C Washburn, Bayfield Street Washington Avenue to Superior Avenue
Solicitation number
20261208043
Issued by
Ashland County, Wisconsin

About this file

This proposal document is issued by the Wisconsin Department of Transportation (WisDOT) for a highway reconstruction project in Washburn, Bayfield County, Wisconsin. The project, identified as 8160-00-76, involves reconstruction of State Highway 13 (Bayfield Street) from Washington Avenue to Superior Avenue and includes excavation, concrete pavement, HMA pavement, base aggregate, backfill, concrete curb and gutter, storm sewer, sidewalk, signing, pavement marking, street lighting, and incidental work as shown on the plans. The contract work must be performed according to WisDOT Standard Specifications for Highway and Structure Construction (2025 Edition) and the special provisions included in this document. Construction must begin within 10 calendar days of the engineer's written notice to proceed, with all work to be completed within the 2027 construction season. Bidders are required to submit a proposal guaranty, include a list of proposed subcontractors, and comply with a detailed schedule of bid preparation requirements, including electronic submittal via the Bid Express platform or paper submission with appropriate waivers and administrative fees.

The proposal requires a $75 administrative fee for paper bid submissions submitted under waiver of electronic submittal requirements. Bidders must possess a valid annual bid bond on file with WisDOT and a digital ID enabled by Info Tech Inc. for electronic submissions. The contract includes extensive utility coordination requirements with multiple service providers including Brightspeed, City of Washburn (sanitary and water systems), Norvado, Spectrum, and Xcel Energy (electricity and gas). Additional requirements include traffic management with full closure of STH 13, detour routing, pedestrian accommodations, environmental protections (aquatic exotic species control and WPDES Transportation Construction General Permit compliance), protection of historic properties, coordination with residents and businesses through monthly meetings, seismic monitoring, pre- and post-construction crack and damage surveys, and participation in the Highway Construction Skills Training (HCST) program with a contract goal of utilizing 2,500 HCST graduate hours and 2,000 HCST apprentice hours at $5.00 per hour reimbursement on Federal-aid projects. The project is funded through Federal-aid sources and must comply with all applicable state and federal regulations including non-discrimination requirements, OSHA standards for petroleum contamination remediation, and restrictions on work during holiday and special event periods.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

!#��$�%��!����#�#��!"%&'�(��&)(�(����*++*�,�&-./����*�0#�#��1�12��3 4232�����3 ���5261�32�6���1��7 ������� 6�871�9&+�:��:.+ �;0<��(�(.�99 <����=� �A�0#�

#>���=�!B#�!�CD

�#��0

�����CD

0%E��&� ?�@$� �A A�@#= !A ���B!

A��AA

!#�$%��!����#�#��!>���!� ��A�!

F�#=#=

�AD

A� G

��AA

�!��=�!AA

��D �����>�!A#�� �$������F��H$��#= �����D A ��B!�# A���I A>��!�� ��A�!

�F�#=�#= !A A����������J G !#���!A�<�!A�#��!�*���������K ���!#@�J G A���@��� !#��$�%��!����#�#��!L&��>���*�� C##� =����������K

���!#@��!��� H��$�#=����CKM*?�A�0

�-N� ���%��

��9>�(�(+&&������<�!#�� #�<���� !A���"�@�C���B!

A�"���AD�!#�B

A�?

���M!# �K��� �O P���� ��

>�CAA�

��>�<�#@>�0#�# >�Q���<�A R A �����D ���B=#*%=�� !A ���B!

A��AA

�>A �@�F��!>���!� #=���S A� !#�#�D A���D T#=�##=

��AA

R���!

A�!A �� A#= ��A$���#=

���!�>E�B=F�@���H��������>�!A����AA

!A�>�!A=�� = H A#= �!A

���##�!B#=��������������AT�!A#=�##=

��AA

����B

�=�D �A�� #�@���!A�� A�!#��!@�B�

A�!�!@ ��� �F�� #�H

#�#�D

��AA�!B�! �!!

#��!F�#=#=��������������A*3U�VUW�XYZV[�VUW\]Ŷ_[�U]�X̀abYW�WcYX��YZcd\e��U]f��]UgUX\h�dc_V�X̀abYWWYVZ�\V�_h_iW]UVYi�aYj�UV�Wc_��VW_]V_Wk0 A��!A��F��!�#��� �#=���A�# �lllllllllllllll-0�B!�# ��� >�0#�#

���
>��#��@��

��� >�0#�#

�<��������!�MR���

�/ -?�AA

��0�B!�#

�?�AA

/-?�AA

/4U]�3_g\]Wb_VW�8X_��Vhe1eg_�Um��U]fn �#�

��$�CF��A�"�#

A "�# �K ���!#@�J A �#��@�0

��o��27�1�4���p�33�7���8����2�

J ��D���>�q����!B>�K��A�!B>�CBB� B�# ���D !#>�C��=��#���D �D ����!A�K �0�A F��H>0#����0 F �>�M�����!�<�!#���>�%��$$� �<�!#���>���D !#�q��H�!B>�J

PLEASE ATTACH

PROPOSAL GUARANTY HERE

Effective with November 2007 Letting Proposal Requirements

PROPOSAL REQUIREMENTS AND CONDITIONS

The bidder, signing and submitting this proposal, agrees and declares as a condition thereof, to be bound by the following conditions and requirements.

If the bidder has a corporate relationship with the proposal design engineering company, the bidder declares that it did not obtain any facts, data, or other information related to this proposal from the design engineering company that was not available to all bidders.

