20261208018proposal.pdf

PDF 4 MB Posted

Attached to
I-94 East West, Early Grading Menomonee River to 32nd Street IH 94
Solicitation number
20261208018
Issued by
Milwaukee County, Mattoon Village, Wisconsin

About this file

This is a proposal document related to the I-94 East West Early Grading project in Wisconsin, which involves clearing, removals, grading, dense graded base, erosion control, water main, culvert pipe, sanitary sewer manhole reconstruction, and restoration work on the Menomonee River to 32nd Street corridor. The document appears to be heavily redacted or corrupted, making it difficult to extract specific details regarding item quantities, response dates, due dates, site visits, bidders' meetings, award dates, and contract terms. The proposal submission format suggests this is a formal bid response to the state or local contracting agency managing the infrastructure project.

Due to the severely compromised legibility of the document, specific information regarding pricing terms, set-asides, incumbent contractors, funding sources, and other salient contract details cannot be reliably determined from the file provided. To obtain complete proposal specifications and contractual terms for this I-94 infrastructure project, a clearer version of the document would be necessary.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

!#��$�%��!����#�#��!"%�&�'���('�'����)**)�+��,-.����)�/#�#��0�01��2 3121�����2 ���4150�21�5���0��6 ������� 5�760���*�8'-8-* �9/:��'�'-�-; 9<�+=�>��#�� �#?�>���@�A��B�!C?D

�E�F ��#��;'!B�/#�

# 9<��+= D��G� H

%I����������?� B�@#I !B ���C!

B��BB

�#�#I !#�$%��!����#�#��!?���!� ��B�!

G�#I#I

�BF

B� J

�#$�����������)%I

��BB

�!��I�!BB

��F �����?�!B#�� �$������G��H$��#I �����F !#�$#I B ��C!�# B���K #��!�#I B?��!�� ��B�!

�G�#I�#I !B B����������E J !#���!B�:�!B�#��!�)���������A ���!#@�E J B���@��� !#��$�%��!����#�#��!L-&?���)�� M##� I����������A

���!#@��!��� H��$�#I����MA>)N�B�/

�,O� ���%��

P ���?�'�'-M���C!

B�"���BF�!#�C

B�N �A��� �Q R���� ��

?�MBB�

?�S���:�B %I��� �!#�� #����� �K B �����F

���CI#)%I��

�#I�##I !B ���C!

B��BB

�?B �@�G��!?���!� #I���T B� !#�#�F �$#I B���F U#I�##I

��BB

�I�� V���!

B�!B �� B#I ��B$���#I

���!�?<�CIG�@���H��������?�!B����BB

!B�?�!BI�� I

H B#I �!B

���##�!C#I��������������BU�!B#I�##I

��BB

����C

�I�F �#I �B�� #�@���!B�� B�!#��!@�C�

B�!�!@ ��� ���!?���#I �G�� #�H

#�#�F

��BB�!C�! �!!

#��!G�#I#I��������������B)2W�XWY�Z[\X]�XWŶ_[̀a]�W_�Zbcd[Y�Ye[Z��[\ef̂ g��W_h��_WiWẐj�feaX�Zbcd[YY[X\�̂X�ajakY_WX[k�c[l�WX�Yea��XYa_XaYm/ B��!B��G��!�#��� �#I���B�# �nnnnnnnnnnnnnnn,/�C!�#

���
?��#��@��

�:��������!�>V���

�. ,N�BB

��/�C!�#

�N�BB

.,N�BB

.3W_�2aî_YdaXY�7Za��Xjg0gia�Wo��W_hp �#�

��$�MG��B�"�#

B "�# �A ���!#@�E B �#��@�/

��q��16�0�3���r�22�6���7����1�

E

��F���?�A��B�!C?�MCC�

C�# ���F G �?�N ���A ��B?�>�����!�:�!#���?�%��$$� �:�!#���?�/�!�#��@?���# �?E

PLEASE ATTACH

PROPOSAL GUARANTY HERE

Effective with November 2007 Letting Proposal Requirements

PROPOSAL REQUIREMENTS AND CONDITIONS

The bidder, signing and submitting this proposal, agrees and declares as a condition thereof, to be bound by the following conditions and requirements.

If the bidder has a corporate relationship with the proposal design engineering company, the bidder declares that it did not obtain any facts, data, or other information related to this proposal from the design engineering company that was not available to all bidders.

The bidder declares that they have carefully examined the site of, and the proposal, plans, specifications and contract forms for the work contemplated, and it is assumed that the bidder has investigated and is satisfied as to the conditions to be encountered, as to the character, quality, and quantities of work to be performed and materials to be furnished, and as to the requirements of the specifications, special provisions and contract. It is mutually agreed that submission of a proposal shall be considered conclusive evidence that the bidder has made such examination.

The bidder submits herewith a proposal guaranty in proper form and amount payable to the party as designated in the advertisement inviting proposals, to be retained by and become the property of the owner of the work in the event the undersigned shall fail to execute the contract and contract bond and return the same to the office of the engineer within fourteen (14) days after having been notified in writing to do so;

otherwise to be returned.

The bidder declares that they understand that the estimate of quantities in the attached schedule is approximate only and that the attached quantities may be greater or less in accordance with the specifications.

The bidder agrees to perform the said work, for and in consideration of the payment of the amount becoming due on account of work performed, according to the unit prices bid in the following schedule, and to accept such amounts in full payment of said work.

