This is a Special Provisions document for Wisconsin Department of Transportation (WisDOT) on a state highway construction project in the Town of Linn, Zenda Road from County Highway B to Linton Road. The work consists of pulverizing existing asphalt, reshaping, installing new curb, installing new storm sewer, replacing culverts, and improving drainage. The project is identified as Contract 3846-02-71 with an assigned Disadvantaged Business Enterprise (DBE) goal requiring DBE participation as a percentage of the total contract bid amount. Key administrative requirements include minimum advance notification periods for traffic control (3 calendar days for shoulder closures and 3 business days for lane and ramp closures), holiday and special event work restrictions during Independence Day weekend (July 2-6, 2027), and coordination with multiple utility companies including Alliant Energy, American Transmission Company, AT&T, Bluebird Fiber, Frontier, Spectrum, and WE Energies for overhead and underground facilities. The project involves 5.50 acres of land-disturbing construction activity and requires coverage under the Wisconsin Pollutant Discharge Elimination System Transportation Construction General Permit (WPDES Permit No. WI-S066796-2). The contractor must submit an Erosion Control Implementation Plan (ECIP) 14 days prior to the pre-construction meeting and obtain DNR approval before commencing land-disturbing activities.
The contract requires contractors to obtain written consent from WisDOT prior to modifying any DBE commitments and mandates strict compliance with Disadvantaged Business Enterprise provisions, with material breaches subject to sanctions including contract termination, payment withholding, and suspension or debarment. Bidders must submit the Commitment to Subcontract to DBE (Form DT1506 or digital entry) at the time of bid, along with Attachments A and DBE quotes within one hour of bid submittal, and Good Faith Effort documentation (Form DT1202) if the goal is not met within 24 hours of bid closing. The contract is federally funded through Federal Highway Administration funds and is also subject to the Highway Construction Skills Training (HCST) Program, offering reimbursement at $5.00 per hour for employing HCST graduates as unskilled laborers (up to 2,000 hours or two years) and HCST apprentices in qualifying trades. Additional requirements include advance notification to local agencies (City of Lake Geneva Fire and EMS, Town of Linn Police, Walworth County Sheriff, and Big Foot School District) at least 14 calendar days before work begins, coordination meetings with residents and businesses at least one week before construction starts, compliance with local ordinances restricting motorized construction equipment operation between 10:00 PM and 7:00 AM, and salvage and storage of Town of Linn Department of Public Works property including culverts, aluminum signs, and sign supports. Special provisions detail requirements for a Storm Sewer Pipe Reinforced Concrete Special Tee Fitting and Section Corner Monument perpetuation coordinated with Southeastern Wisconsin Regional Planning Commission (SEWRPC).
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
!#��$�%��!����#�#��!"%&'����&(�������)��)�*�&+,-����)�.#�#��/�/0��1 2010�����1 ���304/�10�4���/��5 ������� 4�65/�789�:��:,& �;.<�����,�8& %�=�!!>�?
!@��A@><%B�C�#��=�!#�!�A@ =D<�.%A ���E��#F %F����������>� @�G#F ���H!
�#�#F E�#F#F �@I J
�#$�����������)%F �!��F�!@@ ��I �$������E��K$��#F �����I !#�$#F ��H!�# @���L #��!�#F �E�#F�#F @����������A J !#���!@�<�!@�#��!�)���������M ���!#G�A J @���G��� !#��$�%��!����#�#��!N,'>���)�� O##� F����������M
���!#G��!��� K��$�#F����OMP)C�@�.
��8>�����&&������<�!#�� #�<���� O H �#��,>����,O���H!
@�"���@I�!#�H @�C ���P!# �M��� �Q R���� �� >�O@@� ��>�<�#G>�.#�# %F��� �!#�� #���� S �����I
���HF#)%F��
�#F�##F ���H!
�G�E��!>���!� #F���T !#�#�I �$#F @���I U#F�##F �F�� S���!
��G�� @#F ��@$���#F
���!�>B�HFE�G���K��������>�!@����@@
!@�>�!@F�� F K @#F ���##�!H#F��������������@U�!@#F�##F ����H ����G
�F�I �#F #�G���!@�� #�G> @�!#��!G�H�
@�!�!G ��� ���!>���#F �E�� #�K !�!G� #��!�!�
#�#�I ��@@�!H�! �!!
#��!E�#F#F��������������@)1V�WVX�YZ[W\�WVX]̂Z_̀\�V̂�YabcZX�XdZY��Z[de]f��V̂g��̂VhVY]i�ed̀W�YabcZXXZW[�]W�̀ìjX̂VWZj�bZk�VW�Xd̀��WX̀ Ŵ̀Xl.
@��!@��E��!�#��� �#F���@�# �mmmmmmmmmmmmmmm+.�H!�# >� �#��G�� ��$���� �!��!-+���!#����%G�
| � | �� |
| >� | �#��G�� |
�<��������!�PS���
�- +C�@@ ��.�H!�# -+���!#����%G� �C�@@ -+C�@@ -2V̂�1̀ h]̂Xc ẀX�6Ỳ��Wif/fh̀�Vn��V̂go �#�
��$�OE��@�"�#
�M ���!#G�A @ �#��G�.
��p��05�/�2���q�11�5���6����0�
A
��I���>�M��@�!H>�OHH�
H�# >�O��F��#���I �I ����!@�M E �>�P�����!�<�!#���>�� !#�.�H!�!H>%��$$� �<�!#���>���I !#�r��K�!H>�A
PLEASE ATTACH
PROPOSAL GUARANTY HERE
Effective with November 2007 Letting Proposal Requirements
PROPOSAL REQUIREMENTS AND CONDITIONS
The bidder, signing and submitting this proposal, agrees and declares as a condition thereof, to be bound by the following conditions and requirements.
