20261208022proposal.pdf

PDF 4 MB Posted

Attached to
C Racine, Lathrop Ave Republic Ave to Washington Ave Local Street
Solicitation number
20261208022
Issued by
Milwaukee County, Wisconsin

About this file

This is a proposal document related to a local street improvement project in Racine, Wisconsin. The project involves work on Lathrop Avenue from Republic Avenue to Washington Avenue and includes concrete pavement removal, base course installation, erosion control measures, sodding, new concrete pavement, concrete curb and gutter installation, concrete driveway and sidewalk work, traffic signal installation, permanent signing, storm sewer lateral work, and pavement marking, along with all incidental items necessary to complete the work as specified in the contract plans and proposal documents.

The document quality and legibility are significantly compromised, making it difficult to extract specific details regarding pricing terms, bid amounts, response deadlines, site visit requirements, bidders' meetings, award dates, contract term, set-asides, funding sources, and other salient financial or administrative information. A clearer version of the proposal document would be necessary to provide comprehensive details on these contractual elements.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

"��#�$�� ����"�"�� !$%&����%'�������())(�*�%+,-����(�."�"��/�/0��1 2010�����1 ���304/�10�4���/��5 ������� 4�65/��,�78�,8,� �9.:�����,�,, :�;��� �"�����>� A"� �?@ =B:�.$; ;��� C�D"> C ���A

C��CC

"�#$�� ����"�"�� <��� �����C� � E�">"> �C@ C� F

��CC

� ��>� CC

�����<� C"�� �#������E��G#��"> C ��A �" C���H C<�� ������C� � �E�">�"> C C����������;

F "��� C�:� C�"�� �(���������I ��� "D�;

F C���D��� "��#�$�� ����"�"�� J,&<���(�� ?""��>����������I

��� "D�� ����G��#�">����?IK(L�C�.

��M<����)%%������:� "���"�:���� ��%�<����,?���A C�!���C@� "�A C�L ���K " �I��� �N O���� ��

<�?CC�

��<�:�"D<�."�" <�P���:�C Q C ���A>"($>��� C ���A

C��CC

�<C �D�E�� <��� � ">���R C� C���@ S">�"">

��CC

Q��� C� C��� ��D�� C"> ��C#���">

��� �<T�A>E�D���G��������<� C����CC

C�<� C>���> �G C"> � C

���""� A">��������������CS� C">�"">

��CC

����A ����D

�C�� �"�D��� C�� �"�D< C� "�� D�A�

C� � D���� �E�� "�G � D��"�� � �

��CC� A� ��

�"�� E�">">��������������C(1U�VUW�XYZV[�VUW\]Ŷ_[�U]�X̀abYW�WcYX��YZcd\e��U]f��]UgUX\h�dc_V�X̀abYWWYVZ�\V�_h_iW]UVYi�aYj�UV�Wc_��VW_]V_Wk.

C�� C��E�� �"��� �">���C�" �lllllllllllllll+.�A �" <� �"��D�� ��#������ �� -+��� "����$D�

���
<��"��D��

�:�������� �KQ���

�- +L�CC

��.�A �" -+��� "����$D�

�L�CC

-+L�CC

-2U]�1_g\]Wb_VW�6X_��Vhe/eg_�Um��U]fn �"�� ��#�?E��C�!�" C !�" �I ��� "D�;

C �"��D�.

��o��05�/�2���p�11�5���6����0�

��@���<�I��C� A<�?AA�

A�" ���� C�I �.�C E��G<�."����.

E �<�K����� :� "���<�� "�.�A � A<�$��##���:� "���<���@ "�q��G� A<�=�A>"� A<�$��##���.�A ���<�;

PLEASE ATTACH

PROPOSAL GUARANTY HERE

Effective with November 2007 Letting Proposal Requirements

PROPOSAL REQUIREMENTS AND CONDITIONS

The bidder, signing and submitting this proposal, agrees and declares as a condition thereof, to be bound by the following conditions and requirements.

If the bidder has a corporate relationship with the proposal design engineering company, the bidder declares that it did not obtain any facts, data, or other information related to this proposal from the design engineering company that was not available to all bidders.

The bidder declares that they have carefully examined the site of, and the proposal, plans, specifications and contract forms for the work contemplated, and it is assumed that the bidder has investigated and is satisfied as to the conditions to be encountered, as to the character, quality, and quantities of work to be performed and materials to be furnished, and as to the requirements of the specifications, special provisions and contract. It is mutually agreed that submission of a proposal shall be considered conclusive evidence that the bidder has made such examination.

The bidder submits herewith a proposal guaranty in proper form and amount payable to the party as designated in the advertisement inviting proposals, to be retained by and become the property of the owner of the work in the event the undersigned shall fail to execute the contract and contract bond and return the same to the office of the engineer within fourteen (14) days after having been notified in writing to do so;

otherwise to be returned.

The bidder declares that they understand that the estimate of quantities in the attached schedule is approximate only and that the attached quantities may be greater or less in accordance with the specifications.

The bidder agrees to perform the said work, for and in consideration of the payment of the amount becoming due on account of work performed, according to the unit prices bid in the following schedule, and to accept such amounts in full payment of said work.

The bidder declares that all of the said work will be performed at their own proper cost and expense, that they will furnish all necessary materials, labor, tools, machinery, apparatus, and other means of construction in the manner provided in the applicable specifications and the approved plans for the work together with all standard and special designs that may be designed on such plans, and the special provisions in the contract of which this proposal will become a part, if and when accepted. The bidder further agrees that the applicable specifications and all plans and working drawings are made a part hereof, as fully and completely as if attached hereto.

