2027-440_Exhibit_F_Site_Plans.pdf
PDF 3 MB Posted
- Attached to
- DNR RFB Provencher WMA Wetland Restoration
- Solicitation number
- 2000018831
- Issued by
- Mcleod County, Minnesota
About this file
Provencher WMA Wetland Restoration - Site Plans and Project Details
This document is a comprehensive site plan exhibit prepared by the Minnesota Department of Natural Resources (DNR) for the Provencher Wildlife Management Area (WMA) Wetland Restoration project (RFB 2027-440) located near Greenleaf in Meeker County. The project encompasses wetland restoration and site stabilization work including tile investigation (1,250 linear feet), tile removal (1,300 linear feet), sediment removal across seven designated areas totaling approximately 5,736 cubic yards, construction of two plugs for habitat enhancement, erosion control measures, and site preparation and seeding across 4.5 acres of disturbed areas. The total project site covers 86 acres with 4.5 acres designated for disturbance. Key bid line items include mobilization (lump sum), tile removal and investigation (unit pricing), site preparation (lump sum), sediment removal excavation (cubic yard pricing with no adjustment for quantity variance), erosion control blanket installation (1,400 square yards), straw wattles (1,150 linear feet), cultivation (4.5 acres), and sowing and mulching (4.5 acres). The contractor must obtain a Storm Water Pollution Prevention Plan (SWPPP) permit and National Pollution Discharge Elimination System (NPDES) stormwater construction permit from the Minnesota Pollution Control Agency (MPCA) at least 30 days prior to beginning work.
Project specifications require contractors to employ fully integrated GPS machine control technology with finish ground surfaces provided by DNR in Land XML and DXF file formats. The contractor must identify a certified erosion control supervisor and coordinate weekly proposed activities with the DNR field representative. All equipment and materials must be inspected at the staging area to prevent invasive species introduction. Primary project contacts include Cory Netland (Area Manager), Jake Rambow (Area Biologist), and Adam Kleinschmidt (Wetland Specialist). Responses must be submitted electronically through the Swift Portal with unit pricing reflecting all costs including labor, materials, equipment, transportation, and applicable taxes. The contract includes machine control requirements, weekly erosion control inspections, maintenance obligations following rain events, and final site stabilization within 14 days of work completion in specific areas. Prevailing wage rates apply to the project, with updated rates issued by the Department of Labor and Industry noted in the contract addendum.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2027-440_Exhibit_A_Supplement_2___3.pdf | ||
| 2027-440_Exhibit_D_Price_Schedule.xlsx | XLSX spreadsheet | |
| DNR_RFB_Provencher_WMA_Wetland_Restoration.pdf | ||
| 2027-440_Sample_Contract_Addendum__1.pdf | ||
| 2027-440_Attachments.pdf | ||
| 2027-440_Request_for_Bid.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 TMAP MOBILITY Earthstar Geographics SIO © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 TMAP MOBILITY Earthstar Geographics SIO
STATE
CALLONE
GOPHER
CALL BEFORE YOU DIG
PROVENCHER WMA
Operations Services Division Approval Division Approval Title:
File #:
CC2:
Sheet:
Survey:
Drawn:
Checked:
Horz. datum:
Designed:
Drawn:
Checked:
Revisions ByDate
Section: Township: Range: Vert. datum:
Site #:
© Copyright . State of Minnesota, Department of Natural Resources
PROVENCHER WMA
WETLAND RESTORATIONS C-001
#X#####
XXX#######
R########
07/25AK
07/25MO
07/25AK
NAVD88NAD83
06/25MO
06/25MO
05/25AK
TITLE SHEET
NEAR GREENLEAF
3111826
MEEKER COUNTY
F & W
WETLAND RESTORATIONS
MINNESOTA DEPARTMENT OF NATURAL RESOURCES - F & W DIVISION
PLOT DATE: 10/1/2026 2:23 PM C:\C3D\MN-PROVENTURE WMA\5_Drawings\503_Civil\PROVENCHER WMA COVER AND QUANT.dwg
Site Location
Operations Services Division Approval Division Approval
SHEET INDEX:
C-001 TITLE SHEET
C-002 ESTIMATED QUANTITIES AND NOTES
C-003 EXISTING TOPOGRAPHY
C-101 SITE PLAN
C-102 PLAN VIEW TILE INVEST. & REMOVAL
C-103 PLAN VIEW SRA'S & PLUGS
C-104 SRA AND PLUG DETAILS
C-105 PLAN VIEW EROSION CONTROL
C-106 EROSION CONTROL DETAILS
C-107 SWPPP
PROJECT CONTACTS:
CORY NETLAND MN DNR AREA MANAGER
320-347-7632 cory.netland@state.mn.us
JAKE RAMBOW
320-347-7633
MN DNR AREA BIOLOGIST
jacob.rambow@state.mn.us
ADAM KLEINSCHMIDT MN DNR WETLAND SPECIALIST
320-347-7636 adam.kleinchmidt@state.mn.us
180TH STREET
180TH STREET
N
N
ST
AT
E H
W Y
GREENLEAF
CTY HWY 18
0T
H A
VE
180TH ST
0T
H A
VE
LAKE
WILLIE
COOMBS
LAKE
ATKIINSON
LAKE LAKE
HARDEN
PROJECT
LOCATION
PROPERTYPROPERTYPROPERTYPROPERTY
P R
O P
E R
T Y
P R
O P
E R
T Y
P R
O P
E R
T Y
P R
O P
E R
T Y
PROPERTYPROPERTYPROPERTYPROPERTY
P R
O P
E R
T Y
PROPERTY PROPE
R T
Y P
R O
P E
R
TY PROPERTY PROPERTY
P R
O P
E R
T Y
P R
O P
E R
T Y
P R
O P
E R
T Y
P R
O P
E R
T
Y PROPERTY PROPERTY PROPERTY PROPERTY
P R
O P
E R
T Y
P R
O P
E R
T Y
P R
O P
E R
T Y
P R
O P
E R
T Y
P R
O P
E R
T Y
P R
O P
E R
T Y
P R
O P
E R
T Y
P R
O P
E R
T Y
PROPERTY LINE
SRA'S
PLUGS
PROPERTY
MAP POINT " " IS LOCATED AT INTERSECTION OF STATE HWY 22 AND COUNTY HWY 18
IN GREENLEAF, MN. TO PROJECT SITE HEAD NORTH ON STATE HWY 22 ±1 MILE TO
INTERSECTION OF 180TH STREET AND STATE HWY 22. HEAD WEST ON 180TH STREET ±1
MILE TO WMA PARKING LOT LOCATED ON SOUTH SIDE OF ROAD.