The bidder declares that all of the said work will be performed at their own proper cost and expense, that they will furnish all necessary materials, labor, tools, machinery, apparatus, and other means of construction in the manner provided in the applicable specifications and the approved plans for the work together with all standard and special designs that may be designed on such plans, and the special provisions in the contract of which this proposal will become a part, if and when accepted. The bidder further agrees that the applicable specifications and all plans and working drawings are made a part hereof, as fully and completely as if attached hereto.

The bidder, if awarded the contract, agrees to begin the work not later than ten (10) days after the date of written notification from the engineer to do so, unless otherwise stipulated in the special provisions.

The bidder declares that if they are awarded the contract, they will execute the contract agreement and begin and complete the work within the time named herein, and they will file a good and sufficient surety bond for the amount of the contract for performance and also for the full amount of the contract for payment.

Effective with November 2007 Letting Proposal Requirements

The bidder, if awarded the contract, shall pay all claims as required by Section 779.14, Statutes of Wisconsin, and shall be subject to and discharge all liabilities for injuries pursuant to Chapter 102 of the Statutes of Wisconsin, and all acts amendatory thereto. They shall further be responsible for any damages to property or injury to persons occurring through their own negligence or that of their employees or agents, incident to the performance of work under this contract, pursuant to the Standard Specifications for Road and Bridge Construction applicable to this contract.

In connection with the performance of work under this contract, the contractor agrees to comply with all applicable state and federal statutes relating to non-discrimination in employment. No otherwise qualified person shall be excluded from employment or otherwise be subject to discrimination in employment in any manner on the basis of age, race, religion, color, gender, national origin or ancestry, disability, arrest or conviction record (in keeping with s.111.32), sexual orientation, marital status, membership in the military reserve, honesty testing, genetic testing, and outside use of lawful products. This provision shall include, but not be limited to the following: employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation, and selection for training, including apprenticeship. The contractor further agrees to ensure equal opportunity in employment to all applicants and employees and to take affirmative action to attain a representative workforce.

The contractor agrees to post notices and posters setting forth the provisions of the nondiscrimination clause, in a conspicuous and easily accessible place, available for employees and applicants for employment.

If a state public official (section 19.42, Stats.) or an organization in which a state public official holds at least a 10% interest is a party to this agreement, this contract is voidable by the state unless appropriate disclosure is made to the State of Wisconsin Ethics Board.

Effective with August 2015 Letting Bid Preparation

BID PREPARATION

Preparing the Proposal Schedule of Items A. General

(1) Obtain bidding proposals as specified in section 102 of the standard specifications prior to 11:45 AM of the last business day preceding the letting. Submit bidding proposals using one of the following methods:

1. Electronic bid on the internet.

2. Electronic bid on a printout with accompanying diskette or CD ROM.

3. Paper bid under a waiver of the electronic submittal requirements.

(2) Bids submitted on a printout with accompanying diskette or CD ROM or paper bids submitted under a waiver of the electronic submittal requirements govern over bids submitted on the internet.

(3) The department will provide bidding information through the department’s web site at:

https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx

The contractor is responsible for reviewing this web site for general notices as well as information regarding proposals in each letting. The department will also post special notices of all addenda to each proposal through this web site no later than 4:00 PM local time on the Thursday before the letting. Check the department’s web site after 5:00 PM local time on the Thursday before the letting to ensure all addenda have been accounted for before preparing the bid. When bidding using methods 1 and 2 above, check the Bid ExpressΤΜ on-line bidding exchange at http://www.bidx.com/ after 5:00 PM local time on the Thursday before the letting to ensure that the latest schedule of items Expedite file (*.ebs or *.00x) is used to submit the final bid.

(4) Interested parties can subscribe to the Bid ExpressΤΜ on-line bidding exchange by following the instructions provided at the www.bidx.com web site or by contacting:

Info Tech Inc.

5700 SW 34th Street, Suite 1235 Gainesville, FL 32608-5371 email: mailto:customer.support@bidx.com

(5) The department will address equipment and process failures, if the bidder can demonstrate that those failures were beyond their control.

(6) Contractors are responsible for checking on the issuance of addenda and for obtaining the addenda. Notice of issuance of addenda is posted on the department’s web site at:

https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx or by calling the department at (608) 266-1631. Addenda can ONLY be obtained from the department’s web site listed above or by picking up the addenda at the Bureau of Highway Construction, 4th floor, 4822 Madison Yards Way, Madison, WI, during regular business hours.

(7) Addenda posted after 5:00 PM on the Thursday before the letting will be emailed to the eligible bidders for that proposal. All eligible bidders shall acknowledge receipt of the addenda whether they are bidding on the proposal or not. Not acknowledging receipt may jeopardize the awarding of the project.

https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx http://www.bidx.com/ http://www.bidx.com/ mailto:customer.support@bidx.com

B. Submitting Electronic Bids B.1 On the Internet

(1) Do the following before submitting the bid:

4. Have a properly executed annual bid bond on file with the department.

5. Have a digital ID on file with and enabled by Info Tech Inc. Using this digital ID will constitute the bidder's signature for proper execution of the bidding proposal.

