2027-379_Exhibit_F_Drawings.pdf
PDF 8 MB Posted
- Attached to
- DNR RFB Siyo Waste` WMA Wetland Restoration
- Solicitation number
- 2000018860
- Issued by
- Yellow Medicine County, Minnesota
About this file
This document is a set of technical drawings and specifications for a wetland restoration project administered by the Minnesota Department of Natural Resources (DNR) at the Siyo Waste Wildlife Management Area in Yellow Medicine County near Clarkfield, Minnesota. The project encompasses tile investigation and removal, sediment removal area (SRA) excavation, plug construction, erosion control installation, and native vegetation establishment across approximately 160 acres of total project area with 11 acres designated for disturbance. The estimated bid items include mobilization (lump sum), tile removal (2,600 linear feet), site preparation (lump sum), SRA excavation (11,527 cubic yards plan), tile investigation (2,500 linear feet), erosion control blankets (1,400 square yards), straw wattles (1,200 linear feet), silt sock (900 linear feet), construction exits (1 each), storm water permit acquisition (lump sum), cultivation (11 acres), and sowing and mulching (11 acres). The project involves GPS machine control with finish ground surfaces provided in Land XML and DXF file formats, and contractors must comply with invasive species prevention requirements and NPDES stormwater construction permits obtained through the Minnesota Pollution Control Agency (MPCA) a minimum of 30 days prior to construction commencement.
Contractors are responsible for all erosion and sediment control measures, maintenance, and stabilization until 80 percent permanent vegetation establishment is achieved, with weekly inspections required and comprehensive documentation mandated throughout the construction period. The project requires coordination with the Minnesota DNR field representatives and an erosion control supervisor certified in best management practices (BMPs), with weekly schedules of proposed erosion control activities submitted for DNR review and approval prior to implementation. All disturbed areas must be stabilized within specified timeframes ranging from 2 to 7 days depending on slope ratios and proximity to surface waters, and temporary erosion control measures must be removed only after site stabilization determination by both contract documents and the Minnesota DNR. The contractor must notify Gopher State One-Call (1-800-252-1166) for utility locating and comply with all provisions in the Project Manual Division 1 regarding invasive species prevention, with equipment inspection conducted at the designated staging area during the pre-construction meeting.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2027-379_Attachments.pdf | ||
| 2027-379_Exhibit_D_-_Price_Schedule.xlsx | XLSX spreadsheet | |
| 2027-379_Exhibit_A_-_Supplements_2_and_3.pdf | ||
| DNR_RFB_Siyo_Waste`_WMA_Wetland_Restoration.pdf | ||
| 2027-379_Request_for_Bid.pdf | ||
| 2027-379_Sample_Contract_and_Exhibits_.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
© 2026 Microsoft Corporation © 2026 Maxar ©CNES (2026) Distribution Airbus DS © 2026 TMAP MOBILITY Earthstar Geographics SIO © Mapbox © 2026 Microsoft Corporation © 2026 Maxar ©CNES (2026) Distribution Airbus DS © 2026 TMAP MOBILITY Earthstar Geographics SIO © Mapbox
STATE
CALLONE
GOPHER
CALL BEFORE YOU DIG
WETLAND RESTORATIONS
Title:
File #:
CC2:
Sheet:
Survey:
Drawn:
Checked:
Horz. datum:
Designed:
Drawn:
Checked:
Revisions ByDate
Section: Township: Range: Vert. datum:
Site #:
© Copyright . State of Minnesota, Department of Natural Resources
WETLAND RESTORATIONS
SIYO WASTE WMA C-001
#X#####
XXX#######
R########
06/26JK
06/26MO
06/26AK
NAVD88NAD83
06/26MO
06/26MO
05/26JK
Title Sheet
NEAR CLARKFIELD
4111628
YELLOW MEDICINE COUNTY
F & W
SIYO WASTE WMA
MINNESOTA DEPARTMENT OF NATURAL RESOURCES - F & W
PLOT DATE: 6/16/2026 10:52 AM C:\C3D\MN-SIYO WASTE WMA\5_Drawings\503_Civil\SIYO WASTE WMA COVER AN QUANTITIES.dwg
SITE LOCATION
SHEET INDEX:
C-001 TITLE SHEET
C-002 ESTIMATED QUANTITIES AND NOTES
C-003 EXISTING TOPOGRAPHY
C-101 SITE PLAN
C-102 PLAN VIEW TILE INVEST. & REMOVAL
C-103 PLAN VIEW SRA'S AND PLUG
C-104 SRA AND PLUG DETAILS
C-105 PLAN VIEW EROSION CONTROL
C-106 EROSION CONTROL DETAILS
C-107 SWPPP
N
PROJECT LOCATION
CLARKFIELD
CTY RD 67
290TH AVE
280TH AVE U
S
H W
Y
0T
H S
T
0T
H S
T
0T
H S
T
MAP POINT " " IS LOCATED AT INTERSECTION OF COUNTY ROAD 67 AND US HWY 59 LOCATED IN CLARKFIELD, MN. TO PROJECT SITE HEAD NORTH ON US HWY 59 ±2 MILES TO INTERSECTION OF US HWY 59 AND 290TH AVE. HEAD EAST ON 290TH AVE ±0.5 MILES TO STAGING AREA LOCATED ON NORTH
SIDE OF ROAD. LAT: 44° 49' 07" LONG: 95° 47' 54"
N
0T
H S
T
290TH AVE
STAGING AREA
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PLPLPLPLPLPLPLPL
PL
PL
PL
P L P L
P L P L
P L P L
P L P L
P L P L
P L
PL PL PL PL PL PL PL PL PL PL PL PL
SRA'S
PLUG
WMA PROPERTY LINE PL PL
PROJECT CONTACTS:
WENDY KRUEGER AREA WILDLIFE SUPERVISOR
507-766-2010 wendy.krueger@state.mn.us
TROY DALE
507-706-6173
AREA WILDLIFE BIOLOGIST
troy.dale@state.mn.us
TANNER BRUSE
507-706-6171
AREA WILDLIFE BIOLOGIST
tanner.bruse@state.mn.us
ADAM KLEINSCHMIDT
320-347-7636
WILDLIFE WETLAND SPECIALIST
adam.kleinschmidt@state.mn.us
Title:
File #:
CC2:
Sheet:
Survey:
Drawn:
Checked:
Horz. datum:
Designed:
Drawn:
Checked:
Revisions ByDate
Section: Township: Range: Vert. datum:
Site #:
© Copyright . State of Minnesota, Department of Natural Resources
WETLAND RESTORATIONS
SIYO WASTE WMA C-002
#X#####
XXX#######
R########
06/26JK
06/26MO
06/26AK
NAVD88NAD83
06/26MO
06/26MO
05/26JK
ESTIMATED QUANTITIES AND
NOTES
NEAR CLARKFIELD
4111628
YELLOW MEDICINE COUNTY
F & W
PLOT DATE: 7/13/2026 9:17 AM C:\C3D\MN-SIYO WASTE WMA\5_Drawings\503_Civil\SIYO WASTE WMA COVER AN QUANTITIES.dwg
STATEMENT OF ESTIMATED QUANTITIES
ITEM
NOTES ITEM. NO. SPEC. NO. ITEM UNIT
TOTAL
ESTIMATED
QUANTITIES
A 1 01 71 13 MOBILIZATION LUMP SUM 1
B 2 02 41 18 TILE REMOVAL L.F. 2600
C 3 31 14 13 SITE PREPARATION LUMP SUM 1
D 4 31 23 16 EXCAVATION- SEDIMENT REMOVAL AREAS (SRA'S) C.Y.-P 11527
E 5 31 23 33 TILE INVESTIGATION L.F. 2500
6 31 25 00 SILT SOCK L.F. 900
7 31 25 00 EROSION CONTROL BLANKET CAT. 20 - NATURAL NETTING S.Y. 1400
8 31 25 00 9"Ø STRAW WATTLES- NATURAL NETTING L.F. 1200
9 31 25 00 CONSTRUCTION EXIT E.A. 1
F 10 31 25 00 STORM WATER PERMIT FOR CONSTRUCTION LUMP SUM 1
G 11 32 91 13 CULTIVATION ACRE 11
H 12 32 92 00 SOWING AND MULCHING ACRE 11
BID ITEM NOTES:
A) BID ITEM FOR MOBILIZATION SHALL INCLUDE THE SUPPLY OF ALL LABOR, MATERIAL, AND EQUIPMENT TO TRANSPORT ALL NEEDED LABOR, MATERIAL, AND EQUIPMENT TO AND FROM A PROJECT SITE TO SUCCESSFULLY COMPLETE THE PROJECT AS SHOWN ON THE PLANS OR DESCRIBED BY THE DNR
FIELD REPRESENTATIVE.
