This document is a Pre-Bid Meeting Minutes for the Palm Beach County North County Comprehensive Shore Protection Project Segments II & III (Project No. 2026ERM02), held virtually and in-person on November 5, 2026. The project involves beach fill and shore protection construction services with an estimated contract volume of 980,000 cubic yards of fill material. The bid submission deadline is November 18, 2026, at 2:00 p.m., with bid opening occurring the same day at the Palm Beach County ERM offices located at 2300 North Jog Road, 4th Floor, Vista Center. A non-mandatory site visit was scheduled for November 5, 2026, at 1:30 p.m. The contract will be awarded to the lowest responsive responsible bidder through an Invitation for Bid (IFB) process. The contract term is 120 calendar days from the date of commencement, with an anticipated Board of County Commissioners approval date of February 2, 2027. Questions and requests for clarification must be submitted in writing to ERM-Bidding@pbcgov.org no later than November 11, 2026. The project includes construction access and staging areas in Segments 2 and 3, with hydraulic screening requirements for excavated borrow material and disposal at designated sites.
The Engineer's Opinion of Probable Cost to Construct is $21,963,000.00. Bid bonds (Payment and Performance) are required at 5% of the proposed contract price and must accompany bid submissions. Upon award, contractors must submit a certificate of insurance, executed contract, and public construction bonds (Payment and Performance) equal to 100% of the contract price within 14 calendar days of receiving the Notice of Intent to Award, with no time extensions permitted. The Liquidated Damages rate has been set at $1,925 per calendar day. This project is federally funded through the Federal Emergency Management Agency (FEMA) and the Florida Department of Environmental Protection, making applicable federal requirements mandatory and prohibiting geographical preferences and Small Business/Local Preference ordinances. Davis Bacon prevailing wage requirements do not apply. Bid documents, including plans, specifications, and estimates, are available free of charge through the County's Vendor Self-Service (VSS) website at https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService. The project includes 13 line items in the bid schedule and encompasses subsea cable removal, sand fill placement to specified lines and grades, and payment procedures outlined in the Technical Specifications and General Conditions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit_A.pdf | ||
| Exhibit_B.pdf | ||
| Addendum #1 2026ERM02.pdf | ||
| Exhibit_F - Screened Material Disposal.pdf | ||
| Solicitation Documents and Technical Specs.pdf | ||
| Exhibit_D.pdf | ||
| Exhibit_C.pdf | ||
| Exhibit E Cover.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Name and No.: PALM BEACH COUNTY NORTH COUNTY COMPREHENSIVE SHORE
PROTECTION PROJECT SEGMENTS II & III
2026ERM02
Date of Meeting: 11/05/2026 Location: Virtual/WebEx/In-Person
Minutes Prepared By: YV Meeting No. 1
1. Purpose of Meeting
Mandatory Pre-Bid Construction Meeting
2. Attendees
Name
Steve Howard Foth 9004-472-3476 Steve.howard@foth.com
Yamel Vasquez ERM – Contract Manager 561-233-2528 Yvasquez@pbc.gov
Katie Kramer ERM-Environmental
Analyst
561-233-2491 KKramer@pbc.gov
Gretel Sarmiento ERM – BOCO Division
Director III
561-233-2422 Gsarmiento@pbc.gov
Carlos Ramos ERM-Constract/Grants
Coordinator
561 233-2506 cramos@pbc.gov
Monica Trevino Contract Management
Specialist
561-233-2506 MTrevino@pbc.gov
Matt Mitchell ERM-EER Division
Director IV
561 681-3833 MMitchell@pbc.gov
Reubin Bishop Construction Project
Manager
561 233-2519 RBishop@pbc.gov
David Swigler ERM-Senior Professional
Engineer
561 233-2456 DSwigler@pbc.gov
Onthonio Whyte Water Restoration 561-935-5578 Office@whytewr.com
Christy DiFelice GLLD 630-484-6608 CDiFelice@gldd.com
Monica Hanson-Nortey Great Lakes N/A Mahanson-nortey@gldd.com mailto:KKramer@pbc.gov mailto:Gsarmiento@pbc.gov MTrevino@pbc.gov
3. Meeting
Welcome & Introductions Overview on Contract/Bidding Documents – Yamel Vasquez
• All relevant information covered today pertaining to this project (dollar figures, deadlines and numbers) can be found in the solicitation currently posted via the County’s Vendor Self-Service
(VSS) https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService.
• For updates on the stages of the procurement process, visit ERM’s website www.pbcgov.com/erm/
• The deadline to submit proposals is Wednesday, November 18th, at 2 p.m. That is also the date and time of the bid opening public meeting, which will take place at ERM offices located at 2300
North Jog Road, 4th Floor, Vista Center.