(2) In lieu of preparing, delivering, and submitting the proposal as specified in 102.6 and 102.9 of the standard specifications, submit the proposal on the internet as follows:

1. Download the latest schedule of items reflecting all addenda from the Bid ExpressΤΜ web site.

2. Use ExpediteΤΜ software to enter a unit price for every item in the schedule of items.

3. Submit the bid according to the requirements of ExpediteΤΜ software and the Bid ExpressΤΜ web site. Do not submit a bid on a printout with accompanying diskette or CD ROM or a paper bid. If the bidder does submit a bid on a printout with accompanying diskette or a paper bid in addition to the internet submittal, the department will disregard the internet bid

4. Submit the bid before the hour and date the Notice to Contractors designates

5. Do not sign, notarize, and return the bidding proposal described in 102.2 of the standard specifications.

(3) The department will not consider the bid accepted until the hour and date the Notice to Contractors designates.

B.2 On a Printout with Accompanying Diskette or CD ROM

(1) Download the latest schedule of items from the Wisconsin pages of the Bid Express web site reflecting the latest addenda posted on the department’s web site at:

https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx

Use ExpediteΤΜ software to prepare and print the schedule of items. Provide a valid amount for all price fields. Follow instructions and review the help screens provided on the Bid ExpressΤΜ web site to assure that the schedule of items is prepared properly.

(2) Staple an 8 1/2 by 11 inch printout of the Expedite generated schedule of items to the other proposal documents submitted to the department as a part of the bidder's sealed bid. As a separate submittal, not in the sealed bid envelop but due at the same time and place as the sealed bid, also provide the ExpediteΤΜ generated schedule of items on a 3 1/2 inch computer diskette or CD ROM. Label each diskette or CD ROM with the bidder's name, the 4 character department-assigned bidder identification code from the top of the bidding proposal, and a list of the proposal numbers included on that diskette or CD ROM as indicated in the following example:

Bidder Name

BN00

Proposals: 1, 12, 14, & 22

(3) If bidding on more than one proposal in the letting, the bidder may include all proposals for that letting on one diskette or CD ROM. Include only submitted proposals with no incomplete or other files on the diskette or CD ROM.

(4) The bidder-submitted printout of the Expedite generated schedule of items is the governing contract document and must conform to the requirements of section 102 of the standard specifications. If a printout needs to be altered, cross out the printed information with ink or typewriter and enter the new information and initial it in ink. If there is a discrepancy between the printout and the diskette or CD ROM, the department will analyze the bid using the printout information.

(5) In addition to the reasons specified in section 102 of the standard specifications, proposals are irregular and the department may reject them for one or more of the following:

1. The check code printed on the bottom of the printout of the ExpediteΤΜ generated schedule of items is not the same on each page.

2. The check code printed on the printout of the ExpediteΤΜ generated schedule of items is not the same as the check code for that proposal provided on the diskette or CD ROM.

3. The diskette or CD ROM is not submitted at the time and place the department designates.

B Waiver of Electronic Submittal

(1) The bidder may request a waiver of the electronic submittal requirements. Submit a written request for a waiver in lieu of bids submitted on the internet or on a printout with accompanying diskette or CD ROM. Use the waiver that was included with the paper bid document sent to the bidder or type up a waiver on the bidder’s letterhead. The department will waive the electronic submittal requirements for a bidding entity (individual, partnership, joint venture, corporation, or limited liability company) for up to 4 individual proposals in a calendar year. The department may allow additional waivers for equipment malfunctions.

(2) Submit a schedule of items on paper conforming to section 102 of the standard specifications.

The department charges the bidder a $75 administrative fee per proposal, payable at the time and place the department designates for receiving bids, to cover the costs of data entry. The department will accept a check or money order payable to: "Wisconsin, Dept. of Transportation."

(3) In addition to the reasons specified in section 102 of the standard specifications, proposals are irregular and the department may reject them for one or more of the following:

1. The bidder fails to provide the written request for waiver of the electronic submittal requirements.

2. The bidder fails to pay the $75 administrative fee before the time the department designates for the opening of bids unless the bidder requests on the waiver that they be billed for the $75.

3. The bidder exceeds 4 waivers of electronic submittal requirements within a calendar year.

(4) In addition to the reasons specified in section 102 of the standard specifications, the department may refuse to issue bidding proposals for future contracts to a bidding entity that owes the department administrative fees for a waiver of electronic submittal requirements.

PROPOSAL BID BOND Wisconsin Department of Transportation

DT1303 1/2006

Proposal Number Project Number Letting Date

Name of Principal

Name of Surety State in Which Surety is Organized

We, the above-named Principal and the above-named Surety, are held and firmly bound unto the State of Wisconsin in the sum equal to the Proposal Guaranty for the total bid submitted for the payment to be made; we jointly and severally bind ourselves, our heirs, executors, administrators, successors and assigns. The condition of this obligation is that the Principal has submitted a bid proposal to the State of Wisconsin acting through the Department of Transportation for the improvement designated by the Proposal Number and Letting Date indicated above.

If the Principal is awarded the contract and, within the time and manner required by law after the prescribed forms are presented for signature, enters into a written contract in accordance with the bid, and files the bond with the Department of Transportation to guarantee faithful performance and payment for labor and materials, as required by law, or if the Department of Transportation shall reject all bids for the work described, then this obligation shall be null and void; otherwise, it shall be and remain in full force and effect.

In the event of failure of the Principal to enter into the contract or give the specified bond, the Principal shall pay to the Department of Transportation within 10 business days of demand a total equal to the Proposal Guaranty as liquidated damages; the liability of the Surety continues for the full amount of the obligation as stated until the obligation is paid in full.

