About this file
This Request for Proposal (RFP) is issued by the City of West Haven, Connecticut, for the replacement and upgrade of the existing aeration air control system at the West Haven Water Pollution Control Facility located at 2 Beach Street. The project requires furnishing and installation of thirty-six (36) new butterfly air control valves with modulating electric actuators (eighteen 3-inch and eighteen 8-inch), thirty-six (36) thermal mass insertion airflow meters, one (1) main air header pressure transmitter, and upgrades to the existing APG-Neuros blower master control panel. Additional scope includes demolition and disposal of existing equipment, electrical work, SCADA system integration, testing, commissioning, operator training, spare parts, and warranty services. A mandatory site walkthrough is scheduled for November 23, 2026, at 9:00 AM. The information period closes December 8, 2026, at 12:00 PM, and sealed proposals are due January 5, 2027, at 11:00 AM at the Procurement office, 3rd Floor, 355 Main Street, West Haven, Connecticut. The awarded contractor must complete all work by June 30, 2027, or within 120 calendar days from notice to proceed, whichever is later.
Respondents must submit one original and three copies of their proposal in a sealed envelope clearly marked "RFP 2027-15 WPCF Aeration Control." The evaluation criteria include relevant experience and qualifications (up to 20 points), technical approach and equipment compliance (up to 25 points), project schedule and implementation plan (up to 15 points), control system and SCADA integration capabilities (up to 15 points), warranty, training, and technical support (up to 10 points), and cost proposal and overall value (up to 15 points). A 5% bid bond is required for projects exceeding $50,000, and a 100% performance bond is required within 5 days of award. Insurance requirements include Commercial General Liability ($2,000,000 general aggregate), Business Auto ($1,000,000 liability), Workers Compensation per Connecticut law, and Umbrella Liability ($5,000,000 each occurrence). All work includes a 12-month warranty from the date of acceptance. Liquidated damages of $1,000 per calendar day apply for delays beyond the contract completion date. Local vendor bid preference is available to city-based businesses that provide satisfactory proof of principal place of business in West Haven. The City reserves the right to reject any or all responses and to conduct interviews with a shortlist of proposers.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of West Haven Request for Proposal (RFP) 2027-15
WPCF Aeration Control System Replacement
PROJECT SUMMARY
The City of West Haven, Connecticut, is soliciting sealed proposals from qualified contractors for the replacement and upgrade of the existing aeration air control system at the West Haven
Water Pollution Control Facility (WPCF), located at 2 Beach Street, West Haven, Connecticut.
The project consists of furnishing all labor, materials, equipment, supervision, engineering, electrical services, programming, integration, testing, commissioning, and incidentals necessary to provide a complete and fully operational aeration air control system.
The work includes demolition and disposal of existing aeration air control valves and actuators;
furnishing and installing thirty-six (36) new butterfly air control valves with modulating electric actuators; thirty-six (36) airflow meters; one (1) main air header pressure transmitter; upgrading the existing APG-Neuros blower master control panel; electrical modifications; integration with the existing plant Supervisory Control and Data Acquisition (SCADA) system; startup and commissioning; operator training; spare parts; and warranty services.
All work shall be performed in accordance with the specifications contained herein, applicable codes and regulations, manufacturers' recommendations, and the requirements of the City of
West Haven.
PROJECT BACKGROUND
The existing aeration control valves and actuators at the West Haven Water Pollution Control
Facility are beyond their serviceable life and are no longer functioning properly. As a result, the facility is unable to adequately control the distribution of blower air to the aeration tanks.
Proper distribution and regulation of aeration are essential to maintaining wastewater treatment performance and compliance with applicable discharge permit requirements.
The purpose of this project is to replace the deteriorated aeration control equipment and implement an automated control system capable of adjusting airflow based on real-time treatment demand.