The bidder declares that they have carefully examined the site of, and the proposal, plans, specifications and contract forms for the work contemplated, and it is assumed that the bidder has investigated and is satisfied as to the conditions to be encountered, as to the character, quality, and quantities of work to be performed and materials to be furnished, and as to the requirements of the specifications, special provisions and contract. It is mutually agreed that submission of a proposal shall be considered conclusive evidence that the bidder has made such examination.

The bidder submits herewith a proposal guaranty in proper form and amount payable to the party as designated in the advertisement inviting proposals, to be retained by and become the property of the owner of the work in the event the undersigned shall fail to execute the contract and contract bond and return the same to the office of the engineer within fourteen (14) days after having been notified in writing to do so;

otherwise to be returned.

The bidder declares that they understand that the estimate of quantities in the attached schedule is approximate only and that the attached quantities may be greater or less in accordance with the specifications.

The bidder agrees to perform the said work, for and in consideration of the payment of the amount becoming due on account of work performed, according to the unit prices bid in the following schedule, and to accept such amounts in full payment of said work.

The bidder declares that all of the said work will be performed at their own proper cost and expense, that they will furnish all necessary materials, labor, tools, machinery, apparatus, and other means of construction in the manner provided in the applicable specifications and the approved plans for the work together with all standard and special designs that may be designed on such plans, and the special provisions in the contract of which this proposal will become a part, if and when accepted. The bidder further agrees that the applicable specifications and all plans and working drawings are made a part hereof, as fully and completely as if attached hereto.

The bidder, if awarded the contract, agrees to begin the work not later than ten (10) days after the date of written notification from the engineer to do so, unless otherwise stipulated in the special provisions.

The bidder declares that if they are awarded the contract, they will execute the contract agreement and begin and complete the work within the time named herein, and they will file a good and sufficient surety bond for the amount of the contract for performance and also for the full amount of the contract for payment.

Effective with November 2007 Letting Proposal Requirements

The bidder, if awarded the contract, shall pay all claims as required by Section 779.14, Statutes of Wisconsin, and shall be subject to and discharge all liabilities for injuries pursuant to Chapter 102 of the Statutes of Wisconsin, and all acts amendatory thereto. They shall further be responsible for any damages to property or injury to persons occurring through their own negligence or that of their employees or agents, incident to the performance of work under this contract, pursuant to the Standard Specifications for Road and Bridge Construction applicable to this contract.

In connection with the performance of work under this contract, the contractor agrees to comply with all applicable state and federal statutes relating to non-discrimination in employment. No otherwise qualified person shall be excluded from employment or otherwise be subject to discrimination in employment in any manner on the basis of age, race, religion, color, gender, national origin or ancestry, disability, arrest or conviction record (in keeping with s.111.32), sexual orientation, marital status, membership in the military reserve, honesty testing, genetic testing, and outside use of lawful products. This provision shall include, but not be limited to the following: employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation, and selection for training, including apprenticeship. The contractor further agrees to ensure equal opportunity in employment to all applicants and employees and to take affirmative action to attain a representative workforce.

The contractor agrees to post notices and posters setting forth the provisions of the nondiscrimination clause, in a conspicuous and easily accessible place, available for employees and applicants for employment.

If a state public official (section 19.42, Stats.) or an organization in which a state public official holds at least a 10% interest is a party to this agreement, this contract is voidable by the state unless appropriate disclosure is made to the State of Wisconsin Ethics Board.

Effective with August 2015 Letting Bid Preparation

BID PREPARATION

Preparing the Proposal Schedule of Items A. General

(1) Obtain bidding proposals as specified in section 102 of the standard specifications prior to 11:45 AM of the last business day preceding the letting. Submit bidding proposals using one of the following methods:

1. Electronic bid on the internet.

2. Electronic bid on a printout with accompanying diskette or CD ROM.

3. Paper bid under a waiver of the electronic submittal requirements.

(2) Bids submitted on a printout with accompanying diskette or CD ROM or paper bids submitted under a waiver of the electronic submittal requirements govern over bids submitted on the internet.

(3) The department will provide bidding information through the department’s web site at:

https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx

The contractor is responsible for reviewing this web site for general notices as well as information regarding proposals in each letting. The department will also post special notices of all addenda to each proposal through this web site no later than 4:00 PM local time on the Thursday before the letting. Check the department’s web site after 5:00 PM local time on the Thursday before the letting to ensure all addenda have been accounted for before preparing the bid. When bidding using methods 1 and 2 above, check the Bid ExpressΤΜ on-line bidding exchange at http://www.bidx.com/ after 5:00 PM local time on the Thursday before the letting to ensure that the latest schedule of items Expedite file (*.ebs or *.00x) is used to submit the final bid.

(4) Interested parties can subscribe to the Bid ExpressΤΜ on-line bidding exchange by following the instructions provided at the www.bidx.com web site or by contacting:

Info Tech Inc.

5700 SW 34th Street, Suite 1235 Gainesville, FL 32608-5371 email: mailto:customer.support@bidx.com

(5) The department will address equipment and process failures, if the bidder can demonstrate that those failures were beyond their control.

(6) Contractors are responsible for checking on the issuance of addenda and for obtaining the addenda. Notice of issuance of addenda is posted on the department’s web site at:

https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx or by calling the department at (608) 266-1631. Addenda can ONLY be obtained from the department’s web site listed above or by picking up the addenda at the Bureau of Highway Construction, 4th floor, 4822 Madison Yards Way, Madison, WI, during regular business hours.