The Surety, for value received, agrees that the obligations of it and its bond shall not be impaired or affected by any extension of time within which the Department of Transportation may accept the bid; and the Surety does waive notice of any such extension.

IN WITNESS, the Principal and Surety have agreed and have signed by their proper officers and have caused their corporate seals to be affixed this date: (DATE MUST BE ENTERED)

PRINCIPAL

(Company Name) (Affix Corporate Seal)

(Signature and Title)

(Company Name)

(Signature and Title)

(Company Name)

(Signature and Title)

(Company Name)

(Signature and Title)

NOTARY FOR PRINCIPAL

(Date)

State of Wisconsin ) ) ss.

County )

On the above date, this instrument was acknowledged before me by the named person(s).

(Signature, Notary Public, State of Wisconsin)

(Print or Type Name, Notary Public, State of Wisconsin)

(Date Commission Expires)

Notary Seal

(Name of Surety) (Affix Seal)

(Signature of Attorney-in-Fact)

NOTARY FOR SURETY

(Date)

State of Wisconsin ) ) ss.

County )

On the above date, this instrument was acknowledged before me by the named person(s).

(Signature, Notary Public, State of Wisconsin)

(Print or Type Name, Notary Public, State of Wisconsin)

(Date Commission Expires)

Notary Seal

IMPORTANT: A certified copy of Power of Attorney of the signatory agent must be attached to the bid bond.

CERTIFICATE OF ANNUAL BID BOND Wisconsin Department of Transportation

DT1305 8/2003

Time Period Valid (From/To)

Name of Surety

Name of Contractor

Certificate Holder Wisconsin Department of Transportation

This is to certify that an annual bid bond issued by the above-named Surety is currently on file with the Wisconsin Department of Transportation.

This certificate is issued as a matter of information and conveys no rights upon the certificate holder and does not amend, extend or alter the coverage of the annual bid bond.

Cancellation: Should the above policy be cancelled before the expiration date, the issuing surety will give thirty (30) days written notice to the certificate holder indicated above.

(Signature of Authorized Contractor Representative) (Date)

Effective with March 2010 Letting

LIST OF SUBCONTRACTORS

Section 66.0901(7), Wisconsin Statutes, provides that as a part of the proposal, the bidder also shall submit a list of the subcontractors the bidder proposes to contract with and the class of work to be performed by each. In order to qualify for inclusion in the bidder's list a subcontractor shall first submit a bid in writing, to the general contractor at least 48 hours prior to the time of the bid closing. The list may not be added to or altered without the written consent of the municipality. A proposal of a bidder is not invalid if any subcontractor and the class of work to be performed by the subcontractor has been omitted from a proposal; the omission shall be considered inadvertent or the bidder will perform the work personally.

No subcontract, whether listed herein or later proposed, may be entered into without the written consent of the Engineer as provided in Subsection 108.1 of the Standard Specifications.

Name of Subcontractor Class of Work Estimated Value

Effective with December 2000 Letting Debarment Certification

CERTIFICATION REGARDING DEBARMENT, SUSPENSION, AND OTHER

RESPONSIBILITY MATTERS - PRIMARY COVERED TRANSACTIONS

Instructions for Certification

1. By signing and submitting this proposal, the prospective contractor is providing the certification set out below.

2. The inability of a person to provide the certification required below will not necessarily result in denial of participation in this covered transaction. The prospective contractor shall submit an explanation of why it cannot provide the certification set out below. The certification or explanation will be considered in connection with the department or agency's determination whether to enter into this transaction. However, failure of the prospective contractor to furnish a certification or an explanation shall disqualify such person from participation in this transaction.

3. The certification in this clause is a material representation of fact upon which reliance was placed when the department determined to enter into this transaction. If it is later determined that the contractor knowingly rendered an erroneous certification in addition to other remedies available to the Federal Government the department may terminate this transaction for cause or default.

4. The prospective contractor shall provide immediate written notice to the department to whom this proposal is submitted if at any time the prospective contractor learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances.

5. The terms "covered transaction," "debarred," "suspended," "ineligible," "lower tier covered transaction," "participant," "person," "primary covered transaction," "principal," "proposal," and "voluntarily excluded," as used in this clause, have the meanings set out in the Definitions and Coverage sections of the rules implementing Executive Order 12549. You may contact the department to which this proposal is being submitted for assistance in obtaining a copy of those regulations.

6. The prospective contractor agrees by submitting this proposal that, should this contract be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department entering into this transaction.

7. The prospective contractor further agrees by submitting this proposal that it will include the clause titled "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion-Lower Tier Covered Transaction," which is included as an addendum to PR- 1273 - "Required Contract Provisions Federal Aid Construction Contracts," without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions.

8. The contractor may rely upon a certification of a prospective subcontractor/materials supplier that it is not debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A contractor may decide the method and frequency by which it determines the eligibility of its principals. Each contractor may, but is not required to, check the Disapproval List (telephone # 608/266/1631).

Effective with December 2000 Letting Debarment Certification

9. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of a contractor is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings.

10. Except for transactions authorized under paragraph 6 of these instructions, if a contractor in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department may terminate this transaction for cause or default.