If the bidder has a corporate relationship with the proposal design engineering company, the bidder declares that it did not obtain any facts, data, or other information related to this proposal from the design engineering company that was not available to all bidders.
The bidder declares that they have carefully examined the site of, and the proposal, plans, specifications and contract forms for the work contemplated, and it is assumed that the bidder has investigated and is satisfied as to the conditions to be encountered, as to the character, quality, and quantities of work to be performed and materials to be furnished, and as to the requirements of the specifications, special provisions and contract. It is mutually agreed that submission of a proposal shall be considered conclusive evidence that the bidder has made such examination.
The bidder submits herewith a proposal guaranty in proper form and amount payable to the party as designated in the advertisement inviting proposals, to be retained by and become the property of the owner of the work in the event the undersigned shall fail to execute the contract and contract bond and return the same to the office of the engineer within fourteen (14) days after having been notified in writing to do so;
otherwise to be returned.
The bidder declares that they understand that the estimate of quantities in the attached schedule is approximate only and that the attached quantities may be greater or less in accordance with the specifications.
The bidder agrees to perform the said work, for and in consideration of the payment of the amount becoming due on account of work performed, according to the unit prices bid in the following schedule, and to accept such amounts in full payment of said work.
The bidder declares that all of the said work will be performed at their own proper cost and expense, that they will furnish all necessary materials, labor, tools, machinery, apparatus, and other means of construction in the manner provided in the applicable specifications and the approved plans for the work together with all standard and special designs that may be designed on such plans, and the special provisions in the contract of which this proposal will become a part, if and when accepted. The bidder further agrees that the applicable specifications and all plans and working drawings are made a part hereof, as fully and completely as if attached hereto.
The bidder, if awarded the contract, agrees to begin the work not later than ten (10) days after the date of written notification from the engineer to do so, unless otherwise stipulated in the special provisions.
The bidder declares that if they are awarded the contract, they will execute the contract agreement and begin and complete the work within the time named herein, and they will file a good and sufficient surety bond for the amount of the contract for performance and also for the full amount of the contract for payment.
Effective with November 2007 Letting Proposal Requirements
The bidder, if awarded the contract, shall pay all claims as required by Section 779.14, Statutes of Wisconsin, and shall be subject to and discharge all liabilities for injuries pursuant to Chapter 102 of the Statutes of Wisconsin, and all acts amendatory thereto. They shall further be responsible for any damages to property or injury to persons occurring through their own negligence or that of their employees or agents, incident to the performance of work under this contract, pursuant to the Standard Specifications for Road and Bridge Construction applicable to this contract.
In connection with the performance of work under this contract, the contractor agrees to comply with all applicable state and federal statutes relating to non-discrimination in employment. No otherwise qualified person shall be excluded from employment or otherwise be subject to discrimination in employment in any manner on the basis of age, race, religion, color, gender, national origin or ancestry, disability, arrest or conviction record (in keeping with s.111.32), sexual orientation, marital status, membership in the military reserve, honesty testing, genetic testing, and outside use of lawful products. This provision shall include, but not be limited to the following: employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation, and selection for training, including apprenticeship. The contractor further agrees to ensure equal opportunity in employment to all applicants and employees and to take affirmative action to attain a representative workforce.
The contractor agrees to post notices and posters setting forth the provisions of the nondiscrimination clause, in a conspicuous and easily accessible place, available for employees and applicants for employment.
If a state public official (section 19.42, Stats.) or an organization in which a state public official holds at least a 10% interest is a party to this agreement, this contract is voidable by the state unless appropriate disclosure is made to the State of Wisconsin Ethics Board.
Effective with August 2015 Letting Bid Preparation
BID PREPARATION
Preparing the Proposal Schedule of Items A. General
(1) Obtain bidding proposals as specified in section 102 of the standard specifications prior to 11:45 AM of the last business day preceding the letting. Submit bidding proposals using one of the following methods:
1. Electronic bid on the internet.
2. Electronic bid on a printout with accompanying diskette or CD ROM.
3. Paper bid under a waiver of the electronic submittal requirements.
(2) Bids submitted on a printout with accompanying diskette or CD ROM or paper bids submitted under a waiver of the electronic submittal requirements govern over bids submitted on the internet.
(3) The department will provide bidding information through the department’s web site at:
https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx
The contractor is responsible for reviewing this web site for general notices as well as information regarding proposals in each letting. The department will also post special notices of all addenda to each proposal through this web site no later than 4:00 PM local time on the Thursday before the letting. Check the department’s web site after 5:00 PM local time on the Thursday before the letting to ensure all addenda have been accounted for before preparing the bid. When bidding using methods 1 and 2 above, check the Bid ExpressΤΜ on-line bidding exchange at http://www.bidx.com/ after 5:00 PM local time on the Thursday before the letting to ensure that the latest schedule of items Expedite file (*.ebs or *.00x) is used to submit the final bid.
(4) Interested parties can subscribe to the Bid ExpressΤΜ on-line bidding exchange by following the instructions provided at the www.bidx.com web site or by contacting:
Info Tech Inc.
5700 SW 34th Street, Suite 1235 Gainesville, FL 32608-5371 email: mailto:customer.support@bidx.com
(5) The department will address equipment and process failures, if the bidder can demonstrate that those failures were beyond their control.