(7) Addenda posted after 5:00 PM on the Thursday before the letting will be emailed to the eligible bidders for that proposal. All eligible bidders shall acknowledge receipt of the addenda whether they are bidding on the proposal or not. Not acknowledging receipt may jeopardize the awarding of the project.

https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx http://www.bidx.com/ http://www.bidx.com/ mailto:customer.support@bidx.com

B. Submitting Electronic Bids B.1 On the Internet

(1) Do the following before submitting the bid:

4. Have a properly executed annual bid bond on file with the department.

5. Have a digital ID on file with and enabled by Info Tech Inc. Using this digital ID will constitute the bidder's signature for proper execution of the bidding proposal.

(2) In lieu of preparing, delivering, and submitting the proposal as specified in 102.6 and 102.9 of the standard specifications, submit the proposal on the internet as follows:

1. Download the latest schedule of items reflecting all addenda from the Bid ExpressΤΜ web site.

2. Use ExpediteΤΜ software to enter a unit price for every item in the schedule of items.

3. Submit the bid according to the requirements of ExpediteΤΜ software and the Bid ExpressΤΜ web site. Do not submit a bid on a printout with accompanying diskette or CD ROM or a paper bid. If the bidder does submit a bid on a printout with accompanying diskette or a paper bid in addition to the internet submittal, the department will disregard the internet bid

4. Submit the bid before the hour and date the Notice to Contractors designates

5. Do not sign, notarize, and return the bidding proposal described in 102.2 of the standard specifications.

(3) The department will not consider the bid accepted until the hour and date the Notice to Contractors designates.

B.2 On a Printout with Accompanying Diskette or CD ROM

(1) Download the latest schedule of items from the Wisconsin pages of the Bid Express web site reflecting the latest addenda posted on the department’s web site at:

https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx

Use ExpediteΤΜ software to prepare and print the schedule of items. Provide a valid amount for all price fields. Follow instructions and review the help screens provided on the Bid ExpressΤΜ web site to assure that the schedule of items is prepared properly.

(2) Staple an 8 1/2 by 11 inch printout of the Expedite generated schedule of items to the other proposal documents submitted to the department as a part of the bidder's sealed bid. As a separate submittal, not in the sealed bid envelop but due at the same time and place as the sealed bid, also provide the ExpediteΤΜ generated schedule of items on a 3 1/2 inch computer diskette or CD ROM. Label each diskette or CD ROM with the bidder's name, the 4 character department-assigned bidder identification code from the top of the bidding proposal, and a list of the proposal numbers included on that diskette or CD ROM as indicated in the following example:

Bidder Name

BN00

Proposals: 1, 12, 14, & 22

(3) If bidding on more than one proposal in the letting, the bidder may include all proposals for that letting on one diskette or CD ROM. Include only submitted proposals with no incomplete or other files on the diskette or CD ROM.

(4) The bidder-submitted printout of the Expedite generated schedule of items is the governing contract document and must conform to the requirements of section 102 of the standard specifications. If a printout needs to be altered, cross out the printed information with ink or typewriter and enter the new information and initial it in ink. If there is a discrepancy between the printout and the diskette or CD ROM, the department will analyze the bid using the printout information.

(5) In addition to the reasons specified in section 102 of the standard specifications, proposals are irregular and the department may reject them for one or more of the following:

1. The check code printed on the bottom of the printout of the ExpediteΤΜ generated schedule of items is not the same on each page.

2. The check code printed on the printout of the ExpediteΤΜ generated schedule of items is not the same as the check code for that proposal provided on the diskette or CD ROM.

3. The diskette or CD ROM is not submitted at the time and place the department designates.

B Waiver of Electronic Submittal

(1) The bidder may request a waiver of the electronic submittal requirements. Submit a written request for a waiver in lieu of bids submitted on the internet or on a printout with accompanying diskette or CD ROM. Use the waiver that was included with the paper bid document sent to the bidder or type up a waiver on the bidder’s letterhead. The department will waive the electronic submittal requirements for a bidding entity (individual, partnership, joint venture, corporation, or limited liability company) for up to 4 individual proposals in a calendar year. The department may allow additional waivers for equipment malfunctions.

(2) Submit a schedule of items on paper conforming to section 102 of the standard specifications.

The department charges the bidder a $75 administrative fee per proposal, payable at the time and place the department designates for receiving bids, to cover the costs of data entry. The department will accept a check or money order payable to: "Wisconsin, Dept. of Transportation."

(3) In addition to the reasons specified in section 102 of the standard specifications, proposals are irregular and the department may reject them for one or more of the following:

1. The bidder fails to provide the written request for waiver of the electronic submittal requirements.

2. The bidder fails to pay the $75 administrative fee before the time the department designates for the opening of bids unless the bidder requests on the waiver that they be billed for the $75.

3. The bidder exceeds 4 waivers of electronic submittal requirements within a calendar year.

(4) In addition to the reasons specified in section 102 of the standard specifications, the department may refuse to issue bidding proposals for future contracts to a bidding entity that owes the department administrative fees for a waiver of electronic submittal requirements.

PROPOSAL BID BOND Wisconsin Department of Transportation

DT1303 1/2006

Proposal Number Project Number Letting Date

Name of Principal

Name of Surety State in Which Surety is Organized

We, the above-named Principal and the above-named Surety, are held and firmly bound unto the State of Wisconsin in the sum equal to the Proposal Guaranty for the total bid submitted for the payment to be made; we jointly and severally bind ourselves, our heirs, executors, administrators, successors and assigns. The condition of this obligation is that the Principal has submitted a bid proposal to the State of Wisconsin acting through the Department of Transportation for the improvement designated by the Proposal Number and Letting Date indicated above.