Certification Regarding Debarment, Suspension, and Other Responsibility Matters - Primary Covered Transactions

1. The prospective contractor certifies to the best of its knowledge and belief, that it and its principals:

(a) Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal department or agency;

(b) Have not within a three-year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements or receiving stolen property;

(c) Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State or local) with commission of any of the offense enumerated in paragraph (1)(b) of this certification; and

(d) Have not within a three-year period preceding this proposal had one or more public transactions (Federal, State or local) terminated for cause or default.

2. Where the prospective contractor is unable to certify to any of the statements in this certification, such prospective contractor shall attach an explanation to this proposal.

1060-27-76 1 of 46

Special Provisions Table of Contents

Article Description Page #

1. General

2. Scope of Work

3. Prosecution and Progress

4. Traffic

5. Holiday and Special Event Work Restrictions

6. Other Contracts

7. Work By Others

8. Railroad Insurance and Coordination - Soo Line Railroad Company (CP)

9. Hauling Restrictions

10. Utilities

11. Information to Bidders, WPDES Transportation Construction General Permit (TCGP) for Storm

Water Discharges

12. Erosion Control

13. Environmental Protection – Waste

14. Notice to Contractor – Existing Utility Facilities and Clearance to Overhead Electrical Wires

Affecting Project Sight Access and Construction Operations

15. Notice to Contractor - Coordination with American Transmission Company (ATC) Facilities

16. Notice to Contractor - Adjacent Construction by We Energies

17. Notice to Contractor – Coordination of Milwaukee Metropolitan Sewerage District (MMSD)

Facilities

18. Notice to Contractor – Railroad Right-of-Way Restrictions

19. Notice to Contractor – Personnel Identification Program

20. Notice to Contractor – Safety

21. Notice to Contractor – Media Relations

22. Notice to Contractor – Damage Claims

23. Notice to Contractor – Contamination Beyond Construction Limits

24. Notice to Contractor – Work Zone Maintenance

25. Public Convenience and Safety

26. Available Documents

27. Geotechnical Investigation Information

28. Eliminated Work

29. Contractor Notification

30. Municipality Acceptance of Water Main Construction

31. Referenced Construction Specifications

32. Contractor Document Submittals

33. Dust Control Implementation Plan

34. Project Site Air Quality

1060-27-76 2 of 46

35. Backfill Slurry

36. Maintaining Drainage

37. Subletting the Contract

38. QMP Subgrade

39. Topsoil and Salvaged Topsoil

40. Soil Stabilizer Type B

41. Fertilizer Type B

42. Field Facilities

43. Traffic Control

44. Nighttime Work Lighting-Stationary

45. Fence Safety, Item 616.0700.S

46. Roadway Embankment, Item SPV.0035.0001

47. Survey Project 1060-27-76, Item SPV.0060.0132

48. Emergency Response to Pavement Repair, Item SPV.0060.0556

49. Adjusting Water Valve Boxes, Item SPV.0060.5001

50. Reconstructing MMSD Manhole, Item SPV.0060.5013

51. Reconnect Storm Sewer, Item SPV.0060.8002

52. Pavement Cleanup Project 1060-27-76, Item SPV.0075.0206

53. Fence Safety Left in Place, Item SPV.0090.0280

54. Ductile Iron Water Main 12-Inch, Item SPV.0090.5001

55. Vibration Monitoring of ATC Structures, Item SPV.0135.0302

56. Excavation, Hauling and Disposal of Site Garbage, Item SPV.0195.0400

1060-27-76 3 of 46

STSP’S Revised July 1, 2026

SPECIAL PROVISIONS

1. General.

Perform the work under this construction contract for the following projects:

1060-27-76 I-94 East West, Early Grading Menomonee River to 32nd Street

IH 94

Milwaukee County

Perform the work as the plans show and execute the work as specified in the State of Wisconsin, Department of Transportation, Standard Specifications for Highway and Structure Construction, 2025 Edition, as published by the department, and these special provisions.

If all or a portion of the plans and special provisions are developed in the SI metric system and the schedule of prices is developed in the US standard measure system, the department will pay for the work as bid in the US standard system.

100-005 (20260701)

2. Scope of Work.

The work under this contract consists of clearing, removals, grading, dense graded base, erosion control, water main, culvert pipe, sanitary sewer manhole reconstruction, restoration and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.

104-005 (20090901)

3. Prosecution and Progress.

Begin work within 10 calendar days after the engineer issues a written notice to do so.

Provide the start date to the engineer in writing within a month after executing the contract but at least 14 calendar days before the preconstruction conference. Upon approval, the engineer will issue the notice to proceed within ten calendar days before the approved start date.

To revise the start date, submit a written request to the engineer at least two weeks before the intended start date. The engineer will approve or deny that request based on the conditions cited in the request and its effect on the department’s scheduled resources.

The contract time for completion is based on an expedited work schedule and may require extraordinary forces and equipment. Included in this Prosecution and Progress article is a final completion date. This date indicates that work efforts will possibly require multiple or concurrent controlling operations to occur at the same time. This information is included to assist the contractor and its subcontractors and shall not be interpreted as a demonstration of specified means and methods or work periods other than final completion date.

Construction on this project is anticipated to occur over the year 2027. This project is considered a year-round contract and will not include a winter suspension. The number of adverse weather days per 08.10.2.2(1) will not be modified.

