Summary
This is a proposal and bid document for a highway construction project issued by the Wisconsin Department of Transportation (WisDOT) for work in Burnett County. The project, identified as 8368-00-70 (Webster – Hertel STH 35 to Gaslyn Road, CTH X), involves pulverize and relay operations, HMA pavement installation, base aggregate dense, storm sewer construction, concrete curb and gutter, permanent signing, and pavement marking. The contract work must begin within 10 calendar days of written notice to proceed and is scheduled for completion within the 2027 construction season. An interim completion date of August 31, 2027, is established for the urban section (STH 35 to Perch Avenue) with interim liquidated damages of $2,185 per calendar day for delays beyond this date. Bids must be submitted electronically via the Bid Express system or on paper with proper waiver documentation before the deadline specified in the Notice to Contractors. Bidders must provide a proposal guaranty, execute a proposal bid bond, submit a list of proposed subcontractors with at least 48 hours' notice prior to bid closing, and comply with debarment certification requirements.
Payment is structured as unit prices for each bid item, with the contractor responsible for all labor, materials, equipment, and means of construction. The contract includes quality management provisions for pulverize and relay compaction and HMA pavement nuclear density testing, with specific performance standards and documentation requirements. Special provisions address traffic control (maintaining two through lanes during non-working hours with business access preservation), turtle exclusion fencing within 1,000 feet of wetlands connected to the Yellow River (active March 4 through November 16), utility coordination with multiple providers, and compliance with Section 404 permits and WPDES storm water discharge requirements. The contractor must also participate in the Highway Construction Skills Training (HCST) program with a goal of utilizing HCST graduates and apprentices, compensated at $5.00 per hour for qualifying placements. Federal-aid funding supports this project through programs including the Surface Transportation Program (STP).
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
!#��$�%��!����#�#��!"%&��'��&('�'����)**)�+�&,-.����)�/#�#��0�01��2 3121�����2 ���4150�21�5���0��6 ������� 5�760�89*8:��:-� �;/<��'�'-�8+ � �>/%=�9��#��?���@!�A��B <%=�C D %E����������>� B�@#E !B ���F!
B��BB
�#�#E !#�$%��!����#�#��!>���!� ��B�!
G�#E#E
�BH
B� I
�#$�����������)%E
��BB
�!��E�!BB
��H �����>�!B#�� �$������G��J$��#E �����H !#�$#E B ��F!�# B���K #��!�#E B>��!�� ��B�!
�G�#E�#E !B B����������A I !#���!B�<�!B�#��!�)���������?
���!#@�A I B���@��� !#��$�%��!����#�#��!L-�>���)�� M##� E����������?
���!#@��!��� J��$�#E����M?N)D�B�/ �,O� ���%��
��8>�'�'*&&������<�!#�� #�<���� &9��<�� !B���"�@�M���F!
B�"���BH�!#�F
B�D ���N!# �?��� �P Q���� ��
>�MBB�
>�R���<�B %E��� �!#�� #���� S B �����H
���FE#)%E��
�#E�##E !B ���F!
B��BB
�>B �@�G��!>���!� #E���T B� !#�#�H �$#E B���H U#E�##E
��BB
�E�� S���!
B�!B �� B#E ��B$���#E
���!�>=�FEG�@���J��������>�!B����BB
!B�>�!BE�� E
J B#E �!B
���##�!F#E��������������BU�!B#E�##E
��BB
����F
�E�H �#E �B�� #�@���!B�� B�!#��!@�F�
B�!�!@ ��� ���!>���#E �G�� #�J
#�#�H
��BB�!F�! �!!
#��!G�#E#E��������������B)2V�WVX�YZ[W\�WVX]̂Z_̀\�V̂�YabcZX�XdZY��Z[de]f��V̂g��̂VhVY]i�ed̀W�YabcZXXZW[�]W�̀ìjX̂VWZj�bZk�VW�Xd̀��WX̀ Ŵ̀Xl/ B��!B��G��!�#��� �#E���B�# �mmmmmmmmmmmmmmm,/�F!�#
| � | �� |
| >� | �#��@�� |
�<��������!�NS���
�. ,D�BB
��/�F!�#
�D�BB
.,D�BB
.3V̂�2̀ h]̂Xc ẀX�7Ỳ��Wif0fh̀�Vn��V̂go �#�
��$�MG��B�"�#
B "�# ���!#@�A B �#��@�/
��p��16�0�3���q�22�6���7����1�
A
��H���>�?��B�!F>�MFF�
F�# >�M��E��#���H ����!B�?
�/�B G��J>�/#����/ G �>�N�����!�<�!#���>�� !#/�F!�!F>�%��$$� �<�!#���>���H !#�r��J�!F>�A
PLEASE ATTACH
PROPOSAL GUARANTY HERE
Effective with November 2007 Letting Proposal Requirements
PROPOSAL REQUIREMENTS AND CONDITIONS
The bidder, signing and submitting this proposal, agrees and declares as a condition thereof, to be bound by the following conditions and requirements.
If the bidder has a corporate relationship with the proposal design engineering company, the bidder declares that it did not obtain any facts, data, or other information related to this proposal from the design engineering company that was not available to all bidders.
The bidder declares that they have carefully examined the site of, and the proposal, plans, specifications and contract forms for the work contemplated, and it is assumed that the bidder has investigated and is satisfied as to the conditions to be encountered, as to the character, quality, and quantities of work to be performed and materials to be furnished, and as to the requirements of the specifications, special provisions and contract. It is mutually agreed that submission of a proposal shall be considered conclusive evidence that the bidder has made such examination.