(6) Contractors are responsible for checking on the issuance of addenda and for obtaining the addenda. Notice of issuance of addenda is posted on the department’s web site at:
https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx or by calling the department at (608) 266-1631. Addenda can ONLY be obtained from the department’s web site listed above or by picking up the addenda at the Bureau of Highway Construction, 4th floor, 4822 Madison Yards Way, Madison, WI, during regular business hours.
(7) Addenda posted after 5:00 PM on the Thursday before the letting will be emailed to the eligible bidders for that proposal. All eligible bidders shall acknowledge receipt of the addenda whether they are bidding on the proposal or not. Not acknowledging receipt may jeopardize the awarding of the project.
https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx http://www.bidx.com/ http://www.bidx.com/ mailto:customer.support@bidx.com
B. Submitting Electronic Bids B.1 On the Internet
(1) Do the following before submitting the bid:
4. Have a properly executed annual bid bond on file with the department.
5. Have a digital ID on file with and enabled by Info Tech Inc. Using this digital ID will constitute the bidder's signature for proper execution of the bidding proposal.
(2) In lieu of preparing, delivering, and submitting the proposal as specified in 102.6 and 102.9 of the standard specifications, submit the proposal on the internet as follows:
1. Download the latest schedule of items reflecting all addenda from the Bid ExpressΤΜ web site.
2. Use ExpediteΤΜ software to enter a unit price for every item in the schedule of items.
3. Submit the bid according to the requirements of ExpediteΤΜ software and the Bid ExpressΤΜ web site. Do not submit a bid on a printout with accompanying diskette or CD ROM or a paper bid. If the bidder does submit a bid on a printout with accompanying diskette or a paper bid in addition to the internet submittal, the department will disregard the internet bid
4. Submit the bid before the hour and date the Notice to Contractors designates
5. Do not sign, notarize, and return the bidding proposal described in 102.2 of the standard specifications.
(3) The department will not consider the bid accepted until the hour and date the Notice to Contractors designates.
B.2 On a Printout with Accompanying Diskette or CD ROM
(1) Download the latest schedule of items from the Wisconsin pages of the Bid Express web site reflecting the latest addenda posted on the department’s web site at:
https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx
Use ExpediteΤΜ software to prepare and print the schedule of items. Provide a valid amount for all price fields. Follow instructions and review the help screens provided on the Bid ExpressΤΜ web site to assure that the schedule of items is prepared properly.
(2) Staple an 8 1/2 by 11 inch printout of the Expedite generated schedule of items to the other proposal documents submitted to the department as a part of the bidder's sealed bid. As a separate submittal, not in the sealed bid envelop but due at the same time and place as the sealed bid, also provide the ExpediteΤΜ generated schedule of items on a 3 1/2 inch computer diskette or CD ROM. Label each diskette or CD ROM with the bidder's name, the 4 character department-assigned bidder identification code from the top of the bidding proposal, and a list of the proposal numbers included on that diskette or CD ROM as indicated in the following example:
Bidder Name
BN00
Proposals: 1, 12, 14, & 22
(3) If bidding on more than one proposal in the letting, the bidder may include all proposals for that letting on one diskette or CD ROM. Include only submitted proposals with no incomplete or other files on the diskette or CD ROM.
(4) The bidder-submitted printout of the Expedite generated schedule of items is the governing contract document and must conform to the requirements of section 102 of the standard specifications. If a printout needs to be altered, cross out the printed information with ink or typewriter and enter the new information and initial it in ink. If there is a discrepancy between the printout and the diskette or CD ROM, the department will analyze the bid using the printout information.
(5) In addition to the reasons specified in section 102 of the standard specifications, proposals are irregular and the department may reject them for one or more of the following:
1. The check code printed on the bottom of the printout of the ExpediteΤΜ generated schedule of items is not the same on each page.
2. The check code printed on the printout of the ExpediteΤΜ generated schedule of items is not the same as the check code for that proposal provided on the diskette or CD ROM.
3. The diskette or CD ROM is not submitted at the time and place the department designates.
B Waiver of Electronic Submittal
(1) The bidder may request a waiver of the electronic submittal requirements. Submit a written request for a waiver in lieu of bids submitted on the internet or on a printout with accompanying diskette or CD ROM. Use the waiver that was included with the paper bid document sent to the bidder or type up a waiver on the bidder’s letterhead. The department will waive the electronic submittal requirements for a bidding entity (individual, partnership, joint venture, corporation, or limited liability company) for up to 4 individual proposals in a calendar year. The department may allow additional waivers for equipment malfunctions.
(2) Submit a schedule of items on paper conforming to section 102 of the standard specifications.
The department charges the bidder a $75 administrative fee per proposal, payable at the time and place the department designates for receiving bids, to cover the costs of data entry. The department will accept a check or money order payable to: "Wisconsin, Dept. of Transportation."
(3) In addition to the reasons specified in section 102 of the standard specifications, proposals are irregular and the department may reject them for one or more of the following:
1. The bidder fails to provide the written request for waiver of the electronic submittal requirements.
2. The bidder fails to pay the $75 administrative fee before the time the department designates for the opening of bids unless the bidder requests on the waiver that they be billed for the $75.
3. The bidder exceeds 4 waivers of electronic submittal requirements within a calendar year.
(4) In addition to the reasons specified in section 102 of the standard specifications, the department may refuse to issue bidding proposals for future contracts to a bidding entity that owes the department administrative fees for a waiver of electronic submittal requirements.
