This document is a pre-bid meeting minutes from Palm Beach County's Environmental Resource Management (ERM) department for the North County Comprehensive Shore Protection Project Segments II & III (2026ERM02). The project involves beach fill and shore protection construction services across two segments, with an estimated fill quantity of 980,000 cubic yards. The mandatory pre-bid meeting was held on November 5, 2026, virtually and in-person. The bid submission deadline is November 18, 2026, at 2:00 PM, with bid opening scheduled for the same date and time at ERM offices located at 2300 North Jog Road, 4th Floor, Vista Center. A non-mandatory site visit was offered on November 5, 2026, at 1:30 PM. The contract term is 120 calendar days from the date of commencement, as stated in the Notice to Proceed to be issued following Board of County Commissioners (BCC) approval, anticipated for February 2, 2027. Written questions or requests for clarification must be submitted to ERM-Bidding@pbcgov.org by November 11, 2026, seven days prior to bid opening. All contract documents, bid forms, plans, and estimates are available free of charge through the County's Vendor Self-Service website.

The Engineer's Opinion of Probable Cost to Construct is $21,963,000.00, with the bid schedule containing 13 line items. Bid bonds (Payment and Performance) are set at 5 percent of the proposed contract price and must accompany bid submission. The liquidated damages rate is $1,925 per calendar day. Upon contract award, the selected contractor must submit a certificate of insurance, executed contract, and public construction bonds (Payment and Performance) equal to 100 percent of the contract price within 14 calendar days of receiving the Notice of Intent to Award, with no time extensions permitted. This project is federally funded through the Federal Emergency Management Agency (FEMA) and the Florida Department of Environmental Protection, making federal Davis Bacon wage requirements inapplicable and prohibiting geographical preferences. The County's Small Business Enterprise and Local Preference ordinances do not apply to this federally funded procurement. The contract will be awarded to the lowest responsive responsible bidder as this is an Invitation for Bid (IFB).

View the file

Other files

File Type Posted
Exhibit E Cover.pdf PDF
Exhibit_D.pdf PDF
2026ERM02 RFIs.pdf PDF
Addendum #1 2026ERM02.pdf PDF
XYZ Files and Cable Pictures.pdf PDF
Exhibit_C.pdf PDF
Exhibit_F - Screened Material Disposal.pdf PDF
Exhibit_B.pdf PDF
Exhibit_A.pdf PDF
Solicitation Documents and Technical Specs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Name and No.: PALM BEACH COUNTY NORTH COUNTY COMPREHENSIVE SHORE

PROTECTION PROJECT SEGMENTS II & III

2026ERM02

Date of Meeting: 11/05/2026 Location: Virtual/WebEx/In-Person

Minutes Prepared By: YV Meeting No. 1

1. Purpose of Meeting

Mandatory Pre-Bid Construction Meeting

2. Attendees

Name

Steve Howard Foth 9004-472-3476 Steve.howard@foth.com

Yamel Vasquez ERM – Contract Manager 561-233-2528 Yvasquez@pbc.gov

Katie Kramer ERM-Environmental

Analyst

561-233-2491 KKramer@pbc.gov

Gretel Sarmiento ERM – BOCO Division

Director III

561-233-2422 Gsarmiento@pbc.gov

Carlos Ramos ERM-Constract/Grants

Coordinator

561 233-2506 cramos@pbc.gov

Monica Trevino Contract Management

Specialist

561-233-2506 MTrevino@pbc.gov

Matt Mitchell ERM-EER Division

Director IV

561 681-3833 MMitchell@pbc.gov

Reubin Bishop Construction Project

Manager

561 233-2519 RBishop@pbc.gov

David Swigler ERM-Senior Professional

Engineer

561 233-2456 DSwigler@pbc.gov

Onthonio Whyte Water Restoration 561-935-5578 Office@whytewr.com

Christy DiFelice GLLD 630-484-6608 CDiFelice@gldd.com

Monica Hanson-Nortey Great Lakes N/A Mahanson-nortey@gldd.com mailto:KKramer@pbc.gov mailto:Gsarmiento@pbc.gov MTrevino@pbc.gov

3. Meeting

Welcome & Introductions Overview on Contract/Bidding Documents – Yamel Vasquez

• All relevant information covered today pertaining to this project (dollar figures, deadlines and numbers) can be found in the solicitation currently posted via the County’s Vendor Self-Service

(VSS) https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService.

• For updates on the stages of the procurement process, visit ERM’s website www.pbcgov.com/erm/

• The deadline to submit proposals is Wednesday, November 18th, at 2 p.m. That is also the date and time of the bid opening public meeting, which will take place at ERM offices located at 2300

North Jog Road, 4th Floor, Vista Center.