The bidder submits herewith a proposal guaranty in proper form and amount payable to the party as designated in the advertisement inviting proposals, to be retained by and become the property of the owner of the work in the event the undersigned shall fail to execute the contract and contract bond and return the same to the office of the engineer within fourteen (14) days after having been notified in writing to do so;
otherwise to be returned.
The bidder declares that they understand that the estimate of quantities in the attached schedule is approximate only and that the attached quantities may be greater or less in accordance with the specifications.
The bidder agrees to perform the said work, for and in consideration of the payment of the amount becoming due on account of work performed, according to the unit prices bid in the following schedule, and to accept such amounts in full payment of said work.
The bidder declares that all of the said work will be performed at their own proper cost and expense, that they will furnish all necessary materials, labor, tools, machinery, apparatus, and other means of construction in the manner provided in the applicable specifications and the approved plans for the work together with all standard and special designs that may be designed on such plans, and the special provisions in the contract of which this proposal will become a part, if and when accepted. The bidder further agrees that the applicable specifications and all plans and working drawings are made a part hereof, as fully and completely as if attached hereto.
The bidder, if awarded the contract, agrees to begin the work not later than ten (10) days after the date of written notification from the engineer to do so, unless otherwise stipulated in the special provisions.
The bidder declares that if they are awarded the contract, they will execute the contract agreement and begin and complete the work within the time named herein, and they will file a good and sufficient surety bond for the amount of the contract for performance and also for the full amount of the contract for payment.
Effective with November 2007 Letting Proposal Requirements
The bidder, if awarded the contract, shall pay all claims as required by Section 779.14, Statutes of Wisconsin, and shall be subject to and discharge all liabilities for injuries pursuant to Chapter 102 of the Statutes of Wisconsin, and all acts amendatory thereto. They shall further be responsible for any damages to property or injury to persons occurring through their own negligence or that of their employees or agents, incident to the performance of work under this contract, pursuant to the Standard Specifications for Road and Bridge Construction applicable to this contract.
In connection with the performance of work under this contract, the contractor agrees to comply with all applicable state and federal statutes relating to non-discrimination in employment. No otherwise qualified person shall be excluded from employment or otherwise be subject to discrimination in employment in any manner on the basis of age, race, religion, color, gender, national origin or ancestry, disability, arrest or conviction record (in keeping with s.111.32), sexual orientation, marital status, membership in the military reserve, honesty testing, genetic testing, and outside use of lawful products. This provision shall include, but not be limited to the following: employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation, and selection for training, including apprenticeship. The contractor further agrees to ensure equal opportunity in employment to all applicants and employees and to take affirmative action to attain a representative workforce.
The contractor agrees to post notices and posters setting forth the provisions of the nondiscrimination clause, in a conspicuous and easily accessible place, available for employees and applicants for employment.
If a state public official (section 19.42, Stats.) or an organization in which a state public official holds at least a 10% interest is a party to this agreement, this contract is voidable by the state unless appropriate disclosure is made to the State of Wisconsin Ethics Board.
Effective with August 2015 Letting Bid Preparation
BID PREPARATION
Preparing the Proposal Schedule of Items A. General
(1) Obtain bidding proposals as specified in section 102 of the standard specifications prior to 11:45 AM of the last business day preceding the letting. Submit bidding proposals using one of the following methods:
1. Electronic bid on the internet.
2. Electronic bid on a printout with accompanying diskette or CD ROM.
3. Paper bid under a waiver of the electronic submittal requirements.
(2) Bids submitted on a printout with accompanying diskette or CD ROM or paper bids submitted under a waiver of the electronic submittal requirements govern over bids submitted on the internet.
(3) The department will provide bidding information through the department’s web site at:
https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx
The contractor is responsible for reviewing this web site for general notices as well as information regarding proposals in each letting. The department will also post special notices of all addenda to each proposal through this web site no later than 4:00 PM local time on the Thursday before the letting. Check the department’s web site after 5:00 PM local time on the Thursday before the letting to ensure all addenda have been accounted for before preparing the bid. When bidding using methods 1 and 2 above, check the Bid ExpressΤΜ on-line bidding exchange at http://www.bidx.com/ after 5:00 PM local time on the Thursday before the letting to ensure that the latest schedule of items Expedite file (*.ebs or *.00x) is used to submit the final bid.
(4) Interested parties can subscribe to the Bid ExpressΤΜ on-line bidding exchange by following the instructions provided at the www.bidx.com web site or by contacting:
Info Tech Inc.
5700 SW 34th Street, Suite 1235 Gainesville, FL 32608-5371 email: mailto:customer.support@bidx.com
(5) The department will address equipment and process failures, if the bidder can demonstrate that those failures were beyond their control.
(6) Contractors are responsible for checking on the issuance of addenda and for obtaining the addenda. Notice of issuance of addenda is posted on the department’s web site at:
https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx or by calling the department at (608) 266-1631. Addenda can ONLY be obtained from the department’s web site listed above or by picking up the addenda at the Bureau of Highway Construction, 4th floor, 4822 Madison Yards Way, Madison, WI, during regular business hours.