PROJECT VICINITY MAP
NOT TO SCALE
PROJECT LOCATION MAP
NOT TO SCALE
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS LINEGAS GAS
Title:
File #:
CC2:
Sheet:
Survey:
Drawn:
Checked:
Horz. datum:
Designed:
Drawn:
Checked:
Revisions ByDate
Section: Township: Range: Vert. datum:
Site #:
© Copyright . State of Minnesota, Department of Natural Resources
PROVENCHER WMA
WETLAND RESTORATIONS C-002
#X#####
XXX#######
R########
07/25AK
07/25MO
07/25AK
NAVD88NAD83
06/25MO
06/25MO
05/25AK
ESTIMATED QUANTITIES AND NOTES
NEAR GREENLEAF
3111826
MEEKER COUNTY
F & W
PLOT DATE: 10/1/2026 2:45 PM C:\C3D\MN-PROVENTURE WMA\5_Drawings\503_Civil\PROVENCHER WMA COVER AND QUANT.dwg
STATEMENT OF ESTIMATED QUANTITIES
ITEM
NOTES ITEM. NO. SPEC. NO. ITEM UNIT
TOTAL
ESTIMATED
QUANTITIES
A 1 01 71 13 MOBILIZATION LUMP SUM 1
B 2 02 41 18 TILE REMOVAL L.F. 1300
C 3 31 14 13 SITE PREPARATION LUMP SUM 1
D 4 31 23 16 EXCAVATION- SEDIMENT REMOVAL AREAS (SRA'S) C.Y.-P 5736
E 5 31 23 33 TILE INVESTIGATION L.F. 1250
6 31 25 00 EROSION CONTROL BLANKET CAT. 20 - NATURAL NETTING S.Y. 1400
7 31 25 00 9"Ø STRAW WATTLES- NATURAL NETTING L.F. 1150
8 31 25 00 CONSTRUCTION EXIT E.A. 1
F 9 31 25 00 STORM WATER PERMIT FOR CONSTRUCTION LUMP SUM 1
G 10 32 91 13 CULTIVATION ACRE 4.5
H 11 32 92 00 SOWING AND MULCHING ACRE 4.5
BID ITEM NOTES:
A) BID ITEM FOR MOBILIZATION SHALL INCLUDE THE SUPPLY OF ALL LABOR, MATERIAL, AND EQUIPMENT TO TRANSPORT ALL NEEDED LABOR, MATERIAL, AND EQUIPMENT TO AND FROM A PROJECT SITE TO SUCCESSFULLY COMPLETE THE PROJECT AS SHOWN ON THE PLANS OR DESCRIBED BY THE DNR
FIELD REPRESENTATIVE.
B) BID ITEM FOR TILE REMOVAL SHALL INCLUDE STRIPPING, EXCAVATION, REMOVAL, AND BACKFILLING OPERATIONS. CONTRACTOR WILL ONLY BE PAID
FOR THE ACTUAL LINEAR FEET OF TILE REMOVED IN THE FIELD.
C) BID ITEM FOR SITE PREPARATION SHALL INCLUDE STRIPPING BENEATH PLUGS AND SHALL INCLUDE LEVELING/DRAGGING TOPSOIL SUITABLE
ENOUGH TO BE CONSIDERED SEEDBED READY.
D) BID ITEM FOR EXCAVATION- SEDIMENT REMOVAL AREAS SHALL INCLUDE EXCAVATING THE VARIOUS SRA'S AS IDENTIFIED IN THE PLANS.
ALL SPOIL MATERIAL SHALL BE REMOVED FROM WETLAND AREAS AND MOVED TO PLUG LOCATIONS OR DESIGNATED SPOIL AREAS AS SHOWN IN THESE PLANS. PAYMENT IS BASED ON CUBIC YARD PLAN, THERE WILL BE NO ADJUSTMENT MADE FOR INCREASE OR DECREASE TO QUANTITY.
MACHINE CONTROL WILL BE REQUIRED FOR SEDIMENT REMOVAL AREAS, SEE NOTE BELOW. CONTRACTOR WILL INCLUDE ANY MINOR WOODY
REMOVAL WITHIN SRA OR PLUG BOUNDARY UNDER THIS LINE ITEM.
E) BID ITEM FOR TILE INVESTIGATION SHALL INCLUDE STRIPPING, EXCAVATION, AND BACKFILLING OPERATIONS. CONTRACTOR WILL ONLY BE PAID FOR
THE ACTUAL LINEAR FEET INVESTIGATED.
F) BID ITEM FOR STORM WATER PERMIT FOR CONSTRUCTION SHALL INCLUDE THE CONTRACTOR OBTAINING THE STORM WATER PERMIT FOR
CONSTRUCTION ACTIVITIES PRIOR TO THE START OF CONSTRUCTION.
G) BID ITEM FOR CULTIVATION SHALL INCLUDE EQUIPMENT, LABOR, AND ALL ASSOCIATED COST REQUIRED TO CULTIVATE DISTURBED AREAS INCLUDING: SEDIMENT REMOVAL AREAS, PLUGS, SPOIL AREAS, AND TILE INVESTIGATION/REMOVAL AREAS. CONTRACTOR SHALL USE FIELD CULTIVATOR WITH DRAG/ROLLER SECTION OR OTHER IMPLEMENT WITH MINIMUM 4" DEPTH. FINISHED SURFACE SHALL BE SMOOTH FIRM SEEDBED, FREE OF ROCK AND DEBRIS SUITABLE FOR NATIVE SEED PLANTING. CULTIVATION LINE ITEM WILL BE PAID FOR BASED ON ACRES.
H) BID ITEM FOR SOWING AND MULCHING SHALL INCLUDE THE EQUIPMENT AND LABOR REQUIRED TO SOW AND MULCH ALL DISTURBED AREAS. MnDOT TYPE 1 MULCH SHALL BE USED AND CONTRACTOR WILL BE REQUIRED TO DISC ANCHOR IN THE FIELD. THE CONTRACTOR WILL PROVIDE AND SOW THE COVER CROP (OATS) SEED. THE MN DNR WILL PROVIDE THE NATIVE SEED MIXTURE AND THE CONTRACTOR WILL SOW SUCH SEED.
MACHINE CONTROL NOTE:
THE CONTRACTOR WILL BE REQUIRED TO USE FULLY INTEGRATED GPS MACHINE CONTROL FOR THIS PROJECT, SEE SPECIFICATION 01 32 24 FOR DETAILS. THE MINNESOTA DNR WILL PROVIDE FINISH GROUND SURFACES FOR SEDIMENT REMOVAL AREAS (SRA'S) AND PLUGS. THIS WILL COME TO THE CONTRACTOR IN THE FORM OF A LAND XML FILE. ALL OTHER DESIGNATED ITEMS (TILE INVEST/EROSION CONTROL/SPOIL AREAS, ETC) WILL COME TO THE CONTRACTOR IN THE FORM OF A DXF FILE. THERE WILL BE NO STAKES SET IN THE FIELD DELINEATING ANY OF THE REFERENCED ITEMS ABOVE. THE CONTRACTOR WILL BE RESPONSIBLE FOR TYING INTO MN DNR SURVEY CONTROL, EQUIP HEAVY EQUIPMENT, AND PERFORM THE WORK AS OUTLINED IN THESE PLANS AND SPECIFICATIONS. ANY QUESTIONS REGARDING MACHINE CONTROL CAN BE ANSWERED BY CALLING MATT OLSON (MN DNR) @ 320-634-7326 OR E-MAIL @ matt.l.olson@state.mn.us.
NOTES:
THE CONTRACTOR SHALL FIELD VERIFY UTILITY INFORMATION EXACT LOCATIONS PRIOR
TO COMMENCING CONSTRUCTION AS REQUIRED BY STATE LAW. NOTIFY GOPHER STATE
ONE-CALL 1-800-252-1166 OR 651-454-0002.
THE CONTRACTOR SHALL COMPLY WITH THE PROVISIONS IN PROJECT MANUAL, DIVISION
1, (01 30 00) INVASIVE SPECIES PREVENTION IN COMPLETING THE WORK
ALL NECESSARY EASEMENTS, PERMITS AND RIGHTS OF WAY FOR THE PROJECT SHALL
BE SECURED BY THE OWNER OR SPONSOR BEFORE CONSTRUCTION WORK IS
COMMENCED UNLESS OTHERWISE SPECIFIED.
VERIFY ALL DIMENSIONS AND LOCATIONS ON THE JOB. REPORT ALL DISCREPANCIES TO
FISH AND WILDLIFE DIVISION.
DO NOT SCALE DRAWINGS.