If the Principal is awarded the contract and, within the time and manner required by law after the prescribed forms are presented for signature, enters into a written contract in accordance with the bid, and files the bond with the Department of Transportation to guarantee faithful performance and payment for labor and materials, as required by law, or if the Department of Transportation shall reject all bids for the work described, then this obligation shall be null and void; otherwise, it shall be and remain in full force and effect.

In the event of failure of the Principal to enter into the contract or give the specified bond, the Principal shall pay to the Department of Transportation within 10 business days of demand a total equal to the Proposal Guaranty as liquidated damages; the liability of the Surety continues for the full amount of the obligation as stated until the obligation is paid in full.

The Surety, for value received, agrees that the obligations of it and its bond shall not be impaired or affected by any extension of time within which the Department of Transportation may accept the bid; and the Surety does waive notice of any such extension.

IN WITNESS, the Principal and Surety have agreed and have signed by their proper officers and have caused their corporate seals to be affixed this date: (DATE MUST BE ENTERED)

PRINCIPAL

(Company Name) (Affix Corporate Seal)

(Signature and Title)

(Company Name)

(Signature and Title)

(Company Name)

(Signature and Title)

(Company Name)

(Signature and Title)

NOTARY FOR PRINCIPAL

(Date)

State of Wisconsin ) ) ss.

County )

On the above date, this instrument was acknowledged before me by the named person(s).

(Signature, Notary Public, State of Wisconsin)

(Print or Type Name, Notary Public, State of Wisconsin)

(Date Commission Expires)

Notary Seal

(Name of Surety) (Affix Seal)

(Signature of Attorney-in-Fact)

NOTARY FOR SURETY

(Date)

State of Wisconsin ) ) ss.

County )

On the above date, this instrument was acknowledged before me by the named person(s).

(Signature, Notary Public, State of Wisconsin)

(Print or Type Name, Notary Public, State of Wisconsin)

(Date Commission Expires)

Notary Seal

IMPORTANT: A certified copy of Power of Attorney of the signatory agent must be attached to the bid bond.

CERTIFICATE OF ANNUAL BID BOND Wisconsin Department of Transportation

DT1305 8/2003

Time Period Valid (From/To)

Name of Surety

Name of Contractor

Certificate Holder Wisconsin Department of Transportation

This is to certify that an annual bid bond issued by the above-named Surety is currently on file with the Wisconsin Department of Transportation.

This certificate is issued as a matter of information and conveys no rights upon the certificate holder and does not amend, extend or alter the coverage of the annual bid bond.

Cancellation: Should the above policy be cancelled before the expiration date, the issuing surety will give thirty (30) days written notice to the certificate holder indicated above.

(Signature of Authorized Contractor Representative) (Date)

Effective with March 2010 Letting

LIST OF SUBCONTRACTORS

Section 66.0901(7), Wisconsin Statutes, provides that as a part of the proposal, the bidder also shall submit a list of the subcontractors the bidder proposes to contract with and the class of work to be performed by each. In order to qualify for inclusion in the bidder's list a subcontractor shall first submit a bid in writing, to the general contractor at least 48 hours prior to the time of the bid closing. The list may not be added to or altered without the written consent of the municipality. A proposal of a bidder is not invalid if any subcontractor and the class of work to be performed by the subcontractor has been omitted from a proposal; the omission shall be considered inadvertent or the bidder will perform the work personally.

No subcontract, whether listed herein or later proposed, may be entered into without the written consent of the Engineer as provided in Subsection 108.1 of the Standard Specifications.

Name of Subcontractor Class of Work Estimated Value

Effective with December 2000 Letting Debarment Certification

CERTIFICATION REGARDING DEBARMENT, SUSPENSION, AND OTHER

RESPONSIBILITY MATTERS - PRIMARY COVERED TRANSACTIONS

Instructions for Certification

1. By signing and submitting this proposal, the prospective contractor is providing the certification set out below.

2. The inability of a person to provide the certification required below will not necessarily result in denial of participation in this covered transaction. The prospective contractor shall submit an explanation of why it cannot provide the certification set out below. The certification or explanation will be considered in connection with the department or agency's determination whether to enter into this transaction. However, failure of the prospective contractor to furnish a certification or an explanation shall disqualify such person from participation in this transaction.

3. The certification in this clause is a material representation of fact upon which reliance was placed when the department determined to enter into this transaction. If it is later determined that the contractor knowingly rendered an erroneous certification in addition to other remedies available to the Federal Government the department may terminate this transaction for cause or default.

4. The prospective contractor shall provide immediate written notice to the department to whom this proposal is submitted if at any time the prospective contractor learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances.

5. The terms "covered transaction," "debarred," "suspended," "ineligible," "lower tier covered transaction," "participant," "person," "primary covered transaction," "principal," "proposal," and "voluntarily excluded," as used in this clause, have the meanings set out in the Definitions and Coverage sections of the rules implementing Executive Order 12549. You may contact the department to which this proposal is being submitted for assistance in obtaining a copy of those regulations.

6. The prospective contractor agrees by submitting this proposal that, should this contract be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department entering into this transaction.

7. The prospective contractor further agrees by submitting this proposal that it will include the clause titled "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion-Lower Tier Covered Transaction," which is included as an addendum to PR- 1273 - "Required Contract Provisions Federal Aid Construction Contracts," without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions.

8. The contractor may rely upon a certification of a prospective subcontractor/materials supplier that it is not debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A contractor may decide the method and frequency by which it determines the eligibility of its principals. Each contractor may, but is not required to, check the Disapproval List (telephone # 608/266/1631).

Effective with December 2000 Letting Debarment Certification

9. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of a contractor is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings.

10. Except for transactions authorized under paragraph 6 of these instructions, if a contractor in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department may terminate this transaction for cause or default.