The bidder, if awarded the contract, agrees to begin the work not later than ten (10) days after the date of written notification from the engineer to do so, unless otherwise stipulated in the special provisions.

The bidder declares that if they are awarded the contract, they will execute the contract agreement and begin and complete the work within the time named herein, and they will file a good and sufficient surety bond for the amount of the contract for performance and also for the full amount of the contract for payment.

Effective with November 2007 Letting Proposal Requirements

The bidder, if awarded the contract, shall pay all claims as required by Section 779.14, Statutes of Wisconsin, and shall be subject to and discharge all liabilities for injuries pursuant to Chapter 102 of the Statutes of Wisconsin, and all acts amendatory thereto. They shall further be responsible for any damages to property or injury to persons occurring through their own negligence or that of their employees or agents, incident to the performance of work under this contract, pursuant to the Standard Specifications for Road and Bridge Construction applicable to this contract.

In connection with the performance of work under this contract, the contractor agrees to comply with all applicable state and federal statutes relating to non-discrimination in employment. No otherwise qualified person shall be excluded from employment or otherwise be subject to discrimination in employment in any manner on the basis of age, race, religion, color, gender, national origin or ancestry, disability, arrest or conviction record (in keeping with s.111.32), sexual orientation, marital status, membership in the military reserve, honesty testing, genetic testing, and outside use of lawful products. This provision shall include, but not be limited to the following: employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation, and selection for training, including apprenticeship. The contractor further agrees to ensure equal opportunity in employment to all applicants and employees and to take affirmative action to attain a representative workforce.

The contractor agrees to post notices and posters setting forth the provisions of the nondiscrimination clause, in a conspicuous and easily accessible place, available for employees and applicants for employment.

If a state public official (section 19.42, Stats.) or an organization in which a state public official holds at least a 10% interest is a party to this agreement, this contract is voidable by the state unless appropriate disclosure is made to the State of Wisconsin Ethics Board.

Effective with August 2015 Letting Bid Preparation

BID PREPARATION

Preparing the Proposal Schedule of Items A. General

(1) Obtain bidding proposals as specified in section 102 of the standard specifications prior to 11:45 AM of the last business day preceding the letting. Submit bidding proposals using one of the following methods:

1. Electronic bid on the internet.

2. Electronic bid on a printout with accompanying diskette or CD ROM.

3. Paper bid under a waiver of the electronic submittal requirements.

(2) Bids submitted on a printout with accompanying diskette or CD ROM or paper bids submitted under a waiver of the electronic submittal requirements govern over bids submitted on the internet.

(3) The department will provide bidding information through the department’s web site at:

https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx

The contractor is responsible for reviewing this web site for general notices as well as information regarding proposals in each letting. The department will also post special notices of all addenda to each proposal through this web site no later than 4:00 PM local time on the Thursday before the letting. Check the department’s web site after 5:00 PM local time on the Thursday before the letting to ensure all addenda have been accounted for before preparing the bid. When bidding using methods 1 and 2 above, check the Bid ExpressΤΜ on-line bidding exchange at http://www.bidx.com/ after 5:00 PM local time on the Thursday before the letting to ensure that the latest schedule of items Expedite file (*.ebs or *.00x) is used to submit the final bid.

(4) Interested parties can subscribe to the Bid ExpressΤΜ on-line bidding exchange by following the instructions provided at the www.bidx.com web site or by contacting:

Info Tech Inc.

5700 SW 34th Street, Suite 1235 Gainesville, FL 32608-5371 email: mailto:customer.support@bidx.com

(5) The department will address equipment and process failures, if the bidder can demonstrate that those failures were beyond their control.

(6) Contractors are responsible for checking on the issuance of addenda and for obtaining the addenda. Notice of issuance of addenda is posted on the department’s web site at:

https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx or by calling the department at (608) 266-1631. Addenda can ONLY be obtained from the department’s web site listed above or by picking up the addenda at the Bureau of Highway Construction, 4th floor, 4822 Madison Yards Way, Madison, WI, during regular business hours.

(7) Addenda posted after 5:00 PM on the Thursday before the letting will be emailed to the eligible bidders for that proposal. All eligible bidders shall acknowledge receipt of the addenda whether they are bidding on the proposal or not. Not acknowledging receipt may jeopardize the awarding of the project.

https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx http://www.bidx.com/ http://www.bidx.com/ mailto:customer.support@bidx.com

B. Submitting Electronic Bids B.1 On the Internet

(1) Do the following before submitting the bid:

4. Have a properly executed annual bid bond on file with the department.

5. Have a digital ID on file with and enabled by Info Tech Inc. Using this digital ID will constitute the bidder's signature for proper execution of the bidding proposal.

(2) In lieu of preparing, delivering, and submitting the proposal as specified in 102.6 and 102.9 of the standard specifications, submit the proposal on the internet as follows:

1. Download the latest schedule of items reflecting all addenda from the Bid ExpressΤΜ web site.

2. Use ExpediteΤΜ software to enter a unit price for every item in the schedule of items.

3. Submit the bid according to the requirements of ExpediteΤΜ software and the Bid ExpressΤΜ web site. Do not submit a bid on a printout with accompanying diskette or CD ROM or a paper bid. If the bidder does submit a bid on a printout with accompanying diskette or a paper bid in addition to the internet submittal, the department will disregard the internet bid

4. Submit the bid before the hour and date the Notice to Contractors designates

5. Do not sign, notarize, and return the bidding proposal described in 102.2 of the standard specifications.

(3) The department will not consider the bid accepted until the hour and date the Notice to Contractors designates.