The upgraded system will restore the facility's ability to regulate air distribution, improve treatment efficiency, support regulatory compliance, and reduce blower energy consumption through automated dissolved oxygen (DO)-based control
PROJECT TIMELINE
The awarded vendor is expected to complete all aspects of this project by June 30, 2027 or 120 calendar days from notice to proceed (whichever is later).
SUBMISSION INSTRUCTIONS
Pre-Bid Meeting Required No
Pre-Bid Meeting Location
Pre-Bid Meeting Date & Time
Mandatory Walkthrough of Site Yes
Site Location 2 Beach Street, West Haven
Date & Time 11/23/2026 Time: 9:00AM
Information Period Closing Date and Time 12/08/2026 Time: 12:00PM
Solicitation Closing Date 01/05/2027Time: 11:00AM
Respondents are required to submit One (1) original and three (3) copies in a sealed envelope.
must be clearly marked "RFP 2027-15 WPCF Aeration Control". Bids will be opened in the
Procurement office upon bid closing. Address: 3rd flr, 355 Main St West Haven, CT. They will open at 11:00am on 01/05/2027. Proposals received after this time and date specified above will be rejected. No oral, telephonic, emailed, or faxed corrections, deletions, or additions to any response shall be accepted. The required contents are to include the following:
1. Cover Letter
a. Company Information:
b. Authorized representative signature
c. Acknowledgement of all addenda
2. Project Understanding and Approach
a. Description of the Contractor’s methodology for design, evaluation, construction and phasing.
3. Proposed Equipment and Submittal Information
a. Provide preliminary system recommendations, load, assumptions, and equipment approach.
4. Qualification and Experience
a. Include resumes for key personnel and at least three (3) comparable municipal or institutional Aeration Control System projects.
5. Project Schedule
a. Detail design, procurement, construction, and commissioning milestones.
6. Cost Proposal
a. Complete Bid Proposal Sheet (Attachment A) including Lump Fee
b. Proposed Guaranteed Maximum Price
c. Unit pricing for supplemental work
d. Allowances for unforeseen conditions.
7. Required Forms
a. Certificate of Insurance
b. Applicable Connecticut licenses
c. Non-collusion affidavit
d. Corporate resolution (if applicable)
The City reserves the right to reject any or all responses, and to waive any or all formalities in connection with this request. Proposals which do not incorporate our requested format, including quoting items as described, will not be considered. Unless otherwise stated in the solicitation. No alternate responses will be considered unless alternate responses are specifically requested by the
City.
A response to this solicitation does not permit the City to award a contract, to pay any costs incurred in the preparation of a response to this request, or to procure the city contract for services, supplies or equipment. The City will not award to any contractor who is not qualified under applicable Federal, State and local laws and regulations.
Questions regarding this solicitation should be emailed to Kathy Chambers. Telephone or oral questions will not be accepted. (kchambers@westhaven-ct.gov).
An Affirmative Action/Equal Opportunity Employer, Minority/Women's Business Enterprises are encouraged to apply.
INQUIRIES FOR CLARIFICATION
The city will not respond to the Respondent(s) request(s) for oral interpretation and/or clarification of the Solicitation Specifications for any reason. The city will respond to a
Respondent(s) written request(s) for interpretation and/or clarification of the Solicitation
Specifications. Questions regarding this solicitation should be emailed to Kathy Chambers.
Telephone or oral questions will not be accepted. (kchambers@westhaven-ct.gov). The email should be included in the subject line RFP #2027-15. The body of the email should contain the question or clarification. Every interpretation made to a Respondent will be in the form of an
Addendum or Question & Answer to the Solicitation Documents.
mailto:(kchambers@westhaven-ct.gov
ADDENDUMS TO THIS SOLICITAION
Any Addendum(s) to this solicitation document shall become part of the solicitation.
Respondents are required to check the city website for addendum(s). Each respondent shall be bound by such addenda whether received/viewed by the respondent.