STATE
CALLONE
GOPHER
CALL BEFORE YOU DIG
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 TMAP MOBILITY Earthstar Geographics SIO
MONBM 204 MNDNR ALUM CAP 2025
N 16,355,027.6370 E 1,245,052.3490
ELEV. 1147.758
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
MONBM 203 MNDNR REBAR
N 16,355,033.4680 E 1,245,412.3860
ELEV. 1144.236
11441146
11451144
1146 1147
11451143
P R
O P
E R
T Y
P R
O P
E R
T Y
P R
O P
E R
T Y
P R
O P
E R
T Y
P R
O P
E R
T Y
P R
O
PERTYPROPERTYPROPERTYPROPERTYPROPERTYPROPERTYPROPERTYPROPERTY
P R
O P
E R
T Y
P R
O P
E R
T Y
PROPERTY PROPERTY PROPERTY PRO
P E
R T
Y P
R O
P E
R T
Y P
ROPERTY PROPERTY PROPERTY PROPERTY PROPERTY
P R
O P
E R
T Y
P R
O P
E R
T Y
P R
O P
E R
T Y
P R
O P
E R
T Y
P R
O P
E R
T Y
P R
O P
E R
T Y
P R
O P
E R
T Y
P R
O P
E R
T Y
P R
O P
E R
T Y
P R
O P
E R
T Y
P R
O P
E R
T Y
P R
O P
E R
T Y
P R
O P
E R
T Y
P R
O P
E R
T Y
P R
O P
E R
T Y
P R
O P
E R
T Y
P R
O P
E R
T Y
P R
O P
E R
T Y
P R
O P
E R
T Y
P R
O P
E R
T Y
Title:
File #:
CC2:
Sheet:
Survey:
Drawn:
Checked:
Horz. datum:
Designed:
Drawn:
Checked:
Revisions ByDate
Section: Township: Range: Vert. datum:
Site #:
© Copyright . State of Minnesota, Department of Natural Resources
PROVENCHER WMA
WETLAND RESTORATIONS C-003
#X#####
XXX#######
R########
07/25AK
07/25MO
07/25AK
NAVD88NAD83
06/25MO
06/25MO
05/25AK
EXISTING TOPOGRAPHY
NEAR GREENLEAF
3111826
MEEKER COUNTY
F & W
PLOT DATE: 10/2/2026 8:37 AM C:\C3D\MN-PROVENTURE WMA\5_Drawings\503_Civil\PROVENTURE WMA TOPO.dwg
N
SCALE ( IN FEET )
250 500
LEGEND
PROPERTY LINE
GAS LINE
EDGE FIELD
EDGE MARSH
EDGE TREES
PROPERTY PROPERTY
GAS GAS GAS
180TH STREET
CONTROL STATEMENT:
HORIZONTAL CONTROL- COORDINATES ARE UTM ZONE 15 NORTH GRID
COORDINATES IN US FEET [(NAD83 (2011) (MOL)]. THEY WERE
ESTABLISHED USING THE MINNESOTA VRS SURVEYING SYSTEM ON
5-15-2025 WITH INFORMATION FROM A TRIMBLE R12I SURVEY GRADE GNSS
RECEIVER. HORIZONTAL CONTROL WAS CHECKED WITH MNDOT SURVEY
STATION STAMPED "4709 B 1978" (PID QP1938). HORIZONTAL COORDINATES
FOR THIS STATION WERE ESTABLISHED BY GPS OBSERVATIONS AND
ADJUSTED BY THE MINNESOTA DEPARTMENT OF TRANSPORTATION IN
FEBRUARY 2015.
VERTICAL CONTROL- WAS ESTABLISHED FROM THE GEOID 18US AND
CHECKED WITH MNDOT SURVEY STATION STAMPED "4709 B 1978" (PID
QP1938). VERTICAL CONTROL WAS ADJUSTED BY THE NATIONAL
GEODETIC SURVEY IN MARCH 2014.
© 2026 Microsoft Corporation © Maxar ©CNES (2026) Distribution Airbus DS © 2026 TMAP MOBILITY Earthstar Geographics SIO © Mapbox
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
SRA#1
SRA#2
SRA#4
SRA#6
SRA#7
SRA#3
SRA#5
N
SCALE ( IN FEET )
200 400
LEGEND
EDGE FIELD
EDGE TREES
DESIGNATED SPOIL AREA
FULL SERVICE LEVEL
STAGING AREA
GAS LINE
SEDIMENT REMOVAL AREAS (SRA'S)
PLUGS
GAS GAS GAS GAS GAS
PLUG#2
PLUG#1
Title:
File #:
CC2:
Sheet:
Survey:
Drawn:
Checked:
Horz. datum:
Designed:
Drawn:
Checked:
Revisions ByDate
Section: Township: Range: Vert. datum:
Site #:
© Copyright . State of Minnesota, Department of Natural Resources
PROVENCHER WMA
WETLAND RESTORATIONS C-101
#X#####
XXX#######
R########
07/25AK
07/25MO
07/25AK
NAVD88NAD83
06/25MO
06/25MO
05/25AK
SITE PLAN
NEAR GREENLEAF
3111826
MEEKER COUNTY
F & W
PLOT DATE: 10/2/2026 7:05 AM C:\C3D\MN-PROVENTURE WMA\5_Drawings\503_Civil\PROVENTURE WMA BASE.dwg
STAGING AREA
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
1148 1147
SRA#1
SRA#2
SRA#4
SRA#6
SRA#7
SRA#3
SRA#5
Title:
File #:
CC2:
Sheet:
Survey:
Drawn:
Checked:
Horz. datum:
Designed:
Drawn:
Checked:
Revisions ByDate
Section: Township: Range: Vert. datum:
Site #:
© Copyright . State of Minnesota, Department of Natural Resources
PROVENCHER WMA
WETLAND RESTORATIONS C-102
#X#####
XXX#######
R########
07/25AK
07/25MO
07/25AK
NAVD88NAD83
06/25MO
06/25MO
05/25AK
PLAN VIEW TILE INVEST. & REMOVAL
NEAR GREENLEAF
3111826
MEEKER COUNTY
F & W
PLOT DATE: 10/2/2026 7:08 AM C:\C3D\MN-PROVENTURE WMA\5_Drawings\503_Civil\PROVENTURE WMA BASE.dwg
N
SCALE ( IN FEET )
200 400
LEGEND
EDGE FIELD
EDGE TREES
GAS LINE
DESIGNATED SPOIL AREA
TILE INVESTIGATION (T.I.)
GAS GAS GAS GAS GAS
SPOIL AREA
TILE INVESTIGATION NOTE:
THE CONTRACTOR WILL PERFORM TILE INVESTIGATION AS DIRECTED BY THE DNR FIELD REPRESENTATIVE AND AS SHOWN THIS SHEET.
THERE ARE (10) TEN LOCATIONS WHERE TILE INVESTIGATION WILL BE PERFORMED WITH A TOTAL LENGTH OF 1250 L.F. ONCE THE TILE IS FOUND REMOVE DISTANCE AS SPECIFIED ON THESE PLANS AND NOTED IN TILE REMOVAL. THE CONTRACTOR WILL ONLY BE PAID FOR THE ACTUAL LINEAR FEET INVESTIGATED IN THE FIELD AS DETERMINED BY THE DNR FIELD REPRESENTATIVE. THE CONTRACTOR WILL STRIP ALL TOPSOIL AND STOCKPILE PRIOR TO TRENCH EXCAVATION. EXCAVATED MATERIAL WILL BE BUCKET COMPACTED WITH AN EXCAVATOR TO ACHIEVE COMPACTION NEAR THE VIRGIN SOIL. TOPSOIL SHALL BE REPLACED, BLENDED INTO EXISTING LANDSCAPE, AND LEVELED
SUITABLE ENOUGH TO BE CONSIDERED SEEDBED READY.
PAYMENT FOR TILE INVESTIGATION INCLUDING: STRIPPING, STOCKPILING, EXCAVATION, AND BACKFILLING OPERATIONS SHALL BE PAID FOR
BASED ON THE CONTRACTOR'S UNIT BID PRICE FOR "TILE INVESTIGATION."