B.2 On a Printout with Accompanying Diskette or CD ROM

(1) Download the latest schedule of items from the Wisconsin pages of the Bid Express web site reflecting the latest addenda posted on the department’s web site at:

https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx

Use ExpediteΤΜ software to prepare and print the schedule of items. Provide a valid amount for all price fields. Follow instructions and review the help screens provided on the Bid ExpressΤΜ web site to assure that the schedule of items is prepared properly.

(2) Staple an 8 1/2 by 11 inch printout of the Expedite generated schedule of items to the other proposal documents submitted to the department as a part of the bidder's sealed bid. As a separate submittal, not in the sealed bid envelop but due at the same time and place as the sealed bid, also provide the ExpediteΤΜ generated schedule of items on a 3 1/2 inch computer diskette or CD ROM. Label each diskette or CD ROM with the bidder's name, the 4 character department-assigned bidder identification code from the top of the bidding proposal, and a list of the proposal numbers included on that diskette or CD ROM as indicated in the following example:

Bidder Name

BN00

Proposals: 1, 12, 14, & 22

(3) If bidding on more than one proposal in the letting, the bidder may include all proposals for that letting on one diskette or CD ROM. Include only submitted proposals with no incomplete or other files on the diskette or CD ROM.

(4) The bidder-submitted printout of the Expedite generated schedule of items is the governing contract document and must conform to the requirements of section 102 of the standard specifications. If a printout needs to be altered, cross out the printed information with ink or typewriter and enter the new information and initial it in ink. If there is a discrepancy between the printout and the diskette or CD ROM, the department will analyze the bid using the printout information.

(5) In addition to the reasons specified in section 102 of the standard specifications, proposals are irregular and the department may reject them for one or more of the following:

1. The check code printed on the bottom of the printout of the ExpediteΤΜ generated schedule of items is not the same on each page.

2. The check code printed on the printout of the ExpediteΤΜ generated schedule of items is not the same as the check code for that proposal provided on the diskette or CD ROM.

3. The diskette or CD ROM is not submitted at the time and place the department designates.

B Waiver of Electronic Submittal

(1) The bidder may request a waiver of the electronic submittal requirements. Submit a written request for a waiver in lieu of bids submitted on the internet or on a printout with accompanying diskette or CD ROM. Use the waiver that was included with the paper bid document sent to the bidder or type up a waiver on the bidder’s letterhead. The department will waive the electronic submittal requirements for a bidding entity (individual, partnership, joint venture, corporation, or limited liability company) for up to 4 individual proposals in a calendar year. The department may allow additional waivers for equipment malfunctions.

(2) Submit a schedule of items on paper conforming to section 102 of the standard specifications.

The department charges the bidder a $75 administrative fee per proposal, payable at the time and place the department designates for receiving bids, to cover the costs of data entry. The department will accept a check or money order payable to: "Wisconsin, Dept. of Transportation."

(3) In addition to the reasons specified in section 102 of the standard specifications, proposals are irregular and the department may reject them for one or more of the following:

1. The bidder fails to provide the written request for waiver of the electronic submittal requirements.

2. The bidder fails to pay the $75 administrative fee before the time the department designates for the opening of bids unless the bidder requests on the waiver that they be billed for the $75.

3. The bidder exceeds 4 waivers of electronic submittal requirements within a calendar year.

(4) In addition to the reasons specified in section 102 of the standard specifications, the department may refuse to issue bidding proposals for future contracts to a bidding entity that owes the department administrative fees for a waiver of electronic submittal requirements.

PROPOSAL BID BOND Wisconsin Department of Transportation

DT1303 1/2006

Proposal Number Project Number Letting Date

Name of Principal

Name of Surety State in Which Surety is Organized

We, the above-named Principal and the above-named Surety, are held and firmly bound unto the State of Wisconsin in the sum equal to the Proposal Guaranty for the total bid submitted for the payment to be made; we jointly and severally bind ourselves, our heirs, executors, administrators, successors and assigns. The condition of this obligation is that the Principal has submitted a bid proposal to the State of Wisconsin acting through the Department of Transportation for the improvement designated by the Proposal Number and Letting Date indicated above.

If the Principal is awarded the contract and, within the time and manner required by law after the prescribed forms are presented for signature, enters into a written contract in accordance with the bid, and files the bond with the Department of Transportation to guarantee faithful performance and payment for labor and materials, as required by law, or if the Department of Transportation shall reject all bids for the work described, then this obligation shall be null and void; otherwise, it shall be and remain in full force and effect.

In the event of failure of the Principal to enter into the contract or give the specified bond, the Principal shall pay to the Department of Transportation within 10 business days of demand a total equal to the Proposal Guaranty as liquidated damages; the liability of the Surety continues for the full amount of the obligation as stated until the obligation is paid in full.

The Surety, for value received, agrees that the obligations of it and its bond shall not be impaired or affected by any extension of time within which the Department of Transportation may accept the bid; and the Surety does waive notice of any such extension.

IN WITNESS, the Principal and Surety have agreed and have signed by their proper officers and have caused their corporate seals to be affixed this date: (DATE MUST BE ENTERED)

PRINCIPAL

(Company Name) (Affix Corporate Seal)

(Signature and Title)

(Company Name)

(Signature and Title)

(Company Name)

(Signature and Title)

(Company Name)

(Signature and Title)

NOTARY FOR PRINCIPAL

(Date)

State of Wisconsin ) ) ss.