B) BID ITEM FOR TILE REMOVAL SHALL INCLUDE STRIPPING, EXCAVATION, REMOVAL, AND BACKFILLING OPERATIONS. CONTRACTOR WILL ONLY BE PAID
FOR THE ACTUAL LINEAR FEET OF TILE REMOVED IN THE FIELD.
C) BID ITEM FOR SITE PREPARATION SHALL INCLUDE STRIPPING BENEATH PLUG. BID ITEM SHALL ALSO INCLUDE LEVELING/DRAGGING TOPSOIL
SUITABLE ENOUGH TO BE CONSIDERED "SEEDBED READY."
D) BID ITEM FOR EXCAVATION- SEDIMENT REMOVAL AREAS SHALL INCLUDE EXCAVATING THE VARIOUS SRA'S AS IDENTIFIED IN THE PLANS. ALL SPOIL MATERIAL SHALL BE REMOVED FROM WETLAND AREAS AND MOVED TO PLUG AS SHOWN IN THESE PLANS. PAYMENT IS BASED ON CUBIC YARD PLAN, THERE WILL BE NO ADJUSTMENT MADE FOR INCREASE OR DECREASE TO QUANTITY. MACHINE CONTROL WILL BE REQUIRED FOR SEDIMENT
REMOVAL AREAS AND PLUG SEE NOTE BELOW.
E) BID ITEM FOR TILE INVESTIGATION SHALL INCLUDE STRIPPING, EXCAVATION, AND BACKFILLING OPERATIONS. CONTRACTOR WILL ONLY BE PAID FOR
THE ACTUAL LINEAR FEET INVESTIGATED.
F) BID ITEM FOR STORM WATER PERMIT FOR CONSTRUCTION SHALL INCLUDE THE CONTRACTOR OBTAINING THE STORM WATER PERMIT FOR
CONSTRUCTION ACTIVITIES PRIOR TO THE START OF CONSTRUCTION.
G) BID ITEM FOR CULTIVATION SHALL INCLUDE EQUIPMENT, LABOR, AND ALL ASSOCIATED COST REQUIRED TO CULTIVATE DISTURBED AREAS INCLUDING: SEDIMENT REMOVAL AREAS, PLUG, AND TILE INVESTIGATION/REMOVAL AREAS. CONTRACTOR SHALL USE FIELD CULTIVATOR WITH DRAG/ROLLER SECTION OR OTHER IMPLEMENT WITH MINIMUM 4" DEPTH. FINISHED SURFACE SHALL BE SMOOTH FIRM SEEDBED, FREE OF ROCK AND DEBRIS SUITABLE FOR NATIVE SEED PLANTING. CULTIVATION LINE ITEM WILL BE PAID FOR BASED ON ACRES.
H) BID ITEM FOR SOWING AND MULCHING SHALL INCLUDE THE EQUIPMENT AND LABOR REQUIRED TO SOW AND MULCH ALL DISTURBED AREAS. MnDOT TYPE 1 MULCH SHALL BE USED AND CONTRACTOR WILL BE REQUIRED TO DISC ANCHOR IN THE FIELD. THE CONTRACTOR WILL PROVIDE AND SOW THE COVER CROP (OATS) SEED. THE MN DNR WILL PROVIDE THE NATIVE SEED MIXTURE, THE CONTRACTOR WILL BE RESPONSIBLE FOR SOWING THE NATIVE SEED MIXTURE WITH COVER CROPS. ALL SEED MIXTURES WILL BE INSTALLED PRIOR TO MULCH AND EROSION BLANKET INSTALLATIONS.
MACHINE CONTROL NOTE:
THE CONTRACTOR WILL BE REQUIRED TO USE FULLY INTEGRATED GPS MACHINE CONTROL FOR THIS PROJECT, SEE SPECIFICATION 01 32 24 FOR DETAILS. THE MINNESOTA DNR WILL PROVIDE FINISH GROUND SURFACES FOR SEDIMENT REMOVAL AREAS (SRA'S) AND PLUG. THIS WILL COME TO THE CONTRACTOR IN THE FORM OF A LAND XML FILE. ALL OTHER DESIGNATED ITEMS (TILE INVEST/EROSION CONTROL/SPOIL AREAS, ETC) WILL COME TO THE CONTRACTOR IN THE FORM OF A DXF FILE. THERE WILL BE NO STAKES SET IN THE FIELD DELINEATING ANY OF THE REFERENCED ITEMS ABOVE. THE CONTRACTOR WILL BE RESPONSIBLE FOR TYING INTO MN DNR SURVEY CONTROL, EQUIP HEAVY EQUIPMENT, AND PERFORM THE WORK AS OUTLINED IN THESE PLANS. ANY QUESTIONS REGARDING MACHINE CONTROL CAN BE ANSWERED BY CALLING MATT OLSON (MN DNR) @ 320-634-7326 OR E-MAIL @ matt.l.olson@state.mn.us.
NOTES:
THE CONTRACTOR SHALL FIELD VERIFY UTILITY INFORMATION EXACT LOCATIONS PRIOR
TO COMMENCING CONSTRUCTION AS REQUIRED BY STATE LAW. NOTIFY GOPHER STATE
ONE-CALL 1-800-252-1166 OR 651-454-0002.
THE CONTRACTOR SHALL COMPLY WITH THE PROVISIONS IN PROJECT MANUAL, DIVISION
1, (01 30 00) INVASIVE SPECIES PREVENTION IN COMPLETING THE WORK
ALL NECESSARY EASEMENTS, PERMITS AND RIGHTS OF WAY FOR THE PROJECT SHALL
BE SECURED BY THE OWNER OR SPONSOR BEFORE CONSTRUCTION WORK IS
COMMENCED UNLESS OTHERWISE SPECIFIED.
VERIFY ALL DIMENSIONS AND LOCATIONS ON THE JOB. REPORT ALL DISCREPANCIES TO
FISH AND WILDLIFE DIVISION.
DO NOT SCALE DRAWINGS.