TILE REMOVAL NOTE:
THE CONTRACTOR WILL PERFORM TILE REMOVAL AS DIRECTED BY THE DNR FIELD REPRESENTATIVE. THERE ARE (10) TEN LOCATIONS WHERE TILE REMOVALS WILL BE PERFORMED WITH A TOTAL LENGTH OF 1300 L.F. ONCE EXISTING TILE IS FOUND REMOVE DISTANCE AS SPECIFIED IN THESE PLANS. THE CONTRACTOR WILL ONLY BE PAID FOR THE ACTUAL LINEAR FEET OF TILE REMOVAL PERFORMED IN THE FIELD AS DETERMINED BY THE DNR FIELD REPRESENTATIVE. CONCRETE OR CLAY TILE CAN BE BURIED IN TRENCH PROVIDING MATERIAL IS EXCAVATED, CRUSHED, AND THOROUGHLY MIXED IN WITH SOIL (DO NOT CRUSH IN PLACE AS WATER WILL CONTINUE TO SEEP ALONG OLD TILE LINE). ALL PLASTIC TILE SHALL BE REMOVED AND PROPERLY DISPOSED OF OFF-SITE. CONTRACTOR WILL BE REQUIRED TO CAP THE EXISTING TILE AT THE BEGINNING AND ENDING STATIONS OF REMOVAL AS DETERMINED IN THE FIELD. THE CONTRACTOR WILL BE REQUIRED TO STRIP AND STOCKPILE TOPSOIL PRIOR TO EXCAVATION. IN-SITU MATERIAL SHALL BE BUCKET COMPACTED WITH AN EXCAVATOR TO ACHIEVE COMPACTION NEAR THE VIRGIN SOIL. TOPSOIL SHALL BE REPLACED, BLENDED INTO EXISTING LANDSCAPE, AND
LEVELED SUITABLE ENOUGH TO BE CONSIDERED SEEDBED READY.
PAYMENT FOR TILE REMOVAL INCLUDING: STRIPPING, STOCKPILING, EXCAVATION, REMOVAL, DISPOSAL, AND BACKFILLING OPERATIONS
SHALL BE PAID FOR BASED ON THE CONTRACTOR'S UNIT BID PRICE FOR "TILE REMOVAL."
EXISTING WETLAND
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
1148 1147
SRA#1
SRA#2
SRA#4
SRA#6
SRA#7
SRA#3
SRA#5
Title:
File #:
CC2:
Sheet:
Survey:
Drawn:
Checked:
Horz. datum:
Designed:
Drawn:
Checked:
Revisions ByDate
Section: Township: Range: Vert. datum:
Site #:
© Copyright . State of Minnesota, Department of Natural Resources
PROVENCHER WMA
WETLAND RESTORATIONS C-103
#X#####
XXX#######
R########
07/25AK
07/25MO
07/25AK
NAVD88NAD83
06/25MO
06/25MO
05/25AK
PLAN VIEW SRA'S AND PLUGS
NEAR GREENLEAF
3111826
MEEKER COUNTY
F & W
PLOT DATE: 10/2/2026 7:10 AM C:\C3D\MN-PROVENTURE WMA\5_Drawings\503_Civil\PROVENTURE WMA BASE.dwg
N
SCALE ( IN FEET )
200 400
SITE PREPARATION NOTE:
THE CONTRACTOR WILL STRIP 6" DEPTH OF TOPSOIL BENEATH PLUGS #1 & #2
FOOTPRINTS, STOCKPILE, AND UPON COMPLETION OF SRA SPOIL PLACEMENT;
PLACE TOPSOIL OVER COMPLETED PLUGS SIDE SLOPES SURFACE. ANY ADDITIONAL
MATERIAL SHALL BE USED TO FLATTEN PROPOSED GRADING SLOPES INTO
EXISTING LANDSCAPE. PAYMENT FOR SITE PREPARATION INCLUDING: STRIPPING,
STOCKPILING, BLENDING INTO EXISTING LANDSCAPE, AND LEVELING SUITABLE
ENOUGH TO BE CONSIDERED SEEDBED READY SHALL BE PAID FOR BASED ON THE
CONTRACTOR'S LUMP SUM BID FOR "SITE PREPARATION." NOTE: THERE WILL BE NO
STRIPPING UNDER PLUG#1 OVER GAS LINE EASEMENT AREA, CONTRACTOR CAN
FILL OVER EASEMENT AREA BUT NO STRIPPING.
SEDIMENT REMOVAL AREA (SRA) NOTE:
THE CONTRACTOR WILL EXCAVATE SEDIMENT REMOVAL AREAS AS SHOWN THIS SHEET. BOTTOM ELEVATIONS AND QUANTITIES ARE NOTED IN TABLE. CONTRACTOR WILL EXCAVATE TO GRADES LISTED IN THESE PLANS. SIDE SLOPES WILL BE MINIMUM 5:1 AND SHALL HAVE ROUNDED CORNERS AND TRANSITIONS FROM BOTTOM OF SCRAPE TO TOP SURFACE.
ALL SRA'S SHALL BE LEVELED SUITABLE ENOUGH TO BE CONSIDERED SEEDBED READY. FINISH GROUND SURFACE FILES WILL BE PROVIDED TO THE CONTRACTOR FOR EACH SEDIMENT REMOVAL AREA. THERE WILL BE NO STAKES SET IN THE FIELD DELINEATING SRA BOTTOMS OR SIDE SLOPES. SEE MACHINE CONTROL NOTE SHEET C-002.
ALL SPOIL MATERIAL FROM SRA EXCAVATION WILL BE REMOVED FROM WETLAND AREA AND DEPOSITED IN DESIGNATED AREAS SHOWN THIS SHEET. SPOIL MATERIAL FROM SRA #7 WILL BE PLACED IN DESIGNATED SPOIL AREA TO RAISE GROUND TO ELEV. 1145.00. CONTRACTOR WILL DEPOSIT SPOIL OVER FULL AREA, BLENDED INTO EXISTING LANDSCAPE, AND LEVELED SUITABLE ENOUGH TO BE CONSIDERED SEEDBED READY. SPOIL MATERIAL FROM SRA'S 1-6 WILL BE USED TO CREATE PLUGS AS SHOWN AND LISTED IN TABLE THIS SHEET. PLUGS WERE CALCULATED USING A 30% SHRINKAGE FACTOR AND BALANCED USING SRA'S SPOIL MATERIAL. THE CONTRACTOR WILL BE REQUIRED TO MOVE SRA SPOIL MATERIAL TO PLUGS LOCATION AS DETERMINED IN THE FIELD. THE CONTRACTOR WILL STRIP PLUGS AS NOTED IN SITE PREPARATION. THE CONTRACTOR WILL BE REQUIRED TO COMPACT PLUGS USING HEAVY EQUIPMENT TO THE EXTENT POSSIBLE AS APPROVED BY THE DNR FIELD REPRESENTATIVE. FINISH GROUND SURFACE FILES WILL BE PROVIDED TO THE CONTRACTOR FOR THE PLUGS SHOWN AND LISTED IN TABLE. THERE WILL BE NO STAKES SET IN THE FIELD DELINEATING PLUGS. SEE MACHINE CONTROL NOTE SHEET C-002. ALL SPOIL WORK INCLUDING: HAULING, PLACING, COMPACTING, GRADING, AND LEVELING SUITABLE ENOUGH TO BE CONSIDERED SEEDBED READY WILL BE CONSIDERED "INCIDENTAL" TO
SRA EXCAVATION.
THE SEDIMENT REMOVAL AREAS WILL BE BID AS CUBIC YARD PLAN. THERE WILL BE NO ADJUSTMENT MADE FOR INCREASE
OR DECREASE TO QUANTITY.
PAYMENT FOR SEDIMENT REMOVAL AREAS INCLUDING: EXCAVATION, REMOVAL, HAULING, DEPOSITING, GRADING, AND LEVELING SHALL BE PAID FOR BASED ON THE CONTRACTOR'S UNIT BID PRICE FOR "EXCAVATION- SEDIMENT REMOVAL
AREAS (SRA'S)."