(7) Addenda posted after 5:00 PM on the Thursday before the letting will be emailed to the eligible bidders for that proposal. All eligible bidders shall acknowledge receipt of the addenda whether they are bidding on the proposal or not. Not acknowledging receipt may jeopardize the awarding of the project.
https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx http://www.bidx.com/ http://www.bidx.com/ mailto:customer.support@bidx.com
B. Submitting Electronic Bids B.1 On the Internet
(1) Do the following before submitting the bid:
4. Have a properly executed annual bid bond on file with the department.
5. Have a digital ID on file with and enabled by Info Tech Inc. Using this digital ID will constitute the bidder's signature for proper execution of the bidding proposal.
(2) In lieu of preparing, delivering, and submitting the proposal as specified in 102.6 and 102.9 of the standard specifications, submit the proposal on the internet as follows:
1. Download the latest schedule of items reflecting all addenda from the Bid ExpressΤΜ web site.
2. Use ExpediteΤΜ software to enter a unit price for every item in the schedule of items.
3. Submit the bid according to the requirements of ExpediteΤΜ software and the Bid ExpressΤΜ web site. Do not submit a bid on a printout with accompanying diskette or CD ROM or a paper bid. If the bidder does submit a bid on a printout with accompanying diskette or a paper bid in addition to the internet submittal, the department will disregard the internet bid
4. Submit the bid before the hour and date the Notice to Contractors designates
5. Do not sign, notarize, and return the bidding proposal described in 102.2 of the standard specifications.
(3) The department will not consider the bid accepted until the hour and date the Notice to Contractors designates.
B.2 On a Printout with Accompanying Diskette or CD ROM
(1) Download the latest schedule of items from the Wisconsin pages of the Bid Express web site reflecting the latest addenda posted on the department’s web site at:
https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx
Use ExpediteΤΜ software to prepare and print the schedule of items. Provide a valid amount for all price fields. Follow instructions and review the help screens provided on the Bid ExpressΤΜ web site to assure that the schedule of items is prepared properly.
(2) Staple an 8 1/2 by 11 inch printout of the Expedite generated schedule of items to the other proposal documents submitted to the department as a part of the bidder's sealed bid. As a separate submittal, not in the sealed bid envelop but due at the same time and place as the sealed bid, also provide the ExpediteΤΜ generated schedule of items on a 3 1/2 inch computer diskette or CD ROM. Label each diskette or CD ROM with the bidder's name, the 4 character department-assigned bidder identification code from the top of the bidding proposal, and a list of the proposal numbers included on that diskette or CD ROM as indicated in the following example:
Bidder Name
BN00
Proposals: 1, 12, 14, & 22
(3) If bidding on more than one proposal in the letting, the bidder may include all proposals for that letting on one diskette or CD ROM. Include only submitted proposals with no incomplete or other files on the diskette or CD ROM.
(4) The bidder-submitted printout of the Expedite generated schedule of items is the governing contract document and must conform to the requirements of section 102 of the standard specifications. If a printout needs to be altered, cross out the printed information with ink or typewriter and enter the new information and initial it in ink. If there is a discrepancy between the printout and the diskette or CD ROM, the department will analyze the bid using the printout information.
(5) In addition to the reasons specified in section 102 of the standard specifications, proposals are irregular and the department may reject them for one or more of the following:
1. The check code printed on the bottom of the printout of the ExpediteΤΜ generated schedule of items is not the same on each page.
2. The check code printed on the printout of the ExpediteΤΜ generated schedule of items is not the same as the check code for that proposal provided on the diskette or CD ROM.
3. The diskette or CD ROM is not submitted at the time and place the department designates.
B Waiver of Electronic Submittal
(1) The bidder may request a waiver of the electronic submittal requirements. Submit a written request for a waiver in lieu of bids submitted on the internet or on a printout with accompanying diskette or CD ROM. Use the waiver that was included with the paper bid document sent to the bidder or type up a waiver on the bidder’s letterhead. The department will waive the electronic submittal requirements for a bidding entity (individual, partnership, joint venture, corporation, or limited liability company) for up to 4 individual proposals in a calendar year. The department may allow additional waivers for equipment malfunctions.
(2) Submit a schedule of items on paper conforming to section 102 of the standard specifications.
The department charges the bidder a $75 administrative fee per proposal, payable at the time and place the department designates for receiving bids, to cover the costs of data entry. The department will accept a check or money order payable to: "Wisconsin, Dept. of Transportation."
(3) In addition to the reasons specified in section 102 of the standard specifications, proposals are irregular and the department may reject them for one or more of the following:
1. The bidder fails to provide the written request for waiver of the electronic submittal requirements.
2. The bidder fails to pay the $75 administrative fee before the time the department designates for the opening of bids unless the bidder requests on the waiver that they be billed for the $75.
3. The bidder exceeds 4 waivers of electronic submittal requirements within a calendar year.
(4) In addition to the reasons specified in section 102 of the standard specifications, the department may refuse to issue bidding proposals for future contracts to a bidding entity that owes the department administrative fees for a waiver of electronic submittal requirements.
PROPOSAL BID BOND Wisconsin Department of Transportation
DT1303 1/2006
Proposal Number Project Number Letting Date
Name of Principal
Name of Surety State in Which Surety is Organized
We, the above-named Principal and the above-named Surety, are held and firmly bound unto the State of Wisconsin in the sum equal to the Proposal Guaranty for the total bid submitted for the payment to be made; we jointly and severally bind ourselves, our heirs, executors, administrators, successors and assigns. The condition of this obligation is that the Principal has submitted a bid proposal to the State of Wisconsin acting through the Department of Transportation for the improvement designated by the Proposal Number and Letting Date indicated above.