© 2026 Microsoft Corporation © 2026 Maxar ©CNES (2026) Distribution Airbus DS © 2026 TMAP MOBILITY Earthstar Geographics SIO © Mapbox
MONBM 1 2026 REBAR
N 16,294,895.8100 E 915,916.6350
ELEV. 1046.758
MONBM 2 2026 REBAR
N 16,294,730.3900
E 914,612.1780
ELEV. 1045.997
1049 1050
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PLPLPLPLPLPLPLPLPLPLPLPL
PL
PL
PL
PL
PL
PL
PL
P L P L
P L P L
P L P L
P L P L
P L P L
P L P L
P L P L
P L P L
P L P L
P L
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
Title:
File #:
CC2:
Sheet:
Survey:
Drawn:
Checked:
Horz. datum:
Designed:
Drawn:
Checked:
Revisions ByDate
Vert. datum:
Site #:
© Copyright . State of Minnesota, Department of Natural Resources
LAT: LONG:
WETLAND RESTORATIONS
SIYO WASTE WMA C-003
#X#####
XXX#######
R########
06/26JK
06/26MO
06/26AK
NAVD88NAD83
06/26MO
06/26MO
05/26JK
EXISTING TOPOGRAPHY
NEAR CLARKFIELDYELLOW MEDICINE COUNTY
F & W
XX.XXXX -XX.XXXX
PLOT DATE: 6/16/2026 10:54 AM C:\C3D\MN-SIYO WASTE WMA\5_Drawings\503_Civil\SIYO WASTE WMA TOPO.dwg
CONTROL STATEMENT:
HORIZONTAL CONTROL- COORDINATES ARE UTM ZONE 15 NORTH GRID COORDINATES IN
US FEET [(NAD83 (2011) (MOL)]. THEY WERE ESTABLISHED USING THE MINNESOTA VRS
SURVEYING SYSTEM IN MAY 2026 WITH INFORMATION FROM A TRIMBLE R12I SURVEY
GRADE GNSS RECEIVER. HORIZONTAL CONTROL WAS CHECKED WITH MnDOT SURVEY
STATION STAMPED "HAUGEN 2009" (PID DM2987).
VERTICAL CONTROL- WAS ESTABLISHED FROM THE GEOID 18US AND CHECKED WITH
MnDOT SURVEY STATION STAMPED "HAUGEN 2009" (PID DM2987) WHICH IS A SECOND
ORDER CLASS I BENCHMARK IN NAVD88.
N
SCALE ( IN FEET )
300 600
LEGEND
CENTERLINE DITCH
EDGE MARSH
PROPERTY LINEPL PL PL
290TH AVE
0T
H S
T
© 2026 Microsoft Corporation © 2026 Maxar ©CNES (2026) Distribution Airbus DS © 2026 TMAP MOBILITY Earthstar Geographics SIO © Mapbox
X X
X X
X X
Title:
File #:
CC2:
Sheet:
Survey:
Drawn:
Checked:
Horz. datum:
Designed:
Drawn:
Checked:
Revisions ByDate
Section: Township: Range: Vert. datum:
Site #:
© Copyright . State of Minnesota, Department of Natural Resources
WETLAND RESTORATIONS
SIYO WASTE WMA C-101
#X#####
XXX#######
R########
06/26JK
06/26MO
06/26AK
NAVD88NAD83
06/26MO
06/26MO
05/26JK
SITE PLAN
NEAR CLARKFIELD
4111628
YELLOW MEDICINE COUNTY
F & W
PLOT DATE: 6/16/2026 10:55 AM C:\C3D\MN-SIYO WASTE WMA\5_Drawings\503_Civil\SIYO WASTE WMA BASE.dwg
N
SCALE ( IN FEET )
300 600
LEGEND
FENCE LINE
FULL SERVICE LEVEL
STAGING AREA
SEDIMENT REMOVAL AREA (SRA'S)
PLUG
XXXX
SRA#4
SRA#1
SRA#2
SRA#3A
PLUG#1
290TH AVE
0T
H S
T
X X
X X
X X
SRA#1
SRA#2
SRA#3A
SRA#4
PLUG#1
T.I. 550 L.F.
T.I. 1,950 L.F.
10571056
D R
AI
N
D R
AI
N
D R
AI
N
D R
AI
N
DR
AI
N
DRAIN
DRAIN
T.R. 400 L.F.
T.R. 1,000 L.F.
DRAIN
DRAIN
D R
AI
N
D R
AI
N
D R
AI
N
DR
AI
N
D R
AI
N
D R
AI
N
T.R. 500 L.F.
T.R. 700 L.F.
Title:
File #:
CC2:
Sheet:
Survey:
Drawn:
Checked:
Horz. datum:
Designed:
Drawn:
Checked:
Revisions ByDate
Section: Township: Range: Vert. datum:
Site #:
© Copyright . State of Minnesota, Department of Natural Resources
WETLAND RESTORATIONS
SIYO WASTE WMA C-102
#X#####
XXX#######
R########
06/26JK
06/26MO
06/26AK
NAVD88NAD83
06/26MO
06/26MO
05/26JK
PLAN VIEW TILE INVEST. &
REMOVAL
NEAR CLARKFIELD
4111628
YELLOW MEDICINE COUNTY
F & W
PLOT DATE: 7/13/2026 9:30 AM C:\C3D\MN-SIYO WASTE WMA\5_Drawings\503_Civil\SIYO WASTE WMA BASE.dwg
N
SCALE ( IN FEET )
200 400
LEGEND
FENCE LINE
ASSUMED EXISTING TILE
TILE INVESTIGATION (T.I.)
TILE REMOVAL (T.R.)
XXX
TILE INVESTIGATION NOTE:
THE CONTRACTOR WILL PERFORM TILE INVESTIGATION AS DIRECTED BY THE DNR FIELD REPRESENTATIVE AND AS SHOWN THIS SHEET. THERE ARE (2) TWO LOCATIONS WHERE TILE INVESTIGATION WILL BE PERFORMED WITH A TOTAL LENGTH OF 2,500 L.F. ONCE THE TILE IS FOUND REMOVE DISTANCE AS SPECIFIED ON THESE PLANS AND NOTED IN TILE REMOVAL. THE CONTRACTOR WILL ONLY BE PAID FOR THE ACTUAL LINEAR FEET INVESTIGATED IN THE FIELD AS DETERMINED BY THE DNR FIELD REPRESENTATIVE. THE CONTRACTOR WILL STRIP ALL TOPSOIL AND STOCKPILE PRIOR TO TRENCH EXCAVATION. EXCAVATED MATERIAL WILL BE BUCKET COMPACTED WITH AN EXCAVATOR TO ACHIEVE COMPACTION NEAR THE VIRGIN SOIL. TOPSOIL SHALL BE REPLACED, BLENDED INTO
EXISTING LANDSCAPE, AND LEVELED SUITABLE ENOUGH TO BE CONSIDERED SEEDBED READY.
PAYMENT FOR TILE INVESTIGATION INCLUDING: STRIPPING, STOCKPILING, EXCAVATION, AND BACKFILLING OPERATIONS SHALL BE
PAID FOR BASED ON THE CONTRACTOR'S UNIT BID PRICE FOR "TILE INVESTIGATION."