Add the following to 108.10.2.2 Extension of Contract Time for Severe Weather as paragraph (4)

(4) For calendar day or completion date contracts, including interim completion dates, where the closure period does not include the entire calendar month, the number of anticipated adverse weather days tabulated in 108.10.2.2(1) will be prorated by the ratio of contract days to the total calendar days for the given month. Where the prorated days results in a partial day, that day will be rounded up to the next whole calendar day.

1060-27-76 4 of 46

Be advised that there may be multiple mobilizations and/or remobilizations to complete construction operations, for example such items as: clearing, removals, grading, water main, restoration, finishing items and other incidental items. No additional payment will be made, by the department, for additional mobilizations.

Utility Restrictions Existing ATC and We Energies facilities are located within the project area and will remain in service during construction. No planned outages are coordinated with the utilities; the contractor shall plan their work accordingly. Refer to the Utility Article, the Notice to Contractor – Coordination with American Transmission Company (ATC) Facilities Article, and the Notice to Contractor – Coordination with We Energies Electric Facilities Article for additional information regarding utility restrictions.

Existing MMSD facilities are located within the project area and will require 24-hour access for maintenance and emergency response. Refer to the Notice to Contractor – Coordination of Milwaukee Metropolitan Sewerage District (MMSD) Facilities Article for additional information regarding utility restrictions.

Enhanced Final Liquidated Damages Replace standard spec 108.11 paragraph (3) as follows:

The department will assess $10,000 in daily liquidated damages. These liquidated damages reflect the cost of engineering, supervision, and a portion of road user costs.

Anticipated Schedule Project 1060-27-76 The department anticipates that the schedule for each stage shall be as follows:

Conform to the construction staging as shown in the construction staging plans and as described herein unless the engineer approves modifications to the schedule in writing.

Stage 1 Construction:

Off Alignment

Clearing and tree removal

Removals, erosion control, and underground utility construction

Grading and access path construction

Site restoration

Freeway, Ramp, and Local Road Construction

None

Protection of Endangered Bats (Tree Clearing) Federally protected bats have the potential to inhabit the project limits because they roost in trees, bridges and culverts. Roosts may not have been observed on this project, but conditions to support the species exist. The species and all active roosts are protected by the federal Endangered Species Act. If an individual bat or active roost is encountered during construction operations, stop work and notify the engineer and the WisDOT Regional Environmental Coordinator (REC).

Ensure all operators, employees, and subcontractors working in areas of known or presumed bat habitat are aware of environmental commitments and avoidance and minimization measures (AMMs) to protect both bats and their habitat.

Direct temporary lighting, if used, away from wooded areas during the bat active season April 15 to October 31, both dates inclusive.

To avoid adverse impacts upon protected bats, no tree clearing is allowed between April 15 and October 31, both dates inclusive. If the required tree clearing is not completed by April 14, the department will suspend all tree clearing and associated work directly impacted by clearing.

Tree clearing is limited to that which is specified in the plans. Contractor means and methods to remove additional trees will not be allowed. If it is determined that additional trees with a 3-inch or greater diameter at breast height (dbh) need to be removed beyond contractor means and methods, notify the engineer to coordinate with the WisDOT REC to determine if consultation with United States Fish and Wildlife Service (USFWS) is required. The contractor must be aware that the WisDOT REC and/or USFWS may not permit modifications.

1060-27-76 5 of 46

Due to potential for erosion, do not perform grubbing operations at the time of tree clearing unless grading activities will commence in those areas immediately following the tree clearing, or as otherwise approved by the engineer. Provide information for the grubbing and grading activities, including the schedule of operations, in the Erosion Control Implementation Plan (ECIP).

Submit a schedule and description of clearing operations with the ECIP 14 days prior to any clearing operations. The department will determine, based on schedule and scope of work, what additional erosion control measures shall be implemented prior to the start of clearing operations, and list those additional measures in the ECIP.

Threatened and Endangered Species – Rusty Patched Bumble Bee The Rusty patched bumble bee (Bombus affinis) may be present within the project limits. The project includes disturbing low-quality Rusty patched bumble bee feeding habitat and woodlands potentially suitable for Rusty patched bumble bee nesting or overwintering habitat. To minimize impacts to the Rusty patched bumble bee, trees cleared between November 1 and April 14 will be left in place until the Rusty patched bumble bee active season (April 15 to October 10) to avoid disturbing the overwintering habitat of the Rusty patched bumble bee.

4. Traffic.

Keep all local roads, IH 94, all system ramps and all service ramps open to through traffic at all times for the duration of this project. No lane or road closures are permitted under this contract, unless authorized by the engineer for the purposes of emergency pavement repair.

Maintain access along the Hank Aaron State Trail at all times, unless authorized by the engineer for the purposes of emergency pavement repair.

Do not stage vehicles, equipment, or materials within 10 feet of the existing fence at the existing substation located at the west project limit, the existing billboard, or the existing cell tower site.

Maintain emergency vehicle access at all times.

Work Restrictions Maintain access for We Energies and ATC service vehicles at all times to the existing ATC substation located at the west project limits.

Maintain access for We Energies service vehicles at all times to We Energies facility located at 3200 W Canal Street.

Maintain access to all other We Energies/ATC facilities located within the project area at all times.

Maintain access to the existing billboard located within the project area at all times.

Maintain access to the existing cell tower site located within the project area at all times.

Do not close or restrict traffic on IH 94 mainline or ramps.