PROPOSAL BID BOND Wisconsin Department of Transportation
DT1303 1/2006
Proposal Number Project Number Letting Date
Name of Principal
Name of Surety State in Which Surety is Organized
We, the above-named Principal and the above-named Surety, are held and firmly bound unto the State of Wisconsin in the sum equal to the Proposal Guaranty for the total bid submitted for the payment to be made; we jointly and severally bind ourselves, our heirs, executors, administrators, successors and assigns. The condition of this obligation is that the Principal has submitted a bid proposal to the State of Wisconsin acting through the Department of Transportation for the improvement designated by the Proposal Number and Letting Date indicated above.
If the Principal is awarded the contract and, within the time and manner required by law after the prescribed forms are presented for signature, enters into a written contract in accordance with the bid, and files the bond with the Department of Transportation to guarantee faithful performance and payment for labor and materials, as required by law, or if the Department of Transportation shall reject all bids for the work described, then this obligation shall be null and void; otherwise, it shall be and remain in full force and effect.
In the event of failure of the Principal to enter into the contract or give the specified bond, the Principal shall pay to the Department of Transportation within 10 business days of demand a total equal to the Proposal Guaranty as liquidated damages; the liability of the Surety continues for the full amount of the obligation as stated until the obligation is paid in full.
The Surety, for value received, agrees that the obligations of it and its bond shall not be impaired or affected by any extension of time within which the Department of Transportation may accept the bid; and the Surety does waive notice of any such extension.
IN WITNESS, the Principal and Surety have agreed and have signed by their proper officers and have caused their corporate seals to be affixed this date: (DATE MUST BE ENTERED)
PRINCIPAL
(Company Name) (Affix Corporate Seal)
(Signature and Title)
(Company Name)
(Signature and Title)
(Company Name)
(Signature and Title)
(Company Name)
(Signature and Title)
NOTARY FOR PRINCIPAL
(Date)
State of Wisconsin ) ) ss.
County )
On the above date, this instrument was acknowledged before me by the named person(s).
(Signature, Notary Public, State of Wisconsin)
(Print or Type Name, Notary Public, State of Wisconsin)
(Date Commission Expires)
Notary Seal
(Name of Surety) (Affix Seal)
(Signature of Attorney-in-Fact)
NOTARY FOR SURETY
(Date)
State of Wisconsin ) ) ss.
County )
On the above date, this instrument was acknowledged before me by the named person(s).
(Signature, Notary Public, State of Wisconsin)
(Print or Type Name, Notary Public, State of Wisconsin)
(Date Commission Expires)
Notary Seal
IMPORTANT: A certified copy of Power of Attorney of the signatory agent must be attached to the bid bond.
CERTIFICATE OF ANNUAL BID BOND Wisconsin Department of Transportation
DT1305 8/2003
Time Period Valid (From/To)
Name of Surety
Name of Contractor
Certificate Holder Wisconsin Department of Transportation
This is to certify that an annual bid bond issued by the above-named Surety is currently on file with the Wisconsin Department of Transportation.
This certificate is issued as a matter of information and conveys no rights upon the certificate holder and does not amend, extend or alter the coverage of the annual bid bond.
Cancellation: Should the above policy be cancelled before the expiration date, the issuing surety will give thirty (30) days written notice to the certificate holder indicated above.
(Signature of Authorized Contractor Representative) (Date)
Effective with March 2010 Letting
LIST OF SUBCONTRACTORS
Section 66.0901(7), Wisconsin Statutes, provides that as a part of the proposal, the bidder also shall submit a list of the subcontractors the bidder proposes to contract with and the class of work to be performed by each. In order to qualify for inclusion in the bidder's list a subcontractor shall first submit a bid in writing, to the general contractor at least 48 hours prior to the time of the bid closing. The list may not be added to or altered without the written consent of the municipality. A proposal of a bidder is not invalid if any subcontractor and the class of work to be performed by the subcontractor has been omitted from a proposal; the omission shall be considered inadvertent or the bidder will perform the work personally.
No subcontract, whether listed herein or later proposed, may be entered into without the written consent of the Engineer as provided in Subsection 108.1 of the Standard Specifications.
Name of Subcontractor Class of Work Estimated Value
Effective with December 2000 Letting Debarment Certification
CERTIFICATION REGARDING DEBARMENT, SUSPENSION, AND OTHER
RESPONSIBILITY MATTERS - PRIMARY COVERED TRANSACTIONS
Instructions for Certification
1. By signing and submitting this proposal, the prospective contractor is providing the certification set out below.
2. The inability of a person to provide the certification required below will not necessarily result in denial of participation in this covered transaction. The prospective contractor shall submit an explanation of why it cannot provide the certification set out below. The certification or explanation will be considered in connection with the department or agency's determination whether to enter into this transaction. However, failure of the prospective contractor to furnish a certification or an explanation shall disqualify such person from participation in this transaction.
3. The certification in this clause is a material representation of fact upon which reliance was placed when the department determined to enter into this transaction. If it is later determined that the contractor knowingly rendered an erroneous certification in addition to other remedies available to the Federal Government the department may terminate this transaction for cause or default.
4. The prospective contractor shall provide immediate written notice to the department to whom this proposal is submitted if at any time the prospective contractor learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances.
5. The terms "covered transaction," "debarred," "suspended," "ineligible," "lower tier covered transaction," "participant," "person," "primary covered transaction," "principal," "proposal," and "voluntarily excluded," as used in this clause, have the meanings set out in the Definitions and Coverage sections of the rules implementing Executive Order 12549. You may contact the department to which this proposal is being submitted for assistance in obtaining a copy of those regulations.
6. The prospective contractor agrees by submitting this proposal that, should this contract be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department entering into this transaction.
7. The prospective contractor further agrees by submitting this proposal that it will include the clause titled "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion-Lower Tier Covered Transaction," which is included as an addendum to PR- 1273 - "Required Contract Provisions Federal Aid Construction Contracts," without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions.