TILE REMOVAL NOTE:
THE CONTRACTOR WILL PERFORM TILE REMOVAL AS DIRECTED BY THE DNR FIELD REPRESENTATIVE. THERE ARE (4) FOUR LOCATIONS WHERE TILE REMOVALS WILL BE PERFORMED WITH A TOTAL LENGTH OF 2,600 L.F. ONCE EXISTING TILE IS FOUND REMOVE DISTANCE AS SPECIFIED IN THESE PLANS. THE CONTRACTOR WILL ONLY BE PAID FOR THE ACTUAL LINEAR FEET OF TILE REMOVAL PERFORMED IN THE FIELD AS DETERMINED BY THE DNR FIELD REPRESENTATIVE. CONCRETE OR CLAY TILE CAN BE BURIED IN TRENCH PROVIDING MATERIAL IS EXCAVATED, CRUSHED, AND THOROUGHLY MIXED IN WITH SOIL (DO NOT CRUSH IN PLACE AS WATER WILL CONTINUE TO SEEP ALONG OLD TILE LINE). ALL PLASTIC TILE SHALL BE REMOVED AND PROPERLY DISPOSED OF OFF-SITE. CONTRACTOR WILL BE REQUIRED TO CAP THE EXISTING TILE AT THE BEGINNING AND ENDING STATIONS OF REMOVAL AS DETERMINED IN THE FIELD. THE CONTRACTOR WILL BE REQUIRED TO STRIP AND STOCKPILE TOPSOIL PRIOR TO EXCAVATION. IN-SITU MATERIAL SHALL BE BUCKET COMPACTED WITH AN EXCAVATOR TO ACHIEVE COMPACTION NEAR THE VIRGIN SOIL. TOPSOIL SHALL BE REPLACED, BLENDED INTO EXISTING LANDSCAPE, AND LEVELED SUITABLE ENOUGH TO BE CONSIDERED SEEDBED READY.
PAYMENT FOR TILE REMOVAL INCLUDING: STRIPPING, STOCKPILING, EXCAVATION, REMOVAL, DISPOSAL, AND BACKFILLING OPERATIONS SHALL BE PAID FOR BASED ON THE CONTRACTOR'S UNIT BID PRICE FOR "TILE REMOVAL."
DRAIN
TILE MAP PROVIDED BY PREVIOUS LANDOWNER, FOR INFORMATION ONLY.
X X
X X
X X
47 1046
10571056
1049 1050
SRA#4
SRA#3A
SRA#2
SRA#1
PLUG#1
1047.50
Title:
File #:
CC2:
Sheet:
Survey:
Drawn:
Checked:
Horz. datum:
Designed:
Drawn:
Checked:
Revisions ByDate
Section: Township: Range: Vert. datum:
Site #:
© Copyright . State of Minnesota, Department of Natural Resources
WETLAND RESTORATIONS
SIYO WASTE WMA C-103
#X#####
XXX#######
R########
06/26JK
06/26MO
06/26AK
NAVD88NAD83
06/26MO
06/26MO
05/26JK
PLAN VIEW SRA'S AND PLUG
NEAR CLARKFIELD
4111628
YELLOW MEDICINE COUNTY
F & W
PLOT DATE: 6/16/2026 10:57 AM C:\C3D\MN-SIYO WASTE WMA\5_Drawings\503_Civil\SIYO WASTE WMA BASE.dwg
N
SCALE ( IN FEET )
250 500
LEGEND
FENCE LINE
SEDIMENT REMOVAL AREA (SRA'S)
PLUG
XXXX
SITE PREPARATION NOTE:
THE CONTRACTOR WILL STRIP 6" DEPTH OF TOPSOIL BENEATH PLUG FOOTPRINT, STOCKPILE, AND UPON COMPLETION OF SRA SPOIL PLACEMENT; PLACE TOPSOIL OVER COMPLETED PLUG TOP AND SIDE SLOPES SURFACE. ANY ADDITIONAL MATERIAL SHALL BE USED
TO FLATTEN PROPOSED GRADING SLOPES INTO EXISTING LANDSCAPE.
PAYMENT FOR SITE PREPARATION INCLUDING: STRIPPING, STOCKPILING, BLENDING INTO EXISTING LANDSCAPE, AND LEVELING SUITABLE ENOUGH TO BE CONSIDERED SEEDBED READY SHALL BE PAID FOR BASED ON THE CONTRACTOR'S LUMP SUM BID FOR
"SITE PREPARATION."
SEDIMENT REMOVAL AREA (SRA) NOTE:
THE CONTRACTOR WILL EXCAVATE SEDIMENT REMOVAL AREAS AS SHOWN THIS SHEET. BOTTOM ELEVATIONS AND QUANTITIES ARE NOTED IN TABLE. SIDE SLOPES WILL BE MINIMUM 10:1 OR 20:1 AND SHALL HAVE ROUNDED CORNERS AND TRANSITIONS FROM BOTTOM OF SCRAPE TO TOP SURFACE. ALL SRA'S SHALL BE LEVELED SUITABLE ENOUGH TO BE CONSIDERED SEEDBED READY.
FINISH GROUND SURFACE FILES WILL BE PROVIDED TO THE CONTRACTOR FOR EACH SEDIMENT REMOVAL AREA. THERE WILL BE NO STAKES SET IN THE FIELD DELINEATING SRA BOTTOMS OR SIDE SLOPES. SEE MACHINE CONTROL NOTE SHEET C-002.
ALL SPOIL MATERIAL FROM SRA EXCAVATIONS WILL BE PLACED OVER PLUG#1 AS SHOWN AND LISTED IN TABLE THIS SHEET. PLUG WAS CALCULATED USING A 30% SHRINKAGE FACTOR AND BALANCED USING SRA'S SPOIL MATERIAL. THE CONTRACTOR WILL BE REQUIRED TO MOVE SRA SPOIL MATERIAL TO PLUG LOCATION. THE CONTRACTOR WILL STRIP PLUG AS NOTED IN SITE PREPARATION.
THE CONTRACTOR WILL BE REQUIRED TO COMPACT PLUG USING HEAVY EQUIPMENT TO THE EXTENT POSSIBLE AS APPROVED BY THE DNR FIELD REPRESENTATIVE. FINISH GROUND SURFACE FILES WILL BE PROVIDED TO THE CONTRACTOR FOR THE PLUG SHOWN AND LISTED IN TABLE. THERE WILL BE NO STAKES SET IN THE FIELD DELINEATING THE PLUG. SEE MACHINE CONTROL NOTE SHEET C-002. ALL SPOIL WORK INCLUDING: HAULING, PLACING, COMPACTING, GRADING, AND LEVELING SUITABLE ENOUGH TO BE
CONSIDERED SEEDBED READY WILL BE CONSIDERED "INCIDENTAL" TO SRA EXCAVATION.
CONTRACTOR WILL CREATE A NATURAL RUN-OUT ON WEST SIDE OF PLUG#1 TO ELEV. 1047.50, MINIMUM 20' WIDE BOTTOM WITH 10:1
SIDE SLOPES. SPILLWAY WORK CONSIDERED "INCIDENTAL" TO SRA EXCAVATION.
THE SEDIMENT REMOVAL AREAS WILL BE BID AS CUBIC YARD PLAN. THERE WILL BE NO ADJUSTMENT MADE FOR INCREASE OR
DECREASE TO QUANTITY.
PAYMENT FOR SEDIMENT REMOVAL AREAS INCLUDING: EXCAVATION, REMOVAL, HAULING, DEPOSITING, GRADING, AND LEVELING SHALL BE PAID FOR BASED ON THE CONTRACTOR'S UNIT BID PRICE FOR "EXCAVATION- SEDIMENT REMOVAL AREAS (SRA'S)."
EXISTING GROUND
TYPICAL SECTION SEDIMENT REMOVAL AREA (SRA'S)
NOT TO SCALE
10:1 OR 20:110:1 OR 20:1
BTM OF SRA
ELEV. VARIES
NO TOPSOIL STRIPPING
REQUIRED FOR SRA
EXCAVATION.SIDE SLOPES WILL VARY
BETWEEN 10:1 OR 20:1
PER SRA.
MACHINE CONTROL REQUIRED
TYPICAL SECTION PLUG
NOT TO SCALE
TOP WIDTH VARIES
TOP OF PLUG
VARIES
20:1 SLOPE 20:1 SLOPE
MACHINE CONTROL REQUIRED
CONTRACTOR WILL STRIP 6" DEPTH TOPSOIL OVER PLUG
FOOTPRINT, STOCKPILE, AND UPON COMPLETION OF SRA
SPOIL GRADING PLACE TOPSOIL OVER COMPLETED
SURFACE AND BLEND INTO EXISTING LANDSCAPE.