Do not close or restrict traffic on 32nd Street or Canal Street.

Do not close or restrict access to the Hank Aaron State Trail. The trail shall remain open and free of construction debris at all times. Cleanup shall be performed in accordance with Special Provision SPV.0075.0206 Pavement Cleanup Project 1060-27-76.

Residential and Business Property Access Maintain access to properties along Canal Street, 32nd Street, and all adjacent side streets, and any other local road affected by construction for local residents, businesses, and emergency vehicles. Maintain and keep open the access to all driveways and parking lots where alternative access is not available at all times by closing one driveway at a time, building half the driveway at a time and/or plating concrete work.

Plating of concrete work, as directed by the engineer, is included in the item that is being plated. In parking lots that are being reconstructed, stage operations so that parking and access is maintained on existing or proposed base aggregate or pavement.

Inform engineer, property owners and tenants at least 48 hours prior to removing a driveway approach that serves that property. Schedule sidewalk and driveway approach removal and replacement so that the time lapse between removal and replacement is minimal.

1060-27-76 6 of 46

Do not close residential approaches or remove from service without giving sufficient notice to the occupants of the premises to remove their vehicles prior to driveway removal or closing of the driveway approach access. If necessary, make other access arrangements, agreed to in writing and signed by the contractor and the property owner serviced by the driveway. Obtain approval from the engineer prior to alternating construction sequencing.

Pedestrian Access Keep pedestrian facilities open unless otherwise shown on the plans or as approved by the engineer.

Maintain pedestrian access to adjacent properties, businesses, schools, and at bus stops or provide where necessary, as directed by the engineer. Protect pedestrians from falling debris at all times when pedestrian facilities are open.

Provide adequate temporary pedestrian facilities as required under Section 644 of the standard specifications and bridging between the curb and right-of-way line over freshly paved concrete or other obstructions in the sidewalk area, as directed by the engineer.

Maintain pedestrian movements crossing the construction zone at all intersections at all times, unless otherwise directed by the engineer. At all times, ADAAG accessible pedestrian walkways shall be maintained free from mud, sand, construction debris, and construction equipment. Closures of sidewalk must be approved by the engineer. At locations where crosswalks exist on both sides of the intersection, closure of one of the two crosswalks is permitted as long as all other crossings are completely open. At intersections where only one crosswalk exists, stage work to maintain a crosswalk at all times.

Traffic Staging Traffic shifts shown in a given stage may occur at different times during that stage depending on the controlling elements for a given traffic movement. The department anticipates that the schedule of major traffic shifts and roadway openings and closings for each stage shall be as follows, unless approved by the engineer:

Stage 1 Traffic:

Freeway and Ramp Traffic

• Close IH 94 EB outside shoulder

• Maintain all lanes of traffic on IH 94 including all ramps

Maintain Local Road Traffic

• Established Traffic Control for construction vehicle entrance/exit

• Maintain all lanes of traffic on Canal Street and 32nd Street in the existing configuration

Wisconsin Lane Closure System Advance Notification Provide the following advance notification to the engineer for incorporation into the Wisconsin Lane Closure System (LCS).

TABLE 108-1 CLOSURE TYPE AND REQUIRED MINIMUM ADVANCE NOTIFICATION

Closure type with height, weight, or width restrictions (available width, all lanes in one direction < 16 feet) MINIMUM NOTIFICATION

Lane and shoulder closures 7 calendar days

Full roadway closures 7 calendar days

Ramp closures 7 calendar days

Detours 7 calendar days

Closure type without height, weight, or width restrictions (available width, all lanes in one direction > 16 feet) MINIMUM NOTIFICATION

Shoulder Closures 3 calendar days

Lane closures 3 business days

Ramp closures 3 business days

Modifying all closure types 3 business days

Discuss LCS completion dates and provide changes in the schedule to the engineer at weekly project meetings in order to manage closures nearing their completion date.

1060-27-76 7 of 46 stp-wilcs (20260101)

Notify the engineer and TMP Team Lead, if there are any changes in the schedule, early completions, or cancellations of scheduled work.

Notify the engineer and SEF Construction Program Work Zone and Traffic Engineer, Stephanie Leranth,

(414) 750-1397, if there are any changes in the schedule, early completions, or cancellations of scheduled work. Coordinate the locations of messages of portable changeable message sign with engineer and WisDOT Traffic Management Center (414) 227-2142 (tmc@dot.wi.gov). Notify WisDOT Signal Operations, (414) 750-2605, and WisDOT electrical Field Unit, (414) 266-1170, regarding changes for alternate routes and detours.

Long-Term Shoulder Closure Restriction A long-term closure of the IH 94 eastbound outside shoulder, 35th Street eastbound exit ramp outside shoulder, and 35th Street eastbound entrance ramp outside shoulder is permitted for tree clearing operations immediately adjacent to the roadway only. All lanes and ramps must remain open to traffic at all times. Do not close travel lanes or ramps for this work. Do not park vehicles, equipment, or stockpile materials on the freeway shoulder or ramp shoulder. Access into the work zones is not allowed directly from the freeway or ramps.

Limit the shoulder closure to a maximum of 14 continuous calendar days. Once shoulder closure traffic control is installed, prosecute the tree clearing work continuously and with reasonable dispatch until the work is complete. Remove all shoulder closure traffic control devices immediately following completion of the tree clearing operation. Do not leave shoulder closure traffic control devices in place when work is not actively occurring unless otherwise approved by the engineer.