• The contract documents, including bid forms, plans, and estimates, are currently available free of charge through the VSS website referenced earlier. This is also the site where changes and responses to questions will be posted, so be sure to check this website from time to time. There is also a site visit later today at 1:30 pm for those of you who are interested. For those attending online, please note that the site visit is not mandatory.
• Any bidding questions or requests for clarification are to be submitted in writing to ERM-
Bidding@pbcgov.org at least seven (7) days prior to the bid opening. That means the deadline for submitting inquiries is Wednesday, November 11, in this case. Be sure to read the solicitation and submit inquiries early.
• This solicitation is an IFB and for that reason the contract will be awarded to the lowest responsive responsible bidder following our review of the proposals submitted.
• The contract term is 120 calendar days from date of commencement, which will be stated on the
Notice to proceed to be issued following BCC approval.
• The Liquidated Damages rate has been set at $1,925 per calendar day.
• This project is federally funded through FEMA and Florida Department of Environmental
Protection. Applicable federal requirements can be found in the Instruction to Bidders section attachment A. Federal rules prohibit geographical preferences when procuring construction services so the county’s SBD and Local Preference ordinances don’t apply. Davis Bacon is also not applicable
• Bid bonds (Payment and Performance) are set at 5% of the proposed contract price and due with bid submission.
• The Bid Schedule currently features 13 line items.
• the Engineer's Opinion of Probable Cost to Construct this project on the last page of the bid forms, which is $21,963,000.00.
• If you are awarded the contract, you will receive our notice of Intent to Award. This notice will contain instructions on what documents to submit next. They include a certificate of insurance, the executed contract and a public construction bonds (Payment and Performance) in an amount equal to 100% of the contract price. They are all due no later than 2 weeks (14 calendar days) after we issue the Intent to Award notice. There will be no time extensions to submit these materials.
• The County’s General Conditions are standard conditions and cover a wide range of contracts.
Please review the Special Conditions section for project-specific conditions and details. Also, in the event of a conflict between these conditions and the State Grant Requirements, the grant provisions will prevail/govern.
https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService http://www.pbcgov.com/erm/ mailto:ERM-Bidding@pbcgov.org mailto:ERM-Bidding@pbcgov.org
• Appendix A contains useful forms to be used by the selected contractor once the work begins and throughout the life of the contract.
• Appendix B pertains to post-bid information, which the County may or may not require of the selected bidders. If requested by the County, each bidder must be prepared to submit this information within 2 days of the request.
Overview on Technical Specifications – Reubin Bishop
• Project Limits: FDEP reference monument R 21.3 south the R-38.
• Project Permits: The contractor is required to adhere to all project permits. Project permits are attached to the Technical Specifications as Exhibits B and C.
• Construction Access and Staging: There are two accesses available for contractor use depicted on the plans. An access only site is available in Segment 2 at approximately T-26.5. There is a construction access and staging area located in segment 3 Loggerhead Park at approximately R-
34. This is the primary access.
• Fill Quantity: The current fill quantity is estimated at 980,000 cubic yards. This is the anticipated contract volume and assumes construction to high tolerance and continued erosion between the
June 2026 bid survey and date of construction. If necessary, the fill volume may be adjusted through a contract change order.
• Beach Fill: The fill material will meet the sediment quality requirements in T.S.33.Data on borrow area sediments can be found in Exhibit E of the T.S.
• Hydraulic Screening: Hydraulic screening will be required for this job on all material excavated from the borrow area. Technical Specification (T.S.) 38 outlines the hydraulic screening requirements. Disposal of screened material will be conducted as outlined in T.S. 38.1.3. There are 4 disposal sites that can receive varying amounts of screened material. Maps and hauling distances are provided in Exhibit F of the Tech specs.
• Sand Fill Placement: Sand fill placement requirements are found in T.S. 39. Sand shall be placed to the lines and grades depicted in the project plans. The County and Engineer reserves the right to vary the width and grade of the fill template from the lines and grades shown on the plans.
• Removal of Subsea Cable: Requirements for the removal of the subsea cable are contained in T.S.
35.
• Methods of Payment: Payment will be made as outlined in Section II of the Technical
Specifications (T.S) and General Conditions (G.C.) 67 and 68.
Conclusion
• No one registered or requested to attend the non-mandatory site visit, either in person or virtually.
• Questions Deadline: November 11, 2026. All questions must be submitted to ERM-
Bidding@pbc.gov.
• Bid Submission Deadline: November 18, 2026, at 2:00 PM. Bids will be opened the same day.
• Anticipated BCC Approval: February 2, 2027.