EXISTING GROUND
PLUG BALANCED USING SRA SPOIL
MATERIAL, MACHINE COMPACT.
EXISTING GROUND
ALL SPOIL MATERIAL TO BE
REMOVED FROM SRA AREA AND
HAULED TO PLUG LOCATION.
PLUG SURFACE
CREATE CROWN OVER
PLUG TOP TO PROVIDE
POSITIVE DRAINAGE
AND NO PONDING.
SIDE SLOPES WILL BE
MINIMUM 20:1.
CONTRACTOR WILL COVER PLUGS WITH
SITE PREPARATION MATERIAL, BLEND
INTO EXISTING LANDSCAPE, AND LEVEL
SUITABLE ENOUGH TO BE CONSIDERED
SEEDBED READY.
Title:
File #:
CC2:
Sheet:
Survey:
Drawn:
Checked:
Horz. datum:
Designed:
Drawn:
Checked:
Revisions ByDate
Section: Township: Range: Vert. datum:
Site #:
© Copyright . State of Minnesota, Department of Natural Resources
WETLAND RESTORATIONS
SIYO WASTE WMA C-104
#X#####
XXX#######
R########
06/26JK
06/26MO
06/26AK
NAVD88NAD83
06/26MO
06/26MO
05/26JK
SRA AND PLUG DETAILS
NEAR CLARKFIELD
4111628
YELLOW MEDICINE COUNTY
F & W
PLOT DATE: 6/16/2026 10:58 AM C:\C3D\MN-SIYO WASTE WMA\5_Drawings\503_Civil\SIYO WASTE WMA BASE.dwg
X X
X X
X X
47 1046
10571056
1049 1050
SRA#4
SRA#3A
SRA#2
SRA#1
PLUG#1
1047.50
Title:
File #:
CC2:
Sheet:
Survey:
Drawn:
Checked:
Horz. datum:
Designed:
Drawn:
Checked:
Revisions ByDate
Section: Township: Range: Vert. datum:
Site #:
© Copyright . State of Minnesota, Department of Natural Resources
WETLAND RESTORATIONS
SIYO WASTE WMA C-105
#X#####
XXX#######
R########
06/26JK
06/26MO
06/26AK
NAVD88NAD83
06/26MO
06/26MO
05/26JK
PLAN VIEW EROSION CONTROL
NEAR CLARKFIELD
4111628
YELLOW MEDICINE COUNTY
F & W
PLOT DATE: 7/13/2026 9:31 AM C:\C3D\MN-SIYO WASTE WMA\5_Drawings\503_Civil\SIYO WASTE WMA BASE.dwg
N
SCALE ( IN FEET )
250 500
LEGEND
FENCE LINE
STRAW WATTLES
SILT SOCK
EROSION CONTROL BLANKET
CONSTRUCTION EXIT
SEDIMENT REMOVAL AREA (SRA'S)
PLUG
XXXX
EROSION CONTROL ESTIMATED QUANTITIES:
9"Ø STRAW WATTLES- NATURAL NETTING:
· DOWNSTREAM OF PLUG#1 900 L.F.
· SPILLWAY 3 ROWS @ 50 L.F. 150 L.F.
· RUN-OUT SRA#1 50 L.F.
· RUN-OUT SRA#3A 100 L.F.
·· TOTAL 1,200 L.F.
SILT SOCK: PERIMETER CONTROL 900 L.F.
EROSION CONTROL BLANKET CAT. 20-NATURAL NETTING:
· SPILLWAY 600 SQ. YD.
· RUN-OUT SRA#1 200 SQ. YD.
· RUN-OUT SRA#2 400 SQ. YD.
· RUN-OUT SRA#3A 200 SQ. YD.
·· TOTAL 1,400 SQ. YARDS
CONSTRUCTION EXIT:
2"Ø WASHED ROCK 60 TON
SOWING AND MULCHING: 11 ACRES*
SRA'S, PLUG AND ANY OTHER AREAS DISTURBED.
*CONTRACTOR WILL BE SOWING SITE WITH COVER CROP (OATS).
THE MNDNR WILL BE PROVIDING THE NATIVE SEED MIXTURE.
CONRACTOR WILL SOW SITE WITH COVER CROPS AND NATIVE
SEED. MnDOT TYPE 1 MUCH WILL BE APPLIED AT 2.0 TONS/PER
ACRE. CONTRACTOR WILL DISC. ANCHOR.
SOWING & MULCHING NOTE:
THE CONTRACTOR WILL SOW ALL DISTURBED AREAS WITH A COVER CROP
(OATS) AND NATIVE SEED PROVIDED BY THE MN DNR. THIS INCLUDES: SRA'S,
PLUG, SPOIL AREAS, TILE INVEST./REMOVAL, SPILLWAY AND ANY OTHER
AREAS DISTURBED DURING CONSTRUCTION. THE COVER CROP SHALL BE
APPLIED AT 50 LBS/PER ACRE MINIMUM. THE MNDNR WILL PROVIDE THE
CONTRACTOR WITH NATIVE SEED MIXTURE. THE CONTRACTOR WILL BE
PURCHASING THE COVER CROPS ONLY AND SOWING BOTH CROP CROPS
AND NATIVE SEED MIXTURE. THE CONTRACTOR WILL NEED TO COORDINATE
SOWING EFFORTS AND TIMELINES TO COMPLY WITH THE STORM WATER
PERMIT AND SWPPP.
TOTAL PROJECT SITE:
PROJECT SITE 160 ACRES
PROJECT AREAS DISTURBED 11 ACRES
EXISTING IMPERVIOUS AREAS 0 ACRES
PROPOSED IMPERVIOUS AREA 0.1 ACRES
STRAW WATTLE
45°
1"x2"x24" LONG WOODEN STAKES.
STAKES SHALL BE DRIVEN
THROUGH THE BACK HALF OF
THE STRAW WATTLE AT AN
ANGLE OF 45° WITH THE TOP OF
THE STAKE POINTING UPSTREAM.
FINISH GROUND
FLOW
BACKFILL AND COMPACT SOIL
FROM TRENCH ON UPGRADIENT
SIDE OF STRAW WATTLE.
8-10" EMBEDMENT DEPTH
PLACE WATTLE IN SHALLOW
TRENCH 1-2" DEPTH.
NOTES:
· SPACING OF STAKES SHALL BE IN ACCORDANCE TO MANUFACTURE RECOMMENDATIONS.
· STRAW WATTLES SHALL BE 9" DIAMETER WITH NATURAL NETTING.
· PILOT HOLES MAY BE DRIVEN THROUGH THE WATTLES AND INTO THE SOIL WHEN SOIL
CONDITIONS REQUIRE.
STRAW WATTLE DETAIL
NOT TO SCALE
CONSTRUCTION EXIT SPECIFICATIONS:
· STONE SIZE: 2" DIAMETER WASHED ROCK. (60 TON PER EXIT)
· THICKNESS: NOT LESS THAN 12" DEPTH.
· NON-WOVEN FILTER FABRIC PLACED OVER THE ENTIRE AREA PRIOR TO
PLACING ROCK.
· MAINTENANCE: THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION
WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO
PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING
WITH ADDITIONAL STONE AS CONDITIONS DEMAND AND REPAIR AND/OR
CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL
SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC
RIGHT-OF-WAYS MUST BE REMOVED IMMEDIATELY.