SOLICITATION PROTEST
Any Solicitation protest must be submitted in writing. Respondents may file a written protest of the Solicitation results with the City's Purchasing Department. Protest must be submitted via email, kchambers@westhaven-ct.gov.
The City will acknowledge receipt of a written protest. If the Purchasing Department representative has not acknowledged receipt of the protest by the close of business on the following days, please contact Kathy at the above phone number listed.
CONTRACT TERM AND AWARD
The term of the contract will be determined by the City of West Haven and will award the contract to the responsible proposer whose submission is determined to be the most advantageous to the City, considering price, qualifications, and the evaluation criteria contained herein.
SCOPE OF SERVICES
The selected Contractor is to provide all labor, materials, equipment, transportation, engineering programming, supervision, permits, testing and services necessary to complete the project.
The scope of services includes but not limited to the following:
Demolition and Removal
The contractor shall remove and properly dispose of the existing air control aeration valves, actuators, and associated components designated for replacement.
All demolition should be coordinated with facility personnel to minimize disruptions to ongoing wastewater treatment operations.
The contractor shall be responsible for proper handling, transportation, and disposal of removed equipment and materials in accordance with applicable federal, state, and local requirements.
mailto:kchambers@westhaven-ct.gov
Air Control Valves and Electric Actuators
The contractor shall furnish and install thirty-six (36) new resilient-seated butterfly air control valves equipped with modulating electric actuators.
The anticipated quantities and sizes are as follows:
• Eighteen (18) 3-inch butterfly air control valves with modulating electric actuators.
• Eighteen (18) 8-inch butterfly air control valves with modulating electric actuators.
All sizes, dimensions, installation requirements, and existing field conditions shall be verified by prospective proposers during the mandatory site walkthrough.
Basis of Design
• Bray resilient-seated butterfly air control valves with Rotork IQT modulating electric actuators or approved equal compatible with the existing APG-Neuros blower master control panel.
All proposed equipment shall be compatible with the existing APG-Neuros blower master control panel and the proposed upgraded aeration control system.
The contractor shall provide all required mounting hardware, connections, supports, fittings, and accessories necessary for complete installation and operation.
Airflow Meters
The contractor shall furnish and install thirty-six (36) thermal mass insertion airflow meters, with one airflow meter associated with each new air control valve.
Basis of Design: Kurz 410FTB thermal mass insertion airflow meter, or approved equal.
Airflow meters shall be installed a minimum of three (3) pipe diameters upstream of each associated control valve, subject to manufacturer installation requirements.
The contractor shall verify that sufficient straight pipe lengths and appropriate installation conditions exist for accurate airflow measurement. Where straight-run requirements can not be met, the contractor shall include all necessary piping modifications in the submitted proposal.
All meters shall be installed, calibrated, connected, and tested in accordance with the manufacturer's recommendations.
Main Air Header Pressure Transmitter
The contractor shall furnish and install one (1) new main air header pressure transmitter.
The transmitter should provide a 4–20 mA output signal and shall be connected to the upgraded blower master control panel.
The installation is to include all necessary fittings, mounting components, electrical connections, calibration, and testing to provide accurate and reliable header pressure monitoring.
APG-Neuros Blower Master Control Panel Upgrade
The contractor will provide for the upgrade of the existing APG-Neuros blower master control panel.
The upgrade shall include:
• New industrial computer.
• Allen-Bradley CompactLogix programmable logic controller (PLC) and associated input/output modules.
• Updated control panel software.
• PID backup control functionality.
• APG-Neuros Advanced Aeration Control software.
• Configuration for dissolved oxygen-based aeration control.
• First-year Aeration Control Service Plan subscription.
• All required programming, configuration, testing, and commissioning.
The APG-Neuros master control panel and associated advanced aeration control components are proprietary to APG-Neuros, the manufacturer of the facility's existing blowers and control panel.