Certification Regarding Debarment, Suspension, and Other Responsibility Matters - Primary Covered Transactions

1. The prospective contractor certifies to the best of its knowledge and belief, that it and its principals:

(a) Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal department or agency;

(b) Have not within a three-year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements or receiving stolen property;

(c) Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State or local) with commission of any of the offense enumerated in paragraph (1)(b) of this certification; and

(d) Have not within a three-year period preceding this proposal had one or more public transactions (Federal, State or local) terminated for cause or default.

2. Where the prospective contractor is unable to certify to any of the statements in this certification, such prospective contractor shall attach an explanation to this proposal.

8160-00-76 1 of 19

Special Provisions Table of Contents

Article Description Page #

1. General

2. Scope of Work

3. Prosecution and Progress

4. Traffic

5. Holiday and Special Event Work Restrictions

6. Utilities

7. Work by Others

8. Information to Bidders, U.S. Army Corps of Engineers Section 404 Permit

9. Environmental Protection, Aquatic Exotic Species Control

10. Information to Bidders, WPDES Transportation Construction General Permit (TCGP) for Storm

Water Discharges

11. Health and Safety Requirements for Workers Remediating Petroleum Contamination

12. Historic Properties

13. Coordination with Businesses and Residents

14. Public Convenience and Safety

15. Removing Concrete Sidewalk

16. Removal of Lighting Conduit, Conductor and Pull Boxes

17. Removing Planter, Item 204.9060.S

18. Material Transfer Vehicle, Item 460.9000.S

19. Concrete Curb, Concrete Curb and Gutter

20. Concrete Sidewalk

21. Concrete Steps

22. Pipe Underdrain

23. Fence Safety, Item 616.0700.S

24. Seismograph 8160-00-76, Item 999.1001.S

25. Crack and Damage Survey, Item 999.1501.S

26. Inlets 5-FT Diameter, Item SPV.0060.01; Inlets 7-FT Diameter, Item SPV.0060.02

27. Concrete Base Type Special, Item SPV.0060.03

28. Lighting Unit Type Special, Item SPV.0060.04

29. Residential Manholes, Item SPV.0060.05

30. Storm Sewer Pipe PVC 6-Inch, Item SPV.0090.01; Storm Sewer Pipe PVC 8-Inch, Item

SPV.0090.02

31. Scourstop, Item SPV.0165.02

8160-00-76 2 of 19

STSP’S Revised July 1, 2026

SPECIAL PROVISIONS

1. General.

Perform the work under this construction contract for the following projects:

8160-00-76 C Washburn, Bayfield Street Washington Avenue to Superior Avenue

STH 13

Bayfield County

Perform the work as the plans show and execute the work as specified in the State of Wisconsin, Department of Transportation, Standard Specifications for Highway and Structure Construction, 2025 Edition, as published by the department, and these special provisions.

If all or a portion of the plans and special provisions are developed in the SI metric system and the schedule of prices is developed in the US standard measure system, the department will pay for the work as bid in the US standard system.

100-005 (20260701)

2. Scope of Work.

The work under this contract consists of excavation, concrete pavement, HMA pavement, base aggregate dense, backfill granular, concrete curb and gutter, storm sewer, sidewalk, signing, pavement marking, street lighting and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.

104-005 (20090901)

3. Prosecution and Progress.

Begin work within 10 calendar days after the engineer issues a written notice to do so.

Provide the time frame for construction of the project within the 2027 construction season to the engineer in writing within a month after executing the contract but at least 14 calendar days before the preconstruction conference. Assure that the time frame is consistent with the contract completion time.

Upon approval, the engineer will issue the notice to proceed within ten calendar days before the beginning of the approved time frame.

To revise the time frame, submit a written request to the engineer at least two weeks before the beginning of the intended time frame. The engineer will approve or deny that request based on the conditions cited in the request and its effect on the department’s scheduled resources.

Protection of Endangered Bats Federally protected bats have the potential to inhabit the project limits because they roost in trees, bridges, culverts, and other structures. Roosts may not have been observed on this project, but conditions to support the species exist. The species and all active roosts are protected by the federal Endangered Species Act. If an individual bat or active roost is encountered during construction operations, stop work, and notify the engineer and the WisDOT Regional Environmental Coordinator

(REC).

Ensure all operators, employees, and subcontractors working in areas of known or presumed bat habitat are aware of environmental commitments and avoidance and minimization measures (AMMs) to protect both bats and their habitat.

Direct temporary lighting, if used, away from wooded areas during the bat active season April 15 to October 31, both dates inclusive.

8160-00-76 3 of 19

Tree Clearing/Trimming

Tree clearing/trimming is limited to that which is specified in the plans. Contractor means and methods to remove additional trees/branches will not be allowed. If it is determined that additional trees with a 3-inch or greater diameter at breast height (dbh), or branches of any size on those sized trees, need to be removed beyond contractor means and methods, notify the engineer to coordinate with the WisDOT REC to determine if consultation with United States Fish and Wildlife Service (USFWS) is required. The contractor must be aware that the WisDOT REC and/or USFWS may not permit modifications.

Submit a schedule and description of clearing operations with the ECIP 14 days prior to any clearing operations. The department will determine, based on schedule and scope of work, what additional erosion control measures shall be implemented prior to the start of clearing operations, and list those additional measures in the ECIP.

Branch trimming is incidental to other work if no other tree clearing work is necessary.

No storage of construction equipment or materials outside of project limits allowed at Legion Park (50 E.

Bayfield Street) and Washburn Ranger Station (203 E. Bayfield Street). Safety Fence will be installed for construction at Legion Park.