LEGEND
EDGE FIELD
EDGE TREES
DESIGNATED SPOIL AREA
GAS EASEMENT
GAS LINE
SEDIMENT REMOVAL AREAS (SRA'S)
PLUGS
GAS GAS GAS GAS GAS
1144.5
PLUG#2
PLUG#1
60'-0"
60'-0"
EASEMENT EASEMENT
PLACE SPOIL TO ELEV. 1145.00
AS DETERMINED IN THE FIELD.
EXISTING GROUND
TYPICAL SECTION SEDIMENT REMOVAL AREAS (SRA'S)
NOT TO SCALE
5:1
BTM OF SRA
ELEV. VARIES
NO TOPSOIL STRIPPING
REQUIRED FOR SRA
EXCAVATION.
SIDE SLOPES WILL BE
5:1 SLOPE PER SRA.
MACHINE CONTROL REQUIRED
TYPICAL SECTION PLUGS
NOT TO SCALE
TOP WIDTH VARIES
TOP OF PLUGS
ELEV. VARIES
SLOPE VARIES SLOPE VARIES
MACHINE CONTROL REQUIRED
CONTRACTOR WILL STRIP 6" DEPTH TOPSOIL OVER PLUGS
FOOTPRINT, STOCKPILE, AND UPON COMPLETION OF SRA
SPOIL PLACEMENT AND PLUG GRADING PLACE TOPSOIL
OVER COMPLETED SURFACE AND BLEND INTO EXISTING
LANDSCAPE.
EXISTING GROUND
PLUG BALANCED USING SRA SPOIL
MATERIAL, MACHINE COMPACT.
EXISTING GROUND
ALL SPOIL MATERIAL TO BE
REMOVED FROM SRA AREA
AND HAULED TO PLUGS OR
SPOIL LOCATIONS.
PLUG SURFACE
CREATE CROWN OVER
PLUG TOP TO PROVIDE
POSITIVE DRAINAGE
AND NO PONDING.
CONTRACTOR WILL COVER PLUG WITH
SITE PREPARATION MATERIAL, BLEND
INTO EXISTING LANDSCAPE, AND LEVEL
SUITABLE ENOUGH TO BE CONSIDERED
SEEDBED READY.
5:1
SITE PREPARATION NOTE:
CONTRACTOR WILL NOT STRIP PLUG #1 OVER EASEMENT AREA. 30 L.F. EACH SIDE OF CL
GAS LINE. REMAINING FOOTPRINTS OUTSIDE OF EASEMENT AREA WILL BE STRIPPED 6"
DEPTH AS SHOWN THIS SHEET.
Title:
File #:
CC2:
Sheet:
Survey:
Drawn:
Checked:
Horz. datum:
Designed:
Drawn:
Checked:
Revisions ByDate
Section: Township: Range: Vert. datum:
Site #:
© Copyright . State of Minnesota, Department of Natural Resources
PROVENCHER WMA
WETLAND RESTORATIONS C-104
#X#####
XXX#######
R########
07/25AK
07/25MO
07/25AK
NAVD88NAD83
06/25MO
06/25MO
05/25AK
SRA AND PLUG DETAILS
NEAR GREENLEAF
3111826
MEEKER COUNTY
F & W
PLOT DATE: 10/2/2026 7:11 AM C:\C3D\MN-PROVENTURE WMA\5_Drawings\503_Civil\PROVENTURE WMA BASE.dwg
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
EASEMENT
1148 1147
SRA#1
SRA#2
SRA#4
SRA#6
SRA#7
SRA#3
SRA#5
Title:
File #:
CC2:
Sheet:
Survey:
Drawn:
Checked:
Horz. datum:
Designed:
Drawn:
Checked:
Revisions ByDate
Section: Township: Range: Vert. datum:
Site #:
© Copyright . State of Minnesota, Department of Natural Resources
PROVENCHER WMA
WETLAND RESTORATIONS C-105
#X#####
XXX#######
R########
07/25AK
07/25MO
07/25AK
NAVD88NAD83
06/25MO
06/25MO
05/25AK
PLAN VIEW EROSION CONTROL
NEAR GREENLEAF
3111826
MEEKER COUNTY
F & W
PLOT DATE: 10/2/2026 8:27 AM C:\C3D\MN-PROVENTURE WMA\5_Drawings\503_Civil\PROVENTURE WMA BASE.dwg
N
SCALE ( IN FEET )
200 400
LEGEND
EDGE FIELD
EDGE TREES
DESIGNATED SPOIL AREA
GAS EASEMENT
GAS LINE
CONSTRUCTION EXIT
STRAW WATTLES
EROSION CONTROL BLANKET
SEDIMENT REMOVAL AREAS (SRA'S)
PLUGS
GAS GAS GAS GAS GAS
EASEMENT EASEMENT
PROJECT SITE:
TOTAL PROJECT SITE 86 ACRES
TOTAL PROJECT AREAS DISTURBED 4.5 ACRES
TOTAL EXISTING IMPERVIOUS AREAS 0 ACRES
TOTAL PROPOSED IMPERVIOUS AREA 0 ACRES
CONSTRUCTION EXIT:
2"Ø WASHED ROCK 60 TON PER EXIT
SOWING AND MULCHING: (SOUTH AREA) 4.5 ACRES*
SRA'S, SPOIL AREAS, PLUGS AND ANY OTHER AREAS DISTURBED.
*CONTRACTOR WILL BE SOWING SITE WITH COVER CROP (OATS).
THE MNDNR WILL BE PROVIDING THE NATIVE SEED MIXTURE.
CONRACTOR WILL SOW SITE WITH COVER CROPS AND NATIVE
SEED. MnDOT TYPE 1 MUCH WILL BE APPLIED AT 2.0 TONS/PER
ACRE. CONTRACTOR WILL DISC. ANCHOR.
SOWING & MULCHING NOTE:
THE CONTRACTOR WILL SOW ALL DISTURBED AREAS WITH A COVER CROP (OATS) AND NATIVE SEED PROVIDED BY THE MN DNR. THIS INCLUDES: SRA'S, PLUG, SPOIL AREAS, TILE INVEST./REMOVAL, FILL AREAS AND ANY OTHER AREAS DISTURBED DURING CONSTRUCTION. THE COVER CROP SHALL BE APPLIED AT 50 LBS/PER ACRE MINIMUM. THE MNDNR WILL PROVIDE THE CONTRACTOR WITH NATIVE SEED MIXTURE. THE CONTRACTOR WILL BE PURCHASING THE COVER CROPS ONLY AND SOWING BOTH CROP CROPS AND NATIVE SEED MIXTURE. THE CONTRACTOR WILL NEED TO COORDINATE SOWING EFFORTS AND TIMELINES TO
COMPLY WITH THE STORM WATER PERMIT AND SWPPP.
CONSTRUCTION EXIT
PLUG#1
PLUG#2
STRAW WATTLE
45°
1"x2"x24" LONG WOODEN STAKES.
STAKES SHALL BE DRIVEN
THROUGH THE BACK HALF OF
THE STRAW WATTLE AT AN
ANGLE OF 45° WITH THE TOP OF
THE STAKE POINTING UPSTREAM.
FINISH GROUND
FLOW
BACKFILL AND COMPACT SOIL
FROM TRENCH ON UPGRADIENT
SIDE OF STRAW WATTLE.
8-10" EMBEDMENT DEPTH
PLACE WATTLE IN SHALLOW
TRENCH 1-2" DEPTH.
NOTES:
· SPACING OF STAKES SHALL BE IN ACCORDANCE TO MANUFACTURE RECOMMENDATIONS.
· STRAW WATTLES SHALL BE 9" DIAMETER WITH NATURAL NETTING.
· PILOT HOLES MAY BE DRIVEN THROUGH THE WATTLES AND INTO THE SOIL WHEN SOIL
CONDITIONS REQUIRE.