County )

On the above date, this instrument was acknowledged before me by the named person(s).

(Signature, Notary Public, State of Wisconsin)

(Print or Type Name, Notary Public, State of Wisconsin)

(Date Commission Expires)

Notary Seal

(Name of Surety) (Affix Seal)

(Signature of Attorney-in-Fact)

NOTARY FOR SURETY

(Date)

State of Wisconsin ) ) ss.

County )

On the above date, this instrument was acknowledged before me by the named person(s).

(Signature, Notary Public, State of Wisconsin)

(Print or Type Name, Notary Public, State of Wisconsin)

(Date Commission Expires)

Notary Seal

IMPORTANT: A certified copy of Power of Attorney of the signatory agent must be attached to the bid bond.

CERTIFICATE OF ANNUAL BID BOND Wisconsin Department of Transportation

DT1305 8/2003

Time Period Valid (From/To)

Name of Surety

Name of Contractor

Certificate Holder Wisconsin Department of Transportation

This is to certify that an annual bid bond issued by the above-named Surety is currently on file with the Wisconsin Department of Transportation.

This certificate is issued as a matter of information and conveys no rights upon the certificate holder and does not amend, extend or alter the coverage of the annual bid bond.

Cancellation: Should the above policy be cancelled before the expiration date, the issuing surety will give thirty (30) days written notice to the certificate holder indicated above.

(Signature of Authorized Contractor Representative) (Date)

Effective with March 2010 Letting

LIST OF SUBCONTRACTORS

Section 66.0901(7), Wisconsin Statutes, provides that as a part of the proposal, the bidder also shall submit a list of the subcontractors the bidder proposes to contract with and the class of work to be performed by each. In order to qualify for inclusion in the bidder's list a subcontractor shall first submit a bid in writing, to the general contractor at least 48 hours prior to the time of the bid closing. The list may not be added to or altered without the written consent of the municipality. A proposal of a bidder is not invalid if any subcontractor and the class of work to be performed by the subcontractor has been omitted from a proposal; the omission shall be considered inadvertent or the bidder will perform the work personally.

No subcontract, whether listed herein or later proposed, may be entered into without the written consent of the Engineer as provided in Subsection 108.1 of the Standard Specifications.

Name of Subcontractor Class of Work Estimated Value

Effective with December 2000 Letting Debarment Certification

CERTIFICATION REGARDING DEBARMENT, SUSPENSION, AND OTHER

RESPONSIBILITY MATTERS - PRIMARY COVERED TRANSACTIONS

Instructions for Certification

1. By signing and submitting this proposal, the prospective contractor is providing the certification set out below.

2. The inability of a person to provide the certification required below will not necessarily result in denial of participation in this covered transaction. The prospective contractor shall submit an explanation of why it cannot provide the certification set out below. The certification or explanation will be considered in connection with the department or agency's determination whether to enter into this transaction. However, failure of the prospective contractor to furnish a certification or an explanation shall disqualify such person from participation in this transaction.

3. The certification in this clause is a material representation of fact upon which reliance was placed when the department determined to enter into this transaction. If it is later determined that the contractor knowingly rendered an erroneous certification in addition to other remedies available to the Federal Government the department may terminate this transaction for cause or default.

4. The prospective contractor shall provide immediate written notice to the department to whom this proposal is submitted if at any time the prospective contractor learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances.

5. The terms "covered transaction," "debarred," "suspended," "ineligible," "lower tier covered transaction," "participant," "person," "primary covered transaction," "principal," "proposal," and "voluntarily excluded," as used in this clause, have the meanings set out in the Definitions and Coverage sections of the rules implementing Executive Order 12549. You may contact the department to which this proposal is being submitted for assistance in obtaining a copy of those regulations.

6. The prospective contractor agrees by submitting this proposal that, should this contract be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department entering into this transaction.

7. The prospective contractor further agrees by submitting this proposal that it will include the clause titled "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion-Lower Tier Covered Transaction," which is included as an addendum to PR- 1273 - "Required Contract Provisions Federal Aid Construction Contracts," without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions.

8. The contractor may rely upon a certification of a prospective subcontractor/materials supplier that it is not debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A contractor may decide the method and frequency by which it determines the eligibility of its principals. Each contractor may, but is not required to, check the Disapproval List (telephone # 608/266/1631).

Effective with December 2000 Letting Debarment Certification

9. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of a contractor is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings.

10. Except for transactions authorized under paragraph 6 of these instructions, if a contractor in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department may terminate this transaction for cause or default.

Certification Regarding Debarment, Suspension, and Other Responsibility Matters - Primary Covered Transactions

1. The prospective contractor certifies to the best of its knowledge and belief, that it and its principals:

(a) Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal department or agency;

(b) Have not within a three-year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements or receiving stolen property;

(c) Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State or local) with commission of any of the offense enumerated in paragraph (1)(b) of this certification; and

(d) Have not within a three-year period preceding this proposal had one or more public transactions (Federal, State or local) terminated for cause or default.

2. Where the prospective contractor is unable to certify to any of the statements in this certification, such prospective contractor shall attach an explanation to this proposal.