4. Traffic.

Close STH 13 (Bayfield Street) to through traffic. Detour local traffic along Washington Avenue to Maki Road, then back onto STH 13 (Bayfield Street). A single lane in each direction will be available along the local detour route during construction operations. Repair and prepare the local detour route before beginning work. The weight limit on the detour route is 20 tons. Detour truck traffic along 8th Avenue W (CTH C), then back onto STH 13. Install temporary pedestrian accommodations before beginning any major work on STH 13.

Provide and maintain pedestrian access to businesses and residences at all times. Construct multiple entrances onto STH 13 on an open/close alternating basis. Construct properties with single entrances onto STH 13 one half at a time or provide a temporary base aggregate dense entrance constructed next to the existing entrance. Properties with alternate/additional access from a side street or alley shall use the alternate side street access while the entrances onto STH 13 are constructed.

Provide STH 13 (Bayfield Street) vehicular cross traffic access at a minimum of two side street between 1st Avenue W and 3rd Avenue E.

Provide STH 13 (Bayfield Street) pedestrian cross traffic access at a minimum of one side of each street between 1st Avenue W and 3rd Avenue E.

Provide STH 13 (Bayfield Street) vehicular and pedestrian cross traffic access at 6th Avenue E at all times, until the intersection is reconstructed.

Maintain pedestrian and vehicle access to Legion Park from the north and east during construction.

Complete the patching, signing and pavement marking for the truck and local detour of STH 13 (Bayfield Street) traffic utilizing STH 13 as shown on detour plan or as directed by the engineer. A minimum of three working days prior to opening the detour, the engineer, contractor, and Northwest Regional Signing Coordinator will review the signed detour route for acceptance.

Perform work in such a manner to ensure emergency vehicles and personnel access to adjacent residences and businesses at all times. Only one trench may be open at any time in areas that have fire escape access on the front of the buildings. Fire escape access must be maintained at all times in these locations. At the direction of the engineer, construct temporary base aggregate dense walks to replace removed concrete sidewalks.

Coordinate with the City contractor for the sanitary and watermain work. Reconstruct from east to west, the detour routes remain throughout the project.

Wisconsin Lane Closure System Advance Notification Provide the following advance notification to the engineer for incorporation into the Wisconsin Lane Closure System (LCS).

8160-00-76 4 of 19

TABLE 108-1 CLOSURE TYPE AND REQUIRED MINIMUM ADVANCE NOTIFICATION

Closure type with height, weight, or width restrictions (available width, all lanes in one direction < 16 feet) MINIMUM NOTIFICATION

Lane and shoulder closures 7 calendar days

Full roadway closures 7 calendar days

Ramp closures 7 calendar days

Detours 7 calendar days

Closure type without height, weight, or width restrictions (available width, all lanes in one direction > 16 feet) MINIMUM NOTIFICATION

Shoulder Closures 3 calendar days

Lane closures 3 business days

Ramp closures 3 business days

Modifying all closure types 3 business days

Discuss LCS completion dates and provide changes in the schedule to the engineer at weekly project meetings in order to manage closures nearing their completion date.

5. Holiday and Special Event Work Restrictions.

Do not perform work on, nor haul materials of any kind along or across any portion of the highway carrying STH 13 traffic, during the following holiday and special event periods:

- From noon Friday, May 28, 2027, to 6:00 AM Tuesday, June 1, 2027, Memorial Day;

- From noon Friday, July 2, 2027, to 6:00 AM Tuesday, July 6, 2027, Independence Day;

- From noon Friday, September 3, 2027, to 6:00 AM Tuesday, September 7, 2027, Labor Day;

- From noon Thursday, September 30, 2027, to 6:00 AM Monday, October 4, 2027, Bayfield Apple Festival.

6. Utilities.

This contract comes under the provision of Administrative Rule Trans 220.

The utility work plan includes additional detailed information regarding the location of known discontinued, relocated, or removed utility facilities. These can be requested from the department during the bid preparation process, or from the project engineer after the contract has been awarded and executed.

Some of the utility work described below is dependent on prior work being performed by the contractor at a specific site. In such situations, provide the engineer and the affected utility a good faith notice of when the utility is to start work at the site. Provide this notice 14 to 16 calendar days in advance of when the prior work will be completed and the site will be available to the utility. Follow-up with a confirmation notice to the engineer and the utility not less than 3 working days before the site will be ready for the utility to begin its work.

stp-107-065 (20240703)

Any utility facility locations (stations, offsets, elevations, depths) listed in this article are approximate.

Brightspeed (Communications) has underground facilities along and crossing STH 13 at the following locations:

Station 267+33, existing 900 pair and 144 fiber crossing STH 13 on the south side of 1ST Avenue W.

Conflict with pavement, subbase, underdrain, watermain, storm sewer, sanitary sewer and street lighting.

To be cut and left in place. Contact Brightspeed representative to cut.

Station 267+33, Brightspeed to bore (2) inner ducts, 2 feet east of the existing right of way at a depth of 5 feet below the existing surface and connect 144 fiber and 900 pair from existing pedestal on each side of

STH 13.

8160-00-76 5 of 19

Station 276+84, existing 144 fiber crossing STH 13 on south side of 1ST Avenue E. Conflict with pavement, subbase, underdrain, watermain, sanitary sewer, and street lighting. cable. Contact Brightspeed representative to lower cable 1.0 foot below subgrade.

Station 286+32, existing 600/900 pair crossing STH 13, on the south side of 3rd Avenue East. Contact Brightspeed representative to adjust cable to 1.0 foot below the existing depth to avoid storm sewer.

Station 291+20 LT to Station 294+15 LT, existing 50 pair on the west side of STH 13 in conflict with road slopes. Contact Brightspeed representative to adjust cable.