If the Principal is awarded the contract and, within the time and manner required by law after the prescribed forms are presented for signature, enters into a written contract in accordance with the bid, and files the bond with the Department of Transportation to guarantee faithful performance and payment for labor and materials, as required by law, or if the Department of Transportation shall reject all bids for the work described, then this obligation shall be null and void; otherwise, it shall be and remain in full force and effect.
In the event of failure of the Principal to enter into the contract or give the specified bond, the Principal shall pay to the Department of Transportation within 10 business days of demand a total equal to the Proposal Guaranty as liquidated damages; the liability of the Surety continues for the full amount of the obligation as stated until the obligation is paid in full.
The Surety, for value received, agrees that the obligations of it and its bond shall not be impaired or affected by any extension of time within which the Department of Transportation may accept the bid; and the Surety does waive notice of any such extension.
IN WITNESS, the Principal and Surety have agreed and have signed by their proper officers and have caused their corporate seals to be affixed this date: (DATE MUST BE ENTERED)
PRINCIPAL
(Company Name) (Affix Corporate Seal)
(Signature and Title)
(Company Name)
(Signature and Title)
(Company Name)
(Signature and Title)
(Company Name)
(Signature and Title)
NOTARY FOR PRINCIPAL
(Date)
State of Wisconsin ) ) ss.
County )
On the above date, this instrument was acknowledged before me by the named person(s).
(Signature, Notary Public, State of Wisconsin)
(Print or Type Name, Notary Public, State of Wisconsin)
(Date Commission Expires)
Notary Seal
(Name of Surety) (Affix Seal)
(Signature of Attorney-in-Fact)
NOTARY FOR SURETY
(Date)
State of Wisconsin ) ) ss.
County )
On the above date, this instrument was acknowledged before me by the named person(s).
(Signature, Notary Public, State of Wisconsin)
(Print or Type Name, Notary Public, State of Wisconsin)
(Date Commission Expires)
Notary Seal
IMPORTANT: A certified copy of Power of Attorney of the signatory agent must be attached to the bid bond.
CERTIFICATE OF ANNUAL BID BOND Wisconsin Department of Transportation
DT1305 8/2003
Time Period Valid (From/To)
Name of Surety
Name of Contractor
Certificate Holder Wisconsin Department of Transportation
This is to certify that an annual bid bond issued by the above-named Surety is currently on file with the Wisconsin Department of Transportation.
This certificate is issued as a matter of information and conveys no rights upon the certificate holder and does not amend, extend or alter the coverage of the annual bid bond.
Cancellation: Should the above policy be cancelled before the expiration date, the issuing surety will give thirty (30) days written notice to the certificate holder indicated above.
(Signature of Authorized Contractor Representative) (Date)
Effective with March 2010 Letting
LIST OF SUBCONTRACTORS
Section 66.0901(7), Wisconsin Statutes, provides that as a part of the proposal, the bidder also shall submit a list of the subcontractors the bidder proposes to contract with and the class of work to be performed by each. In order to qualify for inclusion in the bidder's list a subcontractor shall first submit a bid in writing, to the general contractor at least 48 hours prior to the time of the bid closing. The list may not be added to or altered without the written consent of the municipality. A proposal of a bidder is not invalid if any subcontractor and the class of work to be performed by the subcontractor has been omitted from a proposal; the omission shall be considered inadvertent or the bidder will perform the work personally.
No subcontract, whether listed herein or later proposed, may be entered into without the written consent of the Engineer as provided in Subsection 108.1 of the Standard Specifications.
Name of Subcontractor Class of Work Estimated Value
Effective with December 2000 Letting Debarment Certification
CERTIFICATION REGARDING DEBARMENT, SUSPENSION, AND OTHER
RESPONSIBILITY MATTERS - PRIMARY COVERED TRANSACTIONS
Instructions for Certification
1. By signing and submitting this proposal, the prospective contractor is providing the certification set out below.
2. The inability of a person to provide the certification required below will not necessarily result in denial of participation in this covered transaction. The prospective contractor shall submit an explanation of why it cannot provide the certification set out below. The certification or explanation will be considered in connection with the department or agency's determination whether to enter into this transaction. However, failure of the prospective contractor to furnish a certification or an explanation shall disqualify such person from participation in this transaction.
3. The certification in this clause is a material representation of fact upon which reliance was placed when the department determined to enter into this transaction. If it is later determined that the contractor knowingly rendered an erroneous certification in addition to other remedies available to the Federal Government the department may terminate this transaction for cause or default.
4. The prospective contractor shall provide immediate written notice to the department to whom this proposal is submitted if at any time the prospective contractor learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances.
5. The terms "covered transaction," "debarred," "suspended," "ineligible," "lower tier covered transaction," "participant," "person," "primary covered transaction," "principal," "proposal," and "voluntarily excluded," as used in this clause, have the meanings set out in the Definitions and Coverage sections of the rules implementing Executive Order 12549. You may contact the department to which this proposal is being submitted for assistance in obtaining a copy of those regulations.
6. The prospective contractor agrees by submitting this proposal that, should this contract be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department entering into this transaction.
7. The prospective contractor further agrees by submitting this proposal that it will include the clause titled "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion-Lower Tier Covered Transaction," which is included as an addendum to PR- 1273 - "Required Contract Provisions Federal Aid Construction Contracts," without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions.