STRAW WATTLE DETAIL
NOT TO SCALE
CONSTRUCTION EXIT SPECIFICATIONS:
· STONE SIZE: 2" DIAMETER WASHED ROCK. (60 TON PER EXIT)
· THICKNESS: NOT LESS THAN 12" DEPTH.
· NON-WOVEN FILTER FABRIC PLACED OVER THE ENTIRE AREA PRIOR TO
PLACING ROCK.
· MAINTENANCE: THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION
WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO
PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING
WITH ADDITIONAL STONE AS CONDITIONS DEMAND AND REPAIR AND/OR
CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL
SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC
RIGHT-OF-WAYS MUST BE REMOVED IMMEDIATELY.
· WASHING: WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR
TO ENTRANCE ONTO PUBLIC RIGHT-OF-WAY. WHEN WASHING IS
REQUIRED, IT SHALL BE DONE ON AN AREA STABLIZED WITH STONE
AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING DEVICE.
· PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE
PROVIDED AFTER EACH RAIN EVENT.
PU
BL
IC
R
O
AD
50 L.F. MIN.
ENTRANCE WIDTH
AS REQUIRED,
MINIMUM 20 L.F.
MINIMUM 12" DEPTH 2"Ø WASHED ROCK
WITH NON-WOVEN FILTER FABRIC BENEATH. RADIUS AS
REQUIRED.
CONSTRUCTION EXIT DETAIL
NOT TO SCALE
MnDOT CATEGORY 20 EROSION
CONTROL BLANKET WITH NATURAL
NETTING.
6"x6" TRENCH BACKFILLED OVER
EROSION CONTROL BLANKET.
FLOW
STRAW WATTLE AND EROSION BLANKET DETAIL
NOT TO SCALE
NOTES;
· DITCH CHECKS, PLACE STRAW WATTLE PERPENDICULAR TO FLOW AND IN A
CRESCENT SHAPE WITH THE ENDS FACING UPSTREAM.
· POINT "A" MUST BE A MINIMUM OF 6" HIGHER THAN POINT "B" TO ENSURE
THAT WATER FLOWS OVER THE DIKE AND NOT AROUND THE ENDS.
· LAY EROSION BLANKET PARALLEL TO THE DIRECTION OF WATER FLOW.
· OVERLAP ADJACENT STRIP EDGES A MINIMUM OF 4" INCHES.
· OVERLAP BLANKET 7" (MIN.) AT EACH END. SHINGLE BLANKET IN THE
DIRECTION OF FLOW.
A
B
Title:
File #:
CC2:
Sheet:
Survey:
Drawn:
Checked:
Horz. datum:
Designed:
Drawn:
Checked:
Revisions ByDate
Section: Township: Range: Vert. datum:
Site #:
© Copyright . State of Minnesota, Department of Natural Resources
PROVENCHER WMA
WETLAND RESTORATIONS C-106
#X#####
XXX#######
R########
07/25AK
07/25MO
07/25AK
NAVD88NAD83
06/25MO
06/25MO
05/25AK
EROSION CONTROL DETAILS
NEAR GREENLEAF
3111826
MEEKER COUNTY
F & W
PLOT DATE: 10/2/2026 8:22 AM C:\C3D\MN-PROVENTURE WMA\5_Drawings\503_Civil\SWPPP TEMPLATE.dwg
Title:
File #:
CC2:
Sheet:
Survey:
Drawn:
Checked:
Horz. datum:
Designed:
Drawn:
Checked:
Revisions ByDate
Section: Township: Range: Vert. datum:
Site #:
© Copyright . State of Minnesota, Department of Natural Resources
PROVENCHER WMA
WETLAND RESTORATIONS C-107
#X#####
XXX#######
R########
07/25AK
07/25MO
07/25AK
NAVD88NAD83
06/25MO
06/25MO
05/25AK
SWPPP
NEAR GREENLEAF
3111826
MEEKER COUNTY
F & W
PLOT DATE: 10/2/2026 8:23 AM C:\C3D\MN-PROVENTURE WMA\5_Drawings\503_Civil\SWPPP TEMPLATE.dwg
EROSION CONTROL NOTES:
1) THE IMPLEMENTATION OF THESE EROSION CONTROL PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT AND UPGRADING OF THESE EROSION CONTROL FACILITIES IS THE RESPONSIBILITY OF THE CONTRACTOR'S EROSION CONTROL SUPERVISOR UNTIL 70% OF PERMANENT VEGETATION IS ESTABLISHED.
2) THE EROSION CONTROLS SHOWN OR DESCRIBED IN THIS PLAN SHALL BE CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES AND IN SUCH A MANNER AS TO ENSURE THAT SEDIMENT LADEN WATER DOES NOT ENTER THE DOWNSTREAM RECEIVING WATERS OR VIOLATE APPLICABLE WATER STANDARDS.
3) CONTRACTOR SHALL NOT DISTURB ANY AREAS BEYOND THE DESIGNATED LIMITS OF CONSTRUCTION SHOWN IN THE PLANS UNLESS THAT WORK IS PRE-APPROVED. CONTRACTOR WILL MINIMIZE DISTURBANCE TO
EXISTING VEGETATION.
4) THE EROSION CONTROL FACILITIES SHOWN IN THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS DURING THE CONSTRUCTION PERIOD. THESE EROSION CONTROL FACILITIES SHALL BE UPGRADED AND AMENDED AS NEEDED FOR CHANGING SITE CONDITIONS AND UNEXPECTED STORM EVENTS.
5) THE EROSION CONTROL FACILITIES SHALL BE INSPECTED AND THE CONDITIONS RECORDED WEEKLY AND WITHIN 24-HOURS FOLLOWING A STORM EVENT GREATER THAN 12" IN 24-HOURS, AND MAINTAINED AS NECESSARY TO ENSURE THEIR CONTINUED FUNCTION. ALL NON-FUNCTIONAL BMP'S SHALL BE REPAIRED, REPLACED, OR SUPPLEMENTED WITH FUNCTIONAL BMP'S BY THE END OF THE NEXT BUSINESS DAY AFTER
DISCOVERY.
6) THE EROSION CONTROL FACILITIES ON INACTIVE AREAS OF THE SITE SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE PER MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT PRODUCING 12" OF RAINFALL
IN 24-HOURS.
7) ALL INSPECTION AND MAINTENANCE CONDUCTED DURING CONSTRUCTION MUST BE RECORDED IN WRITING BY THE EROSION CONTROL SUPERVISOR AND THESE RECORDS MUST BE RETAINED ONSITE WITH THE SWPPP.
8) ANY SITE AREA STRIPPED OF VEGETATION, INCLUDING ROADWAY RIGHT-OF-WAY, WHERE NO FURTHER WORK IS ANTICIPATED SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED EROSION CONTROL METHODS (EX.
HYDRO MULCH, SEED, EROSION CONTROL BLANKET, ETC) BUT IN NO CASE LATER THAN 14-DAYS AFTER
CONSTRUCTION IN THAT AREA HAS CEASED.
9) ALL TEMPORARY ACCESS ROADS PROVIDED FOR THE PUBLIC SHALL BE MAINTAINED FOR THE DURATION OF THE PROJECT; ALL EXISTING PAVED AREAS ARE TO BE KEPT CLEAN FOR THE DURATION OF THE PROJECT.
10) ALL PERIMETER CONTROL DEVICES SHALL BE REPAIRED OR REPLACED WHEN SEDIMENT REACHES 12 OF THE
TOTAL HEIGHT OF THE BMP.
11) WHERE SEEDING FOR TEMPORARY EROSION CONTROL IS REQUIRED, FAST GERMINATING COVER CROP SHALL BE APPLIED AT AN APPROPRIATE RATE. SEED WILL BE VERIFIED WITH DNR REPRESENTATIVE PRIOR TO
INSTALLATION.