The adjustments will occur during construction and is anticipated to take 14 working days.

Contact Brightspeed prior to working in these areas so they have representative available.

City of Washburn (Sewer) has sanitary mains, laterals and manholes within the project limits.

The City of Washburn has hired a consulting firm to develop sanitary and water main plans. Contact the City of Washburn for further information and coordinate with the City’s contractor.

The City of Washburn will be reconstructing the entire existing sanitary sewer on STH 13 from Station 262+85 (2nd Avenue West) to Station 315+42, north of Superior Avenue.

The sanitary sewer will be replaced at the centerline from Station 262+85 (2nd Avenue West) to Station 281+79 (2nd Avenue East).

The sanitary sewer will be replaced at the centerline from Station 286+44 (3rd Avenue East) to Station 291+14.

The sanitary sewer will be replaced from Station 291+14 at centerline and shift out of the street to Station 292+57, 24.0’ RT and continue to Station 315+42, 24.0’ RT (North of Superior Avenue). The sewer laterals will be replaced leading to each property.

Existing manholes along the sanitary main will be replaced at approximately the following locations:

Station 267+65, 0’ LT

Station 272+38, 0’ LT

Station 277+12, 0’ LT

Station 281+79, 0’ LT

Station 286+44, 0’ LT

Station 291+14, 0’ LT

Station 292+57, 24’ RT

Station 296+37, 24’ RT

Station 300+37, 24’ RT

Station 303+32, 24’ RT

Station 305+20, 24’ RT

Station 307+43, 24’ RT

Station 309+85, 24’ RT

Station 312+99, 24’ RT

Station 315+42, 24’ RT

Sanitary mains on the following side streets will also be replaced at existing locations:

2nd Avenue East – Station 281+79 (97’ LT to 0’ RT)

3rd Avenue East – Station 286+44 (43’ LT to 32’ RT)

6th Avenue East – Station 300+37 (45’ LT to 40’ RT)

Construction will take place in conjunction with this DOT project after the DOT contractor has removed the existing roadway pavement and prior to the roadway earthwork and new storm sewer system.

Coordinate with the city contractor. The city contractor will have 10 working days to complete each 450 foot section (city block) of sanitary sewer, watermain, and lateral connections, moving concurrently from end to end.

8160-00-76 6 of 19

City of Washburn (Water) has watermains, manholes, surface valves and curb stop boxes within the project limits.

The City of Washburn will be reconstructing the water main on STH 13 from Station 262+98 (2nd Avenue West) to Station 286+85 (3rd Avenue East), as a separate project completed within the DOT project, as well as at all crossings at all intersections along the corridor. The water main will be relocated under the right parking lane from Station 262+98 to Station 286+85. The water laterals will also be replaced leading to each property.

All existing watermain will be discontinued in place unless removal is necessary to complete project work.

The proposed watermain will be relocated by the City’s contractor. All services will be replaced from the main to the curb box generally located within the existing terrace. No conflicts are anticipated.

Construction will take place in conjunction with this DOT project after the DOT contractor has removed the existing roadway pavement and prior to the roadway earthwork and new storm sewer system.

Coordinate with the city contractor. The city contractor will have 10 working days to complete each 450 foot section (city block) of sanitary sewer, watermain and lateral connections.

Norvado (Communications) has underground facilities along STH 13 and crossing STH 13 at the following locations:

Crossing at Station 282+14, between proposed storm sewer structures 64 and 65. Conflict with existing storm sewer removal, existing sanitary sewer, proposed storm sewer and water main replacement.

Norvado will support fiber when excavating in the area.

Crossing at Station 305+43, Conflict with existing storm sewer removal, proposed storm sewer and water main replacement. Norvado will support fiber when excavating in the area.

Station 305+43 RT through the end of the project at Station 313+37 RT.

Crossing under new culverts at Station 306+44 RT and Station 310+40 RT, no conflicts anticipated.

Contact Norvado prior to working in these areas, Norvado representative will be available to raise the cables. It is estimated that this work will take one day total to complete.

Spectrum (Communications) has underground facilities crossing STH 13 at the following locations:

Station 267+40 Crossing STH 13, on the south side of 1st Avenue West, Spectrum to bore two 2’ conduits at a depth of 12' to avoid conflicts.

Station 286+14 Crossing STH 13, on the south side of 3rd Avenue East, Spectrum to bore two 2' conduits at a depth of 12' to avoid conflicts.

Station 305+47 Crossing STH 13, on the north side of 7th Avenue East, Spectrum to bore two 2' conduits at a depth of 7' to avoid conflicts.

Conflicts with pavement subbase, underdrain, and watermain. Spectrum will provide a watchdog on-site when the contractor is excavating in the area.

The adjustments will occur during construction and is anticipated to take 30 working days.

Xcel Energy (Electricity) has underground facilities on both sides of STH 13 from the beginning project limits to Station 283+80. Xcel Energy underground facilities continue from Station 283+80, RT to Station 285+80, RT. Xcel Energy has overhead facilities along STH 13 from Station 290+95, RT to Station 300+55, RT and from Station 313+20, RT through the end of the project limits. Xcel Energy has overhead facilities crossing STH 13 at the following locations:

Station 290+95, RT – Xcel to remove and replace pole and streetlight. New pole location 5' south and additional 3’ further back in R/W.

Station 290+95, LT – Xcel to remove and replace pole. New pole location 8' south and 3' closer to curb/road to allow room for relocated down guy/anchor.