8. The contractor may rely upon a certification of a prospective subcontractor/materials supplier that it is not debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A contractor may decide the method and frequency by which it determines the eligibility of its principals. Each contractor may, but is not required to, check the Disapproval List (telephone # 608/266/1631).
Effective with December 2000 Letting Debarment Certification
9. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of a contractor is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings.
10. Except for transactions authorized under paragraph 6 of these instructions, if a contractor in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department may terminate this transaction for cause or default.
Certification Regarding Debarment, Suspension, and Other Responsibility Matters - Primary Covered Transactions
1. The prospective contractor certifies to the best of its knowledge and belief, that it and its principals:
(a) Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal department or agency;
(b) Have not within a three-year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements or receiving stolen property;
(c) Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State or local) with commission of any of the offense enumerated in paragraph (1)(b) of this certification; and
(d) Have not within a three-year period preceding this proposal had one or more public transactions (Federal, State or local) terminated for cause or default.
2. Where the prospective contractor is unable to certify to any of the statements in this certification, such prospective contractor shall attach an explanation to this proposal.
3846-02-71 1 of 9
Special Provisions Table of Contents
Article Description Page #
1. General
2. Scope of Work
3. Prosecution and Progress
4. Traffic
5. Holiday and Special Event Work Restrictions
6. Utilities
7. Information to Bidders, WPDES Transportation Construction General Permit (TCGP) for Storm
Water Discharges
8. Environmental Protection, Invasive Species Control
9. Erosion Control
10. Notice to Contractor, Advance Notification
11. Coordination with Businesses and Residents
12. Public Convenience and Safety
13. Salvaged Culverts
14. Removing Signs
15. Removing Small Sign Supports
16. Tubular Steel Sign Posts
17. Storm Sewer Pipe Reinforced Concrete Special Tee Fitting, SPV.0060.01
18. Section Corner Monuments, Item SPV.0060.02
3846-02-71 2 of 9
STSP’S Revised July 1, 2026
SPECIAL PROVISIONS
1. General.
Perform the work under this construction contract for the following projects:
3846-02-71 T Linn, Zenda Rd CTH B to Linton Rd Local Street Walworth County
Perform the work as the plans show and execute the work as specified in the State of Wisconsin, Department of Transportation, Standard Specifications for Highway and Structure Construction, 2025 Edition, as published by the department, and these special provisions.
If all or a portion of the plans and special provisions are developed in the SI metric system and the schedule of prices is developed in the US standard measure system, the department will pay for the work as bid in the US standard system.
100-005 (20260701)
2. Scope of Work.
The work under this contract consists of pulverizing existing asphalt and reshaping, installing new curb, installing new storm sewer, replacing culverts, and improving drainage. All incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
104-05 20090901)
3. Prosecution and Progress.
Begin work within 10 calendar days after the engineer issues a written notice to do so.
Provide the start date to the engineer in writing within a month after executing the contract but at least 14 calendar days before the preconstruction conference. Upon approval, the engineer will issue the notice to proceed within ten calendar days before the approved start date.
To revise the start date, submit a written request to the engineer at least two weeks before the intended start date. The engineer will approve or deny that request based on the conditions cited in the request and its effect on the department’s scheduled resources.
Construction shall not begin or impact traffic on Zenda Road prior to June 7, 2027 to allow for schools to finish the academic year.
4. Traffic.
Zenda Road will be closed to through traffic for the duration of the project. A signed detour will be posted.
Access Access to businesses, local residences, farm operations, and emergency vehicles will be maintained, to the extent possible, by the contractor during construction. Temporary closures will be required during work directly in front of access points. Any access closure will be coordinated with specific owners. Notify agricultural property owners three (3) days in advance of access disruptions.
Wisconsin Lane Closure System Advance Notification Provide the following advance notification to the engineer for incorporation into the Wisconsin Lane Closure System (LCS).
3846-02-71 3 of 9
TABLE 108-1 CLOSURE TYPE AND REQUIRED MINIMUM ADVANCE NOTIFICATION
Closure type with height, weight, or width restrictions (available width, all lanes in one direction < 16 feet) MINIMUM NOTIFICATION
Lane and shoulder closures 7 calendar days
Full roadway closures 7 calendar days
Ramp closures 7 calendar days
Detours 7 calendar days
Closure type without height, weight, or width restrictions (available width, all lanes in one direction > 16 feet) MINIMUM NOTIFICATION
Shoulder Closures 3 calendar days
Lane closures 3 business days
Ramp closures 3 business days
Modifying all closure types 3 business days
Discuss LCS completion dates and provide changes in the schedule to the engineer at weekly project meetings in order to manage closures nearing their completion date.
5. Holiday and Special Event Work Restrictions.
Do not perform work on, nor haul materials of any kind along or across any portion of the highway carrying Zenda Road traffic, and entirely clear the traveled way and shoulders of such portions of the highway of equipment, barricades, signs, lights, and any other material that might impede the free flow of traffic during the following holiday and special event periods:
- From noon Friday, July 2, 2027 to 6:00 AM Tuesday, July 6, 2027 Independence Day stp-107-005 (20210113)
6. Utilities.
This contract does not come under the provision of Administrative Rule Trans 220.
The utility work plan includes additional detailed information regarding the location of known discontinued, relocated, or removed utility facilities. These can be requested from the department during the bid preparation process or from the project engineer after the contract has been awarded and executed.