· WASHING: WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR
TO ENTRANCE ONTO PUBLIC RIGHT-OF-WAY. WHEN WASHING IS
REQUIRED, IT SHALL BE DONE ON AN AREA STABLIZED WITH STONE
AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING DEVICE.
· PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE
PROVIDED AFTER EACH RAIN EVENT.
PU
BL
IC
R
O
AD
50 L.F. MIN.
ENTRANCE WIDTH
AS REQUIRED,
MINIMUM 20 L.F.
MINIMUM 12" DEPTH 2"Ø WASHED ROCK
WITH NON-WOVEN FILTER FABRIC BENEATH. RADIUS AS
REQUIRED.
CONSTRUCTION EXIT DETAIL
NOT TO SCALE
MnDOT CATEGORY 20 EROSION
CONTROL BLANKET WITH NATURAL
NETTING.
6"x6" TRENCH BACKFILLED OVER
EROSION CONTROL BLANKET.
FLOW
STRAW WATTLE AND EROSION BLANKET DETAIL
NOT TO SCALE
NOTES;
· DITCH CHECKS, PLACE STRAW WATTLE PERPENDICULAR TO FLOW AND IN A
CRESCENT SHAPE WITH THE ENDS FACING UPSTREAM.
· POINT "A" MUST BE A MINIMUM OF 6" HIGHER THAN POINT "B" TO ENSURE
THAT WATER FLOWS OVER THE DIKE AND NOT AROUND THE ENDS.
· LAY EROSION BLANKET PARALLEL TO THE DIRECTION OF WATER FLOW.
· OVERLAP ADJACENT STRIP EDGES A MINIMUM OF 4" INCHES.
· OVERLAP BLANKET 7" (MIN.) AT EACH END. SHINGLE BLANKET IN THE
DIRECTION OF FLOW.
A
B
Title:
File #:
CC2:
Sheet:
Survey:
Drawn:
Checked:
Horz. datum:
Designed:
Drawn:
Checked:
Revisions ByDate
Section: Township: Range: Vert. datum:
Site #:
© Copyright . State of Minnesota, Department of Natural Resources
WETLAND RESTORATIONS
SIYO WASTE WMA C-106
#X#####
XXX#######
R########
06/26JK
06/26MO
06/26AK
NAVD88NAD83
06/26MO
06/26MO
05/26JK
EROSION CONTROL DETAILS
NEAR CLARKFIELD
4111628
YELLOW MEDICINE COUNTY
F & W
PLOT DATE: 6/16/2026 11:09 AM C:\C3D\MN-SIYO WASTE WMA\5_Drawings\503_Civil\SWPPP TEMPLATE.dwg
Title:
File #:
CC2:
Sheet:
Survey:
Drawn:
Checked:
Horz. datum:
Designed:
Drawn:
Checked:
Revisions ByDate
Section: Township: Range: Vert. datum:
Site #:
© Copyright . State of Minnesota, Department of Natural Resources
WETLAND RESTORATIONS
SIYO WASTE WMA C-107
#X#####
XXX#######
R########
06/26JK
06/26MO
06/26AK
NAVD88NAD83
06/26MO
06/26MO
05/26JK
SWPPP
NEAR CLARKFIELD
4111628
YELLOW MEDICINE COUNTY
F & W
PLOT DATE: 6/16/2026 11:08 AM C:\C3D\MN-SIYO WASTE WMA\5_Drawings\503_Civil\SWPPP TEMPLATE.dwg
EROSION CONTROL NOTES:
1) THE IMPLEMENTATION OF THESE EROSION CONTROL PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT AND UPGRADING OF THESE EROSION CONTROL FACILITIES IS THE RESPONSIBILITY OF THE CONTRACTOR'S EROSION CONTROL SUPERVISOR UNTIL 80% OF PERMANENT VEGETATION IS ESTABLISHED.
2) THE EROSION CONTROLS SHOWN OR DESCRIBED IN THIS PLAN SHALL BE CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES AND IN SUCH A MANNER AS TO ENSURE THAT SEDIMENT LADEN WATER DOES NOT ENTER THE DOWNSTREAM RECEIVING WATERS OR VIOLATE APPLICABLE WATER STANDARDS.
3) CONTRACTOR SHALL NOT DISTURB ANY AREAS BEYOND THE DESIGNATED LIMITS OF CONSTRUCTION SHOWN IN THE PLANS UNLESS THAT WORK IS PRE-APPROVED. CONTRACTOR WILL MINIMIZE DISTURBANCE TO
EXISTING VEGETATION.
4) THE EROSION CONTROL FACILITIES SHOWN IN THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS DURING THE CONSTRUCTION PERIOD. THESE EROSION CONTROL FACILITIES SHALL BE UPGRADED AND AMENDED AS NEEDED FOR CHANGING SITE CONDITIONS AND UNEXPECTED STORM EVENTS.
5) THE EROSION CONTROL FACILITIES SHALL BE INSPECTED AND THE CONDITIONS RECORDED WEEKLY AND WITHIN 24-HOURS FOLLOWING A STORM EVENT GREATER THAN 12" IN 24-HOURS, AND MAINTAINED AS NECESSARY TO ENSURE THEIR CONTINUED FUNCTION. ALL NON-FUNCTIONAL BMP'S SHALL BE REPAIRED, REPLACED, OR SUPPLEMENTED WITH FUNCTIONAL BMP'S BY THE END OF THE NEXT BUSINESS DAY AFTER
DISCOVERY.
6) THE EROSION CONTROL FACILITIES ON INACTIVE AREAS OF THE SITE SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE PER MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT PRODUCING 12" OF RAINFALL
IN 24-HOURS.
7) ALL INSPECTION AND MAINTENANCE CONDUCTED DURING CONSTRUCTION MUST BE RECORDED IN WRITING BY THE EROSION CONTROL SUPERVISOR AND THESE RECORDS MUST BE RETAINED ONSITE WITH THE SWPPP.
8) ANY SITE AREA STRIPPED OF VEGETATION, INCLUDING ROADWAY RIGHT-OF-WAY, WHERE NO FURTHER WORK IS ANTICIPATED SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED EROSION CONTROL METHODS (EX.
HYDRO MULCH, SEED, EROSION CONTROL BLANKET, ETC) BUT IN NO CASE LATER THAN 7-DAYS AFTER
CONSTRUCTION IN THAT AREA HAS CEASED.
9) ALL TEMPORARY ACCESS ROADS PROVIDED FOR THE PUBLIC SHALL BE MAINTAINED FOR THE DURATION OF THE PROJECT; ALL EXISTING PAVED AREAS ARE TO BE KEPT CLEAN FOR THE DURATION OF THE PROJECT.
10) ALL PERIMETER CONTROL DEVICES SHALL BE REPAIRED OR REPLACED WHEN SEDIMENT REACHES 12 OF THE
TOTAL HEIGHT OF THE BMP.
11) WHERE SEEDING FOR TEMPORARY EROSION CONTROL IS REQUIRED, FAST GERMINATING COVER CROP SHALL BE APPLIED AT AN APPROPRIATE RATE. SEED WILL BE VERIFIED WITH DNR REPRESENTATIVE PRIOR TO
INSTALLATION.
12) WHERE STRAW MULCH FOR TEMPORARY EROSION CONTROL IS REQUIRED, IT SHALL BE CERTIFIED WEED FREE
AND APPLIED AT A MINIMUM OF 2.0 TONS/PER ACRE.