The selected contractor shall coordinate directly with APG-Neuros or its authorized representative to ensure that all required proprietary equipment, software, programming, and commissioning services are included in the proposal.
The contractor shall be responsible for delivering a complete, integrated, and operational system.
Electrical Work
The contractor shall furnish and install all electrical equipment and materials required for the project.
Electrical work is to include:
• Preparation of electrical drawings stamped by a Connecticut licensed professional engineer.
• Installation of conduit and associated supports.
• Three-phase power connections, as required.
• Power and communication wiring to all new devices.
• Wiring and termination of valves, actuators, airflow meters, and pressure transmitters.
• Control panel wiring and modifications.
• Plant control network modifications.
• Electrical testing and verification.
All electrical work shall comply with applicable electrical codes, safety standards, and City requirements.
SCADA System Integration
The contractor shall provide complete integration of the upgraded aeration air control system with the facility's existing SCADA system and dissolved oxygen instrumentation.
SCADA integration work shall be performed by the City's existing SCADA integrator, Knapp
Engineering, as part of this contract.
The contractor is to coordinate directly with Knapp Engineering and include all associated
SCADA integration costs within its proposal.
Integration shall include all necessary programming, communication configuration, system modifications, testing, and verification required to achieve proper communication between the new aeration control equipment, existing DO instrumentation, blower master control panel, and plant SCADA system.
The contractor shall demonstrate that the completed system operates as intended and provides appropriate monitoring and control capabilities.
Spare Parts
The following spare equipment shall be provided:
• One (1) spare 3-inch butterfly air control valve.
• One (1) spare 3-inch electric actuator.
• One (1) spare 8-inch butterfly air control valve.
• One (1) spare 8-inch electric actuator.
• One (1) spare thermal mass insertion airflow meter.
• One (1) spare main air header pressure transmitter.
All spare components are to be new, unused, compatible with the installed equipment, and properly packaged and labeled for storage by the City.
Testing, Startup, and Commissioning
The contractor shall provide all services necessary to test, start up, and commission the completed aeration air control system.
The work will include:
• Instrument calibration and verification.
• Electrical and communication loop checks.
• Valve and actuator operational testing.
• Airflow meter performance verification.
• Header pressure transmitter testing.
• PLC and control system functional testing.
• SCADA communication verification.
• Dissolved oxygen-based control system testing.
• Factory-authorized startup and commissioning.
• Demonstration of complete system functionality.
Commissioning shall be coordinated with APG-Neuros, Knapp Engineering, and City facility personnel.
The system shall not be considered substantially complete until the required equipment has been installed, tested, and demonstrated to operate satisfactorily.
Operation and Maintenance Manuals and Training
The contractor shall provide complete operation and maintenance (O&M) documentation for all equipment installed under this contract.
Documentation shall include manufacturer manuals, equipment specifications, warranties, electrical drawings, control system documentation, calibration information, and recommended maintenance procedures.
The contractor shall provide operator training to designated City personnel covering system operation, monitoring, troubleshooting, routine maintenance, and emergency procedures.
Training shall be conducted by qualified personnel familiar with the installed equipment and control system.
CERTIFICATIONS AND LICENSES
Respondents must have a valid Connecticut business license throughout the solicitation process.
The awarded Respondent must maintain an active Connecticut business license. Failure to reinstate an expired license within 14 days of notice may result in contract.
If the service(s) that the respondent is providing requires a license, certification, or other form of qualification, documentation must be provided at the time of submission. It is the responsibility of the respondent to maintain a license through the entirety of the project. Failure to maintain a required license, certification, or other form of qualification will result in an automatic void of the contract.
PRICING
The pricing for this application shall include all applicable costs as outlined in the bid sheet or bid pricing document. Quantities or hours listed on the bid sheet are estimated. The estimation(s) noted in this solicitation are approximate (estimated only for use in comparing responses); and that the sums obtained by multiplying the Unit Prices by the estimated quantities, and the Total of these sums, are inserted for the purpose of checking this Solicitation and for the convenience of the respondent. The actual contract will be paid for the actual quantities ordered only.