8. The contractor may rely upon a certification of a prospective subcontractor/materials supplier that it is not debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A contractor may decide the method and frequency by which it determines the eligibility of its principals. Each contractor may, but is not required to, check the Disapproval List (telephone # 608/266/1631).
Effective with December 2000 Letting Debarment Certification
9. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of a contractor is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings.
10. Except for transactions authorized under paragraph 6 of these instructions, if a contractor in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department may terminate this transaction for cause or default.
Certification Regarding Debarment, Suspension, and Other Responsibility Matters - Primary Covered Transactions
1. The prospective contractor certifies to the best of its knowledge and belief, that it and its principals:
(a) Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal department or agency;
(b) Have not within a three-year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements or receiving stolen property;
(c) Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State or local) with commission of any of the offense enumerated in paragraph (1)(b) of this certification; and
(d) Have not within a three-year period preceding this proposal had one or more public transactions (Federal, State or local) terminated for cause or default.
2. Where the prospective contractor is unable to certify to any of the statements in this certification, such prospective contractor shall attach an explanation to this proposal.
8368-00-70 1 of 18
Special Provisions Table of Contents
Article Description Page #
1. General
2. Scope of Work
3. Prosecution and Progress
4. Traffic
5. Holiday and Special Event Work Restrictions
6. Utilities
7. Information to Bidders, U.S. Army Corps of Engineers Section 404 Permit
8. Information to Bidders, WPDES Transportation Construction General Permit (TCGP) for Storm
Water Discharges
9. Environmental Protection, Aquatic Exotic Species Control
10. Pulverize and Relay
11. QMP Pulverize and Relay Compaction, Item 374.1020.S
12. QMP HMA Pavement Nuclear Density
13. Adjusting Manhole Covers, Item 611.8110
14. Insulation Board Polystyrene, 2-Inch, Item 612.0902.S
15. Locating No-Passing Zones, Item 648.0100
16. Installing and Maintaining Climbing Turtle Exclusion Fence, Item 999.2100.S
17. Adjusting Water Valve Box, Item SPV.0060.01
18. Inlet & Cover Special, Item SPV.0060.02
8368-00-70 2 of 18
STSP’S Revised July 1, 2026
SPECIAL PROVISIONS
1. General.
Perform the work under this construction contract for the following projects:
8368-00-70 Webster – Hertel STH 35 to Gaslyn Road
CTH X
Burnett County
Perform the work as the plans show and execute the work as specified in the State of Wisconsin, Department of Transportation, Standard Specifications for Highway and Structure Construction, 2025 Edition, as published by the department, and these special provisions.
If all or a portion of the plans and special provisions are developed in the SI metric system and the schedule of prices is developed in the US standard measure system, the department will pay for the work as bid in the US standard system.
100-005 (20260701)
2. Scope of Work.
The work under this contract consists of pulverize and relay, HMA pavement, base aggregate dense, storm sewer, concrete curb & gutter, permanent signing, pavement marking and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
104-005 (20090901)
3. Prosecution and Progress.
Begin work within 10 calendar days after the engineer issues a written notice to do so.
Provide the time frame for construction of the project within the 2027 construction season to the engineer in writing within a month after executing the contract but at least 14 calendar days before the preconstruction conference. Assure that the time frame is consistent with the contract completion time.
Upon approval, the engineer will issue the notice to proceed within ten calendar days before the beginning of the approved time frame.
To revise the time frame, submit a written request to the engineer at least two weeks before the beginning of the intended time frame. The engineer will approve or deny that request based on the conditions cited in the request and its effect on the department’s scheduled resources.
Webster Elementary School The Webster Elementary School is located adjacent to the west project limits. No work on the urban section from STH 35 to Perch Avenue shall begin prior to June 1, 2027.
Webster Elementary School operates summer school from June 7, 2027, to June 18, 2027, as part of the 2026-2027 school year and August 9, 2027, to August 19, 2027 (tentatively scheduled) for the 2027-2028 school year. The school district has indicated they can access the school from E. Birch Street during this time but be advised there may be additional local traffic during these times.
Interim Completion and Liquidated Damages – Urban Section of CTH X from STH 35 to Perch Avenue: August 31, 2027 Complete construction operations on the urban section of CTH X from STH 35 to Perch Avenue to the stage necessary to reopen it to through traffic by August 31, 2027. Do not reopen until completing the following work: All work (excluding HMA pavement and pavement markings).
If the contractor fails to complete the work necessary to reopen the urban section of CTH X from STH 35 to Perch Avenue to traffic by August 31, 2027, the department will assess the contractor $2,185 in interim liquidated damages for each calendar day the contract work remains incomplete beyond 12:01 AM on
8368-00-70 3 of 18
September 1, 2027. An entire calendar day will be charged for any period of time within a calendar day that the road remains closed beyond 12:01 AM.
If contract time expires prior to completing all work specified in the contract, additional liquidated damages will be affixed according to standard spec 108.11.
Climbing Turtle General
Turtles are known to inhabit wetlands connected to the Yellow River, and suitable habitat exists within 1,000 ft of that location. It is assumed turtles are present at or near the project site during construction.
When within 1,000 ft of wetlands connected to the Yellow River, use the following erosion mat types as shown on the plans or directed by the engineer, to minimize animal entrapment:
Erosion Mat Urban Class I Type A Erosion Mat Urban Class I Type B Erosion Mat Class II Type C
Furnish mat of these classes from the WisDOT Erosion Control Product Acceptability List (PAL).