2703-07-72 1 of 33

Special Provisions Table of Contents

Article Description Page #

1. General

2. Scope of Work

3. Prosecution and Progress

4. Traffic

5. Holiday and Special Event Work Restrictions

6. Utilities

7. Work by Others

8. Information to Bidders, WPDES Transportation Construction General Permit (TCGP) for Storm

Water Discharges

9. Erosion Control

10. Notice to Contractor – Racine County Transit System (RYDE)

11. Notice to Contractor – Sign Removal

12. Notice to Contractor – Temporary Mailboxes

13. Notice to Contractor – Coordination with Other Project

14. Material and Equipment Staging

15. Coordination with Businesses and Residents

16. Public Convenience and Safety

17. Tree Protection

18. Adjusting Manhole Covers, Item 611.8110

19. Topsoil

20. Fertilizer Type B

21. Temporary Audible Message Devices, Item 644.1900.S

22. General Requirements for Electrical Work

23. Install Conduit Into Existing Item, Item 652.0700.S

24. Electrical Service Meter Breaker Pedestal Lathrop Avenue and 16th Street, Item 656.0201

25. Pedestrian Push Buttons, Item 658.0500

26. Lamp, Ballast, LED, Switch Disposal by Contractor, Item 659.5000.S

27. Fiber Optic Splice Enclosure, Item 678.0200

28. Sealing Manhole Openings, Item SPV.0060.01

29. Storm Sewer Tap, Item SPV.0060.02

30. Adjust Sanitary Sewer Manhole Covers, Item SPV.0060.03

31. Section Corner Monuments, Item SPV.0060.04

32. Traffic Signal Controller and Cabinet Lathrop Avenue and 16th Street, Item SPV.0060.05

33. Remove and Salvage Traffic Signal Equipment Lathrop Avenue and 16th Street, Item

SPV.0060.06; Lathrop Avenue and Wright Avenue, Item SPV.0060.07

34. Ethernet Switches, Item SPV.0060.08

35. Fiber Optic Termination Panel, Item SPV.0060.09

36. Utility Line Opening (ULO), Item SPV.0060.10

2703-07-72 2 of 33

37. Traffic Signal Detection System Lathrop Avenue and 16th Street, Item SPV.0060.11

38. Street Sweeping, Item SPV.0075.01

2703-07-72 3 of 33

STSP’S Revised July 1, 2026

SPECIAL PROVISIONS

1. General.

Perform the work under this construction contract for the following projects:

2703-07-72 C Racine, Lathrop Ave Republic Ave to Washington Ave Local Street Racine County

Perform the work as the plans show and execute the work as specified in the State of Wisconsin, Department of Transportation, Standard Specifications for Highway and Structure Construction, 2025 Edition, as published by the department, and these special provisions.

If all or a portion of the plans and special provisions are developed in the SI metric system and the schedule of prices is developed in the US standard measure system, the department will pay for the work as bid in the US standard system.

100-005 (20260701)

2. Scope of Work.

The work under this contract consists of concrete pavement removal, base course, erosion control, sodding, concrete pavement, concrete curb and gutter, concrete driveway and sidewalk, traffic signal, permanent signing, storm sewer lateral, and pavement marking and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.

104-005 (20090901)

3. Prosecution and Progress.

Begin work within 10 calendar days after the engineer issues a written notice to do so.

Provide the start date to the engineer in writing within a month after executing the contract but at least 14 calendar days before the preconstruction conference. Upon approval, the engineer will issue the notice to proceed within ten calendar days before the approved start date.

To revise the start date, submit a written request to the engineer at least two weeks before the intended start date. The engineer will approve or deny that request based on the conditions cited in the request and its effect on the department’s scheduled resources.

Protection of Endangered Bats Federally protected bats have the potential to inhabit the project limits because they roost in trees, bridges, culverts, and other structures. Roosts may not have been observed on this project, but conditions to support the species exist. The species and all active roosts are protected by the federal Endangered Species Act. If an individual bat or active roost is encountered during construction operations, stop work, and notify the engineer and the WisDOT Regional Environmental Coordinator

(REC).

Ensure all operators, employees, and subcontractors working in areas of known or presumed bat habitat are aware of environmental commitments and avoidance and minimization measures (AMMs) to protect both bats and their habitat.

Direct temporary lighting, if used, away from wooded areas during the bat active season April 15 to October 31, both dates inclusive.

Tree Clearing/Trimming:

Tree clearing/trimming is limited to that which is specified in the plans. Contractor means and methods to remove additional trees/branches will not be allowed. If it is determined that additional trees with a 3-inch or greater diameter at breast height (dbh), or branches of any size on those sized trees, need to be

2703-07-72 4 of 33 removed beyond contractor means and methods, notify the engineer to coordinate with the WisDOT REC to determine if consultation with United States Fish and Wildlife Service (USFWS) is required. The contractor must be aware that the WisDOT REC and/or USFWS may not permit modifications.

Submit a schedule and description of clearing operations with the ECIP 14 days prior to any clearing operations. The department will determine, based on schedule and scope of work, what additional erosion control measures shall be implemented prior to the start of clearing operations, and list those additional measures in the ECIP.

Branch trimming is incidental to other work if no other tree clearing work is necessary.

Contractor Coordination Attend weekly scheduling meetings to discuss the near term schedule activities, address any long-term schedule issues, and discuss any relevant technical issues. Develop a rolling three-week schedule identifying the previous week worked and a two week “look ahead”. Provide sufficient detail to include actual and planned activities and all the subcontractors for offsite and construction activities, addressing all activities including lane closure schedules to be performed and identifying issues requiring engineering action or input. Subcontractors shall be in attendance at the weekly progress meetings if identifed on the two week "look ahead".