Pricing should not include federal excise or state sales taxes. State Sales Tax is exempt under
Connecticut General State Statute Sec. 12-412. The City is also exempt from transportation taxes when goods are consigned to the City. Tax Exemption certificates will be furnished by the
Finance Department upon satisfactory proof of delivery to the City.
METHOD OF SELECTION
Respondent proposals will be evaluated based on the following criteria (max score of 100 points):
Relevant Experience and Qualifications Up to 20 Points
Technical Approach/Equipment Compliance Up to 25 Points
Project Schedule and Implementation Plan Up to 15 Points
Control System and SCADA Integration Capabilities Up to 15 Points
Warranty, Training, and Technical Support Up to 10 Points
Cost Proposal and Overall Value Up to 15 Points
The City may conduct interviews with a short list of proposers.
COMMENCMENT OF WORK-NO PURCHASE ORDER NO PAY
The City will not be responsible for payment of any work services performed or material(s) supplied by the successful respondent; before the Contractor receives a fully executed agreement and purchase order. Unless an emergency has been declared by the Mayor or Finance Director, who is duly empowered to do so, and the vendor receives written authorization from this individual to proceed. Note: Responsibility for payment shall be limited to only that work deemed necessary by the City to alleviate the immediate emergency.
The respondent(s) awarded shall not begin any work until:
1. An executed contract is signed by the City and the awarded respondent(s)
a. In executing the Agreement, the Awardee will be required to reaffirm and restate all representations made in its solicitation submission.
b. The failure of the Awardee to execute such Agreement, pay any taxes due, to supply the required bonds or submit the Certificate of Insurance, (10) days after the prescribed forms are presented for signature, or within such extended period as the City grants based upon reasons determined sufficient by the City, shall constitute a default and the City reserves the right to any remedies available at law or in equity including pursuit of solicitation bond. The City may either award the
Contract to the next responsible respondent or re-advertise the solicitation.
c. Once a contract is executed the City department responsible for requesting the work will issue Notice to Proceed.
2. A Purchase order is issued for the work
a. The PO Number must be listed on all invoices associated with the project.
BID PREFERENCE FOR LOCAL VENDORS
To this section, "city-based business" shall mean a business with a principal place of business located within the City of West Haven. A business shall not be considered a "city-based business" unless evidence satisfactory with the purchasing agent has been submitted with each bid submitted by said business to establish that said business has a bona fide principal place of business in West Haven.
Such evidence may include evidence of ownership of or a long-term lease of the real estate from which the principal place of business is operated or payment of property taxes on the personal property of the business to be used in the performance of the solicitation. To be considered a City
Based Business you must submit satisfactory proof to the Purchasing Agent of your current City of West Haven address. Some examples of proof include are but not limited to:
1. Proof of payment of City of West Haven Real Estate tax bill(s)
2. A current, long-term lease in the City of West Haven
3. Proof of payment of City of West Haven Personal Property tax bill(s) The Local
Preference ordinance can be found in Section 42-8 [Award of Contract], B2 “Bid preference for local vendors.”. Please review for further details.
BID BOND
A. 5% Bid Bond for projects exceeding $50,000 – Due at time of bid submission
PERFORMANCE BOND
The awarded vendor
A. 100% Performance Bond is required. The selected bidder will furnish the City with this bond within 5 days of being awarded the contract.
INSURANCE REQUIREMENTS
Prior to the commencement of the work, and as a condition of site access, the Respondent
(referred to hereinafter as the “Contractor”) shall deliver to the City of West Haven (referred to hereinafter as the “Owner”) a valid and currently dated Certificate of Insurance (COI).
The insurance coverage carried by the Contractor must be placed with and written by an insurance company admitted doing business in the State of Connecticut, and with a rating of A-or better by A.M. Best.