12) WHERE STRAW MULCH FOR TEMPORARY EROSION CONTROL IS REQUIRED, IT SHALL BE CERTIFIED WEED FREE
AND APPLIED AT A MINIMUM OF 2.0 TONS/PER ACRE.
13) SURFACE WATERS, DRAINAGE DITCHES, AND CONVEYANCE SYSTEMS SHALL BE INSPECTED FOR EVIDENCE OF SEDIMENT DEPOSITION AND EROSION; THE REMOVAL OF SEDIMENT AND STABILIZATION OF ERODED AREAS SHALL TAKE PLACE UPON DISCOVERY AND BE COMPLETED WITHIN 24-HOURS OF DISCOVERY UNLESS
PRECLUDED BY LEGAL, REGULATORY, OR PHYSICAL ACCESS CONSTRAINTS.
14) THE NORMAL WETTED PERIMETER OF ANY TEMPORARY OR PERMANENT DRAINAGE DITCH OR SWALE THAT DRAINS WATER FROM ANY PORTION OF THE CONSTRUCTION SITE WITHIN 200-L.F. OF THE PROPERTY BOUNDARY OR CONNECTION TO A SURFACE WATER SHALL BE STABILIZED WITHIN 24-HOURS AFTER CONNECTION.
15) PIPE OUTLETS MUST HAVE TEMPORARY OR PERMANENT ENERGY DISSIPATION INSTALLED WITHIN 24-HOURS OF
CONNECTION TO A SURFACE WATER.
16) STABILIZED CONSTRUCTION ENTRANCE LOCATIONS AND ADJACENT STREETS SHALL BE INSPECTED FOR EVIDENCE OF OFF-SITE SEDIMENT TRACKING ONTO PAVED (ASPHALT, CONCRETE, OR GRAVEL) SURFACES;
TRACKED SEDIMENTS SHALL BE REMOVED FROM ALL OFF-SITE SURFACES WITHIN 24-HOURS OF DISCOVERY.
17) THE CONTRACTOR SHALL INSTALL DOWN GRADIENT PERIMETER EROSION CONTROL BMP'S PRIOR TO COMMENCING CLEARING & GRADING ACTIVITIES AND SHALL MAINTAIN THE BMP'S FOR THE DURATION OF CONSTRUCTION ACTIVITIES; UPON ESTABLISHMENT (70% COVERAGE MINIMUM) OF PROPOSED PERMANENT GROUND COVER THE CONTRACTOR SHALL REMOVE ALL SYNTHETICS AND SEDIMENT CONTROL LOGS FOR
OFF-SITE DISPOSAL.
18) ALL SLOPES SHALL BE STABILIZED WITHIN 14 DAYS ONCE WORK IS NOT ACTIVE IN THE VICINITY. EROSION CONTROL BLANKETS SHALL BE PLACED ON ALL DISTURBED CHANNEL SLOPES AND ROAD DITCH SLOPES.
19) SOIL STOCKPILES SHALL HAVE SILT FENCE OR OTHER EFFECTIVE PERIMETER SEDIMENT CONTROLS AND CANNOT BE PLACED IN SURFACE WATERS, INCLUDING STORMWATER CONVEYANCES SUCH AS CURB AND GUTTER SYSTEMS, SWALES, CONDUITS, OR DITCHES UNLESS THERE IS A BYPASS SYSTEM IN PLACE FOR THE
STORMWATER.
20) ALL DISTURBED NON-PAVED AREAS SHALL BE PROTECTED WITH TOPSOIL, SEED,
AND MULCH WITHIN THE FOLLOWING TIME FRAMES: IF GREATER THAN A 3:1 SLOPE
2-DAYS, 3:1 TO 10:1 SLOPE 7-DAYS, WITHIN 200 LINEAL FEET OF A SURFACE WATER
24 HOURS FOLLOWING COMPLETION OR SUSPENSION OF GRADING ACTIVITY IN
THAT PARTICULAR AREA.
STORM WATER POLLUTION PREVENTION PLAN NOTES:
1) THE CONTRACTOR IS REQUIRED TO APPLY FOR AND RECEIVE A NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM (NPDES) STORMWATER CONSTRUCTION PERMIT FROM THE MPCA A MIN. OF
30 DAYS PRIOR TO BEGINNING WORK.
2) THE CONTRACTOR SHALL IDENTIFY AN EROSION CONTROL SUPERVISOR WHO SHALL BE
CERTIFIED, KNOWLEDGEABLE, AND EXPERIENCED IN THE APPLICATION OF EROSION PREVENTION, SEDIMENT CONTROL, BEST MANAGEMENT PRACTICES (BMP'S), AND INSPECTIONS.
3) THE EROSION CONTROL SUPERVISOR SHALL WORK WITH THE MN DNR FIELD REPRESENTATIVE TO
OVERSEE THE IMPLEMENTATION AND AMENDMENT OF THE SWPPP, AND THE INSTALLATION, AND
MAINTENANCE OF THE EROSION PREVENTION AND SEDIMENT CONTROL BMP'S.
4) THE CONTRACTOR SHALL DEVELOP A CHAIN OF RESPONSIBILITY WITH ALL OPERATORS ON THE SITE TO ENSURE THAT THE SWPPP WILL BE IMPLEMENTED EFFECTIVELY UNTIL CONSTRUCTION IS COMPLETE, THE ENTIRE SITE HAS UNDERGONE FINAL STABILIZATION, A NOTICE OF TERMINATION
(NOT) HAS BEEN SENT TO THE MPCA, AND THE PROJECT HAS BEEN ACCEPTED BY THE OWNER.
5) THE CONTRACTOR SHALL PREPARE AND SUBMIT A WRITTEN WEEKLY SCHEDULE OF PROPOSED
EROSION CONTROL ACTIVITIES FOR THE MN DNR FIELD REPRESENTATIVE REVIEW AND APPROVAL
PRIOR TO THAT WORK BEING INITIATED. FAILURE TO DO SO WILL RESULT IN UNAUTHORIZED
WORK.
6) THE CONTRACTOR SHALL PROVIDE FOR TEMPORARY AND PERMANENT EROSION PREVENTION
AND SEDIMENT CONTROL BMP'S AS SHOWN IN THE PLANS AND THEY SHALL BE KEPT IN
FUNCTIONAL CONDITION AT ALL TIMES THROUGHOUT CONSTRUCTION; THESE MEASURES MAY BE
AMENDED AS APPROPRIATE FOR CONSTRUCTION STAGING AS DIRECTED BY THE EROSION
CONTROL SUPERVISOR. THE CONTRACTOR SHALL REMAIN IN COMPLIANCE WITH ALL NPDES AND
OTHER PERMIT REQUIREMENTS AT ALL TIMES.
7) THE CONTRACTOR SHALL PROVIDE EFFECTIVE CONTAINMENT FOR CONCRETE AND OTHER
WASTES (LIQUID AND SOLID) GENERATED BY WASHOUT OPERATIONS (CONCRETE, STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS, AND OTHER CONSTRUCTION MATERIALS) RELATED
TO THE CONSTRUCTION ACTIVITY. THE LIQUID AND SOLID WASHOUT WASTES SHALL NOT
CONTACT THE GROUND IN ACCORDANCE WITH PARTS 2.3 AND 12.9 OF THE MPCA NPDES PERMIT.
8) THE CONTRACTOR SHALL ENSURE THAT DISCHARGE POINTS ARE ADEQUATELY PROTECTED
FROM EROSION AND SCOUR; THE DISCHARGE SHALL BE DISPERSED OVER NATURAL ROCK
RIPRAP, SAND BAGS, PLASTIC SHEETING, OR OTHER ENERGY DISSIPATION MEASURES APPROVED
BY THE EROSION CONTROL SUPERVISOR. ADEQUATE SEDIMENTATION CONTROL MEASURES ARE
REQUIRED FOR DISCHARGE THAT CONTAINS SUSPENDED SOLIDS.
9) ANY FUEL OR CHEMICAL TANK STORED ON THE PROJECT AREA SHALL BE PROTECTED BY A SOIL
BERM OR HAVE A NEGATIVE GRADIENT TO ANY WATER RESOURCE; AS PER U.S.C.O.E.
REQUIREMENTS A CONTINGENCY PLAN SHALL BE CREATED BY THE CONTRACTOR TO ADDRESS A
SPILL OR LEAK OF ANY CHEMICAL, INCLUDING PETROCHEMICALS, DEEMED HARMFUL TO THE
ENVIRONMENT. THE CONTRACTOR SHALL HAVE ONSITE THE MATERIALS NECESSARY TO CAPTURE
AND CONTAIN SAID CHEMICAL SPILLS.
10) IN THE EVENT SEDIMENT IS DEPOSITED IN WATERS OF THE STATE OR PRIVATE PROPERTY, THE MATERIAL SHALL BE REMOVED WITHIN 7-DAYS IN ACCORDANCE WITH PART IV, E, 5, C OF THE
MPCA NPDES PERMIT.
INVASIVE SPECIES PREVENTION NOTES:
1) MNDNR REQUIRES THE PREVENTION AND LIMITING THE INTRODUCTION, ESTABLISHMENT, AND
SPREAD OF INVASIVE SPECIES DURING ALL ACTIVITIES ON PUBLIC WATERS AND MNDNR
ADMINISTERED LANDS. SEE SPECIFICATION SECTION 01 30 00 FOR ADDITIONAL INFORMATION AND
RESPONSIBILITIES.
2) CONTRACTOR SHALL PREVENT INVASIVE SPECIES FROM ENTERING INTO OR SPREADING WITHIN A PROJECT SITE BY CLEANING EQUIPMENT AND CLOTHING PRIOR TO ARRIVAL AT THE PROJECT SITE AND NOT IMPORTING MATERIAL INFESTED WITH INVASIVE SPECIES PRIOR TO ARRIVING AT THE
PROJECT SITE. THE MNDNR FIELD REPRESENTATIVE SHALL INSPECT ALL EQUIPMENT AND
CLOTHING AT THE STAGING AREA IDENTIFIED AT THE PRE-CONSTRUCTION MEETING.
3) IF EQUIPMENT OR CLOTHING ARRIVES AT THE PROJECT SITE WITH SOIL, AGGREGATE MATERIAL, MULCH, VEGETATION (INCLUDING SEEDS), OR ANIMALS, IT SHALL BE CLEANED BY CONTRACTOR
USING TOOLS OR EQUIPMENT (COMPRESSED AIR, BRUSH, OR PRESSURE WASHER). IF ANY
MATERIAL IS IMPORTED TO THE SITE WITHOUT PRIOR INSPECTION AND IS SUBSEQUENTLY FOUND
TO CONTAIN INVASIVE SPECIES THE CONTRACTOR SHALL REMOVE THE MATERIAL FROM THE
PROJECT SITE WITHIN 72-HOURS OF NOTIFICATION OR BEAR THE COST OF REMOVAL FROM A
THIRD PARTY, PER AIA A201, 12.2.
4) IF THE PROJECT SITE INCLUDES A WATER BODY, THE CONTRACTOR SHALL CLEAN EQUIPMENT AS
NOTED ABOVE PRIOR TO ENTERING AND UPON LEAVING THE WATER BODY. CONTRACTOR IS
REQUIRED TO DRAIN WATER FROM ALL EQUIPMENT, TANKS, PUMPS PRIOR TO AND
IMMEDIATELY AFTER LEAVING ANY BODY OF WATER.
PROJECT NARRATIVE:
PROJECT LIMITS: SEE SHEET C-101 SITE PLAN OF THESE PLANS FOR PROJECT LIMITS. PROJECT
CONSISTS OF TILE INVESTIGATION, TILE REMOVAL, SEDIMENT REMOVAL AREAS, PLUG
CONSTRUCTION TO ENHANCE OR RESTORE WETLANDS ON PROVENCHER WILDLIFE MANAGEMENT
AREA.
CONSTRUCTION SEQUENCE:
-ARRANGE AND ATTEND THE PRE-CONSTRUCTION MEETING WITH MNDNR.
-CONTACT UTILITY COMPANIES BY CALLING GOPHER STATE ONE CALL (1-800-252-1166)
-ESTABLISH CONSTRUCTION BOUNDARIES AND CLEARING LIMITS PRIOR TO ACTIVITIES BEGINNING.
-INSTALL EROSION AND SEDIMENT CONTROL DEVICES.
-PROCEED WITH SITE GRADING AND CONSTRUCTION ACTIVITIES.
-STABILIZE AREAS DISTURBED BY CONSTRUCTION ACTIVITIES WITH TEMPORARY EROSION AND
SEDIMENT CONTROL MEASURES.
-COMPLETE FINAL GRADING.
-COMPLETE PERMANENT EROSION AND SEDIMENT CONTROL MEASURES.
-REMOVE EXCESS EXCAVATED MATERIALS, TRASH, DEBRIS, AND OTHER WASTE MATERIALS.
-CONTRACTOR WILL REMOVE TEMPORARY EROSION CONTROL MEASURES ONCE SITE HAS BEEN
DETERMINED TO BE STABILIZED BY CONTRACT DOCUMENTS AND MN DNR.
-CONTRACTOR WILL SUBMIT NOTICE OF TERMINATION (NOT) TO CLOSE SWPPP PERMIT.
PROJECT AREAS:
TOTAL PROJECT AREA: 86 ACRES
TOTAL AREAS TO BE DISTURBED: 4.5 ACRES
EXISTING IMPERVIOUS AREA: 0 ACRES
PROPOSED IMPERVIOUS AREA: 0 ACRES
NAME OF RECEIVING WATER BODY/BODIES: LAKE WILLIE
DISCHARGES TO SPECIAL OR IMPAIRED WATERS: PROJECT DOES DISCHARGE TO A SPECIAL OR
IMPAIRED WATERS BUT IS OVER 1-MILE BEFORE ENTERING LAKE WILLIE.
DISCHARGES TO CALCAREOUS FEN: PROJECT DOES NOT HAVE A DISCHARGE TO CALCAREOUS
FEN.
ENDANGERED OR THREATENED SPECIES: NO
HISTORIC PLACES OR ARCHEOLOGICAL SITES: SHPO HAS BEEN COMPLETED AND PROJECT SITE
WILL NOT EFFECT ANY HISTORIC OR ARCHEOLOGICAL SITES.
· SEE PLAN VIEW EROSION CONTROL SWPPP SHEETS FOR BUFFER BOUNDARIES, LOCATION OF
TEMPORARY AND PERMANENT STORMWATER BMP'S, AND ESTIMATED QUANTITIES.
EROSION CONTROL SUPERVISORSWPPP DESIGNER:
MATTHEW L. OLSON
UNIVERSITY OF MINNESOTA
DESIGN OF CONSTRUCTION SWPPP
CERTIFICATION EXPIRES MARCH 2027
PROJECT
LOCATION
| C-001 |
| Sheets and Views |
| C-001 Title Sheet |
| C-002 |
| Sheets and Views |
| C-002 |
| C-003 |
| Sheets and Views |
| C-003 |
| C-101 |
| Sheets and Views |
| C-101 SITE PLAN |
| C-102 |
| Sheets and Views |
| C-102 PLAN VIEW TILE |
| C-103 |
| Sheets and Views |
| C-103 PLAN VIEW SRA'S |
| C-104 |
| Sheets and Views |
| C-104 SRA DETAILS |
| C-105 |
| Sheets and Views |
| C-105 PV EROSION CONTROL |
| C-106 |
| Sheets and Views |
| SWPPP DETAILS |
| C-107 |
| Sheets and Views |
| C-101 Typ_11x17 |
File details come from the government source that posted it. Updated .