Do not remove residential or commercial driveways from service without sufficient notice given to tenants and/or property owners. Sufficient notice is defined as contacting tenants and/or property owners 48 hours prior to removing a driveway from service. Maintain access to the residential or commercial properties that have only one access by completing work on the approach of driveways that are wider than 20 feet in stages. Maintain access to the residential or commercial properties that have only one access by completing work within 24 hours or as directed by the engineer on the approach of driveways that are narrower than 20 feet. Close only one driveway at a time on the properties that have multiple driveways. If the contractor wishes to make other arrangements regarding driveway maintenance, these arrangements shall be agreed to in writing and signed by the prime contractor and property owner of the affected driveway. Provide a copy of the signed written agreement to the engineer.

The contractor is advised that trees, signs, fences, and other items within the Temporary Limited Easement (TLE) shown on the plans are to remain. Do not remove items within the TLE without the approval of the engineer and without contacting the property owner.

4. Traffic.

Install traffic control signs such as Portable Changeable Message Signs (PCMS) at the project ends 7 days in advance of starting work and implementing new traffic patterns. The timeframe may be adjusted by the engineer.

Coordinate the locations of PCMS with the engineer. Obtain acceptance from the engineer for all messages for all PCMS.

Maintain emergency vehicular access at all times to all roadways located along Lathrop Avenue.

Maintain sidewalk access along Lathrop Avenue while roadway is being constructed, once roadway construction is completed, reconstruct the sidewalks by detouring pedestrians to the finished pavement.

Do not close consecutive intersections at the same time. Coordinate side street closures with the City of Racine. Contact Ara Molitor, City Engineer at (262) 636-9487.

Submit all traffic control change requests to the engineer at least 7 days prior to an actual traffic control change. A request does not constitute approval. Provide a 14-day look ahead schedule to the engineer.

Traffic Control Operations Stage 1:

Southbound Lathrop Avenue traffic will use the existing northbound pavement. Maintain one 12-foot travel lane in southbound direction within the construction limits. Detour northbound Lathrop Avenue traffic as shown in the detour plans. Prior to closing northbound Lathrop Avenue from Republic Avenue to Washington Avenue implement the detour route as shown on the plans. Crossover southbound traffic to northbound side of Lathrop Avenue south of Washington Avenue and southbound side of Lathrop Avenue south of Republic Avenue. Construct Victory Avenue, 16th Street, and Wright Avenue half at a time to maintain east-west traffic on them. Maintain local access on Lathrop Avenue at all times or as directed by the engineer.

2703-07-72 5 of 33

Construct pavement, curb and gutter, sidewalk, driveways, storm sewer laterals and structures, and permanent signing on southbound side of Lathrop Avenue within the project limits. Construct sidewalk within one block at a time.

Detour pedestrians on northbound Lathrop Avenue as shown on the plans.

Maintain pedestrian access at all times by only closing one side of the intersection at a time or by detouring pedestrian to the next side street. Do not close crosswalks at two consecutive side roads at the same time.

Maintain sidewalk access along Lathrop Avenue while the roadway is being constructed, once roadway construction is completed, reconstruct the sidewalks by detouring pedestrians on to the finished pavement. Provide temporary curb ramps and temporary pedestrian surface as needed.

Construct sidewalk while southbound Lathrop Avenue remains closed to traffic.

Stage 2:

Southbound Lathrop Avenue traffic will use the newly constructed southbound pavement. Maintain one 11-foot travel lane in southbound direction within the construction limits. Detour northbound Lathrop Avenue traffic as shown in the detour plans. Prior to closing northbound Lathrop Avenue from Republic Avenue to Washington Avenue implement the detour route as shown on the plans. Construct Victory Avenue, 16th Street, and Wright Avenue half at a time to maintain east-west traffic on them.

Maintain local access on Lathrop Avenue at all times or as directed by the engineer.

Construct pavement, curb and gutter, sidewalk, driveways, storm sewer laterals and structures, and permanent signing on northbound side of Lathrop Avenue within the project limits. Construct sidewalk within one block at a time.

Detour pedestrians on southbound Lathrop Avenue as shown on the plans.

Maintain pedestrian access at all times by only closing one side of the intersection at a time or by detouring pedestrian to next side street. Do not close crosswalks at two consecutive side roads at the same time.

Maintain sidewalk access along Lathrop Avenue while the roadway is being constructed, once roadway construction is completed, reconstruct the sidewalks by detouring pedestrians on to the finished pavement. Provide temporary curb ramps and temporary pedestrian surface as needed.

Construct sidewalk while northbound Lathrop Avenue remains closed to traffic.

Wisconsin Lane Closure System Advance Notification Prior to starting work, provide closure information to the engineer for incorporation into the Wisconsin Lane Closure System (LCS).

Discuss LCS completion dates and provide changes in the schedule to the engineer at project meetings in order to manage closures nearing their completion date.

5. Holiday and Special Event Work Restrictions.

Do not perform work on, nor haul materials of any kind along or across any portion of the highway carrying Lathrop Avenue traffic, and entirely clear the traveled way and shoulders of such portions of the highway of equipment, barricades, signs, lights, and any other material that might impede the free flow of traffic during the following holiday and special event periods:

- From noon Friday, May 28, 2027 to 6:00 AM Tuesday, June 1, 2027 for Memorial Day;

- From noon Friday, July 2, 2027 to 6:00 AM Tuesday, July 6, 2027 for Independence Day;

- From noon Friday, September 3, 2027 to 6:00 AM Tuesday, September 7, 2027 for Labor Day.

stp-107-005 (20210113)

6. Utilities.

This contract does not come under the provision of Administrative Rule Trans 220.