The insurance coverage’s carried by the Contractor (shown below) shall apply regardless of whether the operations, actions, derelictions or failures to act, from which any claim arises, are attributable to the Contractor, a subcontractor, a sub-subcontractor, or any consultant, officer, agent, employee or anyone directly or indirectly employed by any of them, including anyone for whose acts any of the aforementioned may be liable by operation of statute, government regulation or applicable state law. Failure of Contractor to provide a Certificate of Insurance shall in no way limit or relieve Contractor of its duties and responsibilities in this Agreement.
At a minimum, the COI shall indicate that the following coverages and limits are in place:
1. Commercial General Liability: Minimum Limits Required
Insurance Amount Liability Category
$2,000,000 General Aggregate
$2,000,000 Producers/Completed Operations Aggregate
$1,000,000 Each Occurrence
$1,000,000 Personal and Advertising Injury
$100,000 Fire Damage – Any One Fire
$5,000 Medical Expense – Any One Person
a. The Owner (The City of West Haven and all its elected or appointed directors, officers, officials, agents, employees and members of all its boards and commissions) The Additional Insured coverage afforded to the Owner shall apply on a primary and non-contributory basis and include completed operations coverage.
b. The CGL policy carried by the Contractor shall contain a Waiver of Subrogation clause and the Contractor hereby agrees to waive the Contractor’s right of recovery against the Owner (the City of West Haven (and all its elected or appointed directors, officers, officials, agents, employees and members of all its boards and commissions).
2. Business Auto / Commercial Auto Insurance – Minimum Limits required
a. $1,000,000 Liability
b. The Owner (The City of West Haven and all its elected or appointed directors, officers, officials, agents, employees and members of all its boards and commissions) will be included as an Additional Insured onto the Commercial
Auto/ Business Auto policy carried by the Contractor.
c. The Business Auto / Commercial Auto policy carried by the Contractor shall contain a Waiver of Subrogation clause and the Contractor hereby agrees to waive the Contractor’s right of recovery against the Owner (the City of West Haven, and all its elected or appointed directors, officials, employees and members of all its boards and commissions).
3. Workers Compensation/Employers Liability Insurance
a. Coverages and limits as required by law Connecticut State law
b. Employers Liability Limits:
c. 500,000 each accident
d. 500,000 aggregates for injury by disease
e. 500,000 each employee for injury by disease
f. The Workers Compensation/Employers Liability policy carried by the Contractor shall contain a Waiver of Subrogation clause and the Contractor hereby agrees to waive the Contractor’s right of recovery against the Owner (the City of West
Haven and all its elected or appointed directors, officers, officials, agents, employees and members of all its boards and commissions).
4. Umbrella Liability/Excess Liability: Minimum Limits required:
a. 5,000,000 Each Occurrence
b. 5,000,000 General Aggregate
c. Policy will provide excess coverage over the Commercial General Liability, Business Auto and Workers Compensation/Employer Liability policies carried by the organization
d. The Umbrella / Excess Liability policy carried by the Contractor shall contain a
Waiver of Subrogation clause and the Contractor hereby agrees to waive the
Contractor’s right of recovery against the Owner (the City of West Haven and all its elected or appointed directors, officers, officials, agents, employees and members of all its boards and commissions).
5. It is the responsibility of the respondent awarded, to maintain insurance during the duration of the project. The vendor must submit the renewed insurance on a yearly basis
(prior to expiration date)
GUARANTEE & WARRANTY
All parts and labor related to contracts must be guaranteed and include a 12-month warranty from the date of acceptance by the City. If any work is unable to be guaranteed, the contractor must inform the City, in writing, prior to the delivery of an item or any work being performed.
Non-guaranteed work must be offered at a discount rate on the proposal prices. Inspection, testing and final determination of non-warranty work shall be performed at no cost to the City.