Station 293+25, RT - Xcel to remove and replace pole. New pole location additional 3' further back in R/W

Station 294+75, RT - Xcel to remove and replace pole. New pole location additional 3' further back in R/W

Station 296+25, RT - Xcel to remove and replace pole and streetlight. New pole location additional 3' further back in R/W

Station 297+70, RT - Xcel to remove and replace pole. New pole location additional 3' further back in R/W

8160-00-76 7 of 19

Station 299+15, RT - Xcel to remove pole. New pole location near Station 298+90 and additional 3' further back in R/W

Station 299+85, LT – Xcel to install new pole near new right of way corner.

Station 300+55, RT - Xcel to remove and replace pole and streetlight. New pole (with streetlight) location 12' east along entrance to park

Station 300+55, LT - Xcel to remove and replace pole. New pole location 45' west along 6th Ave E

Station 313+20, RT - Xcel to remove and replace pole and streetlight. New pole location 25'-30’ east along Superior Avenue.

Existing overhead electric lines will be transferred off old poles and onto new poles or replaced with new lines. Overhead electric lines between Station 298+90 and Station 300+55 are being reconfigured and rerouted, due to conflict with storm sewer, intersection and sidewalk work.

The adjustments will occur during construction and are anticipated to take 30 working days (6 weeks) for relocation work.

Xcel Energy (Gas) has facilities along STH 13 from Station 286+70, LT to Station 313+00, LT. Xcel Energy has facilities at the following locations in conflict with construction activities:

Station 286+70 to Station 290+50, Xcel to discontinue existing gas main and install new gas main.

Station 286+75, Xcel to discontinue crossing of STH 13.

Station 287+00, Xcel to install new gas main across STH 13 at depth of 6 feet.

Station 289+60, no conflict, Xcel to replace service to new main.

Station 290+50 to Station 291+50, Xcel to discontinue existing gas main and install gas main at depth of 7 feet to allow excavation and grade cut due to culvert construction.

Station 291+50 to Station 294+25, Xcel to discontinue existing gas main and install new gas main.

Station 292+35, install new gas service across STH 13 at depth of 4 feet to 5 feet for road construction.

Station 294+25 to Station 295+75, Xcel to discontinue existing gas main and install gas main at depth of 5' to allow excavation and grade cut due to culvert construction.

Station 295+75 to Station 301+75, Xcel to discontinue existing gas main and install new gas main.

Station 300+60, Xcel to discontinue crossing of STH 13.

Station 300+75, Xcel to install new gas main across STH 13 at depth of 5 feet to 6 feet to allow for road construction.

Station 300+95, Xcel to discontinue crossing of STH 13.

Station 301+75 to Station 302+75, Xcel to install gas main at depth of 6 feet to allow excavation and grade cut due to culvert construction.

Station 302+75 to Station 313+00, Xcel to discontinue existing gas main and install new gas main.

Station 302+75 RT, Xcel to discontinue crossing of STH 13, Xcel to replace service to new main.

Station 304+25 RT, Xcel to discontinue crossing of STH 13, Xcel to replace service to new main.

Station 304+90 RT, Xcel to discontinue crossing of STH 13.

Station 302+50 RT to Station 306+15 RT, Xcel to install gas main.

Station 304+95, Xcel to install new gas main across STH 13 at depth of 4 feet to 5 feet to allow for road construction.

Station 306+00 RT, Xcel to discontinue crossing of STH 13, Xcel to replace service to new main.

Station 306+90 RT, Xcel to discontinue crossing of STH 13, Xcel to replace service to new main.

Station 306+75 RT to Station 309+50 RT, Xcel to install gas main.

Station 308+50 RT, Xcel to discontinue crossing of STH 13, Xcel to replace service to new main.

Station 309+50, Xcel to install new gas main across STH 13 at depth of 4 feet to 5 feet to allow for road construction.

8160-00-76 8 of 19

Station 311+50 RT, Xcel to discontinue crossing of STH 13, Xcel to replace service to new main.

Station 312+60 RT, Xcel to discontinue crossing of STH 13, Xcel to replace service to new main.

Station 313+10, no conflict.

The adjustments will occur prior to or during construction and are anticipated to take 20 working days (4 weeks).

The contractor will work around all of Xcel Energy’s gas lines within the project limits.

It is imperative that the highway contractor contact Xcel Energy before removing any gas facilities to verify that they have been discontinued and carry no natural gas. The contractor must not assume that unmarked facilities have been discontinued. At no time is it acceptable to push, pull, cut or drill an unmarked facility without explicit consent from Xcel Energy.

7. Work by Others.

Coordinate scheduling with the utility companies, the City’s Contractor, City of Washburn personnel, and emergency services.

The City’s Contractor shall coordinate all utility tie-ins (sanitary sewer and watermain) with the City. The City’s Contractor shall be responsible for coordinating all service connections to existing service with individual property owners, or their plumbers.

Xcel Energy (Streetlighting) has underground electric street lighting on both sides of STH 13 for the length of the project. Xcel Energy will be removing streetlights and bases and discontinuing conduit/wire between streetlights between Station 263+55 and Station 277+70. The contractor will install new street lighting, these streetlights will be City owned streetlights.

Xcel Energy will be removing and re-installing streetlights, bases and pull boxes and installing new conduit/wire between Station 277+70 and Station 286+70. Xcel Energy will be re-installing streetlighting once new curb, sidewalks, pedestrian ramps, are installed and prior to any finished landscaping work.

Coordinate the removal and re-install of the street lighting by Xcel. 10 - 20 working days (2 - 4 weeks) to re-install streetlighting.

Streetlights which are currently on wood poles, that are being relocated, will remain on wood poles.

8. Information to Bidders, U.S. Army Corps of Engineers Section 404 Permit.

The…