Nesting Habitat
No ground disturbance, heavy equipment operation or supply/equipment storage shall occur within 200 ft of wetlands connected to the Yellow River during the turtle nesting season from March 4 to November 16, both dates inclusive, unless exclusion fencing has been installed prior to March 4 to keep turtles from entering the work area. Install and/or maintain exclusion fencing in accordance with the Turtle Exclusion Fencing, Climbing Turtle bid item included in the contract.
Installation of exclusion fencing from March 4 to November 16 is not allowed, even if a turtle survey is conducted, as it must be assumed that turtles have established nests as of May 20. A survey is not sufficient to identify established nests, resulting in potential egg mortality. Adjustment of these dates will not be considered.
Carefully move any turtles found within the project area to suitable habitat outside the project area.
4. Traffic.
Close CTH X to through traffic. No signed detour route will be marked.
Maintain two through lanes of traffic during non-working hours. Provide shoulder drop-off signs and traffic control drums when shoulder drop-offs are left overnight.
Maintain access to businesses and residences on CTH X within the project limits. Notify the property owners a minimum of 24 hours in advance if construction operations require a temporary closure of business or residential entrances. Charmed Clothing Company Boutique’s only business access is at Station 11+87 on the south side of CTH X.
Wisconsin Lane Closure System Advance Notification Prior to starting work, provide closure information to the engineer for incorporation into the Wisconsin Lane Closure System (LCS).
Discuss LCS completion dates and provide changes in the schedule to the engineer at project meetings in order to manage closures nearing their completion date.
5. Holiday and Special Event Work Restrictions.
Do not perform work on, nor haul materials of any kind along or across any portion of the highway carrying CTH X traffic, and entirely clear the traveled way and shoulders of such portions of the highway of equipment, barricades, signs, lights, and any other material that might impede the free flow of traffic during the following holiday and special event periods:
- From noon Friday, May 28, 2027 to 6:00 AM Tuesday, June 1, 2027 for Memorial Day;
- From noon Friday, July 2, 2027 to 6:00 AM Tuesday, July 6, 2027 for Independence Day;
- From noon Friday, September 3, 2027 to 6:00 AM Tuesday, September 7, 2027 for Labor Day.
8368-00-70 4 of 18 stp-107-005 (20210113)
6. Utilities.
This contract does not come under the provision of Administrative Rule Trans 220.
stp-107-066 (20240703)
Any utility facility locations (stations, offsets, elevations, depths) listed in this article are approximate.
Note: All utility facilities may not be shown on the project plans.
Brightspeed (Communications) has underground facilities running parallel to the roadway from STH 35 (Station 10+50) to the private drive located near Fire Number 5783 CTH X (Station 231+50). Prior to construction, Brightspeed will remove pedestals located at Stations 12+25 & 13+10. Prior to construction, Brightspeed will discontinue in place the underground copper facility from Station 12+25 to Station 19+18. Note: Brightspeed’s underground fiber optic in this same area will remain.
No other conflicts anticipated.
Northwestern WI Electric Co (Electric) has overhead electric running parallel to the roadway approximately 18 – 25’ north of the centerline of CTH X within the Village of Webster from STH 35 (Station 10+50) to Station 32+35.
Four existing utility poles are in conflict with the proposed curb & gutter from Walleye Avenue to Perch Avenue. Prior to construction, Northwestern WI Electric Co will relocate the four power poles.
The power pole at Station 19+85, 24’ LT to be moved to Station 19+90, 25’ LT.
The power poles at Station 21+08, 18’ LT & Station 22+68, 18’ LT to be moved to an offset of 25’ LT.
The power pole at Station 23+50, 21’ LT to be moved to Station 23+45, 25’ LT.
No other conflicts anticipated.
Polk-Burnett Electric Coop (Electric) has underground electric running parallel to the roadway from Fire Number 7051 CTH X (Station 56+00) to Fire Number 6330 CTH X (Station 155+50). Polk-Burnett Electric Coop has overhead electric running parallel to the roadway from Fire Number 6032 CTH X (Station 199+00) to Station 221+85 with underground electric continuing to Gaslyn Road (Station 262+50);
No conflicts anticipated.
Siren Telephone (Communications) has underground facilities running parallel to the roadway from STH 35 (Station 10+50) to Stengel Avenue (Station 63+50).
No conflicts anticipated.
Starwire Technologies (Communications) has underground facilities running parallel to the roadway from Fire Number 6689 CTH X (Station 79+00) to Gaslyn Road (Station 262+50).
No conflicts anticipated.
Village of Webster (Water) has underground facilities running parallel to the roadway within the Village Limits (Station 10+50 to Station 36+00). The 6” watermain has an approximate depth of 5.5 – 7 feet.
Adjust water valve box to match the new finished pavement elevation. Perform this work in accordance with the requirements of Adjusting Water Valve Box.
No other conflicts anticipated.
Village of Webster (Sewer) has underground facilities running parallel to the roadway within the Village Limits (Station 10+50 to Station 36+00). The 8” sanitary sewer has a depth of 4.2 feet at Staton 35+82 and increases to a depth of 15+ feet as it flows west to STH 35 (Station 10+50). The Village of Webster has a 6” sanitary forcemain that pumps sewage from STH 35 (Station 10+50) to the Wastewater Treatment Facility (Station 31+00). The forcemain has an approximate depth of 10 feet.
Adjust manholes to match the new finished pavement elevation. Perform this work in accordance with the requirements of Adjusting Manhole Covers.