NO LIMITATION ON LIABILITY
With regard to any/all claims made against the Additional Insured by any employee of the
Contractor, any subcontractor or anyone directly or indirectly employed by the Contractor or any subcontractor, or anyone for whose acts the Contractor or any subcontractor might be liable, the indemnification obligation shall not be limited by any limitation on the amount or type of damages, compensation or benefits payable by or for the Contractor or any subcontractor under
Workers Compensation acts, disability benefits acts or other employee benefit acts.
INDEMNIFICATION
To the fullest extent permitted by law, the Contractor shall indemnify, defend and hold harmless the Owner, and all of its elected or appointed directors, officers, officials, agents, employees and members of all of its boards and commissions, as well as the State of Connecticut, from and against any/all claims, actions, damages, losses and expenses, including but not limited to attorney’s fees, for any actual or alleged injury to any person or persons, including death, or any damage to or destruction of property, arising out of or in connection with the project.
OTHER TERMS AND CONDITIONS
1. Liquidated Damages
a. If the Contractor fails to achieve Substantial Completion (or Final Completion, as applicable) by the date(s) specified in the Contract (including any change orders or approved extensions), the Contractor shall pay to the City liquidated damages in the amount of $1,000 for each calendar day of delay beyond the Contract Time until the work is complete and accepted.
b. The parties acknowledge and agree that actual damages resulting from delay are difficult to ascertain, and that the liquidated damages set forth above constitute a reasonable estimate of the probable loss or damage that the Owner will suffer in the event of delay. The amount is not a penalty.
c. Liquidated damages shall be City’s sole remedy for delay in achieving Substantial
Completion (or Final Completion) except for delay arising from Contractor’s breach of other contract obligations, for which the Owner retains any remedies available under Contract or by law.
d. Acceptance or occupancy of any portion of the work by the Owner shall not constitute a waiver of the Owner’s right to assess liquidated damages for that portion of delay unless expressly agreed in writing.
e. The Contractor shall not be liable for liquidated damages for delays caused by excusable causes, meaning those beyond the Contractor’s control and without fault or negligence, including but not limited to acts of God, acts of public enemy, unusually severe weather, changes in laws or regulations, or other such causes as defined in the Contract. Contractor must give prompt written notice of any such delay, in accordance with the notice provisions of the Contract.
f. The City reserves the right to withhold additional funds as may be necessary to protect the City from claims, defective work, or failure to comply with the terms of this Contract. No interest shall accrue or be payable on retainage amounts held by the City.
ATTACHMENTS TO THIS SOLICITATION
1. City Disclosure form, Vendor Form, and W-9
2. Applicability Letter regarding Prevailing Wage (PDF page 7 to 8).
3. CT Department of Labor Wage and Workplace Standards Division (PDF page 9 to 17).
4. Bid Pricing Sheet (Attachment A)
| PROJECT SUMMARY |
| PROJECT BACKGROUND |
| PROJECT TIMELINE |
| The awarded vendor is expected to complete all aspects of this project by June 30, 2027 or 120 calendar days from notice to proceed (whichever is later). |
| SUBMISSION INSTRUCTIONS |
| INQUIRIES FOR CLARIFICATION |
| ADDENDUMS TO THIS SOLICITAION |
| SOLICITATION PROTEST |
| CONTRACT TERM AND AWARD |
| SCOPE OF SERVICES |
| CERTIFICATIONS AND LICENSES |
| PRICING |
| METHOD OF SELECTION |
| BID PREFERENCE FOR LOCAL VENDORS |
| BID BOND |
| PERFORMANCE BOND |
| INSURANCE REQUIREMENTS |
| GUARANTEE & WARRANTY |
| NO LIMITATION ON LIABILITY |
| INDEMNIFICATION |
| OTHER TERMS AND CONDITIONS |
| ATTACHMENTS TO THIS SOLICITATION |
File details come from the government source that posted it. Updated .