13) SURFACE WATERS, DRAINAGE DITCHES, AND CONVEYANCE SYSTEMS SHALL BE INSPECTED FOR EVIDENCE OF SEDIMENT DEPOSITION AND EROSION; THE REMOVAL OF SEDIMENT AND STABILIZATION OF ERODED AREAS SHALL TAKE PLACE UPON DISCOVERY AND BE COMPLETED WITHIN 24-HOURS OF DISCOVERY UNLESS
PRECLUDED BY LEGAL, REGULATORY, OR PHYSICAL ACCESS CONSTRAINTS.
14) THE NORMAL WETTED PERIMETER OF ANY TEMPORARY OR PERMANENT DRAINAGE DITCH OR SWALE THAT DRAINS WATER FROM ANY PORTION OF THE CONSTRUCTION SITE WITHIN 200-L.F. OF THE PROPERTY BOUNDARY OR CONNECTION TO A SURFACE WATER SHALL BE STABILIZED WITHIN 24-HOURS AFTER CONNECTION.
15) PIPE OUTLETS MUST HAVE TEMPORARY OR PERMANENT ENERGY DISSIPATION INSTALLED WITHIN 24-HOURS OF
CONNECTION TO A SURFACE WATER.
16) STABILIZED CONSTRUCTION ENTRANCE LOCATIONS AND ADJACENT STREETS SHALL BE INSPECTED FOR EVIDENCE OF OFF-SITE SEDIMENT TRACKING ONTO PAVED (ASPHALT, CONCRETE, OR GRAVEL) SURFACES;
TRACKED SEDIMENTS SHALL BE REMOVED FROM ALL OFF-SITE SURFACES WITHIN 24-HOURS OF DISCOVERY.
17) THE CONTRACTOR SHALL INSTALL DOWN GRADIENT PERIMETER EROSION CONTROL BMP'S PRIOR TO COMMENCING CLEARING & GRADING ACTIVITIES AND SHALL MAINTAIN THE BMP'S FOR THE DURATION OF CONSTRUCTION ACTIVITIES; UPON ESTABLISHMENT (80% COVERAGE MINIMUM) OF PROPOSED PERMANENT GROUND COVER THE CONTRACTOR SHALL REMOVE ALL SYNTHETICS AND SEDIMENT CONTROL LOGS FOR
OFF-SITE DISPOSAL.
18) ALL SLOPES SHALL BE STABILIZED WITHIN 7 DAYS ONCE WORK IS NOT ACTIVE IN THE VICINITY. EROSION CONTROL BLANKETS SHALL BE PLACED ON ALL DISTURBED CHANNEL SLOPES AND ROAD DITCH SLOPES.
19) SOIL STOCKPILES SHALL HAVE SILT FENCE OR OTHER EFFECTIVE PERIMETER SEDIMENT CONTROLS AND CANNOT BE PLACED IN SURFACE WATERS, INCLUDING STORMWATER CONVEYANCES SUCH AS CURB AND GUTTER SYSTEMS, SWALES, CONDUITS, OR DITCHES UNLESS THERE IS A BYPASS SYSTEM IN PLACE FOR THE
STORMWATER.
20) ALL DISTURBED NON-PAVED AREAS SHALL BE PROTECTED WITH TOPSOIL, SEED,
AND MULCH WITHIN THE FOLLOWING TIME FRAMES: IF GREATER THAN A 3:1 SLOPE
2-DAYS, 3:1 TO 10:1 SLOPE 7-DAYS, WITHIN 200 LINEAL FEET OF A SURFACE WATER
24 HOURS FOLLOWING COMPLETION OR SUSPENSION OF GRADING ACTIVITY IN
THAT PARTICULAR AREA.
STORM WATER POLLUTION PREVENTION PLAN NOTES:
1) THE CONTRACTOR IS REQUIRED TO APPLY FOR AND RECEIVE A NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM (NPDES) STORMWATER CONSTRUCTION PERMIT FROM THE MPCA A MIN. OF
30 DAYS PRIOR TO BEGINNING WORK.
2) THE CONTRACTOR SHALL IDENTIFY AN EROSION CONTROL SUPERVISOR WHO SHALL BE
CERTIFIED, KNOWLEDGEABLE, AND EXPERIENCED IN THE APPLICATION OF EROSION PREVENTION, SEDIMENT CONTROL, BEST MANAGEMENT PRACTICES (BMP'S), AND INSPECTIONS.
3) THE EROSION CONTROL SUPERVISOR SHALL WORK WITH THE MN DNR TO
OVERSEE THE IMPLEMENTATION AND AMENDMENT OF THE SWPPP, AND THE INSTALLATION, AND
MAINTENANCE OF THE EROSION PREVENTION AND SEDIMENT CONTROL BMP'S.
4) THE CONTRACTOR SHALL DEVELOP A CHAIN OF RESPONSIBILITY WITH ALL OPERATORS ON THE SITE TO ENSURE THAT THE SWPPP WILL BE IMPLEMENTED EFFECTIVELY UNTIL CONSTRUCTION IS COMPLETE, THE ENTIRE SITE HAS UNDERGONE FINAL STABILIZATION, A NOTICE OF TERMINATION
(NOT) HAS BEEN SENT TO THE MPCA, AND THE PROJECT HAS BEEN ACCEPTED BY THE OWNER.
5) THE CONTRACTOR SHALL PREPARE AND SUBMIT A WRITTEN WEEKLY SCHEDULE OF PROPOSED
EROSION CONTROL ACTIVITIES FOR THE MN DNR REVIEW AND APPROVAL PRIOR TO THAT WORK
BEING INITIATED. FAILURE TO DO SO WILL RESULT IN UNAUTHORIZED WORK.
6) THE CONTRACTOR SHALL PROVIDE FOR TEMPORARY AND PERMANENT EROSION PREVENTION
AND SEDIMENT CONTROL BMP'S AS SHOWN IN THE PLANS AND THEY SHALL BE KEPT IN
FUNCTIONAL CONDITION AT ALL TIMES THROUGHOUT CONSTRUCTION; THESE MEASURES MAY BE
AMENDED AS APPROPRIATE FOR CONSTRUCTION STAGING AS DIRECTED BY THE EROSION
CONTROL SUPERVISOR. THE CONTRACTOR SHALL REMAIN IN COMPLIANCE WITH ALL NPDES AND
OTHER PERMIT REQUIREMENTS AT ALL TIMES.
7) THE CONTRACTOR SHALL PROVIDE EFFECTIVE CONTAINMENT FOR CONCRETE AND OTHER
WASTES (LIQUID AND SOLID) GENERATED BY WASHOUT OPERATIONS (CONCRETE, STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS, AND OTHER CONSTRUCTION MATERIALS) RELATED
TO THE CONSTRUCTION ACTIVITY. THE LIQUID AND SOLID WASHOUT WASTES SHALL NOT
CONTACT THE GROUND IN ACCORDANCE WITH PARTS 2.3 AND 12.9 OF THE MPCA NPDES PERMIT.
8) THE CONTRACTOR SHALL ENSURE THAT DISCHARGE POINTS ARE ADEQUATELY PROTECTED
FROM EROSION AND SCOUR; THE DISCHARGE SHALL BE DISPERSED OVER NATURAL ROCK
RIPRAP, SAND BAGS, PLASTIC SHEETING, OR OTHER ENERGY DISSIPATION MEASURES APPROVED
BY THE EROSION CONTROL SUPERVISOR. ADEQUATE SEDIMENTATION CONTROL MEASURES ARE
REQUIRED FOR DISCHARGE THAT CONTAINS SUSPENDED SOLIDS.
9) ANY FUEL OR CHEMICAL TANK STORED ON THE PROJECT AREA SHALL BE PROTECTED BY A SOIL
BERM OR HAVE A NEGATIVE GRADIENT TO ANY WATER RESOURCE; AS PER U.S.C.O.E.
REQUIREMENTS A CONTINGENCY PLAN SHALL BE CREATED BY THE CONTRACTOR TO ADDRESS A
SPILL OR LEAK OF ANY CHEMICAL, INCLUDING PETROCHEMICALS, DEEMED HARMFUL TO THE
ENVIRONMENT. THE CONTRACTOR SHALL HAVE ONSITE THE MATERIALS NECESSARY TO CAPTURE
AND CONTAIN SAID CHEMICAL SPILLS.
10) IN THE EVENT SEDIMENT IS DEPOSITED IN WATERS OF THE STATE OR PRIVATE PROPERTY, THE MATERIAL SHALL BE REMOVED WITHIN 7-DAYS IN ACCORDANCE WITH PART IV, E, 5, C OF THE
MPCA NPDES PERMIT.
INVASIVE SPECIES PREVENTION NOTES:
1) MNDNR REQUIRES THE PREVENTION AND LIMITING THE INTRODUCTION, ESTABLISHMENT, AND
SPREAD OF INVASIVE SPECIES DURING ALL ACTIVITIES ON PUBLIC WATERS AND MNDNR
ADMINISTERED LANDS. SEE SPECIFICATION SECTION 01 30 00 FOR ADDITIONAL INFORMATION AND
RESPONSIBILITIES.
2) CONTRACTOR SHALL PREVENT INVASIVE SPECIES FROM ENTERING INTO OR SPREADING WITHIN A PROJECT SITE BY CLEANING EQUIPMENT AND CLOTHING PRIOR TO ARRIVAL AT THE PROJECT SITE AND NOT IMPORTING MATERIAL INFESTED WITH INVASIVE SPECIES PRIOR TO ARRIVING AT THE
PROJECT SITE. THE MNDNR FIELD REPRESENTATIVE SHALL INSPECT ALL EQUIPMENT AND
CLOTHING AT THE STAGING AREA IDENTIFIED AT THE PRE-CONSTRUCTION MEETING.
3) IF EQUIPMENT OR CLOTHING ARRIVES AT THE PROJECT SITE WITH SOIL, AGGREGATE MATERIAL, MULCH, VEGETATION (INCLUDING SEEDS), OR ANIMALS, IT SHALL BE CLEANED BY CONTRACTOR
USING TOOLS OR EQUIPMENT (COMPRESSED AIR, BRUSH, OR PRESSURE WASHER). IF ANY
MATERIAL IS IMPORTED TO THE SITE WITHOUT PRIOR INSPECTION AND IS SUBSEQUENTLY FOUND
TO CONTAIN INVASIVE SPECIES THE CONTRACTOR SHALL REMOVE THE MATERIAL FROM THE
PROJECT SITE WITHIN 72-HOURS OF NOTIFICATION OR BEAR THE COST OF REMOVAL FROM A
THIRD PARTY, PER AIA A201, 12.2.
4) IF THE PROJECT SITE INCLUDES A WATER BODY, THE CONTRACTOR SHALL CLEAN EQUIPMENT AS
NOTED ABOVE PRIOR TO ENTERING AND UPON LEAVING THE WATER BODY. CONTRACTOR IS
REQUIRED TO DRAIN WATER FROM ALL EQUIPMENT, TANKS, PUMPS PRIOR TO AND
IMMEDIATELY AFTER LEAVING ANY BODY OF WATER.
PROJECT NARRATIVE:
PROJECT LIMITS: SEE SHEETS C-101 SITE PLAN FOR PROJECT LIMITS. PROJECT
CONSISTS OF TILE INVESTIGATION, TILE REMOVAL, SEDIMENT REMOVAL AREAS, PLUG
CONSTRUCTION,TO ENHANCE OR RESTORE WETLANDS ON SIYO WASTE WILDLIFE MANAGEMENT
AREA.
CONSTRUCTION SEQUENCE:
-ARRANGE AND ATTEND THE PRE-CONSTRUCTION MEETING WITH MNDNR.
-CONTACT UTILITY COMPANIES BY CALLING GOPHER STATE ONE CALL (1-800-252-1166)
-ESTABLISH CONSTRUCTION BOUNDARIES AND CLEARING LIMITS PRIOR TO ACTIVITIES BEGINNING.
-INSTALL EROSION AND SEDIMENT CONTROL DEVICES.
-PROCEED WITH SITE GRADING AND CONSTRUCTION ACTIVITIES.
-STABILIZE AREAS DISTURBED BY CONSTRUCTION ACTIVITIES WITH TEMPORARY EROSION AND
SEDIMENT CONTROL MEASURES.
-COMPLETE FINAL GRADING.
-COMPLETE PERMANENT EROSION AND SEDIMENT CONTROL MEASURES.
-REMOVE EXCESS EXCAVATED MATERIALS, TRASH, DEBRIS, AND OTHER WASTE MATERIALS.
-CONTRACTOR WILL REMOVE TEMPORARY EROSION CONTROL MEASURES ONCE SITE HAS BEEN
DETERMINED TO BE STABILIZED BY CONTRACT DOCUMENTS AND MN DNR.
-CONTRACTOR WILL SUBMIT NOTICE OF TERMINATION (NOT) TO CLOSE SWPPP PERMIT.
PROJECT AREAS:
TOTAL PROJECT AREA: 160 ACRES
TOTAL AREAS TO BE DISTURBED: 11 ACRES
EXISTING IMPERVIOUS AREA: 0 ACRES
PROPOSED IMPERVIOUS AREA: 0.1 ACRES
NAME OF RECEIVING WATER BODY/BODIES: MEADOWBROOK CREEK
DISCHARGES TO SPECIAL OR IMPAIRED WATERS: PROJECT DOES DISCHARGE TO A SPECIAL OR
IMPAIRED WATERS UNNAMED DITCH.
DISCHARGES TO CALCAREOUS FEN: PROJECT DOES NOT HAVE A DISCHARGE TO CALCAREOUS
FEN.
ENDANGERED OR THREATENED SPECIES: NO
HISTORIC PLACES OR ARCHEOLOGICAL SITES: SHPO HAS BEEN COMPLETED AND PROJECT SITE
WILL NOT EFFECT ANY HISTORIC OR ARCHEOLOGICAL SITES.
· SEE PLAN VIEW EROSION CONTROL SWPPP SHEETS FOR BUFFER BOUNDARIES, LOCATION OF
TEMPORARY AND PERMANENT STORMWATER BMP'S, AND ESTIMATED QUANTITIES.
EROSION CONTROL SUPERVISORSWPPP DESIGNER:
MATTHEW L. OLSON
UNIVERSITY OF MINNESOTA
DESIGN OF CONSTRUCTION SWPPP
CERTIFICATION EXPIRES MARCH 2027
PROJECT
LOCATION
| C-001 |
| Sheets and Views |
| C-001 Title Sheet |
| C-002 |
| Sheets and Views |
| C-002 QUANTITIES |
| C-003 |
| Sheets and Views |
| C-003 TOPO |
| C-101 |
| Sheets and Views |
| C-101 SITE PLAN |
| C-102 |
| Sheets and Views |
| C-102 TILE |
| C-103 |
| Sheets and Views |
| C-103 SRA'S |
| C-104 |
| Sheets and Views |
| C-104 SRA DETAILS |
| C-105 |
| Sheets and Views |
| C-105 PV EROSION |
| C-106 |
| Sheets and Views |
| SWPPP DETAILS |
| C-107 |
| Sheets and Views |
| C-101 Typ_11x17 |
File details come from the government source that posted it. Updated .