No other conflicts anticipated.
We Energies (Gas) has underground gas service running parallel to the roadway on the south side from STH 35 (Station 10+50) to house number 7237 CTH X (Station 29+00).
8368-00-70 5 of 18
No conflicts anticipated.
7. Information to Bidders, U.S. Army Corps of Engineers Section 404 Permit.
The department has received written verification of coverage under the Section 404 Transportation Regional General Permit from the U.S. Army Corps of Engineers. Comply with the requirements of the permit in addition to requirements of the special provisions.
A copy of the permit is available from the regional office by contacting Tou Yang, P.E. at (715) 833-5570.
If the contractor requires work outside the proposed slope intercepts, based on their method of operation to construct the project, it is the contractor’s responsibility to determine whether a U.S. Army Corps of Engineers Section 404 permit modification is required. If a Section 404 permit modification is necessary, obtain the permit modification prior to beginning construction operations requiring the permit. No time extensions as discussed in standard spec 108.10 will be granted for the time required to apply for and obtain the permit modification. The contractor must be aware that the U.S. Army Corps of Engineers may not grant the permit modification request.
stp-107-054 (20230629)
8. Information to Bidders, WPDES Transportation Construction General Permit (TCGP) for Storm Water Discharges.
The following Project IDs have one acre or more of land disturbing construction activity and are required to obtain coverage under the TCGP. The permit requirements are part of the contract:
Project ID Design Calculated Amount of Land Disturbing Construction Activity (acres)
8368-00-70 3.75
This permit is the Wisconsin Pollutant Discharge Elimination System, Transportation Construction General Permit, (WPDES Permit No. WI-S066796-2) and is located at:
https://widnr.widen.net/s/s5mwp2gd7s/finalsignedwisdotcsgp
The department will apply for coverage under the TCGP upon submittal of the complete ECIP from the contractor, and concurrent with the department providing the ECIP to the Department of Natural Resources (DNR). The DNR will convey permit coverage upon the department’s approval of the ECIP and DNR concurrence that the project has met the requirements for coverage under the TCGP.
Do not begin land disturbing construction activity until the ECIP is approved and the DNR conveys TCGP coverage for the project.
A “Certificate of Permit Coverage” will be provided by the DNR upon conveyance of coverage under the permit. Post the “Certificate of Permit Coverage” in a conspicuous place at the construction site.
Stormwater discharge permit coverage for additional land disturbing construction activities related to contractor means and methods, including temporary support activity sites, will be considered as part of the ECIP review and approval process. Coverage under the TCGP for additional land disturbance areas will be considered if the areas meet all of the following:
• Must meet the TCGP applicability criteria.
• Must be for the exclusive use of WisDOT projects.
• Land disturbance first commences after the ECIP approval, and the areas are fully restored to meet the final stabilization criteria of the TCGP upon completion of the work.
Obtain any permits for areas that are not approved by the department for coverage under the TCGP.
stp-107-056 (20260701) https://widnr.widen.net/s/s5mwp2gd7s/finalsignedwisdotcsgp
8368-00-70 6 of 18
9. Environmental Protection, Aquatic Exotic Species Control.
Exotic invasive organisms such as VHS, zebra mussels, purple loosestrife, and Eurasian water milfoil are becoming more prolific in Wisconsin and pose adverse effects to waters of the state. Wisconsin State Statutes 30.07, "Transportation of Aquatic Plants and Animals; Placement of Objects in Navigable Waters", details the state law that requires the removal of aquatic plants and zebra mussels each time equipment is put into state waters.
At construction sites that involve navigable water or wetlands, use the follow cleaning procedures to minimize the chance of exotic invasive species infestation. Use these procedures for all equipment that comes in contact with waters of the state and/or infested water or potentially infested water in other states.
Ensure that all equipment that has been in contact with waters of the state, or with infested or potentially infested waters, has been decontaminated for aquatic plant materials and zebra mussels before being used in other waters of the state. Before using equipment on this project, thoroughly disinfect all equipment that has come into contact with potentially infested waters. Guidelines from the Wisconsin Department of Natural Resources for disinfection are available at:
http://dnr.wi.gov/topic/invasives/disinfection.html
Use the following inspection and removal procedures:
1. Before leaving the contaminated site, wash machinery and ensure that the machinery is free of all soil and other substances that could possibly contain exotic invasive species;
2. Drain all water from boats, trailers, bilges, live wells, coolers, bait buckets, engine compartments, and any other area where water may be trapped;
3. Inspect boat hulls, propellers, trailers and other surfaces. Scrape off any attached mussels, remove any aquatic plant materials (fragments, stems, leaves, seeds, or roots), and dispose of removed mussels and plant materials in a garbage can before leaving the area or invested waters; and
4. Disinfect your boat, equipment and gear by either:
4.1. Washing with ~212 F water (steam clean), or
4.2. Drying thoroughly for five days after cleaning with soap and water and/or high pressure water, or
4.3. Disinfecting with either 200 ppm (0.5 oz per gallon or 1 Tablespoon per gallon) Chlorine for
10-minute contact time or 1:100 solution (38 grams per gallon) of Virkon Aquatic for 20- to 30-minute contact time. Note: Virkon is not registered to kill zebra mussel veligers nor invertebrates like spiny water flea. Therefore, this disinfect should be used in conjunction with a hot water (>104º F) application.