2703-07-72 6 of 33

The utility work plan includes additional detailed information regarding the location of known discontinued, relocated, or removed utility facilities. These can be requested from the department during the bid preparation process or from the project engineer after the contract has been awarded and executed.

Some of the utility work described below is dependent on prior work being performed by the contractor at a specific site. In such situations, provide the engineer and the affected utility a good faith notice of when the utility is to start work at the site. Provide this notice 14 to 16 calendar days in advance of when the prior work will be completed and the site will be available to the utility. Follow-up with a confirmation notice to the engineer and the utility not less than 3 working days before the site will be ready for the utility to begin its work.

stp-107-066 (20240703)

Any utility facility locations (stations, offsets, elevations, depths) listed in this article are approximate.

Known utilities in the project are as follows:

AT&T Wisconsin–Communication Line has underground and overhead communication facilities within the project limits. Conflict is not anticipated with overhead facilities. Manhole frame and cover to be adjusted to match new road grade at Station 12+70 F, 17.5’ RT. Adjustment is anticipated to take one day. Adjustment of AT&T facilities will be completed during construction. Contact AT&T prior to starting Stage 2A.

City of Racine–Sanitary Sewer has underground sanitary sewer facilities within the project limits.

Adjust manholes to match the new finished pavement elevation. Perform this work in accordance with the requirements of Adjust Sanitary Sewer Manhole Covers.

Crown Castle Fiber–Communication Line has aerial fiber that crosses 16th Street on the north side.

Conflict with Crown Castel Fiber facilities is not anticipated.

Midwest Fiber Networks–Communication Line has underground and overhead communication facilities within the project limits.

Midwest Fiber Networks (MFN) will be transferring in-line north/south aerial attachments from the following We Energies poles to new poles:

Existing pole 68-25374 to new pole located at northwest (NW) corner of Lathrop Avenue and Republic Avenue intersection.

Existing pole 12-12685 to new pole located at NW corner of Lathrop Avenue and 17th Street intersection.

Existing pole 68-25370 to new pole located at NW corner of Lathrop Avenue and Victory Avenue intersection.

Existing pole 13-0770 to new pole located at southwest corner of Lathrop Avenue and 16th Street intersection.

Relocations of MFN’s facilities will be completed prior to construction. Relocation is anticipated to start 15 days after AT&T’s relocation is completed. The anticipated number of working days to complete relocation of MFN’s facilities is 3 to 5 days.

Midwest Fiber Networks is live within the project. Midwest Fiber Networks’ Operations Center phone number is 1-866-831-1661.

Racine Wastewater Utility–Sanitary Sewer has underground sanitary sewer facilities within the project limits.

The manholes throughout the project area will need to be adjusted. Perform this work in accordance with the requirements of Adjust Sanitary Sewer Manhole Covers.

Conflicts and relocation of the interceptor sewer pipe is not anticipated.

Racine Water Works Commission–Water has underground water facilities within the project limits.

Watermain replacement east-west through Wright, 16th, and Victory intersections. Along Wright Avenue, at Lathrop Avenue and to the west, the watermain was relocated approximately 7’ to the north. Along 16th Street, the watermain was relocated approximately 4’ to the north. Along Victory Avenue, at Lathrop Avenue and to the west, the watermain was relocated approximately 4’ to the south. Along Victory Avenue, east of Lathrop Avenue, the watermain was discontinued.

2703-07-72 7 of 33

Valve box adjustments to be performed during paving operations. Contact the Utility Construction Department at (262) 636-9437 to coordinate. Valve box adjustments will each take approximately 5 minutes.

Spectrum (Charter)–Communication Line has overhead communication facilities within the project limits.

Charter has their facilities on We Energies poles along Lathrop Avenue. Charter to transfer their facilities from the existing We Energies poles to new poles placed by We Energies. Charter would obtain any necessary permitting needed prior to work is performed.

Charter will complete the transfer within 20 days after notified by We Energies of new pole(s) placement.

Relocations of Charter’s facilities will be completed prior to construction.

TDS Metrocom–Communication Line has underground and overhead communication facilities within the project limits.

TDS facilities at Lathrop Avenue and 16th Street intersection are aerial and no conflicts are anticipated.

We Energies–Electricity has underground and overhead electric facilities within the project limits.

Relocations and/or adjustments of We Energies facilities will be constructed as listed in the table below.

Highway stationing has been used where possible to locate new facilities.

Conflict ID Existing Facility Location Work Proposed

Elec-101 85+80 25’ LT Secondary pole to be removed

Elec-800 86+00 25’ LT New secondary pole to be installed

Elec-110 91+99 24’ LT Primary, secondary, SVC drop pole to be removed

Elec-801 92+25 25’ LT New primary, secondary, SVC drop pole to be installed

Elec-900 91+85 54’ LT New primary, secondary, SVC drop pole to be installed

Elec-113 94+53 24’ LT Primary, secondary pole to be removed

Elec-803 94+70 24’ LT New primary, secondary pole to be installed

Elec-114 94+61 24’ RT Streetlight and SVC drop pole to be removed

Elec-802 94+70 24’ RT New streetlight and SVC drop pole to be installed

Elec-118 98+66 22’ LT Primary, secondary, and streetlight pole to be removed

Elec-804 98+10 24’ LT New primary, secondary, and streetlight pole to be installed