• The contract documents, including bid forms, plans, and estimates, are currently available free of charge through the VSS website referenced earlier. This is also the site where changes and responses to questions will be posted, so be sure to check this website from time to time. There is also a site visit later today at 1:30 pm for those of you who are interested. For those attending online, please note that the site visit is not mandatory.

• Any bidding questions or requests for clarification are to be submitted in writing to ERM-

Bidding@pbcgov.org at least seven (7) days prior to the bid opening. That means the deadline for submitting inquiries is Wednesday, November 11, in this case. Be sure to read the solicitation and submit inquiries early.

• This solicitation is an IFB and for that reason the contract will be awarded to the lowest responsive responsible bidder following our review of the proposals submitted.

• The contract term is 120 calendar days from date of commencement, which will be stated on the

Notice to proceed to be issued following BCC approval.

• The Liquidated Damages rate has been set at $1,925 per calendar day.

• This project is federally funded through FEMA and Florida Department of Environmental

Protection. Applicable federal requirements can be found in the Instruction to Bidders section attachment A. Federal rules prohibit geographical preferences when procuring construction services so the county’s SBD and Local Preference ordinances don’t apply. Davis Bacon is also not applicable

• Bid bonds (Payment and Performance) are set at 5% of the proposed contract price and due with bid submission.

• The Bid Schedule currently features 13 line items.

• the Engineer's Opinion of Probable Cost to Construct this project on the last page of the bid forms, which is $21,963,000.00.

• If you are awarded the contract, you will receive our notice of Intent to Award. This notice will contain instructions on what documents to submit next. They include a certificate of insurance, the executed contract and a public construction bonds (Payment and Performance) in an amount equal to 100% of the contract price. They are all due no later than 2 weeks (14 calendar days) after we issue the Intent to Award notice. There will be no time extensions to submit these materials.

• The County’s General Conditions are standard conditions and cover a wide range of contracts.

Please review the Special Conditions section for project-specific conditions and details. Also, in the event of a conflict between these conditions and the State Grant Requirements, the grant provisions will prevail/govern.

https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService http://www.pbcgov.com/erm/ mailto:ERM-Bidding@pbcgov.org mailto:ERM-Bidding@pbcgov.org

• Appendix A contains useful forms to be used by the selected contractor once the work begins and throughout the life of the contract.

• Appendix B pertains to post-bid information, which the County may or may not require of the selected bidders. If requested by the County, each bidder must be prepared to submit this information within 2 days of the request.

Overview on Technical Specifications – Reubin Bishop

• Project Limits: FDEP reference monument R 21.3 south the R-38.

• Project Permits: The contractor is required to adhere to all project permits. Project permits are attached to the Technical Specifications as Exhibits B and C.

• Construction Access and Staging: There are two accesses available for contractor use depicted on the plans. An access only site is available in Segment 2 at approximately T-26.5. There is a construction access and staging area located in segment 3 Loggerhead Park at approximately R-

34. This is the primary access.

• Fill Quantity: The current fill quantity is estimated at 980,000 cubic yards. This is the anticipated contract volume and assumes construction to high tolerance and continued erosion between the

June 2026 bid survey and date of construction. If necessary, the fill volume may be adjusted through a contract change order.

• Beach Fill: The fill material will meet the sediment quality requirements in T.S.33.Data on borrow area sediments can be found in Exhibit E of the T.S.

• Hydraulic Screening: Hydraulic screening will be required for this job on all material excavated from the borrow area. Technical Specification (T.S.) 38 outlines the hydraulic screening requirements. Disposal of screened material will be conducted as outlined in T.S. 38.1.3. There are 4 disposal sites that can receive varying amounts of screened material. Maps and hauling distances are provided in Exhibit F of the Tech specs.

• Sand Fill Placement: Sand fill placement requirements are found in T.S. 39. Sand shall be placed to the lines and grades depicted in the project plans. The County and Engineer reserves the right to vary the width and grade of the fill template from the lines and grades shown on the plans.

• Removal of Subsea Cable: Requirements for the removal of the subsea cable are contained in T.S.

35.

• Methods of Payment: Payment will be made as outlined in Section II of the Technical

Specifications (T.S) and General Conditions (G.C.) 67 and 68.

Conclusion

• No one registered or requested to attend the non-mandatory site visit, either in person or virtually.

• Questions Deadline: November 11, 2026. All questions must be submitted to ERM-

Bidding@pbc.gov.

• Bid Submission Deadline: November 18, 2026, at 2:00 PM. Bids will be opened the same day.

• Anticipated BCC Approval: February 2, 2027.