Complete the inspection and removal procedure before equipment is brought to the project site and before the equipment leaves the project site.
stp-107-055 (20130615)
10. Pulverize and Relay.
Replace standard spec 325.3(2) with the following:
(2) Immediately after pulverizing, relay the material with a paver, grader, or both the paver and grader. Use equipment with automatic grade and slope control systems for adjusting the slope through super-elevated curves, transitions, and tangent sections and an averaging device to achieve a smooth profile. If the automatic control systems break down, the contractor may use manual controls for the remainder of that day only.
stp-325-001 (20080902)
11. QMP Pulverize and Relay Compaction, Item 374.1020.S.
A Description
(1) This special provision describes modifying the compaction and density testing documentation requirements of work done under the Mill and Relay Pavement and Pulverize and Relay bid items.
Conform to standard spec 325 and 330 as modified in this special provision.
http://dnr.wi.gov/topic/invasives/disinfection.html
8368-00-70 7 of 18
(2) Provide and maintain a quality management program. A quality management program is defined as all activities, including process control, inspection, sampling and testing, and necessary adjustments in the process related to construction of a milled and re-laid and pulverized and re-laid base which meets all the requirements of this provision.
(3) Chapter 8 of the department’s Construction and Materials Manual (CMM) provides additional detailed guidance for QMP work and describes sampling and testing procedures. The contractor may obtain the CMM from the department’s web site at:
https://wisconsindot.gov/Pages/doing-bus/eng-consultants/cnslt-rsrces/rdwy/default.aspx
(4) This special provision applies to Mill and Relay and Pulverize and Relay material placed on both the mainline traveled way and its adjacent mainline shoulders according to the typical finished sections.
Unless otherwise specified by the contract, all Mill and Relay and Pulverize and Relay material placed on side roads, private and public entrances, ramps, tapers, turn lanes, and other locations not described as the mainline traveled way and its adjacent mainline shoulders is exempt from the compaction and density requirement modifications and testing contained within this special provision.
B (Vacant) C Construction
C.1 General Replace paragraph (4) of standard spec 325.3 and standard spec 330.3 with the following:
(4) Re-laid material will be accepted for compaction on a target density lot basis. Compact the re-laid material to a minimum of 96.0% of the material target density. Ensure that adequate moisture is present during placement and compaction operations to prevent segregation and to help achieve compaction.
The material target density will be identified using the average of 10 random control strip wet density measurements as described in section C.2.5.1.
Field density tests will not be considered for lot acceptance on the basis of compaction under the requirements of this provision until the moisture content of the in-place material is within -2.0 or +4.0 percentage points of the average moisture content of the 10 density tests representing a control strip.
C.2 Quality Management Program
C.2.1 Quality Control Plan
(1) Submit a comprehensive written quality control plan to the engineer no later than 10 business days before placement of material. Do not construct any re-laid base before the engineer reviews and accepts the plan. Construct the project as the plan provides.
(2) Do not change the quality control plan without the engineer’s review and acceptance. Update the plan with changes as they become effective. Provide a current copy of the plan to the engineer and post in the contractor’s laboratory as changes are adopted. Ensure that the plan provides the following elements:
1. An organizational chart with names, telephone numbers, current certifications and/or titles, and roles and responsibilities of QC personnel.
2. The process used to disseminate QC information and corrective action efforts to the appropriate persons.
Include a list of recipients, the communication process that will be used, and action time frames.
3. An outline for resolving a process control problem. Include responsible personnel, required documentation, and appropriate communication steps.
4. Location of the QC laboratory, retained sample storage, and other documentation.
5. A summary of the random locations and calculated quantities to be tested under this provision.
6. A description of placement methods and operations. Including, but not limited to: staging, construction of an initial working platform, lift thicknesses, and equipment.
C.2.2 Pre-Placement Meeting
(1) A minimum of two weeks before the start of placement of material, hold a pre-placement meeting at a mutually agreed upon time and location. Present the Quality Control Plan at the meeting. Attendance at the pre-placement meeting is mandatory for the project superintendent, quality control manager, project inspection and testing staff, all appropriate contractor personnel involved in the sampling, testing, and quality control including subcontractors, and the engineer or designated representatives.
https://wisconsindot.gov/Pages/doing-bus/eng-consultants/cnslt-rsrces/rdwy/default.aspx
8368-00-70 8 of 18
C.2.3 Personnel
(1) Perform the quality control sampling, testing, and documentation required under this provision using technicians certified by the Department’s Highway Technician Certification Program (HTCP). Have a HTCP Nuclear Density Technician I, or ACT certified technician, perform field density and field moisture content testing.
(2) If an ACT is performing sampling or testing, a certified technician must coordinate and take responsibility for the work an ACT performs. Have a certified technician ensure that all sampling and testing is performed correctly, analyze test results, and post resulting data. No more than one ACT can work under a single certified technician.
C.2.4 Equipment
(1) Furnish the necessary equipment and supplies for performing quality control testing. Ensure that all testing equipment conforms to the equipment specifications applicable to the required testing methods.
The engineer may inspect the measuring and testing devices to confirm both calibration and condition.
Calibrate all testing equipment according to the CMM and maintain a calibration record at the laboratory.
(2) Furnish nuclear gauges from the department’s approved product list at:
https://wisconsindot.gov/Pages/doing-bus/eng-consultants/cnslt-rsrces/tools/appr-prod/default.aspx
(3) Ensure that the nuclear gauge manufacturer or an approved calibration service calibrates the gauge the same calendar year it is used on the project.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .