE EVENT SEDIMENT IS DEPOSITED IN WATERS OF THE STATE OR PRIVATE PROPERTY, THE MATERIAL SHALL BE REMOVED WITHIN 7-DAYS IN ACCORDANCE WITH PART IV, E, 5, C OF THE

MPCA NPDES PERMIT.

INVASIVE SPECIES PREVENTION NOTES:

1) MNDNR REQUIRES THE PREVENTION AND LIMITING THE INTRODUCTION, ESTABLISHMENT, AND

SPREAD OF INVASIVE SPECIES DURING ALL ACTIVITIES ON PUBLIC WATERS AND MNDNR

ADMINISTERED LANDS. SEE SPECIFICATION SECTION 01 30 00 FOR ADDITIONAL INFORMATION AND

RESPONSIBILITIES.

2) CONTRACTOR SHALL PREVENT INVASIVE SPECIES FROM ENTERING INTO OR SPREADING WITHIN A PROJECT SITE BY CLEANING EQUIPMENT AND CLOTHING PRIOR TO ARRIVAL AT THE PROJECT SITE AND NOT IMPORTING MATERIAL INFESTED WITH INVASIVE SPECIES PRIOR TO ARRIVING AT THE

PROJECT SITE. THE MNDNR FIELD REPRESENTATIVE SHALL INSPECT ALL EQUIPMENT AND

CLOTHING AT THE STAGING AREA IDENTIFIED AT THE PRE-CONSTRUCTION MEETING.

3) IF EQUIPMENT OR CLOTHING ARRIVES AT THE PROJECT SITE WITH SOIL, AGGREGATE MATERIAL, MULCH, VEGETATION (INCLUDING SEEDS), OR ANIMALS, IT SHALL BE CLEANED BY CONTRACTOR

USING TOOLS OR EQUIPMENT (COMPRESSED AIR, BRUSH, OR PRESSURE WASHER). IF ANY

MATERIAL IS IMPORTED TO THE SITE WITHOUT PRIOR INSPECTION AND IS SUBSEQUENTLY FOUND

TO CONTAIN INVASIVE SPECIES THE CONTRACTOR SHALL REMOVE THE MATERIAL FROM THE

PROJECT SITE WITHIN 72-HOURS OF NOTIFICATION OR BEAR THE COST OF REMOVAL FROM A

THIRD PARTY, PER AIA A201, 12.2.

4) IF THE PROJECT SITE INCLUDES A WATER BODY, THE CONTRACTOR SHALL CLEAN EQUIPMENT AS

NOTED ABOVE PRIOR TO ENTERING AND UPON LEAVING THE WATER BODY. CONTRACTOR IS

REQUIRED TO DRAIN WATER FROM ALL EQUIPMENT, TANKS, PUMPS PRIOR TO AND

IMMEDIATELY AFTER LEAVING ANY BODY OF WATER.

PROJECT NARRATIVE:

PROJECT LIMITS: SEE SHEET C-101 SITE PLAN OF THESE PLANS FOR PROJECT LIMITS. PROJECT

CONSISTS OF TILE INVESTIGATION, TILE REMOVAL, SEDIMENT REMOVAL AREAS, PLUG

CONSTRUCTION TO ENHANCE OR RESTORE WETLANDS ON PROVENCHER WILDLIFE MANAGEMENT

AREA.

CONSTRUCTION SEQUENCE:

-ARRANGE AND ATTEND THE PRE-CONSTRUCTION MEETING WITH MNDNR.

-CONTACT UTILITY COMPANIES BY CALLING GOPHER STATE ONE CALL (1-800-252-1166)

-ESTABLISH CONSTRUCTION BOUNDARIES AND CLEARING LIMITS PRIOR TO ACTIVITIES BEGINNING.

-INSTALL EROSION AND SEDIMENT CONTROL DEVICES.

-PROCEED WITH SITE GRADING AND CONSTRUCTION ACTIVITIES.

-STABILIZE AREAS DISTURBED BY CONSTRUCTION ACTIVITIES WITH TEMPORARY EROSION AND

SEDIMENT CONTROL MEASURES.

-COMPLETE FINAL GRADING.

-COMPLETE PERMANENT EROSION AND SEDIMENT CONTROL MEASURES.

-REMOVE EXCESS EXCAVATED MATERIALS, TRASH, DEBRIS, AND OTHER WASTE MATERIALS.

-CONTRACTOR WILL REMOVE TEMPORARY EROSION CONTROL MEASURES ONCE SITE HAS BEEN

DETERMINED TO BE STABILIZED BY CONTRACT DOCUMENTS AND MN DNR.

-CONTRACTOR WILL SUBMIT NOTICE OF TERMINATION (NOT) TO CLOSE SWPPP PERMIT.

PROJECT AREAS:

TOTAL PROJECT AREA: 86 ACRES

TOTAL AREAS TO BE DISTURBED: 4.5 ACRES

EXISTING IMPERVIOUS AREA: 0 ACRES

PROPOSED IMPERVIOUS AREA: 0 ACRES

NAME OF RECEIVING WATER BODY/BODIES: LAKE WILLIE

DISCHARGES TO SPECIAL OR IMPAIRED WATERS: PROJECT DOES DISCHARGE TO A SPECIAL OR

IMPAIRED WATERS BUT IS OVER 1-MILE BEFORE ENTERING LAKE WILLIE.

DISCHARGES TO CALCAREOUS FEN: PROJECT DOES NOT HAVE A DISCHARGE TO CALCAREOUS

FEN.

ENDANGERED OR THREATENED SPECIES: NO

HISTORIC PLACES OR ARCHEOLOGICAL SITES: SHPO HAS BEEN COMPLETED AND PROJECT SITE

WILL NOT EFFECT ANY HISTORIC OR ARCHEOLOGICAL SITES.

· SEE PLAN VIEW EROSION CONTROL SWPPP SHEETS FOR BUFFER BOUNDARIES, LOCATION OF

TEMPORARY AND PERMANENT STORMWATER BMP'S, AND ESTIMATED QUANTITIES.

EROSION CONTROL SUPERVISORSWPPP DESIGNER:

MATTHEW L. OLSON

UNIVERSITY OF MINNESOTA

DESIGN OF CONSTRUCTION SWPPP

CERTIFICATION EXPIRES MARCH 2027

PROJECT

LOCATION

C-001
Sheets and Views
C-001 Title Sheet
C-002
Sheets and Views
C-002
C-003
Sheets and Views
C-003
C-101
Sheets and Views
C-101 SITE PLAN
C-102
Sheets and Views
C-102 PLAN VIEW TILE
C-103
Sheets and Views
C-103 PLAN VIEW SRA'S
C-104
Sheets and Views
C-104 SRA DETAILS
C-105
Sheets and Views
C-105 PV EROSION CONTROL
C-106
Sheets and Views
SWPPP DETAILS
C-107
Sheets and Views
C-101 Typ_11x17

File details come from the government source that posted it. Updated .