Shoulder closure traffic control items are measured and paid for in accordance with standard specification 643; however, payment for these items is limited to a maximum of 14 calendar days, regardless of the actual number of days traffic control devices are in place. Do not receive additional compensation for traffic control installation, maintenance, or removal beyond this maximum.

Work Zone Ingress/Egress All locations of Work Zone Ingress or Egress for construction vehicles are subject to approval from the engineer. Do not park vehicles, equipment, or stockpile materials on the freeway shoulder or ramp shoulder. Access into the work zones is not allowed directly from the freeway or ramps. All access to the work area shall be from approved local road ingress and egress points as directed by the engineer. All construction vehicles shall yield to all through traffic at all locations.

Any initial set-up and/or changes to the Work Zone Ingress – Egress construction detail in the plan or location(s) should be submitted a minimum of 10 working days before use and are subject to approval by the engineer and the Southeast Region Work Zone Engineer.

ser-643-005 (20180131)

5. Holiday and Special Event Work Restrictions.

The following Holiday Restrictions and Special Event Restrictions apply to the contract

Holiday Restrictions Do not perform work on, nor haul materials of any kind, and entirely clear the traveled way and shoulders of equipment, barricades, signs, lights, and any other material that might impede the free flow of traffic during the following holiday and special event periods:

- From noon Wednesday, December 30, 2026 to 6:00 AM Monday, January 4, 2027 for New Year's Day;

- From noon Friday, May 28, 2027 to 6:00 AM Tuesday, June 1, 2027 for Memorial Day;

- From noon Friday, July 2, 2027 to 6:00 AM Tuesday, July 6, 2027 for Independence Day;

Special Event Work Restrictions During Milwaukee Brewers home games, no short-term lane closures will be allowed until four hours after the beginning of the event in all directions.

During other special events at American Family Field, restrictions will be defined during construction on an as needed basis as determined by the engineer.

stp-107-005 (20210113)

1060-27-76 8 of 46

6. Other Contracts.

The following projects may be under construction concurrently with the work under this contract.

Coordinate activities, detours, work zone traffic control, roadway and lane closures, and other work items as required with other contracts.

Modifications to the traffic control plan may be required by the engineer to be safe and consistent with the adjacent work by others.

Project 1060-27-74 IH 94 East West

Early East Leg

WisDOT contact: Chris Zacharias; (414) 548-6716

Project 1060-27-71 IH 94 East West

West Leg

WisDOT contact: Evan Limberatos; (414) 548-8797

7. Work By Others.

AT&T Legacy - Communications will be installing new underground facilities within the project limits during construction. This work is part of AT&T Legacy’s relocation work for the 1060-27-71 project. The work has begun and is anticipated to continue during this project.

AT&T Legacy will directional bore one 8-inch HDPE SDR 11 pipe with six 2-inch HDPE SDR 11 innerducts from Selig Drive, crossing the railroad with a minimum depth of 15 feet from the top of pipe to the bottom of rail. The bore will then cross We Energies property and WisDOT right of way with a minimum depth of 10 feet of cover and terminate in an AT&T handhole approximately 1,300 feet east of 35th Street along W. Park Hill Avenue.

AT&T Legacy will also perform additional utility work south of Selig Drive, through Canal Street and the Hank Aaron State Trail, terminating at the 68th Street/W. Dickinson Street intersection.

8. Railroad Insurance and Coordination - Soo Line Railroad Company (CP).

A. Description

Comply with standard spec 107.17 for all work affecting Soo Line Railroad Company (CP) property and any existing tracks.

A.1 Railroad Insurance Requirements

In addition to standard spec 107.26, provide railroad protective liability insurance coverage as specified in standard spec 107.17.3 Insurance is filed in the name of Soo Line Railroad Company d/b/a Canadian Pacific.

Notify evidence of the required coverage, and duration to Jacob Anderson, Manager Public Works;

KCGO – Cathedral Square, 427 W 12th St, Kansas City, MO 64105 Telephone (816) 728-9108; E-mail Jacob.Anderson@cpkcr.com

Also send a copy to the following: Jason Kazmierski, SE Region Railroad Coordinator, 141 N. Barstow Street, Waukesha, WI 53188; Telephone (262)548-6700; E-mail jason.kazmierski@dot.wi.gov

Include the following information on the insurance document:

- Project ID: 1060-27-76

- Project Location: Milwaukee, Wisconsin

- Route Name: WE Energies access path from Canal St to substation, Milwaukee County

- Crossing ID: Project limits parallel CPKC right-of-way to the north mailto:Jacob.Anderson@cpkcr.com

1060-27-76 9 of 46

- Railroad Subdivision: C&M and Watertown Subs

- Railroad Milepost: C&M Sub MP 87.15 to Watertown Sub MP 87.70

- Work Performed on or within 50’ of RR ROW: Grading operations, traffic control.

A.1 Railroad Insurance Requirements In addition to 107.26 of the standard specifications, provide railroad protective liability insurance coverage as specified in subsection 107.17.3 of the standard specifications. Requirements of the standard specifications are changed as follows:1

Before the state issues its notice to proceed to the contractor or contractors (collectively, the contractor) awarded the contract for construction involving the project described in this stipulation (the project), the state shall require the contractor to provide certain insurance coverage to protect the railroad (as defined in this…