Some of the utility work described below is dependent on prior work being performed by the contractor at a specific site. In such situations, provide the engineer and the affected utility a good faith notice of when the utility is to start work at the site. Provide this notice 14 to 16 calendar days in advance of when the prior work will be completed and the site will be available to the utility. Follow-up with a confirmation notice to the engineer and the utility not less than 3 working days before the site will be ready for the utility to begin its work.
stp-107-066 (20240703)
Any utility facility locations (stations, offsets, elevations, depths) listed in this article are approximate.
Alliant Energy (ELCTY) – has both overhead and underground electric within project limits. Alliant’s overhead is attached to ATC’s poles on the west side of the road for the entire length of the project.
Alliant has underground electric crossing the road at stations 109+42, 110+23, and 170+09. Alliant Energy has underground electric running along the west side of the project from station 109+42 to 110+23, station 135+57 to 137+85. No conflicts anticipated.
American Transmission Company (ATC) (ELCTY) – has overhead electric and poles running along the entire west side of Zenda Road. No conflicts anticipated.
AT&T (COMLN) – has an underground communication line along the east side of Zenda Road from station 141+61 to 180+13 and continues north outside the project limits. AT&T line crosses Zenda Road at station 178+69 and continues north to Linton Road. AT&T has a line that goes east and west along the
3846-02-71 4 of 9 south side of Linton Road. AT&T plans to discontinue the line and remove pedestals from station 141+61 to 178+69. Work is anticipated to take 30 days. All work will be done prior to construction.
Bluebird Fiber (COMLN) – has an underground communication line that crosses under Zenda Road at station 179+77 and continues east and west along the south side of Linton Road. No conflicts anticipated.
Frontier (COMLN) – has an underground communication line on the west side of the road from outside of the south project limits to station 101+88. The line then crosses under Zenda Road to the east side of Zenda Road. It then runs along the east side of Zenda Road to station 153+20. Frontier plans to discontinue line prior to construction.
Spectrum (COMLN) – has an underground communications line that crosses under Zenda Road at station 101+12, 167+38, and 176+18. Spectrum has a second underground communication line on the west side of the road from station 101+25 to 127+42. It then crosses under Zenda Road to the east side of the road and continues to station 134+43. The line crosses back under Zenda Road to the west side and continues along the west side to past the north project limits. No conflicts anticipated.
WE Energies (GAS) – has underground gas along the west side of the project from County B to Linton Road. WE Energies has underground gas services that cross the road at several locations for each property and the main crosses at station 101+40. WE Energies has a conflict with the gas main from station 179+25 to Linton Road along the west side. WE Energies to replace gas main from station 179+25 to the north side of Linton Road with placement of new main 5 feet west of right of way along Zenda Road and discontinue existing main. Work is anticipated to take 5 days. All work will be done prior to construction.
7. Information to Bidders, WPDES Transportation Construction General Permit (TCGP) for Storm Water Discharges.
The following Project IDs have one acre or more of land disturbing construction activity and are required to obtain coverage under the TCGP. The permit requirements are part of the contract:
Project ID Design Calculated Amount of Land Disturbing Construction Activity (acres)
3846-02-71 5.50
This permit is the Wisconsin Pollutant Discharge Elimination System, Transportation Construction General Permit, (WPDES Permit No. WI-S066796-2) and is located at:
https://widnr.widen.net/s/s5mwp2gd7s/finalsignedwisdotcsgp
The department will apply for coverage under the TCGP upon submittal of the complete ECIP from the contractor, and concurrent with the department providing the ECIP to the Department of Natural Resources (DNR). The DNR will convey permit coverage upon the department’s approval of the ECIP and DNR concurrence that the project has met the requirements for coverage under the TCGP.
Do not begin land disturbing construction activity until the ECIP is approved and the DNR conveys TCGP coverage for the project.
A “Certificate of Permit Coverage” will be provided by the DNR upon conveyance of coverage under the permit. Post the “Certificate of Permit Coverage” in a conspicuous place at the construction site.
Stormwater discharge permit coverage for additional land disturbing construction activities related to contractor means and methods, including temporary support activity sites, will be considered as part of the ECIP review and approval process. Coverage under the TCGP for additional land disturbance areas will be considered if the areas meet all of the following:
• Must meet the TCGP applicability criteria.
• Must be for the exclusive use of WisDOT projects.
• Land disturbance first commences after the ECIP approval, and the areas are fully restored to meet the final stabilization criteria of the TCGP upon completion of the work.
Obtain any permits for areas that are not approved by the department for coverage under the TCGP.
stp-107-056 (20260701) https://widnr.widen.net/s/s5mwp2gd7s/finalsignedwisdotcsgp
3846-02-71 5 of 9
8. Environmental Protection, Invasive Species Control.
The project has the potential for spreading invasive species, primarily Emerald Ash Borer, Oak Wilt, and Phragmites. Follow WisDOT best management practices to prevent spreading these species to areas where it is not yet established.
Reference the WisDOT and Wisconsin Department of Natural Resources guidance and websites located at:
• Emerald Ash Borer: https://dnr.wisconsin.gov/topic/urbanforests/eabtoolbox
• Phragmites: https://dnr.wisconsin.gov/newsroom/release/78891
9. Erosion Control.
All disturbed, graded, or soil stockpile areas shall be permanently restored withing fourteen (14) calendar days of any contractor disturbance. If any disturbed, graded or soil stockpile areas (including intersection/turn lanes and all newly graded/filled areas) will not be permanently restored within fourteen
(14) calendar days, they shall receive temporary seed and mulch within four (4) calendar days on initial disturbance.