Elec-121 99+24 41’LT Primary, secondary, and streetlight pole to be removed

Elec-901 99+24 59’ LT New primary, secondary, and streetlight pole to be installed

Elec-126 104+09 26’ LT Streetlight and SVC drop pole to be removed

Elec-805 104+00 24’ LT New streetlight and SVC drop pole to be installed

Elec-806 104+20 46’ LT New secondary pole to be installed

Elec-131 108+75 26’ LT Secondary, SVC drop, streetlight and pole to be removed

Elec-807 108+66 25’ LT New secondary, SVC drop, streetlight & pole to be installed

Elec-132 108+75 26’ RT Secondary. SVC drop pole to be removed

Elec-808 108+66 25’ RT New secondary, SVC drop pole to be installed

Elec-133 109+61 26’ LT Secondary pole and riser to UG SVC to be removed

Elec-143 115+93 23’ RT 3Ø primary, secondary, and streetlight pole to be removed

Elec-809 116+04 24’ RT New 3Ø primary, secondary, and streetlight pole to be installed

Construction is estimated to require 15 working days prior to construction, not including joint use work.

This work is to begin no later than November 15th, 2026.

2703-07-72 8 of 33

Any facilities not explicitly identified as being relocated and/or adjusted have been deemed to be not in conflict and will remain in place as is. We Energies has determined that the project is constructible with these facilities left within the work-zone.

It is imperative that the highway contractor contact We Energies before removing any electrical underground cables, to verify that they have been discontinued and carry no electrical current. The contractor must not assume that unmarked facilities have been discontinued. At no time is it acceptable to push, pull, cut or drill an unmarked facility without explicit consent from We Energies. Contractor must call the We Energies 24 hour Dispatch lines to arrange for this verification.

We Energies Electric Dispatch number 1-800-662-4797.

We Energies–Gas/Petroleum has underground gas facilities parallel and across Lathrop Avenue within the project limits in the following locations:

Any facilities not explicitly identified as being relocated and/or adjusted have been deemed to be not in conflict and will remain in place as is. We Energies has determined that the project is constructible with these facilities left within the work-zone.

Contact 1-800-261-5325 for gas emergencies, to identify if gas facilities are live and gas valve box adjustments.

We Energies will be relocating the following gas facilities to the indicated location along Lathrop Avenue and some side roads:

12-inch steel pipe from Station 85+14 to Station 121+00:

Station 85+14 85+35 to 118+00 118+60 119+50 120+00 120+50 121+00

Offset 8’ LT 16’ LT 15.5’ LT 15’ LT 14’ LT 14’ LT 13’ LT

2-inch polyethylene pipe from Station 85+40 to Station 120+25:

Station 85+40 85+82 85+82 to 93+50 100+00 to 103+00 104+17 105+00 to 108+00

Offset 52’ RT 50’ RT 50’ RT 32’ RT N/A 32’ RT

Station 110+50 to 112+50 113+25 113+50 to 120+25 11+82 E 12+35 E

Offset 32’ RT N/A 32’ RT 24’ RT 21.5’ RT

Station 12+81 F 13+12 F

Offset 37’ RT 37’ RT

6-inch polyethylene pipe from Station 12+33 D to Station 13+38 D:

Station 12+33 D 12+80 D 13+05 D 13+38 D

Offset 27’ RT 16.5’ RT 16.5’ RT N/A

4-inch polyethylene pipe from Station 12+06 D to Station 12+25 D:

Station 12+06 D 12+25 D

Offset 27’ RT 27.0’ RT

Notify We Energies for each location of utility relocation and/or adjustment work.

Anticipated number of working days to complete the relocations is 80 days. Anticipated relocation start date is September 1, 2026. Relocation of We Energies Gas facilities except gas valve adjustment will be completed prior to construction.

2703-07-72 9 of 33

The following We Energies Gas facilities are no longer in use but have been left in place in the project area:

• 10-inch steel 25 feet to 26 feet LT from the reference line within the entire length of the project.

• 2-inch steel/polyethylene 10 feet West of East (WOE) right-of-way from Republic Avenue to Victory Avenue.

• 2-inch steel crossing Lathrop Avenue at approximate Station 89+35.

• 4-inch polyethylene crossing Lathrop Avenue at approximate Station 99+20.

• 2-inch steel 10 feet WOE right-of-way from Station 100+00 to Station 104+00.

• 2-inch steel main crossing Lathrop Avenue at Station 104+23.

• 2-inch steel main from 10 feet WOE right-of-way from Station 105+50 to Station 108+25.

• 2-inch steel main crossing Lathrop Avenue at approximate Station 107+25.

• 2-inch steel main crossing Lathrop Avenue at approximate Station 108+95.

• 2-inch steel main located 11 feet WOE right-of-way from Station 110+50 to Station 115+00.

• 2-inch steel main crossing Lathrop Avenue at approximate Station 113+30.

• 2-inch steel located 10 feet WOE right-of-way from Station 116+00 to Station 120+00.

• 2-inch steel main crossing Lathrop at approximate Station 117+22.

It is imperative that the highway contractor contact We Energies before removing any gas facilities to verify that they have been discontinued and carry no natural gas. The contractor must not assume that unmarked facilities have been discontinued. At no time is it acceptable to push, pull, cut or drill an unmarked facility without explicit consent from We Energies.

This is the start of the file's text. The full file is on GovTribe.