When performing saw cutting operations, squeegee the saw cut slurry to the curb apron, and remove this material as approved by the engineer. Saw cut slurry, grinding and chipping waste must be collected during the process and not allowed to run or fall unmanaged into wetlands.
Add to standard spec 107.20 with the following:
Erosion control best management practices (BMP’s) shown on the plans are at suggested locations. The actual locations will be determined by the contractor’s ECIP and by the engineer. Include dust control and each dewatering or by-pass (mechanical pumping) operation in the ECIP submittal. The ECIP will supplement information shown on the plans and not reproduce it. The ECIP will identify how to implement the project’s erosion control plan. ECIP will demonstrate timely and diligently staged operations, continuing all construction operations methodically from the initial removals and topsoil stripping operations through the subsequent grading, paving, re-application of top soil, and restoration of permanent vegetation to minimize the period of exposure to possible erosion.
Provide the ECIP 14 days prior to the pre-construction meeting. Provide 1 copy of the ECIP to the department and 1 copy of the ECIP to the WDNR Liaison Craig Webster, (262) 574-2141, Craig.Webster@wisconsin.gov Do not implement the ECIP without department approval and perform all work conforming to the approved ECIP.
Maintain Erosion Control BMP’s until permanent vegetation is established or until the engineer determines that the BMP is no longer required.
Stockpile excess materials or spoils on upland areas away from wetlands, floodplains, and waterways.
Prevent the discharge of sediment eroding from soil stockpiles. If soil stockpiles will be left for more than 14 days, install temporary stabilization measures as the engineer orders and as identified in the approved
ECIP.
When land disturbing construction activities have temporarily ceased and will not resume for a period exceeding 14 calendar days, install temporary stabilization measures as the engineer orders and as identified in the approved ECIP.
Final stabilization activity shall commence when land disturbing activities cease and final grade has been reached on any portion of the site.
Maintaining Drainage Maintain drainage at and through worksite during construction conforming to standard spec 107.20, 204.3.2.1(3), 205.3.3 and 520.3.1(2). Use existing storm sewers, existing culvert pipes, existing drainage channels, temporary culvert pipes, or temporary drainage channels to maintain existing surface and pipe drainage. Pumps may be required to drain the surface, pipe, and structure discharges during construction. Costs for furnishing, operating, and maintaining the pumps is considered incidental to the contract.
SER-107-003 (20161220)
https://dnr.wisconsin.gov/topic/urbanforests/eabtoolbox https://dnr.wisconsin.gov/newsroom/release/78891
3846-02-71 6 of 9
10. Notice to Contractor, Advance Notification.
Notify the following agencies or businesses 14 calendar days in advance of beginning work or erecting traffic control.
• City of Lake Geneva Fire and EMS, Chief John Peters, Phone: (262) 248-7228
• Town of Linn Police Department, Chief Graham Gunyon, Phone: (262) 275-6194
• Walworth County Sheriff’s Office, Sheriff Dave Gerber, Phone: (262) 741-4400
• Big Foot School District, District Administrator Doug Parker, Phone: (262) 394-4501
• Big Foot School District bus service, Dousman Transport- Terminal Manager Lori Chalchoff, Phone: (262) 728-2166
11. Coordination with Businesses and Residents.
The contractor shall arrange and conduct a meeting between the contractor, the department, affected residents, local officials and business people to discuss the project schedule of operations including vehicular and pedestrian access during construction operations. Hold the first meeting at least one week before the start of work under this contract and no further meetings will be required unless directed by the engineer. The contractor shall arrange for a suitable location for meetings that provides reasonable accommodation for public involvement. The department will prepare and coordinate publication of the meeting notices and mailings for meetings. The contractor shall schedule meetings with at least 2 weeks’ prior notice to the engineer to allow for these notifications.
stp-108-060 (20141107)
12. Public Convenience and Safety.
Revise standard spec 107.8(6) as follows:
Check for and comply with local ordinances governing the hours of operation of construction equipment.
Do not operate motorized construction equipment from 10:00 PM until the following 7:00 AM, unless prior written approval is obtained from the engineer.
stp-107-001 (20060512)
13. Salvaged Culverts Add the following to standard spec 524.3:
(3) Small pipe culverts along Zenda Road are the property of the Town of Linn Department of Public Works. Store these pipes for the Town of Linn Department of Public Works pickup. Contact Matt Wittum at the Highway shop at (262) 275-6300 at least 3 business days in advance to coordinate pickup. No pickups shall occur on Friday. Contractor shall provide a receipt for verification of deliverables.
Add the following to standard spec 524.5:
Payment for the 524 bid items also includes carefully removing the pipes, handling, and storing Town of Linn pipes, and restoring the site.
14. Removing Signs.
Replace standard spec 638.3.4(2) with the following:
Aluminum Type II signs along Zenda Road are the property of the Town of Linn Department of Public Works. Store these signs for the Town of Linn Department of Public Works. Signs shall be palletized for handling with a forklift. Contact Matt Wittum at the Highway shop at (262) 275-6300 at least 3 business days in advance to coordinate pickup. No pickups shall occur on Friday. Contractor shall provide a receipt for verification of deliverables.
Add the following to standard spec 638.5(2):
3846-02-71 7 of 9
Payment for removing signs is full compensation for carefully removing the roadway signs, handling, palletizing, and storing Town of Linn signs, and restoring the site.
15. Removing Small Sign Supports.
Replace standard spec 638.3.5(1) with the following:
Remove wood, flanged and channel steel, structural steel, or other sign supports not assigned structure ID numbers. Supports are the property of the Town of Linn Department of Public Works. The contractor shall salvage, stockpile, and store these supports for the Town of Linn Department of Public Works.
Remove unused concrete footings as specified in 638.3.8. Contact Matt Wittum at the Highway shop at
(262) 275-6300 at least 3 business days in advance to coordinate pickup. No pickups shall occur on Friday. Contractor shall provide a receipt for verification of deliverables.
Salvage red reflective panels attached to sign posts and red and white spin alert at top of posts. Carefully remove safety devices, store materials and fasteners, and reinstall with new sign supports under standard specifications 634 for Posts Tubular Steel.
Add the following to standard spec 638.5(2):
Payment for removing small sign supports is full compensation for removing the roadway sign supports, handling, palletizing, and storing Town of Linn signs, and restoring the site. And for salvaging attached reflective safety equipment for future installation.
16. Tubular Steel Sign Posts Add the following to standard spec 634.3:
(7) Attach salvaged red and white spin alerts and reflective panels to new posts. Inspect salvaged hardware for damage, wear, and rust. Dispose of damaged or rusted nuts and bolts and provided new fasteners.
Revise standard spec 634.5(3) to the following:
Payment for the Posts Tubular Steel bid items is full compensation for providing, hauling, and placing the posts; treating cut post ends; and providing hardware and anchors. The department will not pay for replacing damaged posts or upper tube cut-offs. Payment also includes mounting reflective safety panels and alerts and associated new hardware.
17. Storm Sewer Pipe Reinforced Concrete Special Tee Fitting, SPV.0060.01 A Description This special provision describes providing a Storm Sewer Pipe Reinforced Concrete special tee fitting.
The tee fitting comprises of a Storm Sewer Pipe Reinforced Concrete Horizontal Elliptical Class IV 19X30-Inch Pipe (base) that connects to a Storm Sewer Pipe Reinforced Concrete Class IV 18-Inch Pipe (branch) at a 90-degree angle.
B Materials Furnish Storm Sewer Pipe Reinforced Concrete Horizontal Elliptical Class IV 19X30-Inch and Storm Sewer Pipe Reinforced Concrete Class IV 18-Inch that conform to standard spec 608.
C Construction The construction of Storm Sewer Pipe Reinforced Concrete Horizontal Elliptical Class IV 19X30-Inch and Storm Sewer Pipe Reinforced Concrete Class IV 18-Inch shall conform to standard spec 608. The special fitting shall be fabricated in a plan listed under precast concrete fabricators on the APL. The length of the 18-Inch branch pipe shall be of sufficient length to permit making a proper joint when it connects to the 19X30-Inch base pipe. The branch pipe shall terminate in a bell.
D Measurement The department will measure Storm Sewer Pipe Reinforced Concrete Special Fitting by each unit acceptably completed.
3846-02-71 8 of 9
E Payment The department will pay for measured quantities at the contract unit price under the following bid item:
ITEM NUMBER DESCRIPTION UNIT
SPV.0060.01 Storm Sewer Pipe Reinforced Concrete Special Tee Fitting EACH
Payment is full compensation for providing the Storm Sewer Pipe Reinforced Concrete Horizontal Elliptical Class IV 19X30-Inch (base) and the section of Storm Sewer Pipe Reinforced Concrete Class IV 18-Inch (branch) that contains the fitting; for fabricating the tee fitting between these two pipes; for excavating, except for rock excavation; for providing and removing sheeting and shoring; for constructing the foundation; for backfilling; for cleaning out; and for restoring the site.
18. Section Corner Monuments, Item SPV.0060.02.
A Description Coordinate with Southeastern Wisconsin Regional Planning Commission (SEWRPC) for the perpetuation and replacement of a section corner (Public Land Survey System- PLSS) monument.
B Materials SEWRPC will provide a pre-cast concrete monument or brass disk to be used to mark the PLSS corner.
Furnish base aggregate dense materials that conform to standard spec 305. Furnish concrete, asphalt, topsoil or other materials depending on the surface surrounding the corner.
C Construction SEWRPC will perpetuate existing section corner monument. The CONTRACTOR is responsible to coordinate with SEWRPC and the WisDOT Project Manager throughout the perpetuation and replacement process. The CONTRACTOR will contact the engineer and SEWRPC at (262) 853-8463 at least two (2) weeks before starting construction operations or the preconstruction meeting to allow for section corner monument perpetuation.
CONTRACTOR must excavate and completely remove the existing monument. CONTRACTOR is responsible for providing a backfilled 3 to 4 foot deep hole where existing monument was removed.
CONTRACTOR is responsible to coordinate the materials and methodology to complete the construction of the surface surrounding the monument. This may include but is not limited to a 2’ x 2’ “box out” or 24” diameter core hole in concrete, asphalt pavement/paving rings, coring to facilitate poured in place monuments, topsoil, seed and mulching or other materials or methodologies as agreed to by the CONTRACTOR and SEWPRC.
Contact Information:
Attn: Andy Traeger (Construction Coordinator) Southeastern Wisconsin Regional Planning Commission W239 N1812 Rockwood Drive P.O. Box 1607 Waukesha, WI 53187-1607 Phone (262) 953-4296 Cell (262) 853-8463 Fax (262) 547-1103 atraeger@sewrpc.org
D Measurement The department will measure Section Corner Monuments by the individual unit acceptably completed.
E Payment The department will pay for measured quantities at the contract unit price under the following bid item:
ITEM NUMBER DESCRIPTION UNIT
SPV.0060.02 Section Corner Monuments Each mailto:atraeger@sewrpc.org
3846-02-71 9 of 9
Payment is full compensation for all excavating; removal of existing monument, for placing and compacting backfill material; for disposing of surplus materials; for concrete…